Search NASA⌕ Search

SEARCH · Search NASA

Results for “EARTHMOVING EQUIPMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

3-D Radiological Data Acquisition, Visualization and Modeling - 20211

The U.S. Army Corps of Engineers (USACE) was tasked to investigate and remediate low activity radiological contamination from research and production of the nation's first nuclear weapons at the former DuPont Chambers Works Formerly Utilized Sites Remedial Action Program (FUSRAP) site (DuPont). The DuPont site had several buildings used for the Manhattan project that were demolished in the 1940's and 1950's apparently using heavy earthmoving equipment. Some of the contaminated rubble from the demolition appears to have been spread out by this equipment resulting in somewhat random scattering of radiologically contaminated soil and debris along with aqueous spills. Traditional investigative methods such as soil borings, test pits and 2-dimensional gamma walkovers were only partially successful in delineating the radiological contamination at the site. It was feared that even 'chasing' the contamination during remediation would miss contamination if the demolition resulted in discontinuous trails of radiologically contaminated soils. In evaluating the data generated over the interceding decades, the USACE determined that a better method to collect and process the remedial action radiological data was needed to enable the project team to optimize predictive planning and meet documentation expectations. The purpose of this paper is to provide an overview of the effort and progress to combine and organize radiological survey methods into a highly flexible sampling, modeling, and decision analysis approach that emphasizes the quality of decision-making during remediation. This innovative system blends multiple tools to develop a methodology that can extend MARRSIM [1] into the subsurface and provide tools that can be applied to other sites. (authors)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Additive Manufacturing Advances to Facilitate Novel Robot and Remote System Construction - 18493

Additive manufacturing (AM), in both polymer and metal, has advanced to the point where it can significantly facilitate robot and remote system design and implementation. Properly used AM creates features and capabilities otherwise not possible in machined or cast products. AM design rules are still being developed and must be applied differently based on the process and purpose of the final component, but progress is being made in practical implementation. Polymer-based AM has been commercially available for quite some time and is regularly used for prototyping and test fitting parts before they are fabricated from metal or produced in low production quantity parts that do not require high structural strength. Metal printing processes are more diverse than polymer print processes. Both polymer and metal printing systems can be used to make parts or complete systems for robotics. Two implementation examples that illustrate the possibilities and identify issues that remain in metal printing are: a dual arm hydraulic manipulator and a distal link of an excavator arm. The dual arm hydraulic manipulator was printed in titanium using an e-beam fusing process. All hydraulics and electrical cabling passageways were printed into the manipulator; there are no external hoses or cables. The distal link of an excavator arm was printed using a wire-fed metal inert gas process. The excavator was then used for digging as part of an equipment exposition validating the structural integrity of the printed part. (authors)

3D PRINTING↗

Testing and Deployment of Remote Systems to Remove Highly Radioactive Soil at Hanford's 324 Building - 18043

U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CHPRC) is in the process of procuring, testing and deploying remotely operated tools to safely remove highly contaminated soil from beneath the 324 Building on the Hanford Site in southeastern Washington State. The 324 Building operated for more than 40 years, completing a variety of high-dose engineering development and demonstration activities inside six hot cells that shielded the workers from the highly radioactive materials. Activities to decommission, decontaminate and demolish the facility began in 2008. In 2010, soil contamination was found in the soil under one of the hot cells, and building deactivation was paused to evaluate the soil contamination. Sampling efforts, using borehole technology, revealed significant under-building contamination with dose rates measuring has high as 130 Sv/hr (13,000 R/hr). The highly-contaminated soil has to be removed before traditional open air deactivation activities can continue. CHPRC completed proof of concept testing and built a full-scale test facility to demonstrate the effectiveness of three primary tools that will accomplish the floor and soil removal. The tools include a commercially available concrete saw, and a commercially available excavator arm that have been modified to operate remotely in the high-radiation environment within the hot-cell. In order to reduce the wear on the hot-cell overhead cranes, a remote operated rail and cart system has been designed to transport soil and debris out of the hot-cell to an airlock area where the waste will be separated, according to its level of radioactivity. A camera and light system has been designed to provide visual and audio coverage of the hot-cell area that will allow the operations to proceed from remote control stations. This paper will describe the primary remote operated equipment designed for the project and the challenges and processes for developing, testing and deploying the equipment necessary to excavate the soil from below the 324 Building. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concepts and Tests for the Remote-Controlled Dismantling of the Biological Shield and Form work of the KNK Reactor - 13425

The compact sodium-cooled nuclear reactor facility Karlsruhe (KNK), a prototype Fast Breeder, is currently in an advanced stage of dismantling. Complete dismantling is based on 10 partial licensing steps. In the frame of the 9. decommissioning permit, which is currently ongoing, the dismantling of the biological shield is foreseen. The biological shield consists of heavy reinforced concrete with built-in steel fitments, such as form-work of the reactor tank, pipe sleeves, ventilation channels, and measuring devices. Due to the activation of the inner part of the biological shield, dismantling has to be done remote-controlled. During a comprehensive basic design phase a practical dismantling strategy was developed. Necessary equipment and tools were defined. Preliminary tests revealed that hot wire plasma cutting is the most favorable cutting technology due to the geometrical boundary conditions, the varying distance between cutter and material, and the heavy concrete behind the steel form-work. The cutting devices will be operated remotely via a carrier system with an industrial manipulator. The carrier system has expandable claws to adjust to the varying diameter of the reactor shaft during dismantling progress. For design approval of this prototype development, interaction between manipulator and hot wire plasma cutting was tested in a real configuration. For the demolition of the concrete structure, an excavator with appropriate tools, such as a hydraulic hammer, was selected. Other mechanical cutting devices, such as a grinder or rope saw, were eliminated because of concrete containing steel spheres added to increase the shielding factor of the heavy concrete. Dismantling of the biological shield will be done in a ring-wise manner due to static reasons. During the demolition process, the excavator is positioned on its tripod in three concrete recesses made prior to the dismantling of the separate concrete rings. The excavator and the manipulator carrier system will be operated alternately. Main boundary condition for all the newly designed equipment is the decommissioning housing of limited space within the reactor building containment. To allow for a continuous removal of the concrete rubble, an additional opening on the lowest level of the reactor shaft will be made. All equipment and the interaction of the tools have to be tested before use in the controlled area. Therefore a full-scale model of the biological shield will be provided in a mock-up. The tests will be performed in early 2014. The dismantling of the biological shield is scheduled for 2015. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High Angle Remediation Antimony, Mercury, and Pu-239/240 Contaminated Soil at LANL near Los Alamos Town Site - 18579

The Manhattan Project and early Cold War era operations at Los Alamos National Laboratory (LANL) left behind soil contaminated with antimony, mercury, and Pu-239/240. TerranearPMC (TPMC) successfully completed a phased three-year high-angle legacy cleanup project to excavate contaminated soil from a steep, difficult-to-access canyon wall in the Upper Los Alamos Canyon Aggregate Area bordering Los Alamos town site. The first and third phases of the project (years 2015 and 2017) utilized a Menzi Muck (spider excavator) in concert with a 275 US ton telescoping crane to remove ∼158 cubic yards (cy) of mercury-contaminated rock and soil (i.e. media) from one solid waste management unit (SWMU) in 2015; and ∼70 cy of antimony contaminated media, and ∼65 cy of collocated mercury and Pu-239/240 contaminated media from two SWMUs in 2017. All soil excavated from the site was containerized in soft-sided 1.0 cy, 1.77 cy, and 3.5 cy IP-1 containers and shipped to an approved, licensed, off-site disposal facility. The crane was also used to move the spider excavator, field personnel, tools, the packaged waste, and restoration materials into and out of the canyon. In 2016, conventional but miniaturized excavation equipment was used to remove about 133 cy of Pu-239/240 contaminated media from four SWMUs west of both the 2015 and 2017 excavations. A total of 398 soil screening, waste composite, characterization/bounding, and confirmation samples were collected during the project. Media that was left in place after the excavation was sampled to confirm that human health concerns and environmental risk issues had been mitigated. This proven technical approach was the preferred method for cleaning up ∼426 cy of contaminated media from steep, difficult-to-access legacy waste sites within the Upper Los Alamos Canyon Aggregate Area between 2015 and 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Idaho-Developed Technologies, Processes Offer Unique Solutions to Waste Management Challenges - 19281

INL Site cleanup contractor Fluor Idaho, LLC (Fluor Idaho) and its predecessors have developed a host of state-of-the-art technologies and specialized processes for nuclear waste handling, treatment, storage, and shipping. The cleanup program has also repurposed and upgraded previously idled Cold War-era buildings to treat and repackage both on- and off-site generated radioactive and hazardous wastes. And lastly, Fluor Idaho is using one-of-a-kind equipment to protect waste management personnel as they undertake their work to meet cleanup commitments that the Department of Energy (DOE) made to the state of Idaho. Such applications, although developed for Idaho's wastes, have the potential to benefit other facilities within the DOE Complex. Engineers and fabricators have teamed up to develop truly unique devices made of specialized metals, like stainless steel alloys, and more readily available materials such as Lexan. All waste types that Fluor Idaho manages daily - spent nuclear fuel, both high- and low-level wastes, and both remote-handled (RH) and CH-TRU - benefit from these innovations. Without question, the greatest number of specialized equipment, processes, and worker-protection technologies developed are for the retrieving, characterizing, repackaging, and shipping of TRU wastes, which makes sense considering the INL Site stores the most TRU waste in the DOE Complex. On the CH-TRU retrieval front, crews are using specially modified Gradall excavators to protect workers while they exhume Rocky Flats Plant wastes that were sent to Idaho in the 1950's and 1960's and buried in a shallow landfill. The excavators are supplied with extra Lexan windows to protect operators from the potential for flying debris during exhumation. On-board supplied air, pumped into the cab, and individual air supplies protect workers from inhalation hazards. Also on-board infrared cameras allow operators to detect heat generating from reactive metals at the dig face. At the Advanced Mixed Waste Treatment Facility (AMWTP), Brokk robotic arm operators use a 'super clam' claw, designed and built at the INL Site, on the remotely operated heavy equipment to size-reduce waste boxes, drums, concrete, and metal containing TRU constituents. The super clam is so powerful and dexterous that operators can crush a 55-gallon drum into the size of a basketball, but also delicately turn the pages of a magazine. Boxes too large to be sized at the AMWTP's box-lines are sent to the Accelerated Retrieval Project VII facility to be sized by Waste Management personnel. Such waste boxes, which sometimes contain 'flighty' plutonium-238 material, have forced the project to employ a heavily ventilated and filtered interior tent. Not all technologies developed for the Waste Management program are high-technology; in fact, one piece of equipment is so simple it's literally ingenious. Operators who inspect and repackage RH-TRU inside a hot cell at the Idaho Nuclear Technology and Engineering Center (INTEC) needed a backup plan in case the hot cell port couldn't be closed in the event of a power outage. Engineers and fabricators collaborated to develop a port cover actuator mechanism, which allows operators to open and close the cell's hatch cover with nothing more than a cordless drill. Also at INTEC, Maintenance Shop fabricators developed a Lexan container or 'pig' suitable for shielding neutron-emitting TRU waste sources. Lexan was chosen as the preferred shielded container material for this special type of waste because neutrons are best shielded with materials containing lots of hydrogen, such as plastics, which are composed of carbon and hydrogen molecules. Once approved for shipment, the high-activity waste will be loaded into specialty casks and shipped to WIPP for permanent disposal. Although all these technologies and processes were initially developed for resolving challenges at the INL Site, their applications could be far-reaching. Like the INL Site, many other facilities in the DOE Complex manage, treat, store, and ship TRU, low-and high-level wastes, and spent nuclear fuel. The technologies and processes developed in Idaho protect Waste Management personnel as they undertake their work, but these benefits could be utilized by other facilities and personnel doing similar work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A study experiment of auto idle application in the excavator engine performance

The purpose of this study was to analyze the effect of applying auto idle to excavator engine performance, such as machine unitization and fuel consumption in Excavator. Steps to be done are to modify the system JA 44 and 67 in Vehicle Electronic Control Unit (V-ECU). The modifications will be obtained from the pattern of the engine speed. If the excavator attachment is not operated, the engine speed will return to the idle speed automatically. From the experiment results the auto idle reduces fuel consumption in excavator engine.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Slow speed object detection for haul trucks

Caterpillar integrates radar technology with its current camera based system. Caterpillar has developed the Integrated Object Detection System, a slow speed object detection system for mining haul trucks. Object detection is a system that aids the truck operator's awareness of their surroundings. The system consists of a color touch screen display along with medium- and short-range radar as well as cameras, harnesses and mounting hardware. It is integrated into the truck's Work Area Vision System (WAVS). After field testing in 2007, system commercialization began in 2008. Prototype systems are in operation in Australia, Utah and Arizona and the Integrated Object Detection System will be available in the fourth quarter of 2009 and on production trucks 785C, 789C, 793D and 797B. The article is adapted from a presentation by Mark Richards of Caterpillar to the Haulage & Loading 2009 conference, May, held in Phoenix, AZ. 1 fig., 5 photos.

01 COAL, LIGNITE, AND PEAT↗

Dust control for draglines

Monitoring dust levels inside draglines reveals room for improvement in how filtration systems are used and maintained. The Australian firm BMT conducted a field test program to measure airflow parameters, dust fallout rates and dust concentrations, inside and outside the machine house, on four draglines and one shovel. The study involved computational fluid dynamics (CFD) simulations. The article describes how the tests were made and gives results. It was not possible to say which of the two main filtration systems currently used on Australian draglines - Dynavane or Floseps - performs better. It would appear that more frequent maintenance and cleaning would increase the overall filtration performance and systems could be susceptible to repeat clogging in a short time. 2 figs., 1 photos.

01 COAL, LIGNITE, AND PEAT↗

Pipeline Decommissioning Trial AWE Berkshire UK - 13619

This Paper details the implementation of a 'Decommissioning Trial' to assess the feasibility of decommissioning the redundant pipeline operated by AWE located in Berkshire UK. The paper also presents the tool box of decommissioning techniques that were developed during the decommissioning trial. Constructed in the 1950's and operated until 2005, AWE used a pipeline for the authorised discharge of treated effluent. Now redundant, the pipeline is under a care and surveillance regime awaiting decommissioning. The pipeline is some 18.5 km in length and extends from AWE site to the River Thames. Along its route the pipeline passes along and under several major roads, railway lines and rivers as well as travelling through woodland, agricultural land and residential areas. Currently under care and surveillance AWE is considering a number of options for decommissioning the pipeline. One option is to remove the pipeline. In order to assist option evaluation and assess the feasibility of removing the pipeline a decommissioning trial was undertaken and sections of the pipeline were removed within the AWE site. The objectives of the decommissioning trial were to: - Demonstrate to stakeholders that the pipeline can be removed safely, securely and cleanly - Develop a 'tool box' of methods that could be deployed to remove the pipeline - Replicate the conditions and environments encountered along the route of the pipeline The onsite trial was also designed to replicate the physical prevailing conditions and constraints encountered along the remainder of its route i.e. working along a narrow corridor, working in close proximity to roads, working in proximity to above ground and underground services (e.g. Gas, Water, Electricity). By undertaking the decommissioning trial AWE have successfully demonstrated the pipeline can be decommissioned in a safe, secure and clean manor and have developed a tool box of decommissioning techniques. The tool box of includes; - Hot tapping - a method of breaching the pipe while maintaining containment to remove residual liquids, - Crimp and shear - remote crimping, cutting and handling of pipe using the excavator - Pipe jacking - a way of removing pipes avoiding excavations and causing minimal disturbance and disruption. The details of the decommissioning trial design, the techniques employed, their application and effectiveness are discussed and evaluated here in. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Development of an Automated Instrument for Measuring Radioactivity in an Excavator Bucket - 16246

Increasing interest and emphasis is being given to the presence of radioactive contamination in the environment and the methods by which this contamination can be remediated. Radioactive contamination may arise from industrial process including the operation of nuclear facilities. It may also arise from the enhancement of naturally occurring radioactive material by industrial processes. An area of particular concern is the remediation of soil and rubble with radioactive contamination. Traditional methods of soil remediation involve sampling followed by the excavation of areas where contamination is found. The soil removal process is normally very inefficient and can involve multiple handling of excessive quantities of soil and ultimately an over estimate of the quantity of soil with radioactive contamination. In order to both minimize material handling and to reduce the final volume of contaminated material, which must be handled for disposal, a sensitive instrument has been developed and tested which is designed to measure the radioactive content of an excavator bucket. The instrument detector is positioned automatically just above the open top of the bucket and the measurement employs a high efficiency sodium iodide crystal which has a graded shadow shield to reduce the effect of background radioactivity. The measurement efficiency is enhanced as the detector is located in close proximity to the soil in the bucket and the thick steel shell of the bucket acts as a shield to further reduce the effect of background from the ground below. The method has obvious advantages over methods, which attempt to measure the potentially radioactive soil through the shielding provided by the thick steel bucket shell. As the first stage of the bucket measurement the excavator operator fills the bucket and locates it in a designated position with the open top of the bucket facing upwards, close to the operator cab. A measurement technician, located outside the danger area of the excavator boom, begins the measurement using a tablet computer with a wireless connection to the instrument. The shielded detector is moved from a storage position above the operator cab to the measurement position close to the open surface of the excavator bucket. Once the measurement is completed in typically one to two minutes, the detector is repositioned in its storage location and the measurement data is transmitted to the tablet computer. At this point the measurement technician makes the decision based on the measurement results as to how to disposition the bucket contents. Typically contaminated material will be transferred to a vehicle for off-site disposal. Alternatively, and this is the great advantage of this technique, uncontaminated material may be returned directly to the site of the excavation without the need for further handling. The development, detailed design and preliminary testing of the instrument are described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deployment of Rapid Assay Systems for Real-time Sorting of Excavation Spoil on Contaminated Land - 19258

To optimise segregation at source, and hence minimise waste production, NUVIA have developed and utilised the Gamma Excavation Monitor (GEM) system. The GEM was designed for land remediation projects, to provide a rapid screening tool for excavator buckets of material. Following successful deployment in the UK, including the Olympic Park site in London, and two major Magnox land remediation projects, the first GEM unit was deployed to Canadian Nuclear Laboratories' (CNL) Chalk River Laboratory (CRL) in 2016. The GEM unit was fitted with a plastic scintillator detector; recent developments have included the utilisation of a sodium iodide. The system is initiated by the presence of an excavator bucket above the detector which triggers proximity switches that automatically start the counting routine. At the end of a short count time, typically 10 seconds, the materials category is indicated by means of a traffic light system, based on either the gross gamma activity or a photo-peak. Using this instrument, material determined not to be radioactive can be re-used on-site. In addition to the traffic light system, results are also transmitted wirelessly to a tablet device. These combined features allow operation of the system without the need to have operatives near the mechanical excavator bucket; therefore, eliminating a significant industrial hazard. Deployments of the GEM on the CRL site have included Storm Water Management project, within the CRL controlled area, and the Foundation Road Landfill Project. The use of the GEM in these projects enabled in-situ decisions to be made regarding the segregation and sentencing of soil rather than having to wait for the analysis of samples; saving time and cost to the project. The Building 492 project involved the excavation of soil within a supervised area to prepare for the installation of modular trailer units. For this specific job, the GEM was calibrated to ensure soil met clearance criteria as stipulated in the Nuclear Substances and Radiation Devices Regulations (Canadian Nuclear Safety Commission; SOR/2000-207). A total of 326 loads of soil were monitored during this project and re-assurance sampling conducted by CNL corroborated the results produced by the GEM system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Technology to Retrieve Waste Below the 324 Building at the Hanford Site - 19622

The Waste Technology Engineering Laboratory (324 Building) is a Category 2 Nuclear Facility at Hanford. The 324 Building Disposition Project is responsible for the removal and remedial actions under CERCLA. Additionally, there are RCRA Dangerous Waste Management Units which the CERCLA actions are presumed to satisfy. The Radiochemical Engineering Complex (REC) is a group of four hot cells (A, B, C and D Cells) with an interconnecting airlock inside of the 324 Building. Underneath the REC B-Cell are contaminated soils that have an estimated 12,793 R/Hr dose rate and remediation is under CERCLA 300-FF-2 Operable Unit. The current action consists of debris removal from the floor of B-Cell, B-Cell floor removal, and excavation of the soils beneath the floor to a depth of up to twelve feet with four Remote Excavator Arms (REA). This paper provides insight into the preparation and performance of high tolerance core drilling into a hot cell complex. Installation of the REA Through Support (REA TS) mechanism through the 4'-6' concrete shield walls is a complex series of tasks with demanding tolerances at each of four locations around the perimeter of B-Cell. The use of training mock ups was included in the completion of this work. The REA TS is two 11 inch diameter high strength steel sleeves that have expandable collars at each end allowing the interstitial space between the outside of the sleeve and inside of the core drill to be grouted to form a substantial structural connection, and a 10 inch pipe with hydraulic hoses to power the REA. There are three cores required for each REA location. The REAs themselves are customized excavator arms, mounted on support columns to be used in the excavation and transfer of the contaminated soil into storage facilities. The tasks for the installation of the REA TSs are: 1) Characterization of B-Cell Cubicles. 2) Embedded Pipe Fill. 3) Interference Removal. a. Internal Walls, b. External Walls. 4) Core Drilling. 5) Go/No-Go gauge, and video inspection. 6) Installation of REA Through Support Assembly. The 324 Building REC Hot Cells have internal, external, and embedded utilities throughout the shield walls in conflict with the REA TS locations. Some of the embedded utilities have connection points inside of the B-Cell Cubicles. There were two separate issues at the conflicted locations. The first issue was the core drill cooling water would flow along the embedded utility potentially spreading legacy chemical and radiological contamination to areas of the facility that was unwanted. The second issue was that the REA TS required a substantial structural connection to the B-Cell wall, the cored diameter is larger than the REA TS and these interstitial areas required a full grouted connection. The embedded utilities posed a hazard that if unfilled, the interstitial grout would flow into the embedded utility and destabilize the required grouted structural connection. The B-Cell Cubicles had not been opened in over 10 years. A mockup was completed to install a glovebag over the cubicle opening and then to verify functionality and port requirements. The embedded utility pipe connections in the cubicles were then opened inside a glovebag to verify the correct connection points, connection method for future embedded pipe fill material delivery system, radiological characterization, and air flow to show that the embedded utility pipes were not blocked and would not pressurize. The embedded pipe fill material and grout system was mocked up and run several times to verify methodology and functionality. The B-Cell Cubicles were then reentered and the embedded utility pipe fill was completed using a hand pump. External interferences at the core drill locations were removed using standard interference removal techniques. Internal interferences at the core drill locations were removed using a remote cutting tool that was controlled through the use of the B-Cell crane, remote cameras and remote lighting. The core drilling was mocked up two separate times, the project's purpose built 'Mock Up Facility' was core drilled to verify tolerances and methodology prior to subcontract award, the core drill subcontractor built a 'dummy wall' to train and practice on achieving the demanding tolerances, coordinated alignments between the cores, short term and long term dose shielding techniques, and contamination control techniques. A core drill template, and additional anchoring techniques were used to maximize accuracy and precision of the REA TS core drills. A 'Go/No-Go' gauge was built and installed at each of the four REA TS locations to verify that the core drill met tolerances. The core drill locations were visually inspected using a boroscope. The REA TS installation was mocked up at the projects 'Mock Up Facility' beginning with basic hazard controls, then with intermediate hazard controls, and finally with full occupational safety, industrial hygiene, and radiological controls. The REA TSs were installed and grouted into place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗