Search NASASearch

SEARCH · Search NASA

Results for “Dakota”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley

DE-FE0029488 - North Dakota Integrated Carbon Capture and Storage Complex Feasibility Study Public Data

Data from award DE-FE0029488 - North Dakota Integrated Carbon Capture and Storage Complex Feasibility Study performed by the Energy & Environmental Research Center including the following: - 2D Seismic {Input data, sgy files, maps, logs, and descriptors} - Core Petrophysics {Core analysis of plugs from the two stratigraphic test wells (Flemmer-1 [API 33-057-00039] and BNI-1 [API 33-065-00018])} - North Dakota Oil and Gas File No 37380 Files - North Dakota Oil and Gas File No 37672 Files - Well Testing Data {Summary of well testing methods and results from the stratigraphic test wells (Flemmer-1 and BNI-1)} Additional References: https://www.netl.doe.gov/sites/default/files/2017-12/Wesley-Peck-_Mastering-the-Subsurface_CarbonSAFE-Phase-II_August-2017-final.pdf Peck, W.D., Ayash, S.C., Klapperich, R.J., Gorecki, C.D. (2019) The North Dakota integrated carbon storage complex feasibility study, International Journal of Greenhouse Gas Control, Volume 84, 2019, Pages 47-53, https://doi.org/10.1016/j.ijggc.2019.03.001

Carbon Storage

Quantifying CO 2 Plume Stabilization at Carbon Storage Projects, North Dakota, USA

This study presents an approach for quantifying when injected carbon dioxide (CO 2 ) stabilizes pursuant to carbon capture and storage (CCS) project permitting and site closure requirements. The distribution of mobile-phase CO 2 (CO 2 plume) will evolve within the storage reservoir during and after injection through both physical and chemical trapping mechanisms. CCS policies generally agree that the CO 2 plume’s migratory behavior in post-injection should demonstrate nonendangerment to the environment but do not provide specific guidance on how to meet the definition of plume stabilization, generating some uncertainty for operators. Plume stability herein means the CO 2 plume 1) changes size minimally and predictably in the storage reservoir such that it will not cross key boundaries identified in the permit and 2) does not pose a threat to human health, underground sources of drinking water (USDWs), and the environment because of lateral migration to areas where leakage pathways may exist. Published literature on plume metrics was reviewed to determine which metric(s) may be most appropriate for determining CO 2 plume stability. A technical approach that defines plume stabilization by estimating the rate of change in the geographic footprint of the CO 2 plume with respect to time was developed and illustrated using a case study from North Dakota, USA, as a proposed solution for CCS operators to apply at the project permitting stage. Any prospective CCS operator may benefit from using the same approach to inform the selection of pore space lease and monitoring areas and develop post-injection site care plans.

03 NATURAL GAS

Exploring the Feasibility of a Carbon Dioxide Storage Hub in Western North Dakota

The University of North Dakota Energy & Environmental Research Center (EERC) and project partner ONEOK, Inc. (ONEOK) are investigating the feasibility of establishing a CO2 (carbon dioxide) storage hub in western North Dakota—in the heart of the Williston Basin. The conceived Roughrider Carbon Storage Hub would store CO2 captured from six gas-processing plants owned and operated by project partner ONEOK and a planned gas-to-liquids plant. This 2-year U.S. Department of Energy-sponsored Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Phase II feasibility study is evaluating the aggregation of the CO2 captured from these seven sources for injection into stacked geologic storage complexes. The proposed hub includes several aspects that make it a highly qualified candidate for a feasibility study with a notably reduced project risk profile. These include 1) a project partner (ONEOK) with a committed goal to reduce greenhouse gas emissions; 2) prior subsurface data analysis supporting a potential stacked storage configuration with adequate CO2 storage resource; 3) commitment from local, regional, and state-level stakeholders; and 4) a state with U.S. Environmental Protection Agency underground injection control Class VI primacy. ONEOK’s assets in the Williston Basin provide significant environmental benefits by capturing and processing natural gas that may otherwise be flared or vented. Storing CO2 from these gas-processing facilities will reduce overall CO2 emissions in the basin while providing essential services to producers there and contributing to continued energy independence in the domestic markets.

03 NATURAL GAS

Reservoir Simulations and Accuracy Measures for CO 2 and Pressure Plumes for the Broom Creek Formation in Central North Dakota

Conference paper presented at 17th International Conference on Greenhouse Gas Control Technologies (GHGT-17), Calgary, Alberta, Canada, October 20–24, 2024. This study estimated the accuracy of the predicted 5-year carbon dioxide (CO 2 ) and pressure plumes for a hypothetical geological storage project injecting CO 2 into the Broom Creek Formation near central North Dakota.

01 COAL, LIGNITE, AND PEAT

Utilizing 3D Mechanical Earth Models for Calibration and Validation in a Large-Scale Carbon Capture and Storage Project in North Dakota

Conference paper presented at 17th International Conference on Greenhouse Gas Control Technologies (GHGT-17), Calgary, Alberta, Canada, October 20–24, 2024. Three-dimensional (3D) mechanical earth models (MEMs) are pivotal in assessing geological sites for carbon dioxide (CO 2 ) storage and mitigating potential risks associated with storage and injection. The Energy & Environmental Research Center is exploring innovative carbon storage monitoring techniques at a CO 2 storage site near Beulah, North Dakota. These methods aim to provide lower-impact, faster feedback for commercial carbon capture and storage (CCS) projects. The research includes monitoring CO 2 injection using various approaches: 1) an automated, integrated modular monitoring station; 2) time-lapse electromagnetic (EM) field surveys; 3) drone-based surveillance; 4) time-lapse seismic techniques; and 5) advanced wellbore monitoring.

02 PETROLEUM

Direct Detection of Dark Matter at the University of South Dakota

The grant supports experimental research to address one of the pressing questions of our time is the nature and composition of the dark matter. Direct detection of dark matter is possible because the rotation curves of galaxies suggest the presence of a sufficiently-large weakly interacting massive particle (WIMP) density. However, the absence of any confirmed dark matter detection indicates the need for more sensitive experiments. SuperCDMS SNOLAB is a generation-2 dark matter search experiment that is designed to have vastly improved sensitivity to low-mass WIMPs. SuperCDMS SNOLAB unique capabilities also enable sensitivity to a broader range of science beyond WIMPs. The SuperCDMS SNOLAB experiment is being installed and integrated at SNOLAB, near Sudbury, Ontario in Canada. The University of South Dakota (USD) group is deeply invested in the installation, integration and planning for commissioning and operations of the SuperCDMS SNOLAB experiment.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS

Rare Earth Extraction and Concentration at Pilot-Scale from North Dakota Coal-Related Feedstocks (Final Technical Report)

The objectives of this project were to design, construct, commission, and operate a pilot-scale system utilizing UND's REE extraction technology from lignite, and complete saleability and economic evaluations of products. The process includes a dilute-acid extraction process from low-rank-coals, followed by selective precipitations and further processing to produce mixed rare earth oxide materials. The pilot was successfully constructed to a 1,000 lb/hr nameplate capacity and tested with over 100 tons of >300-ppm lignite-based feedstocks and produced saleable-quality products during operation. The team successfully attained a TRL status of 6 with the completion and testing of the pilot system, and the technology is poised for demonstration at a commercial scale.

01 COAL, LIGNITE, AND PEAT

Novel CCS Monitoring of Approved Class VI Storage in North Dakota

Presentation at Dallas Geophysical Society Meeting, Dallas, Texas, April 24, 2025. This high-level overview of focuses on novel and sustainable monitoring methods at various stages of planning or demonstration to accelerate the deployment at future carbon capture, utilization, and storage (CCUS) sites.

02 PETROLEUM

Understanding Commercial Building Energy Use in Small Urban Areas in the Dakotas, Idaho, Montana, and Wyoming: Building Stock Segmentation for Retrofit Planning

This report is part of the second phase of a publication series focusing on approximately 100 different local geographies, or "clusters." Each report provides characteristic features and energy data for commercial buildings in a specific area to help policy makers at the city, county, and state level better understand building energy use and emissions. This report breaks down the energy consumption and emissions of the building stock in the counties shown in Figure 2 by building type, building size, end use, energy consumption, emissions, and segment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Understanding Multifamily Energy Use in Small Urban Areas in the Dakotas, Idaho, Montana, and Wyoming: Building Stock Segmentation for Retrofit Planning

This report is an addendum to a publication series that focuses on approximately 100 different local geographies, or "clusters". This addendum expands the report series to include large multifamily building characteristics as well as energy and emission data for each local geography. The intention of this addendum is to help policymakers at the city, county, and state levels better understand building energy use and emissions in large multifamily buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Williston Basin Resource Study for Commercial-Scale Subsurface Hydrogen Storage

The Energy & Environmental Research Center (EERC), in partnership with the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL), the EERC’s State Energy Research Center (SERC), MPLX Operations LLC, and TC Energy Development Holdings Inc. (a subsidiary of TC Energy Corporation), studied the potential for subsurface hydrogen storage and recovery in the Williston Basin of western North Dakota. The project’s goal was to evaluate the feasibility of large-scale, secure geologic H 2 storage to support future hydrogen generation, storage, and use. This work included laboratory testing, H 2 –rock–fluid exposure experiments, literature reviews on H 2 embrittlement, and reservoir modeling and simulations. The study included an assessment of storage potential across three types of storage reservoirs using both reservoir simulation and DOE’s web-based tool SHASTA-HELP (Subsurface Hydrogen Assessment, Storage, and Technology Acceleration – Hydrogen Estimator for Logistical Planning), as well as investigation of potential H 2 production and markets for commercial-scale deployment. Building on prior EERC gas storage research, three storage options were selected for detailed evaluation: the Broom Creek Formation (a clastic saline reservoir), the Dickinson Lodgepole Mounds (DLM) complex (carbonate mud mound structures) of the Lodgepole Formation (an active oil and gas producing reservoir), and the Dunham Salt Interval of the Piper Formation (to be used for engineered salt cavern development). These targets were prioritized based on prior EERC research using datasets related to seal capacity, reservoir quality, mechanical integrity, and injectivity. Exposure tests on Broom Creek and DLM samples showed mineral dissolution and precipitation that increased brine salinity and altered reservoir rock surfaces. Although these results provide useful insight, they are limited by small sample sizes and short-term (30-day) exposure, requiring further study to assess long-term storage integrity. Salt formations were not tested because of their known nonreactivity and established mechanical stability. Results of reservoir simulations performed for a single site demonstrated that the Broom Creek Formation may be capable of receiving up to 42,000 tonnes of injected H 2 over 7 months via one well. H 2 recovery took place over 5 months, resulting in approximately 26,000 tonnes (~62% without cushion gas [CG]). This work suggests water production may be important and subsequent cycles of injection and production may perform more efficiently; however, significant site-specific work in the future is needed to assess actual reservoir performance of injection and withdrawal of H 2 storage. For oil reservoir potential, a multiple-well model was used to simulate injection of approximately 32,000 tonnes of H 2 into a single wellbore while simultaneously producing in place reservoir fluids from four offset wells to maintain reservoir pressure. The simulation results suggested a high recovery (~98%); in addition, cost advantages through existing infrastructure could be realized. Challenges in this reservoir include vi managing gas purity and leakage risks. In both scenarios, production of H 2 takes place in a single-well scenario with 10 cycles (7 months of injection and 5 months of production) over 10 years. Finally, the use of engineered caverns in the Dunhan Salt was evaluated, and the results suggest that while they have a smaller capacity (<1000 tonnes per cavern), they exhibit nearly complete gas recovery (>99%), fast response times, and low purity risk. While caverns in North Dakota may be smaller in capacity, fields can be developed in galleries to accommodate the volumetric needs and rapid turnaround times necessary to meet market demands. Geographic limitations and thin salt intervals in North Dakota may represent less total storage potential than salt domes elsewhere, but significant opportunities exist to expand this market for gas storage in North Dakota. A basinwide assessment was performed to estimate a first-of-its-kind value for H 2 storage on a large scale. DOE’s SHASTA-HELP, combined with EERC simulation work, was used to perform the assessment. Estimated H 2 storage potential varied widely for each formation type. The Broom Creek saline formation was estimated to have a storage potential of approximately 1.7–90.5 million tonnes (MMt). The DLM oil reservoirs were estimated to have 0.07–0.19 MMt of capacity. Notably, each of these estimates relies on significant assumptions regarding reservoir thickness, porosity, permeability, and CG needed for operation. Much research is needed to understand the true site-specific storage resource potential of each formation. Using the Dunham Salt Interval for cavern development may result in as much as 4.79 MMt (up to 2.87 MMt working gas) of H 2 storage potential. An important note for consideration is that the values presented here need significantly more geological characterization and engineering assessments prior to gaining confidence in performance. This will be a focal point for future research and development needs. The basinwide evaluation also indicated that North Dakota has significant H 2 generation potential, with estimates up to a possible 13 MMt annually, suggesting a substantial opportunity for H 2 market development and thus the need for commercial-scale H 2 storage to facilitate growth and resilience. Key Recommendations 1. Conduct detailed site characterization (3D seismic, well logs, core sampling) to reduce geologic uncertainty. 2. Perform techno-economic analyses incorporating market, regulatory, and incentive frameworks. 3. Investigate long-term interactions among H 2 , CGs, well materials, and formations to assess risks. 4. Develop pilot- and field-scale demonstrations to validate models and establish best practices.

03 NATURAL GAS

Advanced Processing of Coal and Coal Waste to Produce Graphite for Fast-Charging Lithium-Ion Battery Anode

The University of North Dakota (UND) Energy & Environmental Research Center (EERC), in collaboration with the UND Center for Process Engineering Research (CPER), conducted a project to validate two technologies capable of converting North Dakota lignite and lignite coal waste to high-quality graphite for fast-charging lithium-ion battery (LIB) anode. The project was conducted over about 3 years from April 7, 2022, to July 6, 2025. The two technological paths pursued in this project include path A – direct conversion of coal or coal waste to graphite by the upgraded carbon ores to products (UCOP) process being developed at the EERC and path B – lignite-derived coal tar pitch (CTP) conversion to graphite (CTP2G) process being developed at CPER. The results from this project validate the two technological approaches and are expected to be an integral part of a portfolio of emerging technologies for making high-quality graphite not only from North Dakota lignite, but from all ranks of U.S. domestic coal and coal waste resources. The quality of the graphite produced by these technologies is high enough for various applications, including batteries for the fast-growing electric vehicle industry, energy storage applications, electric arc furnace electrodes for steel production, and graphene production, among others. Although the two technologies can produce high-quality graphite, they are fundamentally different in that the UCOP technology provides a direct path to transform coal to graphite, while the CTP2G technology needs to go through a CTP intermediate and a coking process for the intermediate, which requires a special facility to accomplish. For application in the industry, the UCOP process is designed to be more flexible, with feedstock to include potentially any carbonaceous material such as all coal ranks and biochar, while the CTP2G process is designed to utilize CTP as the starting precursor. The key project accomplishments include the following: • Successful preparation of high-quality synthetic graphite from North Dakota lignite coal/coal wastes and lignite-derived CTP. • Patent application has been filed for the UCOP process and an internal invention disclosure has been filed for the CTP2G process. • The produced graphite performs better than a commercial battery-grade sample in LIB coin cells, especially fast-charging capability, stability, and long-duration cycling. • Coin-type Li-ion half-cells with CTP2G graphite showed excellent performance, with >370 mAh/g capacity, >90% initial coulombic efficiency, and 93%/67% retention at 1C/2C rate, which outperforms commercial graphite in charging speed, stability, and cycling. • Results of fabricated 18650 cells were consistent with the observations in coin cells. • Preliminary techno-economic analysis (TEA) estimates for the UCOP technology indicate a manufacturing cost of about $\$$39/kg based on 50-metric ton/year capacity. • Preliminary TEA estimates for the CTP2G technology indicate a market price of about $\$$7107/ton ($\$$7/kg) based on 22,000-ton/year production capacity.

01 COAL, LIGNITE, AND PEAT