Search NASA⌕ Search

SEARCH · Search NASA

Results for “Dynamic Contingency Analysis Tool”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

IMPACT 1.0—Task Impairment: A Novel Approach for Assessing Impairment during Exploration-Class Missions

Exploration-class and International Space Station (ISS) missions have significantly different levels of associated medical risk for crewmembers. The Integrated Medical Model (IMM), the probabilistic risk assessment tool used for ISS medical trade-space analyses, uses a Functional Impairment (FI) metric to determine quality time lost should a crewmember be afflicted with a medical condition. While IMM-based FI has been successful for ISS operations, it has limitations when applied to exploration-class missions. As the National Aeronautics and Space Administration (NASA) looks ahead to Gateway, Artemis, and Martian missions, a novel, dynamic, and mission-appropriate impairment paradigm is necessary for accurate contingency planning. This paradigm, Task Impairment (TI), fulfills that need by utilizing mission-specific tasks. TI will allow future capability for a loss of mission metric, previously not available with IMM. TI serves as a replacement metric for FI within IMPACT, the next-generation trade-space analysis tool suite created to replace the IMM. IMPACT significantly increases the fidelity of probabilistic risk assessment for exploration-class missions. The Human Exploration of Mars Preliminary List of Crew Tasks (MTL, a source of 1100+ exploration-class mission-specific tasks for crewmembers) was used to calculate TI. Using the Task List, 18 individual Human System Categories were identified as being required to perform each task (e.g., Cardiopulmonary, Cognitive, etc.). Each of the 1200+ tasks were mapped to the Human System categories listed in the Task List. The total number of tasks in each category were tallied to determine how many tasks required each Human System. Lastly, each of the 120 medical conditions from the IMPACT condition list were mapped to the Human System categories to complete the TI calculation. NASA subject matter experts across five medical specialties established consensus for the mapping of each condition. The resulting total tasks impaired by each condition were used to calculate discrete TI values. This process was repeated for each of the four severity/resource utilization variants of each condition, and for each of the three phases of clinical care. Through this process, discrete TI values were calculated for each of the 120 IMPACT medical conditions and their variants. The Task Impairment metric provides higher fidelity, dynamic utility, and quicker analysis of medical impairment compared to the previous Functional Impairment metric used for the Integrated Medical Model. TI will be used for higher fidelity medical impairment analysis and contingency planning during Lunar, Martian, and other long-term exploration-class missions.

William L Fernandez↗

The cryogenics analysis program for Apollo mission planning and analysis

The cryogenics analysis program was developed as a simplified tool for use in premission planning operations for the Apollo command service module. Through a dynamic development effort, the program has been extended to include real time and postflight analysis capabilities with nominal and contingency planning features. The technical aspects of the program and a comparison of ground test and mission data with data generated by using the cryogenics analysis program are presented. The results of the program capability to predict flight requirements also are presented. Comparisons of data from the program with data from flight results, from a tank qualifications program, and from various system anomalies that have been encountered are discussed. Future plans and additional considerations for the program also are included. Among these plans are a three tank management scheme for hydrogen, venting profile generation for Skylab, and a capability for handling two gas atmospheres. The plan for two gas atmospheres will involve the addition of the capability to handle nitrogen as well as oxygen and hydrogen.

Scott, W.↗

SRMS Assisted Docking and Undocking for the Orbiter Repair Maneuver

As part of the Orbiter Repair Maneuver (ORM) planned for Return to Flight (RTF) operations, the Shuttle Remote Manipulator System (SRMS) must undock the Orbiter, maneuver it through a complex trajectory at extremely low rates, present it to an EVA crewman at the end of the Space Station Remote Manipulator System to perform the Thermal Protection System (TPS) repair, and then retrace back through the trajectory to dock the Orbiter with the Orbiter Docking System (ODS). The initial and final segments of this operation involve the interaction between the SRMS, ISS, Orbiter and ODS. Previously, a technique entitled "SRMS assisted docking" for installation of a payload to the ODS had been developed and was utilized for the Russian provided Docking Module on STS-74 during Shuttle-Mir missions and both the Node 1 and FGB elements on STS-88/Flight 2A. This procedure consisted of the SRMS grappling the respective payload, maneuvering it to a pre-install position inches above the ODS Androgynous Peripheral Attachment System (APAS) ring, commanding the SRMS into Test mode (which allows brakes-off motion of the joints), and then down-firing Primary Reaction Control System (PRCS) jets in order to effect a capture of the APAS latches. Once a successful capture had been achieved, then the AP AS was operated through its nominal retraction sequence to complete the mating sequence. While this technique can once again be used for the tail end docking portion of the ORM, the initial undocking of the orbiter and ISS vehicles with the assistance of the SRMS has yet to be attempted on orbit. The objective here is to determine the most efficient means to separate or extract the vehicles. Two techniques were analyzed in support of RTF: (1) the 'nominal' demating from the mated interface, and (2) the SRMS performing the operation (either in an active or passive fashion). In the first operation, the demating process would replicate standard undocking operations, with the exception that the SRMS is allowed to arrest the resulting motion. The second operation would be to extend the APAS ring to a ready to dock position, open the capture latches, and then detach the vehicles using the SRMS either actively or passively. In the active case, the APAS ring is extended and latched, and the SRMS is commanded to pull the two interfaces apart (assuming that the effective pull force of the SRMS can overcome the spec values of the combined latch resistance). In the passive case, the SRMS brakes are engaged and the AP AS mechanism is commanded to retract, pulling the two interfaces apart. Since the emphasis of both STS-74 and STS-88 had solely been on the installation operation, as opposed to the separation operation, two new models required development and incorporation within simulation tools designed to analyze those scenarios. These enhancements included: (1) a detailed demating dynamics model to characterize the pusher spring characteristics during undocking, and (2) contact and mechanical system modeling of the back side of the latches to represent unlatching dynamics. This paper first provides an overview of the Monte-Carlo screening analysis for the installation (both nominal and contingency), including the variation of separation distance, misalignment conditions, SRMS joint/brake parameter characteristics, and PRCS jet combinations and corresponding thrust durations. The resulting 'optimum' solution is presented based on trade studies between predicted capture success and integrated system loads. This paper then discusses the upgrades to the APAS math model associated with the new SRMS assisted undocking technique and reviews simulation results for various options investigated for either the active and passive separation of the ISS from the Orbiter.

Space Station Remote Manipulator System↗

Adaptive Planning: Understanding Organizational Workload to Capability/ Capacity through Modeling and Simulation

In August 2003, the Secretary of Defense (SECDEF) established the Adaptive Planning (AP) initiative [1] with an objective of reducing the time necessary to develop and revise Combatant Commander (COCOM) contingency plans and increase SECDEF plan visibility. In addition to reducing the traditional plan development timeline from twenty-four months to less than twelve months (with a goal of six months)[2], AP increased plan visibility to Department of Defense (DoD) leadership through In-Progress Reviews (IPRs). The IPR process, as well as the increased number of campaign and contingency plans COCOMs had to develop, increased the workload while the number of planners remained fixed. Several efforts from collaborative planning tools to streamlined processes were initiated to compensate for the increased workload enabling COCOMS to better meet shorter planning timelines. This paper examines the Joint Strategic Capabilities Plan (JSCP) directed contingency planning and staffing requirements assigned to a combatant commander staff through the lens of modeling and simulation. The dynamics of developing a COCOM plan are captured with an ExtendSim [3] simulation. The resulting analysis provides a quantifiable means by which to measure a combatant commander staffs workload associated with development and staffing JSCP [4] directed contingency plans with COCOM capability/capacity. Modeling and simulation bring significant opportunities in measuring the sensitivity of key variables in the assessment of workload to capability/capacity analysis. Gaining an understanding of the relationship between plan complexity, number of plans, planning processes, and number of planners with time required for plan development provides valuable information to DoD leadership. Through modeling and simulation AP leadership can gain greater insight in making key decisions on knowing where to best allocate scarce resources in an effort to meet DoD planning objectives.

Hase, Chris↗