Search NASA⌕ Search

SEARCH · Search NASA

Results for “Disassembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Catastrophic disassembly of actin filaments via Mical-mediated oxidation

Actin filament assembly and disassembly are vital for cell functions. MICAL Redox enzymes are important post-translational effectors of actin that stereo-specifically oxidize actin’s M44 and M47 residues to induce cellular F-actin disassembly. Here we show that Mical-oxidized (Mox) actin can undergo extremely fast (84 subunits/s) disassembly, which depends on F-actin’s nucleotide-bound state. Using near-atomic resolution cryoEM reconstruction and single filament TIRF microscopy we identify two dynamic and structural states of Mox-actin. Modeling actin’s D-loop region based on our 3.9 Å cryoEM reconstruction suggests that oxidation by Mical reorients the side chain of M44 and induces a new intermolecular interaction of actin residue M47 (M47-O-T351). Site-directed mutagenesis reveals that this interaction promotes Mox-actin instability. Moreover, we find that Mical oxidation of actin allows for cofilin-mediated severing even in the presence of inorganic phosphate. Thus, in conjunction with cofilin, Mical oxidation of actin promotes F-actin disassembly independent of the nucleotide-bound state.

Science & Technology - Other Topics↗

Disassembling 2D van der Waals crystals into macroscopic monolayers and reassembling into artificial lattices

Two-dimensional materials from layered van der Waals (vdW) crystals hold great promise for electronic, optoelectronic, and quantum devices, but technological implementation will be hampered by the lack of high-throughput techniques for exfoliating single-crystal monolayers with sufficient size and high quality. Here, we report a facile method to disassemble vdW single crystals layer by layer into monolayers with near-unity yield and with dimensions limited only by bulk crystal sizes. The macroscopic monolayers are comparable in quality to microscopic monolayers from conventional Scotch tape exfoliation. The monolayers can be assembled into macroscopic artificial structures, including transition metal dichalcogenide multilayers with broken inversion symmetry and substantially enhanced nonlinear optical response. This approach takes us one step closer to mass production of macroscopic monolayers and bulk-like artificial materials with controllable properties.

Science & Technology - Other Topics↗

Low cytoplasmic pH reduces ER-Golgi trafficking and induces disassembly of the Golgi apparatus

The Golgi apparatus was dramatically disassembled when cells were incubated in a low pH medium. The cis-Golgi disassembled quickly, extended tubules and spread to the periphery of cells within 30 min. In contrast, medial- and trans-Golgi were fragmented in significantly larger structures of smaller numbers at a slower rate and remained largely in structures distinct from the cis-Golgi. Electron microscopy revealed the complete disassembly of the Golgi stack in low pH treated cells. The effect of low pH was reversible; the Golgi apparatus reassembled to form a normal ribbon-like structure within 1–2 h after the addition of a control medium. The anterograde ER to Golgi transport and retrograde Golgi to ER transport were both reduced under low pH. Phospholipase A{sub 2} inhibitors (ONO, BEL) effectively suppressed the Golgi disassembly, suggesting that the phospholipase A{sub 2} was involved in the Golgi disassembly. Over-expression of Rab1, 2, 30, 33 and 41 also suppressed the Golgi disassembly under low pH, suggesting that they have protective role against Golgi disassembly. Low pH treatment reduced cytoplasmic pH, but not the luminal pH of the Golgi apparatus, strongly suggesting that reduction of the cytoplasmic pH triggered the Golgi disassembly. Because a lower cytoplasmic pH is induced in physiological or pathological conditions, disassembly of the Golgi apparatus and reduction of vesicular transport through the Golgi apparatus may play important roles in cell physiology and pathology. Furthermore, our findings indicated that low pH treatment can serve as an important tool to analyze the molecular mechanisms that support the structure and function of the Golgi apparatus. - Highlights: • The Golgi apparatus reversibly disassembles by low pH treatment. • The cis-Golgi disassembles quickly generating tubular structures. • Both anterograde and retrograde transport between the ER and the Golgi apparatus are reduced. • Phospholipase A{sub 2} inhibitors (ONO-RS082, BEL) prevented the low pH induced Golgi disassembly. • Rab1, 2, 30, 33 and 41 suppress low pH induced Golgi disassembly.

60 APPLIED LIFE SCIENCES↗

Autophagy alteration prevents primary cilium disassembly in RPE1 cells

Highlights: • Autophagy abatement and cilia disassembly is correlated during serum-restimulation. • Both activation and inhibition of autophagy flux during serum-restimulation prevents disassembly of primary cilium. • Inhibition of autophagy maintains cilium length during serum-restimulation. • Rapamycin-induced autophagy results in shortened cilium length during serum-restimulation. Primary cilium is a microtubule structure that emanates from the surface of most human cells. Primary cilia assemble during the resting stage (G{sub 0} phase) and disassemble with cell cycle progression. Defects associated with the control of the assembly or disassembly of the primary cilium have been implicated in various human diseases, including ciliopathy and cancer. Although studies have suggested the interplay between activation of autophagy and ciliogenesis, any direct mechanism between autophagy abatement and disassembly of primary cilium remains elusive. In this study, we found that the gradual abatement in autophagy during serum-restimulation was a dynamic process and significantly correlated with the disassembly of primary cilium in human retinal pigmented epithelial (RPE1) cells. Although autophagy activity was gradually decreased during serum-restimulation, the alteration in autophagy under the same condition prevented the disassembly of the primary cilium. Autophagy inhibitors such as chloroquine, U18666A and 3-methyladenine (3-MA) retained both the number of ciliated cells and cilium length. In contrast, rapamycin treatment during serum-restimulation maintained the number of ciliated cells with shortened cilia. Taken together, alteration in autophagy during serum-restimulation prevent the disassembly of the primary cilium, and autophagy modulators may serve as useful compounds for studying mechanistic details related to the disassembly of the primary cilium and ciliopathy.

60 APPLIED LIFE SCIENCES↗

Reimagining Disassembly Interfaces With Visualization: Combining Instruction Tracing and Control Flow With DisViz

In applications where efficiency is critical, developers may examine their compiled binaries, seeking to understand how the compiler transformed their source code and what performance implications that transformation may have. This analysis is challenging due to the vast number of disassembled binary instructions and the many-to-many mappings between them and the source code. These problems are exacerbated as source code size increases, giving the compiler more freedom to map and disperse binary instructions across the disassembly space. Interfaces for disassembly typically display instructions as an unstructured listing or sacrifice the order of execution. Here, we design a new visual interface for disassembly code that combines execution order with control flow structure, enabling analysts to both trace through code and identify familiar aspects of the computation. Central to our approach is a novel layout of instructions grouped into basic blocks that displays a looping structure in an intuitive way. We add to this disassembly representation a unique block-based mini-map that leverages our layout and shows context across thousands of disassembly instructions. Finally, we embed our disassembly visualization in a web-based tool, DisViz, which adds dynamic linking with source code across the entire application. DizViz was developed in collaboration with program analysis experts following design study methodology and was validated through evaluation sessions with ten participants from four institutions. Participants successfully completed the evaluation tasks, hypothesized about compiler optimizations, and noted the utility of our new disassembly view. Our evaluation suggests that our new integrated view helps application developers in understanding and navigating disassembly code.

Computer science↗

Mitotic entry drives replisome disassembly at stalled replication forks

Highlights: • Forced entry into M-phase drives replisome disassembly at stalled replication forks. • CDK activity and K48- and K63-linked ubiquitylation is required for mitotic replisome disassembly. • Mitotic replisome disassembly is mechanistically distinct from that of replication termination. The disassembly of eukaryotic replisome during replication termination is mediated by CRL-dependent poly-ubiquitylation of Mcm7 and p97 segregase. The replisome also disassembles at stalled or collapsed replication forks under certain stress conditions, but the underlying mechanism is poorly understood. Here, we discovered a novel pathway driving stepwise disassembly of the replisome at stalled replication forks after forced entry into M-phase using Xenopus egg extracts. This pathway was dependent on M-CDK activity and K48- and K63-linked poly-ubiquitylation but not on CRL and p97, which is different from known pathways. Furthermore, this pathway could not disassemble converged replisomes whose Mcm7 subunit had been poly-ubiquitylated without p97. These results suggest that there is a distinctive pathway for replisome disassembly when stalled replication forks persist into M-phase.

60 APPLIED LIFE SCIENCES↗

AGR-1 Irradiated Test Train Preliminary Inspection and Disassembly First Look

The AGR-1 irradiation experiment ended on November 6, 2009, after 620 effective full power days in the Advanced Test Reactor, achieving a peak burnup of 19.6% FIMA. The test train was shipped to the Materials and Fuels Complex in March 2010 for post-irradiation examination. The first PIE activities included non-destructive examination of the test train, followed by disassembly of the test train and individual capsules and detailed inspection of the capsule contents, including the fuel compacts and the graphite fuel holders. Dimensional measurements of the compacts, graphite holders, and steel capsules shells were performed using a custom vision measurement system (for outer diameters and lengths) and conventional bore gauges (for inner diameters). Gamma spectrometry of the intact test train gave a preliminary look at the condition of the interior components. No evidence of damage to compacts or graphite components was evident from the isotopic and gross gamma scans. Neutron radiography of the intact Capsule 2 showed a high degree of detail of interior components and confirmed the observation that there was no major damage to the capsule. Disassembly of the capsules was initiated using procedures qualified during out-of-cell mockup testing. Difficulties were encountered during capsule disassembly due to irradiation-induced changes in some of the capsule components’ properties, including embrittled niobium and molybdenum parts that were susceptible to fracture and swelling of the graphite fuel holders that affected their removal from the capsule shells. This required various improvised modifications to the disassembly procedure to avoid damage to the fuel compacts. Ultimately the capsule disassembly was successful and only one compact from Capsule 4 (out of 72 total in the test train) sustained damage during the disassembly process, along with the associated graphite holder. The compacts were generally in very good condition upon removal. Only relatively minor damage or markings were visible using high resolution photographic inspection. Compact dimensional measurements indicated diametrical shrinkage of 0.9 to 1. 4%, and length shrinkage of 0.2 to 1.1%. The shrinkage was somewhat dependent on compact location within each capsule and within the test train. Compacts exhibited a maximum diametrical shrinkage at a fast neutron fluence of approximately 3×1021 n/cm2. A multivariate statistical analysis indicates that fast neutron fluence as well as compact position in the test train influence compact shrinkage.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGC-4 Disassembly Report

The Advanced Reactor Terminology Graphite Research and Development program is currently measuring irradiated material property changes in several grades of nuclear graphite to predict behavior and operating performance within the core of these new high temperature reactor designs. The Advanced Graphite Creep (AGC) experiment, consisting of six irradiation capsules, will generate the irradiated graphite performance data for the Very High Temperature Reactor operating conditions. All six capsules in the experiment conducted at Idaho National Laboratory will be irradiated in the Advanced Test Reactor, disassembled in the Hot Fuel Examination Facility, and examined at the Idaho National Laboratory Research Center. This is the disassembly report describing the disassembly, shipment, post irradiation inspection, and storage of the graphite specimens contained within the AGC 4 irradiation test series capsule (the fourth irradiation capsule of the series). AGC 4 was irradiated in the Advanced Test Reactor (ATR) East Flux Trap (EFT) during ATR Cycle 157D, 158A, 162A, 162B, 164A, 164B, 166A, and Cycle 166B. Approximately 3.6 dpa was achieved. Desired experiment temperatures were exceeded by at least 100C during the second Cycle of irradiation due to the insertion of the KJRR experiment. The capsule was removed from the ATR and transferred to the Hot Fuel Examination Facility on May 15, 2020 and eventually unloaded into the Hot Fuel Examination Facility (HFEF) Decon Cell through Penetration 2D on February 26, 2021. It was moved to the HFEF Main Cell Window 3M for disassembly on March 15, 2021. Disassembly and specimen extraction began March 18, 2021, and packaging of the graphite specimens was completed on April 16, 2021. Several anomalies were noted, specifically that the radiological dose rates were nominally an order of magnitude higher than that of the previous AGC experiments. This report summarizes the disassembly of the AGC 4 experiment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGC-4 Disassembly Report

The Advanced Reactor Terminology Graphite Research and Development program is currently measuring irradiated material property changes in several grades of nuclear graphite to predict behavior and operating performance within the core of these new high temperature reactor designs. The Advanced Graphite Creep (AGC) experiment, consisting of six irradiation capsules, will generate the irradiated graphite performance data for the Very High Temperature Reactor operating conditions. All six capsules in the experiment conducted at Idaho National Laboratory will be irradiated in the Advanced Test Reactor, disassembled in the Hot Fuel Examination Facility, and examined at the Idaho National Laboratory Research Center. This is the disassembly report describing the disassembly, shipment, post irradiation inspection, and storage of the graphite specimens contained within the AGC 4 irradiation test series capsule (the fourth irradiation capsule of the series). AGC 4 was irradiated in the Advanced Test Reactor (ATR) East Flux Trap (EFT) during ATR Cycle 157D, 158A, 162A, 162B, 164A, 164B, 166A, and Cycle 166B. Approximately 3.6 dpa was achieved. Desired experiment temperatures were exceeded by at least 100C during the second Cycle of irradiation due to the insertion of the KJRR experiment. The capsule was removed from the ATR and transferred to the Hot Fuel Examination Facility on May 15, 2020 and eventually unloaded into the Hot Fuel Examination Facility (HFEF) Decon Cell through Penetration 2D on February 26, 2021. It was moved to the HFEF Main Cell Window 3M for disassembly on March 15, 2021. Disassembly and specimen extraction began March 18, 2021, and packaging of the graphite specimens was completed on April 16, 2021. Several anomalies were noted, specifically that the radiological dose rates were nominally an order of magnitude higher than that of the previous AGC experiments. This report summarizes the disassembly of the AGC 4 experiment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Polymer–Peptide Conjugates Disassemble Amyloid β Fibrils in a Molecular-Weight Dependent Manner

Amyloid aggregation and deposition are associated with many intractable human diseases. Although the inhibition of amyloid protein aggregation has been well-studied, the disaggregation and dissolution of existing amyloid fibrils is less known. Taking a fibrillar assembly of amyloid β (Aβ) peptide as the model system, in this paper we report multivalent polymer–peptide conjugates (mPPCs) that disassemble preformed Aβ fibrils into dispersible sub-100 nm structures. Atomic force microscopy and dynamic light scattering studies show that the disassembly rate of preformed Aβ fibrils is controlled by the molecular weight of mPPCs. Rate equations on fibril disappearance are deduced from a simple model, which indicate that the disassembly reaction is first-order in the concentration of Aβ fibrils and a pseudo-first-order reaction in the concentration of peptide moieties on mPPCs, respectively. We eliminate the possibility that the disassembly occurs by the association between mPPCs and Aβ monomer/oligomers based on circular dichroism and Thioflavin T fluorescence assays. It is mostly likely that the mPPCs disassemble Aβ fibrils through a direct interaction. Finally, the mPPCs may thus offer a general macromolecular design concept that breaks down existing amyloid fibrils in a predictable fashion.

60 APPLIED LIFE SCIENCES↗

How short peptides disassemble tau fibrils in Alzheimer’s disease

Reducing fibrous aggregates of the protein tau is a possible strategy for halting the progression of Alzheimer’s disease (AD). Previously, we found that in vitro, the d-enantiomeric peptide (D-peptide) D-TLKIVWC disassembles ultra-stable tau fibrils extracted from the autopsied brains of individuals with AD (hereafter, these tau fibrils are referred to as AD-tau) into benign segments, with no energy source other than ambient thermal agitation. To consider D-peptide-mediated disassembly as a potential route to therapeutics for AD, it is essential to understand the mechanism and energy source of the disassembly action. Here, in this work, we show that the assembly of D-peptides into amyloid-like (‘mock-amyloid’) fibrils is essential for AD-tau disassembly. These mock-amyloid fibrils have a right-handed twist but are constrained to adopt a left-handed twist when templated in complex with AD-tau. The release of strain that accompanies the conversion of left-twisted to right-twisted, relaxed mock-amyloid produces a torque that is sufficient to break the local hydrogen bonding between tau molecules, and leads to the fragmentation of AD-tau. This strain-relief mechanism seems to operate in other examples of amyloid fibril disassembly, and could inform the development of first-in-class therapeutics for amyloid diseases.

Alzheimer's disease↗

AGR-2 Irradiated Test Train Preliminary Inspection and Disassembly First Look

The AGR 2 irradiation experiment began in June 2010 and was completed in October 2013. The test train was shipped to the Materials and Fuels Complex in July 2014 for post-irradiation examination (PIE). The first PIE activities included nondestructive examination of the test train, followed by disassembly of the test train and individual capsules and detailed inspection of the capsule contents, including the fuel compacts and their graphite fuel holders. Dimensional metrology was then performed on the compacts, graphite holders, and steel capsule shells. AGR 2 disassembly and metrology were performed with the same equipment used successfully on AGR 1 test train components. Gamma spectrometry of the intact test train gave a preliminary look at the condition of the interior components. No evidence of damage to compacts or graphite components was evident from the isotopic and gross gamma scans. Disassembly of the AGR 2 test train and its capsules was conducted rapidly and efficiently by employing techniques refined during the AGR 1 disassembly campaign. Only one major difficulty was encountered while separating the test train into capsules when thermocouples (of larger diameter than used in AGR 1) and gas lines jammed inside the through tubes of the upper capsules, which required new tooling for extraction. Disassembly of individual capsules was straightforward with only a few minor complications. On the whole, AGR 2 capsule structural components appeared less embrittled than their AGR 1 counterparts. Compacts from AGR 2 Capsules 2, 3, 5, and 6 were in very good condition upon removal. Only relatively minor damage or markings were visible using high resolution photographic inspection. Compact dimensional measurements indicated radial shrinkage between 0.8 to 1.7%, with the greatest shrinkage observed on Capsule 2 compacts that were irradiated at higher temperature. Length shrinkage ranged from 0.1 to 0.9%, with by far the lowest axial shrinkage on Capsule 3 compacts—possibly as a consequence of lower packing fraction or larger particle size. Differences in fast neutron fluence among compacts from these four capsules had no obvious effect on radial and axial shrinkage. (The AGR 2 experiment included Capsule 1 containing French compacts and Capsule 4 with compacts made at Oak Ridge National Laboratory using South African fuel particles. Information on these two batches of AGR 2 fuel compacts is confined to restricted Appendices A and B because of proprietary information limitations.)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SAVANNAH RIVER SITE R REACTOR DISASSEMBLY BASIN IN SITU DECOMMISSIONING

The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate in tact, structurally sound facilities that are no longer needed for their original purpose of, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate if from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,424 cubic meters or 31,945 cubic yards. Portland cement-based structural fill materials were design and tested for the reactor ISD project and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and work flow considerations, the recommended maximum lift height is 5 feet with 24 hours between lifts. Pertinent data and information related to the SRS 105-R-Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs and testing, and fill placement strategy. This information is applicable to decommissioning both the 105-P and 105-R facilities. The ISD process for the entire 105-P and 105-R reactor facilities will require approximately 250,000 cubic yards (191,140 cubic meters) of grout and 2,400 cubic yards (1,840 cubic meters) of structural concrete which will be placed over a twelve month period to meet the accelerated schedule ISD schedule. The status and lessons learned in the SRS Reactor Facility ISD process will be described.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SAVANNAH RIVER SITE R-REACTOR DISASSEMBLY BASIN IN-SITU DECOMMISSIONING -10499

The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate intact, structurally sound facilities that are no longer needed for their original purpose, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the 105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate it from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,384 cubic meters or 31,894 cubic yards. Portland cement-based structural fill materials were designed and tested for the reactor ISD project, and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and material flow considerations, maximum lift heights and differential height requirements were determined. Pertinent data and information related to the SRS 105-R Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs and testing, and fill placement strategy. This information is applicable to decommissioning both the 105-P and 105-R facilities. The ISD process for the entire 105-P and 105-R reactor facilities will require approximately 250,000 cubic yards (191,140 cubic meters) of grout and approximately 3,900 cubic yards (2,989 cubic meters) of structural concrete which will be placed over about an eighteen month period to meet the accelerated schedule ISD schedule. The status and lessons learned in the SRS Reactor Facility ISD process will be described.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Authorized Limits for the Release of a 25 Ton Locomotive, Serial Number 21547, at the Area 25 Engine Maintenance, Assembly, and Disassembly Facility, Nevada Test Site, Nevada

This document contains process knowledge and radiological data and analysis to support approval for release of the 25-ton locomotive, Serial Number 21547, at the Area 25 Engine Maintenance, Assembly, and Disassembly (EMAD) Facility, located on the Nevada Test Site (NTS). The 25-ton locomotive is a small, one-of-a-kind locomotive used to move railcars in support of the Nuclear Engine for Rocket Vehicle Application project. This locomotive was identified as having significant historical value by the Nevada State Railroad Museum in Boulder City, Nevada, where it will be used as a display piece. A substantial effort to characterize the radiological conditions of the locomotive was undertaken by the NTS Management and Operations Contractor, National Security Technologies, LLC (NSTec). During this characterization process, seven small areas on the locomotive had contamination levels that exceeded the NTS release criteria (limits consistent with U.S. Department of Energy [DOE] Order DOE O 5400.5, “Radiation Protection of the Public and the Environment”). The decision was made to perform radiological decontamination of these known accessible impacted areas to further the release process. On February 9, 2010, NSTec personnel completed decontamination of these seven areas to within the NTS release criteria. Although all accessible areas of the locomotive had been successfully decontaminated to within NTS release criteria, it was plausible that inaccessible areas of the locomotive (i.e., those areas on the locomotive where it was not possible to perform radiological surveys) could potentially have contamination above unrestricted release limits. To access the majority of these inaccessible areas, the locomotive would have to be disassembled. A complete disassembly for a full radiological survey could have permanently destroyed parts and would have ruined the historical value of the locomotive. Complete disassembly would also add an unreasonable financial burden for the contractor. A decision was reached between the NTS regulator and NSTec, opting for alternative authorized limits from DOE Headquarters. In doing so, NSTec personnel performed a dose model using the DOE-approved modeling code RESRAD-BUILD v3.5 to evaluate scenarios. The parameters used in the dose model were conservative. NSTec’s Radiological Engineering Calculation, REC-2010-001, “Public Dose Estimate from the EMAD 25 Ton Locomotive,” concluded that the four scenarios evaluated were below the 25-millirem per year limit, the “likely” dose scenarios met the “few millirem in a year” criteria, and that the EMAD 25-ton locomotive met the radiological requirements to be released with residual radioactivity to the public.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sequence-defined Energetic Shifts Control the Disassembly Kinetics and Microstructure of Amelogenin Adsorbed onto Hydroxyapatite (100)

The interactions between proteins and surfaces are critical to a number of important processes including biomineralization, the biocompatibility of biomaterials, and the function of biosensors. Although many proteins exist as monomers or small oligomers, amelogenin is a unique protein that self-assembles into supramolecular structures called “nanospheres,” aggregates of 100’s of monomers that are 20-60 nm in diameter. The nanosphere quaternary structure is observed in solution, however, the quaternary structure of amelogenin adsorbed onto hydroxyapatite (HAP) surfaces is not known even though it may be important to amelogenin’s function in forming highly elongated and intricately assembled HAP crystallites during enamel formation. We report studies of the interactions of the enamel protein, amelogenin (rpM179), with a well-defined (100) face prepared by synthesis of large crystals of HAP. High resolution, in-situ atomic force microscopy (AFM) was used to directly observe protein adsorption onto HAP at the molecular level within an aqueous solution environment. Our study shows that the amelogenin nanospheres disassemble onto the HAP surface, breaking down into oligomeric (25-mer) subunits of the larger nanosphere. In some cases, the disassembly event is directly observed by in situ imaging for the first time. Quantification of the adsorbate amounts by size analysis led to the determination of a protein binding energy (17.1 kbT) to a specific face of HAP (100). The kinetics of disassembly are greatly slowed in aged solutions, indicating there are time-dependent increases in oligomer-oligomer binding interactions within the nanosphere. A small change in the sequence of amelogenin by the attachment of a histidine tag to the N-terminus of rpM179 to form rp(H)M180 results in the adsorption of a complete second layer on top of the underlying first layer. Our research elucidates how supramolecular protein structures interact and break down at surfaces and how small changes in the primary sequence of amelogenin can affect the disassembly process.

AFM↗

Formation and Assembly-Disassembly Processes of ZnO Hexagonal Pyramids Driven by Dipolar and Excluded Volume Interactions

ZnO hexagonal pyramids were obtained in hydrophilic media without any traditional stabilizers (capping agents). The absence of a thick organic shell reducing the anisotropy of nanoparticle (NP) interactions, oxide nature of the materials, and new geometry of the nanocrystals makes possible the observation of new self-organization phenomena. Several new features not present in the previous cases of NP self-organization were identified and discussed. The formation of ZnO pyramids involved recrystallization of larger amorphous NPs followed by the multistage disassembly of intermediate aggregates into individual virtually perfectly shaped nanocrystals. The evolution of NPs begins with crystallization of clustered plates within the original amorphous spherical colloids, and then agglomerated truncated pyramids are formed. These agglomerates further transform into chained pyramids, which eventually separate from each other. The crystallization and disassembly processes can be associated with the decrease of potential and anisotropy of the attractive force field around the crystallites represented in part by dipole moments. The reassembly of the pyramids can still be attained via engaging excluded volume interaction after adding similarly charged polymer. Overall, in this system, we see the first examples of (1) coupled crystallization and disassembly process; (2) induced assembly of nanoscale particles using excluded volume interactions, which were previously used only for aggregation of microscale colloids; and (3) nanoparticle assemblies with variable and experimentally verifiable relative orientation of dipoles including head-to-tail, tail-to-tail pairs, and antiparallel chains. Described assemblies of ZnO pyramids with collective behavior of individual building blocks as well as distinct and experimentally controlled stages of assembly and disassembly present a fundamentally interesting nanoparticle system with rich dynamic behavior.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Static Detection of Disassembly Errors

Static disassembly is a crucial first step in reverse engineering executable files, and there is a consider- able body of work in reverse-engineering of binaries, as well as areas such as semantics-based security anal- ysis, that assumes that the input executable has been correctly disassembled. However, disassembly errors, e.g., arising from binary obfuscations, can render this assumption invalid. This work describes a machine- learning-based approach, using decision trees, for stat- ically identifying possible errors in a static disassem- bly; such potential errors may then be examined more closely, e.g., using dynamic analyses. Experimental re- sults using a variety of input executables indicate that our approach performs well, correctly identifying most disassembly errors with relatively few false positives.

97 MATHEMATICS AND COMPUTING↗