Search NASA⌕ Search

SEARCH · Search NASA

Results for “DevOps”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Operational Evolution of FTS3: A DevOps Driven Approach to Elastic Operations

The File Transfer Service (FTS3) is a distributed data movement service developed at CERN and widely used to transfer data across the Worldwide LHC Computing Grid (WLCG). At Fermilab, FTS3 supports data transfers for multiple experiments, including Intensity Frontier experiments such as DUNE, enabling reliable data movement between WebDAV endpoints in Europe and the Americas.​ At CHEP 2021, we reported on the initial containerized deployment of FTS3 on OKD, the community Kubernetes distribution of Red Hat OpenShift. In this work, we present the subsequent evolution of this deployment, focusing on new operational capabilities introduced to improve scalability, robustness, and long-term maintainability.​ We describe the adoption of more secure and reproducible container build workflows, the integration of DevOps-driven operational practices, and enhancements in monitoring and automation. A key new result is the introduction of horizontal scaling and elastic resource management, allowing FTS3 components to dynamically adapt to workload variations while maintaining service reliability. We also discuss improvements in fault tolerance and operational procedures derived from production experience.​ Finally, we summarize lessons learned from operating FTS3 as a Kubernetes-native service and outline how these developments have improved the resilience and efficiency of data movement operations at Fermilab.

Munoz Flores, Victor Leopoldo [Fermilab]↗

Controls Status of Fermilab's PIP-II Project

The Fermilab Proton Improvement Project II (PIP-II) is building a new Super Conducting Linear Accelerator (SCL) accelerating protons to 800 MeV for injection into the rest of the FNAL beam complex. Key progress since the last status report given at ICALEPCS includes the adoption of modern DevOps practices with continuous integration and GitOps-based deployments, commissioning of EPICS-based systems at the Cryomodule Test Facility, and integration of a Virtual Accelerator framework for application development ahead of installation. In parallel, web-based applications using Dart and Flutter have matured, providing secure, unified access to both EPICS and legacy ACNET data. Data acquisition and timing systems have also evolved. This paper presents the current state of controls, emphasizing these recent developments and outlining upcoming milestones as PIP-II approaches commissioning of its cryoplant in 2026 and the Warm Front End in 2027.

Crisp, D. B. [Fermilab]↗