Search NASA⌕ Search

SEARCH · Search NASA

Results for “Design verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Dynamic testing for shuttle design verification

Space shuttle design verification requires dynamic data from full scale structural component and assembly tests. Wind tunnel and other scaled model tests are also required early in the development program to support the analytical models used in design verification. Presented is a design philosophy based on mathematical modeling of the structural system strongly supported by a comprehensive test program; some of the types of required tests are outlined.

Green, C. E.↗

A Design Rationale Capture Tool to Support Design Verification and Re-use

A design rationale tool (DR tool) was developed to capture design knowledge to support design verification and design knowledge re-use. The design rationale tool captures design drivers and requirements, and documents the design solution including: intent (why it is included in the overall design); features (why it is designed the way it is); information about how the design components support design drivers and requirements; and, design alternatives considered but rejected. For design verification purposes, the tool identifies how specific design requirements were met and instantiated within the final design, and which requirements have not been met. To support design re-use, the tool identifies which design decisions are affected when design drivers and requirements are modified. To validate the design tool, the design knowledge from the Taxiway Navigation and Situation Awareness (T-NASA; Foyle et al., 1996) system was captured and the DR tool was exercised to demonstrate its utility for validation and re-use.

design verification↗

Ames Research Center Mars/Pathfinder Heat Shield Design Verification ARC-JET Test

Design verification tests were performed on samples representing the aerobrake of the Mars/Pathfinder vehicle. The test specimens consisted of the SLA-561V ablator bonded to the honeycomb structure. The primary objective was to evaluate the ablation materials performance and to measure temperatures within the ablator, at the structural bondline and at the back sheet of the honeycomb structure. Other objectives were to evaluate the effect of ablative repair plug material treatment and voids in the heat shield. A total of 29 models were provided for testing in the Ames 60MW arc-jet facility. Of these, 23 models were flat-faced and six remaining models were curved edge ones, intended to simulate the conditions on the curved rim of the forebody where the maximum shear occurred. Eight sets of test conditions were used. The stagnation point heating rates varied from 47 to 240 W/cm2 and the stagnation pressures from 0.15 to 0.27 atm. (The maximum flight values are 132 W/cm2 and 0.25 atm) The majority of these runs were made at a nominal stagnation pressure of 0.25 atm. Two higher pressure runs were made to check the current (denser) ablation material for spallation, or other forms of thermal stress failure. Over 60% of the flatfaced models yielded good thermocouple data and all produced useful surface recession information. Of the five curved-edge models that were tested, only one gave good data; the remaining ones experienced model-holder failure. The test results can be summarized by noting that no failure of the ablative material was observed on any model. Also, the bondline temperature design limit of 250 C was never reached within an equivalent flight time despite a stagnation point heat load that exceeded the maximum flight value by up to 130%. At heating rates of over 200W/cm2 and stagnation pressures of 0.25 atm, or greater, the average surface recessions exceeded 0.5 cm on some models. The surface roughness increased dramatically at pressures above 0.25 atm and was four times greater at 0.27 atm than at 0.25 atm. Procured repair plug material performed much better than room-temperature cured plugs, as observed in the previous tests. Voids in the ablator did not increase local temperatures and gaps did not grow during testing.

Tran, Huy K.↗

SSME Alternate Turbopump Development Program: Design verification specification for high-pressure fuel turbopump

The design and verification requirements are defined which are appropriate to hardware at the detail, subassembly, component, and engine levels and to correlate these requirements to the development demonstrations which provides verification that design objectives are achieved. The high pressure fuel turbopump requirements verification matrix provides correlation between design requirements and the tests required to verify that the requirement have been met.

Source record↗

In-Space Engine (ISE-100) Development - Design Verification Test

In the past decade, NASA has formulated science mission concepts with an anticipation of landing spacecraft on the lunar surface, meteoroids, and other planets. Advancing thruster technology for spacecraft propulsion systems has been considered for maximizing science payload. Starting in 2010, development of In-Space Engine (designated as ISE-100) has been carried out. ISE-100 thruster is designed based on heritage Missile Defense Agency (MDA) technology aimed for a lightweight and efficient system in terms volume and packaging. It runs with a hypergolic bi-propellant system: MON-25 (nitrogen tetroxide, N2O4, with 25% of nitric oxide, NO) and MMH (monomethylhydrazine, CH6N2) for NASA spacecraft applications. The utilization of this propellant system will provide a propulsion system capable of operating at wide range of temperatures, from 50 C (122 F) down to -30 C (-22 F) to drastically reduce heater power. The thruster is designed to deliver 100 lb(sub f) of thrust with the capability of a pulse mode operation for a wide range of mission duty cycles (MDCs). Two thrusters were fabricated. As part of the engine development, this test campaign is dedicated for the design verification of the thruster. This presentation will report the efforts of the design verification hot-fire test program of the ISE-100 thruster in collaboration between NASA Marshall Space Flight Center (MSFC) and Aerojet Rocketdyne (AR) test teams. The hot-fire tests were conducted at Advance Mobile Propulsion Test (AMPT) facility in Durango, Colorado, from May 13 to June 10, 2016. This presentation will also provide a summary of key points from the test results.

Trinh, Huu P.↗

Optics Design for the U.S. SKA Technology Development Project Design Verification Antenna

The U.S. design concept for the Square Kilometer Array (SKA) program is based on utilizing a large number of 15 meter dish antennas. The Technology Development Project (TDP) is planning to design and build the first of these antennas to provide a demonstration of the technology and a solid base on which to estimate costs. This paper describes the performance of the selected optics design. It is a dual-shaped offset Gregorian design with a feed indexer that can accommodate corrugated horns, wide band single pixel feeds or phased array feeds.

Corrugated Horns↗

Design verification test matrix development for the STME thrust chamber assembly

This report presents the results of the test matrix development for design verification at the component level for the National Launch System (NLS) space transportation main engine (STME) thrust chamber assembly (TCA) components including the following: injector, combustion chamber, and nozzle. A systematic approach was used in the development of the minimum recommended TCA matrix resulting in a minimum number of hardware units and a minimum number of hot fire tests.

Dexter, Carol E.↗

Thermal/structural design verification strategies for large space structures

Requirements for space structures of increasing size, complexity, and precision have engendered a search for thermal design verification methods that do not impose unreasonable costs, that fit within the capabilities of existing facilities, and that still adequately reduce technical risk. This requires a combination of analytical and testing methods. This requires two approaches. The first is to limit thermal testing to sub-elements of the total system only in a compact configuration (i.e., not fully deployed). The second approach is to use a simplified environment to correlate analytical models with test results. These models can then be used to predict flight performance. In practice, a combination of these approaches is needed to verify the thermal/structural design of future very large space systems.

Benton, David↗

Space station prototype Sabatier reactor design verification testing

A six-man, flight prototype carbon dioxide reduction subsystem for the SSP ETC/LSS (Space Station Prototype Environmental/Thermal Control and Life Support System) was developed and fabricated for the NASA-Johnson Space Center between February 1971 and October 1973. Component design verification testing was conducted on the Sabatier reactor covering design and off-design conditions as part of this development program. The reactor was designed to convert a minimum of 98 per cent hydrogen to water and methane for both six-man and two-man reactant flow conditions. Important design features of the reactor and test conditions are described. Reactor test results are presented that show design goals were achieved and off-design performance was stable.

Cusick, R. J.↗

Pre-Installation Acceptance (PIA) Functional Performance of the Design Verification Test (DVT) Exploration Extra-vehicular Mobility Unit (xEMU)

In an effort that began with technology investment by NASA in a few key components during the Constellation Program and then evolved to demonstrate a packaged Portable Life Support System (PLSS) as part of the Advanced Exploration Systems (AES) Program, the next evolution of the PLSS is now a key component of the Exploration Extra-vehicular Mobility Unit (xEMU) and is assembled as a Design Verification Test (DVT) unit. The xEMU has been detailed with respect to completing a demonstration on the International Space Station (ISS) with support of units for initial lunar capability. The xEMU completed the Preliminary Design Review (PDR) with subsequent Safety Review Panel (SRP) Phase I reviews in 2019-2020. The objectives for DVT are to validate requirements, train the team, learn how to fabricate the hardware with appropriate process controls, assemble the hardware, test the hardware, determine the failure mechanisms/limits of the hardware design and buy down the most risk possible for the qualification and flight phases of the development. With completion of the assembly and initial functional testing of the DVT PLSS in laboratory ambient conditions and vacuum conditions the xEMU has progressed significantly into the DVT objectives. A key part of the test sequences for DVT and all future phases is the Pre-Installation Acceptance (PIA) functional testing which validates the performance of integrated systems including: primary thermal control, auxiliary thermal control, suit ventilation, primary oxygen, secondary oxygen, power distribution, as well as caution and warning all with respect to the applied requirements. This discussion will include an overview of the assembly, summary of the PIA functional testing, lessons learned, and corrective actions implemented moving forward into the remainder of the DVT phase for xEMU.

Colin Campbell↗

Design for Verification: Using Design Patterns to Build Reliable Systems

Components so far have been mainly used in commercial software development to reduce time to market. While some effort has been spent on formal aspects of components, most of this was done in the context of programming language or operating system framework integration. As a consequence, increased reliability of composed systems is mainly regarded as a side effect of a more rigid testing of pre-fabricated components. In contrast to this, Design for Verification (D4V) puts the focus on component specific property guarantees, which are used to design systems with high reliability requirements. D4V components are domain specific design pattern instances with well-defined property guarantees and usage rules, which are suitable for automatic verification. The guaranteed properties are explicitly used to select components according to key system requirements. The D4V hypothesis is that the same general architecture and design principles leading to good modularity, extensibility and complexity/functionality ratio can be adapted to overcome some of the limitations of conventional reliability assurance measures, such as too large a state space or too many execution paths.

Mehlitz, Peter C.↗

Design verification of SIFT

A SIFT reliable aircraft control computer system, designed to meet the ultrahigh reliability required for safety critical flight control applications by use of processor replications and voting, was constructed for SRI, and delivered to NASA Langley for evaluation in the AIRLAB. To increase confidence in the reliability projections for SIFT, produced by a Markov reliability model, SRI constructed a formal specification, defining the meaning of reliability in the context of flight control. A further series of specifications defined, in increasing detail, the design of SIFT down to pre- and post-conditions on Pascal code procedures. Mechanically checked mathematical proofs were constructed to demonstrate that the more detailed design specifications for SIFT do indeed imply the formal reliability requirement. An additional specification defined some of the assumptions made about SIFT by the Markov model, and further proofs were constructed to show that these assumptions, as expressed by that specification, did indeed follow from the more detailed design specifications for SIFT. This report provides an outline of the methodology used for this hierarchical specification and proof, and describes the various specifications and proofs performed.

Moser, Louise↗

The Design, Verification and Performance of the James Webb Space Telescope

The James Webb Space Telescope (JWST) is NASA’s flagship mission successor to the highly successful Hubble Space Telescope. It is an infrared observatory featuring a cryogenic 6.6 m aperture, deployable Optical Telescope Element (OTE) with a payload of four science instruments (SIs) assembled into an Integrated Science Instrument Module (ISIM) that provide imagery and spectroscopy in the near-infrared band between 0.6 and 5 μm and in the mid-infrared band between 5 and 28.1 μm. JWST was successfully launched on 2021 December 25 aboard an Ariane 5 launch vehicle. All 50 major deployments were successfully completed on 2022 January 8. The observatory performed all midcourse correction maneuvers and achieved its operational mission orbit around the Sun–Earth second Lagrange point (L2). All commissioning and calibration activities have been completed, and JWST has begun its science mission. This paper will provide a description of the driving requirements and their technical challenges, the engineering processes involved in the design formulation, the resulting observatory design, the verification programs that proved it to be flightworthy, and the measured on-orbit performance of the observatory. Since companion papers will describe the details of the OTE and SIs, this paper will concentrate on describing the key features of the observatory architecture that accommodates these elements, particularly those features and capabilities associated with accommodating the radiometric and image-quality performance.

Galaxy evolution↗

EVA Design, Verification, and On-Orbit Operations Support Using Worksite Analysis

The International Space Station (ISS) design is a very large and complex orbiting structure with thousands of Extravehicular Activity (EVA) worksites. These worksites are used to assemble and maintain the ISS. The challenge facing EVA designers was how to design, verify, and operationally support such a large number of worksites within cost and schedule. This has been solved through the practical use of computer aided design (CAD) graphical techniques that have been developed and used with a high degree of success over the past decade. The EVA design process allows analysts to work concurrently with hardware designers so that EVA equipment can be incorporated and structures configured to allow for EVA access and manipulation. Compliance with EVA requirements is strictly enforced during the design process. These techniques and procedures, coupled with neutral buoyancy underwater testing, have proven most valuable in the development, verification, and on-orbit support of planned or contingency EVA worksites.

Hagale, Thomas J.↗

Thermal design verification testing of the Clementine spacecraft: Quick, cheap, and useful

At this writing, Clementine had successfully fulfilled its moon-mapping mission; at this reading it will have also, with continued good fortune, taken a close look at the asteroid Geographos. The thermal design that made all this possible was indeed formidable in many respects, with very high ratios of requirements-to-available resources and performance-to-cost and mass. There was no question that a test verification of this quite unique and complex design was essential, but it had to be squeezed into an unyielding schedule and executed with bare-bones cost and manpower. After describing the thermal control subsystem's features, we report all the drama, close-calls, and cost-cutting, how objectives were achieved under severe handicap but (thankfully) with little management and documentation interference. Topics include the newly refurbished chamber (ready just in time), the reality level of the engineering model, using the analytical thermal model, the manner of environment simulation, the hand-scratched film heaters, functioning of all three types of heat pipes (but not all heat pipes), and the BMDO sensors' checkout through the chamber window. Test results revealed some surprises and much valuable data, resulting in thermal model and flight hardware refinements. We conclude with the level of correlation between predictions and both test temperatures and flight telemetry.

Kim, Jeong H.↗