Search NASA⌕ Search

SEARCH · Search NASA

Results for “Departure Approval Request”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Departure Approval Request Compliance Effects on Overhead Stream Insertion

Integrated Arrival-Departure-Surface (IADS) air traffic management relies on information sharing and integration between automation systems for efficiency, predictability, and throughput improvements throughout the National Airspace System (NAS). The NASA Airspace Technology Demonstration 2 (ATD-2) project supports this effort by integrating SWIM (System Wide Information Management) information and evaluating and refining potential TFDM (Terminal Flight Data Manager) functionality in a surface traffic management system fielded at Charlotte-Douglas International Airport (CLT). Among the IADS areas under study during ATD-2 is the use of electronically negotiated departure times for efficiently inserting flights into overhead traffic streams. Stream-insertion accuracy is important for reducing excessive vectoring that negatively impacts the NAS by increasing controller workload along with aircraft fuel burn and emissions. Departure-time approval requests (APREQs) provide center-approved departure times to allow for smooth stream insertion. In this presentation, TBFM (Time-Based Flow Management) and ATD-2 flight summary data are used to empirically show that APREQ compliance leads to improved stream insertion.

Overhead-Stream Insertion↗

Electronic Departure Approval Requests in ATD-2 Daily Operations

The NASA Airspace Technology Demonstration 2 project is investigating Integrated Arrival-Departure-Surface air traffic management through progressive refinement of a surface air traffic management system fielded at Charlotte-Douglas International Airport. Among the areas under study are departure release-time approval request (APREQ) traffic management initiatives. Scheduling departures at downstream points and complying with approved departure release times helps flights fit smoothly into busy traffic streams. This paper presents a review of APREQ operations and compliance data from daily electronic APREQ negotiations over fourteen months beginning in January 2018. It describes APREQ-compliance improvements observed as the electronic negotiation process has matured and discusses contributing factors, including renegotiation of departure release times.

Call for release↗

Electronic Departure Approval Requests in ATD-2 Daily Operations

The NASA Air Traffic Management Demonstration 2 project is investigating Integrated Arrival-Departure-Surface (IADS) air traffic management through progressive refinement of a surface air traffic management system fielded at Charlotte-Douglas International Airport. Among the IADS areas under study are departure release-time approval request (APREQ) traffic management initiatives. This paper presents a review of APREQ operations and compliance data from daily electronic APREQ negotiations. It describes APREQ-compliance improvements observed as the ATD-2 electronic negotiation process has matured and discusses contributing factors.

call for release↗

Evolution of Electronic Approval Request Procedures at Charlotte Douglas International Airport

A departure approval request, or APREQ, establishes a later runway departure time for a flight, allowing it to absorb tactical delay on the ground. APREQ times are traditionally coordinated by a process known as "call-for-release" whereby an airport surface traffic manager calls an airspace traffic manager on the telephone. This research examines new electronic APREQ coordination enabled by the NASA Airspace Technology Demonstration-2 system and compares it to the traditional call-for-release method of coordination. During the initial deployment period, electronic APREQ coordination was used for more than half of eligible flights. A majority of electronic requests were approved in less than one minute on average. Both the average tactical delay and compliance with the electronically coordinated departure times did not differ significantly from departure times coordinated using call-for-release.

APREQ↗

Evolution of Electronic Approval Request Procedures at Charlotte Douglas International Airport

At many major U.S. airports, a departure approval request, or 'APREQ,' establishes a later runway departure time for a flight, allowing it to absorb tactical delay on the ground. APREQ times are traditionally coordinated by a process known as 'call-for-release' whereby an airport surface traffic manager calls an airspace traffic manager on the telephone. This research examines new electronic APREQ coordination enabled by the NASA Airspace Technology Demonstration-2 system and compares it to the call-for-release method of coordination. During the initial deployment period, electronic APREQ coordination was used for more than half of eligible flights. A majority of electronic requests were approved in less than one minute on average. Data suggest that both the average tactical delay and compliance with the electronically coordinated departure times did not differ significantly from departure times coordinated using call-for-release.

APREQ↗

Evaluation of Approval Request 47; Call for Release Procedures for Charlotte Douglas International Airport

NASA is collaborating with the Federal Aviation Administration (FAA) and aviation industry partners to develop and demonstrate new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the goals of the IADS capabilities in the ATD-2 project is to increase predictability and throughput of airspace operations by improving Traffic Management Initiative (TMI) compliance. This paper focuses on the Approval Request (APREQ) procedures developed for the ATD-2 project between the Air Traffic Control (ATC) Tower at Charlotte Douglas International Airport and Washington Center. In March 2017, NASA conducted a Human-in-the-Loop (HITL) simulation to evaluate the operational procedures and information requirements for the APREQ procedures in the ATD-2 IADS system between ATC Tower and Center. The findings from the HITL are used to compare ATD-2 APREQ procedures with information about current day APREQ procedures.

Stevens, Lindsay↗

Evaluation of Approval Request/Call for Release Coordination Procedures for Charlotte Douglas International Airport

NASA is collaborating with the Federal Aviation Administration (FAA) and aviation industry partners to develop and demonstrate new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the goals of the IADS capabilities in the ATD-2 project is to increase predictability and throughput of airspace operations by improving Traffic Management Initiative (TMI) compliance. This paper focuses on the Approval Request (APREQ) procedures developed for the ATD-2 project between the Air Traffic Control (ATC) Tower at Charlotte Douglas International Airport and Washington Center. In March 2017, NASA conducted a Human-in-the-Loop (HITL) simulation to evaluate the operational procedures and information requirements for the APREQ procedures in the ATD-2 IADS system between ATC Tower and Center. The findings from the HITL are used to compare ATD-2 APREQ procedures with information about current day APREQ procedures.

APREQ↗

Editorial: Benchmark experiments, development and needs in support of advanced reactor design

Advanced nuclear reactor designs will for the most part be a departure from low enrichment light water reactor (LWR) designs currently operated around the world. Such advanced designs include but are not limited to new TRISO-fueled high temperature gas reactors, heat-pipe cooled micro-reactors, fluoride salt cooled high-temperature reactors, molten salt reactors, lead cooled fast reactors, nuclear thermal propulsion concepts, and include LWR designs with advanced fuel and clad types. Modeling and simulation methods for advanced reactors is necessary for regulators to approve license requests. However, regulators also require that modeling approaches be validated against experimental measurements. Hence, there is a crucial need for data for advanced reactor systems that will support validation of analysis methods. To this end, this Research Topic includes eleven papers organized into topical seven categories relevant for advanced reactor design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

ATD-2 Benefits Mechanism

NASA has been developing and demonstrating a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, through a close partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The Phase 2 Fused IADS capabilities include the fusion of strategic and tactical surface metering, Atlanta Center airspace tactical scheduling, Electronic Flight Data (EFD) integration, Terminal Flight Data Manager (TFDM) Terminal Publication (TTP) prototype, and Mobile App for General Aviation (GA) community. In the Phase 2 field evaluation, strategic surface metering provides advance notice of metering and additional stability to the assigned gate holds. The users of the IADS system in Phases 1 and 2 include the personnel at Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington and Atlanta Center. This document describes the ATD-2 benefits mechanism used to assess the Phases 1 and 2 IADS capabilities and field evaluation conducted at CLT since September 2017. The ATD-2 benefits mechanism mainly consists of surface metering and overhead stream insertion. This document provides detailed calculation methods of major benefit metrics, such as fuel savings, gas emissions savings, and engine runtime reduction, which can be obtained through surface metering, gate hold of Approval Request (APREQ) flights prior to pushback, and the renegotiation of release time while taxiing. As of March 31, 2020, it is estimated that 5,075,981 pounds of fuel savings and 15,634,022 pounds of CO2 emission reduction have been achieved so far, with a reduction of 3,832 hours in total engine runtime. The amount of CO2 savings is estimated to be equivalent to planting 116,254 urban trees. The pre- and post-metering comparison results using FAA’s Aviation System Performance Metrics (ASPM) data have also shown that the surface metering had no negative impact on the on-time arrival performance of both outbound and inbound flights at CLT.

ATD-2↗

ATD-2 Benefits Mechanism

NASA has been developing and demonstrating a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, through a close partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The Phase 2 Fused IADS capabilities include the fusion of strategic and tactical surface metering, Atlanta Center airspace tactical scheduling, Electronic Flight Data (EFD) integration, Terminal Flight Data Manager (TFDM) Terminal Publication (TTP) prototype, and Mobile App for General Aviation (GA) community. In the Phase 2 field evaluation, strategic surface metering provides advance notice of metering and additional stability to the assigned gate holds. The users of the IADS system in Phases 1 and 2 include the personnel at Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington and Atlanta Center. This document describes the ATD-2 benefits mechanism used to assess the Phases 1 and 2 IADS capabilities and field evaluation conducted at CLT since September 2017. The ATD-2 benefits mechanism mainly consists of surface metering and overhead stream insertion. This document provides detailed calculation methods of major benefit metrics, such as fuel savings, gas emissions savings, and engine runtime reduction, which can be obtained through surface metering, gate hold of Approval Request (APREQ) flights prior to pushback, and the renegotiation of release time while taxiing. As of April 30, 2020, it is estimated that 5,097,173 pounds of fuel savings and 15,699,292 pounds of CO2 emission reduction have been achieved so far, with a reduction of 3,831 hours in total engine runtime. The amount of CO2 savings is estimated to be equivalent to planting 116,739 urban trees. The pre- and post-metering comparison results using FAA’s Aviation System Performance Metrics (ASPM) data have also shown that the surface metering had no negative impact on the on-time arrival performance of both outbound and inbound flights at CLT.

ATD-2↗

Assessment of Air Traffic Controller Acceptability of Aircrew Route Change Requests

NASA developed the traffic aware strategic aircrew requests concept for a cockpit automation that identifies route improvements and advises the aircrew to request the change from the air traffic controller. In order to increase the chance of air traffic control approval, the automation ensures that the route is clear of known traffic, weather, and airspace restrictions. Hence the technology is anticipated to provide benefits in areas such as flight efficiency, flight schedule compliance, passenger comfort, and pilot and controller workload. In support of a field trial of a prototype of the technology, observations were conducted at the Atlanta and Jacksonville air traffic control centers to identify the main factors that affect the acceptability of aircrew requests by air traffic controllers. Observers shadowed air traffic controllers as the test flight pilot made pre-scripted requests to invoke acceptability issues and then they interviewed voluntarily fifty controllers with experience ranging from one to thirty-five years. The most common reason for rejecting requests is conflicting with traffic followed by violating air traffic procedures, increasing sector workload, and conflicting with major arrival and departure flows and flow restrictions. Quantitative parameters such as the distance that a route should maintain from sector boundaries and special use airspace were identified and recommended for inclusion in the automation.

Flight Optimization; Field Trial↗

Assessment of Air Traffic Controller Acceptability of Aircrew Route Change Requests

NASA developed the traffic aware strategic aircrew requests concept for a cockpit automation that identifies route improvements and advises the aircrew to request the change from the air traffic controller. In order to increase the chance of air traffic control approval, the automation ensures that the route is clear of known traffic, weather, and airspace restrictions. Hence the technology is anticipated to provide benefits in areas such as flight efficiency, flight schedule compliance, passenger comfort, and pilot and controller workload. In support of a field trial of a prototype of the technology, observations were conducted at the Atlanta and Jacksonville air traffic control centers to identify the main factors that affect the acceptability of aircrew requests by air traffic controllers. Observers shadowed air traffic controllers as the test flight pilot made pre-scripted requests to invoke acceptability issues and then they interviewed voluntarily fifty controllers with experience ranging from one to thirty-five years. The most common reason for rejecting requests is conflicting with traffic followed by violating air traffic procedures, increasing sector workload, and conflicting with major arrival and departure flows and flow restrictions. Quantitative parameters such as the distance that a route should maintain from sector boundaries and special use airspace were identified and recommended for inclusion in the automation.

Flight Optimization; Field Trial↗

Deliver Signal Phase and Timing (SPAT) for Energy Optimization of Vehicle Cohort Via Cloud-Computing and LTE Communications

Predictive Signal Phase and Timing (SPAT) message set is one fundamental building block for vehicle-to-infrastructure (V2I) applications such as Eco-Approach and Departure (EAD) at traffic signal controlled urban intersections. Among the two complementary communication methods namely short-range sidelink (PC5) and long-range cellular radio link (Uu), this paper documents the work with long-range link: the complete data chain includes connecting to the traffic signals via existing backhaul communication network, collecting the raw signal phase state data, predicting the signal state changes and delivering the SPAT data via a geofenced service to requests over HTTP protocols. An Application Programming Interface (API) library is developed to support various cellular data transmission reduction and latency improvement techniques. An emulation-based algorithm is applied to predict the traffic signal state changes to provide adequate prediction horizon (e.g., at minimum 2 minutes) for the cohort energy optimization. In fact, the same connectivity and SPAT delivery methodology has been applied to traffic signalized intersections nationwide in the United States upon public agency approvals for access to their firewalled traffic control network and signal control systems or directly to individual controllers. This methodology proves its effectiveness and potential for rapid growth of such SPAT deliveries at mass production scale without needing infrastructure hardware retrofit or excessive communication means. To support the energy optimization of light and heavy-duty vehicle cohorts of mixed automation and propulsion systems (EV, ICE and hybrid), the connection and SPAT deliveries at two sites were completed, including public roads in Washtenaw County, Michigan and closed track test sites at American Center for Mobility (ACM) in Ypsilanti, Michigan. However, only closed test track results at ACM will be presented in this paper. A neuroevolution based optimizer is developed and implemented to control the speed of a vehicle cohort with different propulsion systems and automation levels. Closed track tests showed significant energy savings of the cohort operation.

99 GENERAL AND MISCELLANEOUS↗