Search NASA⌕ Search

SEARCH · Search NASA

Results for “Design for Manufacture and Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Design, Manufacturing, Assembly, and Lessons Learned of the Pre-production 325 MHz Couplers for the PIP-II Project at Fermilab

Five 325 MHz high-power couplers will be integrated into the pre-production Single Spoke Resonator Type-II (ppSSR2) cryomodule for the PIP-II project at Fermilab. Couplers were procured by both Fermilab and IJCLAB for this effort. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life cycle, including design, manufacturing, and assembly, along with the lessons learned at each stage.

43 PARTICLE ACCELERATORS↗

Design, Manufacturing, Assembly, Testing, and Lessons Learned of the Prototype 650 MHz Couplers

Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning and the lessons learned at each stage.

43 PARTICLE ACCELERATORS↗

CEA Contribution to the PIP-II Linear Accelerator

The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018, and will deliver 10 low-beta cryomodules as In-Kind Contribution to the PIP-II project, with cavities supplied by LASA-INFN and power couplers and tuning systems supplied by Fermilab. This paper presents the CEA scope of work that includes the design, manufacturing, assembly and tests of the cryomodules and the upgrade of the existing infrastructures to the PIP-II requirements.

43 PARTICLE ACCELERATORS↗

Development of Integrated Mechanical Pods

This presentation highlights early wins, updated progress, and upcoming developments on ‘national-scale shared development platform’ for rapid prototyping, testing and validation of various integrated Mechanical Pod solutions and form factors. Such pod solutions consist of a set of all-electric heat pump mechanical equipment that have integrated functionalities through built-in controls, with heating, cooling, hot water, ventilation (including energy recovery), electrical management, and battery storage within a single package. The presentation draws inspiration from the success of bathroom pods in the US modular construction industry, UK’s efforts with unitizing mechanical systems as ‘utility cupboards’, and VEIC’s early wins in design-build of all-electric Mechanical Pod solutions in Vermont. The presentation includes researchers and partners involved with NREL in Design for Manufacturing and Assembly (DfMA), Virtual Design and Construction (VDC), and digital twin based process optimization modeling of integrated Mechanical Pod solutions. The presentation aims to highlight early wins from such a platform and how various physical and virtual tools are currently being employed as part of NREL’s ongoing multi-year project funded by US DOE. Streamlined procurement, coordination, installation, and O&M of Mechanical Pods such that the majority of work is delegated to the off-site modular factory implies monetary savings. Such a seemingly basic shift in location of the construction process leads to great reduction in complexity, first cost, lead time, and waste, and greater opportunities for innovative compartmentalization and integration of mechanical systems appropriately sized for each apartment or hotel guest room. However, past studies on unitized combination systems show that high installation costs, maintenance issues, challenges with system integration, limitations in existing electrical infrastructure, and lack of architecturally appealing solutions are key barriers. NREL and partners aim to address key barriers through DfMA approach, rapid prototyping and testing, and digital twin process optimization modeling. The presentation is also a call for interested entities to partner with NREL as part of the national-scale development platform, help drive both product and process innovation, and encourage open source sharing of learnings. Learning objectives include (1) learn about the vision of national-scale shared development platform for process-product innovation on integrated mechanical pod solutions and how to get involved, (2) gain an understanding of the components of an all-electric, high performance home, design characteristics and equipment included in an all-electric mechanical pod, integration of mechanical systems within a modular factories’ assembly line, and the system’s commissioning, operation and maintenance. The pre-planning and coordination with the factory and sub-contractors are also highlighted, (3) gain an understanding of using process modeling tools to quantify resource-constrained performance of operations (such as integration of energy efficiency strategies) to manufacture modules of varying design, (4) gain insights on virtual design, rapid prototyping, and emulated testing of various form factors across different climatic conditions. The need for such preliminary testing with open source sharing of learnings will also be highlighted.

30 DIRECT ENERGY CONVERSION↗

Robotics for Systems Integration in Buildings: Pilot Study of Viable Approaches to Install Hygrothermal and Rigid Electrical Systems

The Industrialized Construction Innovation (ICI) team at the National Renewable Energy Laboratory (NREL) has been exploring the use of robotics to integrate hygrothermal, mechanical, electrical, and plumbing systems in prefabricated building assemblies (off-site construction) and 3D-printed buildings (on-site construction). Such multisystem integration tasks often require specialized robots and custom end effectors to handle a range of rigid and nonrigid building components. This paper begins with a brief overview of the current state of robotics in construction, followed by a pilot study exploring the use of robotics to integrate a simple prototype multitrade wall assembly composed of structural studs, hygrothermal layer, wall finishing, and electrical fixtures. The study was funded by the US Department of Energy's (DOE's) Advanced Materials and Manufacturing Technologies Office (AMMTO). Insights about the implementation of design for manufacturing and assembly (DfMA) principles in designing the prototype wall for robotic assembly, and selection of appropriate robotic end-effector hardware to handle these components are included. Detailed comparison of computational toolpath simulations of the robotic assembly process and real-life demonstration of the same are presented. Finally, limitations and lessons learned from this study are included, along with future research recommendations for robotic assembly of more complex multitrade assemblies, including potential scenarios such as robotic outfitting of facilities in extraterrestrial environments.

advanced manufacturing↗

Robotics for Systems Integration in Buildings - Pilot Study of Viable Approaches to Install Hygrothermal and Rigid Electrical Systems: Preprint

The Industrialized Construction Innovation (ICI) team at the National Renewable Energy Laboratory (NREL) has been exploring the use of robotics to integrate hygrothermal, mechanical, electrical, and plumbing systems in prefabricated building assemblies (offsite construction) and 3D Printed buildings (onsite construction). Such multi-system integration tasks often require specialized robots and custom end-effectors for handling a range of rigid and non-rigid building components. This paper begins with a brief overview of the current state of robotics in construction, followed by a pilot study exploring the use of robotics to integrate a simple prototype multi-trade wall assembly composed of structural studs, hygrothermal layer, wall finishing, and electrical fixtures. The study was funded by the Department of Energy's (DOE) Advanced Materials and Manufacturing Technologies Office (AMMTO). Insights about the implementation of design for manufacturing and assembly (DfMA) principles in designing the prototype wall for robotic assembly, and selection of appropriate robotic end effector hardware for handling these components are included. Detailed comparison of computational toolpath simulations of the robotic assembly process and real-life demonstration of the same is presented. Finally, limitations and lessons learned from this study along with future research recommendations for robotic assembly of more complex multi-trade assemblies, including potential scenarios such as robotic outfitting of facilities in extra-terrestrial environments is included.

advanced manufacturing↗

Distant Observer™ [SWR-12-09]

Distant Observer™ (DO) is an optical measurement tool, designed for parabolic trough solar collectors, that determines reflector slope error, absorber position error, and the combined errors based on images of the receiver-tube reflection taken from different angles. We have demonstrated that DO can provide a measurement accuracy of 0.25 mrad for the slope and receiver position errors. DO has two implementation versions: ground-based and drone-driven. As we pursue efforts to lower the capital and installation costs of parabolic trough solar collectors, it is essential to maintain high optical performance. The Distant Observer™ (DO) tool, developed by engineers at NREL, is a fast and highly accurate tool that provides complete characterization of the performance of the optical components which include the mirror panels and thermal receiver. This tool is very useful for testing both prototype and operational modules. The Distant Observer™ is an optical measurement tool for parabolic solar collectors that measures reflector slope error, absorber position error and the combined errors. Reflector slope errors occur for many reasons including imperfection in structural frame design, manufacturing and assembly. Absorber position error can be caused by poor structural design, poor installation, sag from the absorber weight, or change in the structure over time.

Ihas, Benjamin↗

Cost analysis of hydrogen production by high-temperature solid oxide electrolysis

In this study, we estimate construction and operation costs of gigawatt-scale solid oxide electrolysis (SOE) facilities for producing high purity hydrogen gas from water. Manufacturing and assembly costs for two types of SOE cell stacks are estimated using a detailed design for manufacture and assembly (DFMA®) analysis. Modular balance of plant (BOP) process equipment is designed and sized with Aspen®, and cost estimated using equipment vendor quotes. Factory and on-site assembly and installation costs for SOEC stack and BOP equipment integration into modular SOE process units are calculated using a simplified DFMA® method. Total stack costs on a stack input power (SIP) basis reduce to <$100/kW e DC SIP for >500 MW e DC SIP /year production rates with electrode cermet, interconnects, and high-temperature heat treatments dominating the total cost. Integration of stacks with larger BOP equipment operating at higher pressures offers ~36% cost reduction in total facility capital cost due to an economies of physical scale effect since BOP equipment comprises >50% of facility costs. Optimized H 2 prices decrease from ~$\$$4/kgH 2 to ~$\$$2/kgH 2 for 1 GWe DCSIP facilities using $\$$0.025/kWh electricity price. All costs are reported in 2021 US dollars.

08 HYDROGEN↗

Hydrogen Storage System Cost Analysis (2017-2021) (Final Report)

This final technical report summarizes hydrogen storage system cost analysis results from 2017-2021. Results include onboard hydrogen storage system costs for light-duty vehicles, medium-duty vehicles, heavy-duty vehicles, class 8 long haul trucks, and passenger buses. Multiple storage systems are included, primarily focusing on compressed and cryo-compressed hydrogen in Type 3 and Type 4 storage systems. Additional analysis includes large-scale gaseous and liquid hydrogen storage at refueling stations in tube trailers and Dewars; advanced materials-based storage systems such as metal organic frameworks and metal hydrides; and a baseline setting analysis of compressed natural gas storage systems in support of the Institute for Advanced Composites Manufacturing Initiative (IACMI). Analyses were primarily conducted using a Design for Manufacture and Assembly ® methodology, which is a bottom-up process-based approach to estimating factory costs. Multiple annual production rates are reported to project high-volume costs relevant to mature markets.

08 HYDROGEN↗

Accelerating Optimal Integration of Energy Efficiency Strategies with Industrialized Modular Construction: Preprint

The National Renewable Energy Laboratory's (NREL's) Industrialized Construction Innovation team first introduced the Industrialized Construction Assessment Framework to achieve affordable, net-zero energy (NZE) modular multifamily buildings in the 2020 ACEEE paper "Integrating Energy Efficiency Strategies with Industrialized Construction for our Clean Energy Future." Since then, NREL has continued to drive the ambitious plan to accelerate optimal integration of energy efficiency strategies during industrialized construction with little or no additional cost, labor, and production time. This follow-on paper introduces the Energy in Modular (EMOD) buildings method and presents NREL's research efforts over the last two years in collaboration with industry, including affordable housing partners. NREL has developed an idealized NZE modular multifamily building design that incorporates five energy efficiency strategies well suited for industrialized construction in factories: (1) envelope thermal control, (2) envelope infiltration control, (3) mechanical, electrical, and plumbing systems, (4) smart controls, and (5) solar plus storage. This paper highlights results from leveraging design for manufacturing and assembly principles, testing, and validation pilots with factory partners; demonstrating pod prototypes in test stand at NREL; and performing simulations. Overall, these research efforts address barriers to whole-building system integration, such as poor installation quality of thermal and air barriers; lack of unitized systems for space conditioning, energy recovery and ventilation, and water heating; problematic on-site installation, commissioning, and configuration of controls; and lack of cost-effective integration for grid-friendly design and emerging technologies. Conclusively, the paper delineates next steps for future work with NREL's partners toward developing a transformational pathway for our clean energy future.

affordable housing↗

Low-Cost Heliostat for High-Flux Small-Area Receivers (Final Technical Report)

This project analyzed a two-stage heliostat concept consisting of a tracking stage and a concentrating stage. The tracking stage uses mirrors mounted on a common drive that move to track the sun. The concentrating stage consists of stationary mirrors that each have a unique angle to direct rays towards a small-area, high-flux, point-focused receiver. By splitting the collection and concentrating process into two stages, multiple small, inexpensive mirrors can share a structure and be controlled by a single drive in the tracking stage. The project effort developed modeling techniques that were specifically relevant to this two-stage heliostat concept. Both field-level and unit-level models were developed. The field-level model does not explicitly consider unit-level losses which are predicted by the unit-level model and then integrated into the field-level model through a correlation referred to as an efficiency modifier. This approach is referred to as the two-model approach; the development and demonstration of this two-model approach for a multi-stage heliostat technology is a key outcome of this work. The field-level model is used to design a field that hits a specific design day power given a set of heliostat design parameters. An oversized field is simulated and then heliostat units are removed based on their annual energy production in order to generate the highest performing field. The field reduction procedure fits a smooth curve fit to annual energy production as a function of position in the field which has the effect of reducing the noise that is otherwise caused by the Monte Carlo ray tracing technique. This approach is referred to as the annual energy fit method and substantially reduces computational run time for a given field level modeling accuracy. The annual energy fit approach enables the selection of a properly sized, high-performing field using orders of magnitude fewer rays than would otherwise be possible and the development of this approach is a second key outcome of this work. These models are used within a genetic optimization algorithm in order to optimize the geometric parameters associated with a heliostat in order to achieve the lowest cost per unit of collected design day power. The cost modeling that underlies the optimization is a simple, scaling type analysis backed up by a much more detailed Design for Manufacture and Assembly (DFMA) analysis. Although the figure of merit used for optimization was not cost per mirror area, this metric is reasonable to use as a means of comparison. The optimally designed 500 kW design has a tracking mirror specific cost of $181.85/m 2 , which is significantly larger than the target value and also larger than the current state of the art. The cost of the torque-tube type linkages contributed substantially to the overall cost. Based on this observation, potentially attractive alternative design configuration utilizing a capstan type actuation system should be investigated. Finally, NREL compared the performance of the two-stage heliostat to the performance of a focused and different sized flat conventional heliostats and showed that, as expected, additional losses versus the convention heliostat caused by a worse cosine efficiency, two stages of reflection, and interstage interactions. The two-stage heliostat requires around 75% more reflective area than a flat 1x1 meter conventional heliostat (similar to a focused heliostat) and 40% more than a flat 2x2 meter conventional heliostat.

14 SOLAR ENERGY↗

First-Principles Cost Estimation of a Sodium Fast Reactor Nuclear Plant

A multi-tiered cost analysis is performed to estimate full costs of a nuclear power plant (NPP) based on sodium-cooled fast reactor (SFR) technology. To address the lack of fully transparent cost estimations from past undertakings for NPPs, we have developed a detailed and first-principles-based cost estimate for a generalized SFR NPP. Our intent is to achieve a high degree of transparency with our cost assumptions and develop a cost model that is flexible and easily extendable to variations in NPP design and other nuclear reactor types. Furthermore, we strive to achieve a clear organization of costs and complete identification of key cost drivers based on first principles. To this end, the cost results of our analysis as given in Table 24 and Table 25 are organized and categorized into a code of accounts (COA) under development at Idaho National Laboratory (INL). Varying degrees of first-principles methods are employed, such as design for manufacture and assembly® (DFMA® ), to elucidate costs in all process levels of the plant equipment, buildings and site structures, personnel, and other miscellaneous but significant cost elements. These approaches have been successfully applied in past cost analysis projects and are designed to enable rapid and flexible cost estimation. Application of these techniques for evaluating NPP costs is similar in concept to the full, detailed estimation of construction and fabrication costs determined in a later stage of NPP development. Note that our approach tries to avoid use of other past analysis results and data such as those from the legacy Energy Economic Data Base (EEDB) Program, as these resources are based on historical NPP costs and thus may not be indicative of new reactor technologies or construction and fabrication/manufacturing techniques. However, we provide a comparison of our SFR NPP cost results in Table 90 against those included in the EEDB for a representative pressurized water reactor (PWR).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Energy in Modular (EMOD) Buildings Method: A Guide to Energy-Efficient Design for Industrialized Construction of Modular Buildings

Industrialized construction has immense potential to address the growing need globally to build and upgrade the building stock to be affordable, energy-efficient, and resilient. It can also help achieve the United States' goal of a 50% reduction in U.S. greenhouse gas (GHG) emissions by 2030. Despite this potential, and the ever-increasing push for electrification and decarbonization of households in the United States, industrialized construction has not yet been leveraged specifically to help address these challenges and accelerate the pathway to meet these goals. The National Renewable Energy Laboratory (NREL) aims to claim this missed opportunity by focusing on delivering affordable, grid-efficient net-zero energy (NZE) modular buildings for underserved communities to ensure an equitable transition to the future of clean energy, accelerate decarbonization of the built environment, and support the development of a high-productivity construction and energy efficiency workforce. The Energy in Modular (EMOD) method is our approach to designing, producing, and delivering affordable, net-zero energy, low-carbon, and healthier buildings at scale. The following energy efficiency strategies are part of the scope of this guide: envelope thermal control, envelope infiltration control, mechanical, electrical, and plumbing systems, smart controls, and solar plus storage. We draw synergies between design for manufacturing and assembly, process optimization, retrofit technologies, and digitization. Our goal is to influence the improvement and production of buildings to increase performance, enhance energy efficiency, and reduce GHG emissions. This guide documents the research and development efforts initiated by a set of design objectives to "modularize" a set of energy efficiency and low-carbon strategies into a housing unit while preserving and enhancing energy efficiency benefits and decarbonization pathways. This guide is intended to serve as a framework for housing developers, housing agencies, architects, energy experts, and process engineers or factory operator personnel who are critical to today's modular builder teams. This guide focuses on specific energy efficiency strategies, decarbonization pathways, and associated processes as part of NREL's research efforts. Stakeholders may substitute other means, methods, and technologies for the ones evaluated in this study.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost Update: Commercial and Advanced Heliostat Collectors

The research team performed a detailed bottom-up manufacturing cost estimate for 2 heliostat designs: i) a commercially available design, the Stellio; and ii) an advanced heliostat design, the Drop-C. The Drop-C is designed and developed by Solar Dynamics (SD) of the United States, whilst the Stellio has been developed primarily by Schlaich Bergermann Und Partner, Sonne Gmbh (sbp) of Germany. The Stellio heliostat has been deployed at commercial scale and is being used at the Hami CSP 50-megawatt electric (MW e ) power tower plant in China. For each design, this includes all components for manufacturing and assembly in a manufacturing facility (e.g., struts and frame) using Design for Manufacturing and Assembly (DFMA), and the purchased parts (e.g., mirrors, control systems, and drives). The field-assembly and construction activities are also considered to determine the installed cost of the modelled solar fields.

14 SOLAR ENERGY↗

Hydrogen Production Cost from Proton-Conducting Solid Oxide Electrolysis

Rigorous stakeholder-vetted techno-economic analysis (TEA) was conducted to estimate the cost of hydrogen (H 2 ) production using Proton-Conducting Solid Oxide (PSO) electrolysis. The analysis evaluates Current (2025) and Future (2035) technology cases at centralized plant scales of 50 and 500 metric tonnes per day (MTD), assuming electricity, water, and air as the only system inputs. Untaxed, unsubsidized levelized cost of hydrogen (LCOH) is projected to range from 2020 $\$$1.81 to $\$$2.47/kg H 2 at an electricity price of $\$$0.03/kWh and 97% capacity factor under Nth-of-a-kind (NOAK) deployment assumptions. Total installed capital cost was developed using bottom-up Design for Manufacture and Assembly (DFMA) stack cost modeling and detailed balance-of-plant estimates, including mechanical and electrical subsystems, installation, site preparation, engineering, and contingency. Stack performance assumptions include thermoneutral operation, degradation over time, and periodic replacement. LCOH was calculated using the Hydrogen Analysis (H2A) discounted cash flow model in constant 2020 dollars. Results indicate PSO electrolysis has potential for competitive hydrogen production costs under low-cost electricity and mature manufacturing conditions.

08 HYDROGEN↗

Standardization and First Lessons Learned of the Prototype HB650 Cryomodule for PIP-II at Fermilab

The prototype High Beta 650 MHz cryomodule (pHB650 CM) has been designed by an integrated design team, consisting of Fermilab (USA), CEA (France), STFC UKRI (UK), and RRCAT (India). The manufacturing and assembly of this prototype cryomodule is being done at Fermilab, whereas the production cryomodules will be manufactured and assembled by STFC-UKRI. As the first PIP-II cryomodule for which standardization was applied, the design, manufacturing and assembly of this cryomodule led to significant lessons being learnt and experiences gathered. These were incorporated into the design of the pre-production Single Spoke Resonator Type 2 cryomodule (ppSSR2 CM) and the pre-production Low Beta 650 MHz cryomodule (ppLB650 CM). This paper presents the pHB650 CM lessons learned and experiences gathered from the design to the lower coldmass assembly and how this cryomodule has a positive impact on all the next Proton Improvement Plan-II (PIP-II) cryomodules due to the standardization set up among SSR and 650 cryomodules.

43 PARTICLE ACCELERATORS↗