Search NASA⌕ Search

SEARCH · Search NASA

Results for “EARTHMOVING EQUIPMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

3-D Radiological Data Acquisition, Visualization and Modeling - 20211

The U.S. Army Corps of Engineers (USACE) was tasked to investigate and remediate low activity radiological contamination from research and production of the nation's first nuclear weapons at the former DuPont Chambers Works Formerly Utilized Sites Remedial Action Program (FUSRAP) site (DuPont). The DuPont site had several buildings used for the Manhattan project that were demolished in the 1940's and 1950's apparently using heavy earthmoving equipment. Some of the contaminated rubble from the demolition appears to have been spread out by this equipment resulting in somewhat random scattering of radiologically contaminated soil and debris along with aqueous spills. Traditional investigative methods such as soil borings, test pits and 2-dimensional gamma walkovers were only partially successful in delineating the radiological contamination at the site. It was feared that even 'chasing' the contamination during remediation would miss contamination if the demolition resulted in discontinuous trails of radiologically contaminated soils. In evaluating the data generated over the interceding decades, the USACE determined that a better method to collect and process the remedial action radiological data was needed to enable the project team to optimize predictive planning and meet documentation expectations. The purpose of this paper is to provide an overview of the effort and progress to combine and organize radiological survey methods into a highly flexible sampling, modeling, and decision analysis approach that emphasizes the quality of decision-making during remediation. This innovative system blends multiple tools to develop a methodology that can extend MARRSIM [1] into the subsurface and provide tools that can be applied to other sites. (authors)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Best of Germany 2008

This supplement discusses German mining equipment and technology under the following sections: mining experience and machinery export; underground mining technology; surface mining technology; materials handling technology; coal and minerals processing technology; power technology; and automation, specialized components and materials. Manufacturers of the different equipment and their contact details are given. 4 figs.

01 COAL, LIGNITE, AND PEAT↗

UK mining invests, suppliers profit

In the midst of a major economic crisis in the United Kingdom, equipment suppliers have been reporting a number of considerable purchases by British coal mining companies. In December 2008, Liebherr-Great Britain delivered the first two of four Rq350 Litronic hydraulic excavators for use at the Broken Cross opencast coal site in Lanarkshire, Scotland. Ten Terex TR100 rigid haulers were delivered to the site in late 2008. Hatfield Colliery at Stainforth, South Yorkshire, has been reopened by PowerFuel. The main equipment for two longwall faces was supplied by Joy Mining Machinery UK Ltd. 2 photos.

01 COAL, LIGNITE, AND PEAT↗

Additive Manufacturing Advances to Facilitate Novel Robot and Remote System Construction - 18493

Additive manufacturing (AM), in both polymer and metal, has advanced to the point where it can significantly facilitate robot and remote system design and implementation. Properly used AM creates features and capabilities otherwise not possible in machined or cast products. AM design rules are still being developed and must be applied differently based on the process and purpose of the final component, but progress is being made in practical implementation. Polymer-based AM has been commercially available for quite some time and is regularly used for prototyping and test fitting parts before they are fabricated from metal or produced in low production quantity parts that do not require high structural strength. Metal printing processes are more diverse than polymer print processes. Both polymer and metal printing systems can be used to make parts or complete systems for robotics. Two implementation examples that illustrate the possibilities and identify issues that remain in metal printing are: a dual arm hydraulic manipulator and a distal link of an excavator arm. The dual arm hydraulic manipulator was printed in titanium using an e-beam fusing process. All hydraulics and electrical cabling passageways were printed into the manipulator; there are no external hoses or cables. The distal link of an excavator arm was printed using a wire-fed metal inert gas process. The excavator was then used for digging as part of an equipment exposition validating the structural integrity of the printed part. (authors)

3D PRINTING↗

2008 Coal Age buyers guide

The buyers guide lists more than 1200 companies mainly based in the USA, that provide equipment and services to US coal mines and coal preparation plants. The guide is subdivided by product categories.

01 COAL, LIGNITE, AND PEAT↗

2009 Coal Age Buyers Guide

The buyers guide lists more than 1200 companies mainly based in the USA, that provide equipment and services to US coal mines and coal preparation plants. The guide is subdivided by product categories.

01 COAL, LIGNITE, AND PEAT↗

Mining into the new millennium

After more than 3 years of production and a billion tons of coal shipped, Foundation Coal West, a subsidiary of Foundation Coal Holding Inc., continues to operate two of the original surface mines in Wyoming's Powder River Basin. The article describes equipment (conveyors, trucks, surface miners etc.) deployed at Belle Ayr and Eagle Butte PRB operations. 3 photos.

01 COAL, LIGNITE, AND PEAT↗

Testing and Deployment of Remote Systems to Remove Highly Radioactive Soil at Hanford's 324 Building - 18043

U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CHPRC) is in the process of procuring, testing and deploying remotely operated tools to safely remove highly contaminated soil from beneath the 324 Building on the Hanford Site in southeastern Washington State. The 324 Building operated for more than 40 years, completing a variety of high-dose engineering development and demonstration activities inside six hot cells that shielded the workers from the highly radioactive materials. Activities to decommission, decontaminate and demolish the facility began in 2008. In 2010, soil contamination was found in the soil under one of the hot cells, and building deactivation was paused to evaluate the soil contamination. Sampling efforts, using borehole technology, revealed significant under-building contamination with dose rates measuring has high as 130 Sv/hr (13,000 R/hr). The highly-contaminated soil has to be removed before traditional open air deactivation activities can continue. CHPRC completed proof of concept testing and built a full-scale test facility to demonstrate the effectiveness of three primary tools that will accomplish the floor and soil removal. The tools include a commercially available concrete saw, and a commercially available excavator arm that have been modified to operate remotely in the high-radiation environment within the hot-cell. In order to reduce the wear on the hot-cell overhead cranes, a remote operated rail and cart system has been designed to transport soil and debris out of the hot-cell to an airlock area where the waste will be separated, according to its level of radioactivity. A camera and light system has been designed to provide visual and audio coverage of the hot-cell area that will allow the operations to proceed from remote control stations. This paper will describe the primary remote operated equipment designed for the project and the challenges and processes for developing, testing and deploying the equipment necessary to excavate the soil from below the 324 Building. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FLUOR HANFORD DECOMMISSIONING UPDATE

Fluor Hanford is completing D&D of the K East Basin at the U.S. Department of Energy's (DOE's) Hanford Site in southeastern Washington State this spring, with demolition expected to begin in June. Located about 400 yards from the Columbia River, the K East Basin is one of two indoor pools that formerly contained irradiated nuclear fuel, radioactive sludge and tons of contaminated debris. In unique and path-breaking work, workers finished removing the spent fuel from the K Basins in 2004. In May 2007, workers completed vacuuming the sludge into containers in the K East Basin, and transferring it into containers in the K West Basin. In December, they finished vacuuming the remainder of K West Basin sludge into these containers. The K East Basin was emptied of its radioactive inventory first because it was more contaminated than the K West Basin, and had leaked in the past. In October 2007, Fluor Hanford began physical D&D of the 8,400-square foot K East Basin by pouring approximately 14-inches of grout into the bottom of it. Grout is a type of special cement used for encasing waste. Two months later, Fluor Hanford workers completed sluicing contaminated sand from the large filter that had sieved contaminants from the basin water for more than 50 years. Next, they poured grout into the filter housing and the vault that surrounds the filter, as well as into ion exchange columns that also helped filter basin water. For a six-week period in February and March, personnel drained the approximately one million gallons of contaminated water from the K East Basin. The effort required more than 200 tanker truck loads that transported the water to an effluent treatment facility for treatment and then release. A thin fixative was also applied to the basin walls as the water was removed to hold residual contamination in place. As soon as the water was out of the basin, Fluor pumped in approximately 18 feet of 'controlled density fill' material (somewhat similar to sand) to shield workers to a safe level from the residual radioactivity. Workers then continued preparations for demolishing the structure. Currently, they are isolating utilities, removing asbestos, draining oils, and removing other items not allowed to be disposed in Hanford's Environmental Restoration Disposal Facility (ERDF). The basin's superstructure will be demolished using a heavy industrial excavator equipped with a shear. This portion of the work is expected to be completed in September, with removal of the basin substructure to follow in 2009. D&D of the K East Basin eliminated the final major radioactive sources there, and made the Columbia River and the adjacent environment safer for everyone who lives downstream.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sandvik sharpens in-pit crushing focus

Major mining equipment supplier Sandvik Mining and Construction has announced a full-fledged fully mobile crushing plant, the PF300. This is shaping up to be the decade's major addition to the large scale open-cut mining toolkit. The PF300 can be connected to a face conveyor by a loading bridge as well as by belt wagon or transfer conveyor. The article describes design features. 2 figs.

01 COAL, LIGNITE, AND PEAT↗

Concepts and Tests for the Remote-Controlled Dismantling of the Biological Shield and Form work of the KNK Reactor - 13425

The compact sodium-cooled nuclear reactor facility Karlsruhe (KNK), a prototype Fast Breeder, is currently in an advanced stage of dismantling. Complete dismantling is based on 10 partial licensing steps. In the frame of the 9. decommissioning permit, which is currently ongoing, the dismantling of the biological shield is foreseen. The biological shield consists of heavy reinforced concrete with built-in steel fitments, such as form-work of the reactor tank, pipe sleeves, ventilation channels, and measuring devices. Due to the activation of the inner part of the biological shield, dismantling has to be done remote-controlled. During a comprehensive basic design phase a practical dismantling strategy was developed. Necessary equipment and tools were defined. Preliminary tests revealed that hot wire plasma cutting is the most favorable cutting technology due to the geometrical boundary conditions, the varying distance between cutter and material, and the heavy concrete behind the steel form-work. The cutting devices will be operated remotely via a carrier system with an industrial manipulator. The carrier system has expandable claws to adjust to the varying diameter of the reactor shaft during dismantling progress. For design approval of this prototype development, interaction between manipulator and hot wire plasma cutting was tested in a real configuration. For the demolition of the concrete structure, an excavator with appropriate tools, such as a hydraulic hammer, was selected. Other mechanical cutting devices, such as a grinder or rope saw, were eliminated because of concrete containing steel spheres added to increase the shielding factor of the heavy concrete. Dismantling of the biological shield will be done in a ring-wise manner due to static reasons. During the demolition process, the excavator is positioned on its tripod in three concrete recesses made prior to the dismantling of the separate concrete rings. The excavator and the manipulator carrier system will be operated alternately. Main boundary condition for all the newly designed equipment is the decommissioning housing of limited space within the reactor building containment. To allow for a continuous removal of the concrete rubble, an additional opening on the lowest level of the reactor shaft will be made. All equipment and the interaction of the tools have to be tested before use in the controlled area. Therefore a full-scale model of the biological shield will be provided in a mock-up. The tests will be performed in early 2014. The dismantling of the biological shield is scheduled for 2015. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High Angle Remediation Antimony, Mercury, and Pu-239/240 Contaminated Soil at LANL near Los Alamos Town Site - 18579

The Manhattan Project and early Cold War era operations at Los Alamos National Laboratory (LANL) left behind soil contaminated with antimony, mercury, and Pu-239/240. TerranearPMC (TPMC) successfully completed a phased three-year high-angle legacy cleanup project to excavate contaminated soil from a steep, difficult-to-access canyon wall in the Upper Los Alamos Canyon Aggregate Area bordering Los Alamos town site. The first and third phases of the project (years 2015 and 2017) utilized a Menzi Muck (spider excavator) in concert with a 275 US ton telescoping crane to remove ∼158 cubic yards (cy) of mercury-contaminated rock and soil (i.e. media) from one solid waste management unit (SWMU) in 2015; and ∼70 cy of antimony contaminated media, and ∼65 cy of collocated mercury and Pu-239/240 contaminated media from two SWMUs in 2017. All soil excavated from the site was containerized in soft-sided 1.0 cy, 1.77 cy, and 3.5 cy IP-1 containers and shipped to an approved, licensed, off-site disposal facility. The crane was also used to move the spider excavator, field personnel, tools, the packaged waste, and restoration materials into and out of the canyon. In 2016, conventional but miniaturized excavation equipment was used to remove about 133 cy of Pu-239/240 contaminated media from four SWMUs west of both the 2015 and 2017 excavations. A total of 398 soil screening, waste composite, characterization/bounding, and confirmation samples were collected during the project. Media that was left in place after the excavation was sampled to confirm that human health concerns and environmental risk issues had been mitigated. This proven technical approach was the preferred method for cleaning up ∼426 cy of contaminated media from steep, difficult-to-access legacy waste sites within the Upper Los Alamos Canyon Aggregate Area between 2015 and 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electric shovels meet the demands for mining operations

Rugged, intelligent shovels offer better productivity and help mine operators avoid costly downtime in a very tight market. In 2007 P & H Mining Equipment began to produce a new breed of electric mining shovels designed to help reduce operating cost in coal and other mining operations. These were designated the P & H C-Series. All have an advanced communication, command and control system called the Centurion system. Coal mining applications for this series include 4100XPCs in Australia, China and Wyoming, USA. The Centurion system provides information on shovel performance and systems health which is communicated via graphic user interface terminals to the operators cab. Bucyrus International is developing a hydraulic crowd mechanism for its electric shovels and is now field testing one for its 495 series shovel. The company has also added greater capability in the primary software in the drive system for troubleshooting and fault identification to quickly diagnose problems onboard or remotely. 4 photos.

01 COAL, LIGNITE, AND PEAT↗

Idaho-Developed Technologies, Processes Offer Unique Solutions to Waste Management Challenges - 19281

INL Site cleanup contractor Fluor Idaho, LLC (Fluor Idaho) and its predecessors have developed a host of state-of-the-art technologies and specialized processes for nuclear waste handling, treatment, storage, and shipping. The cleanup program has also repurposed and upgraded previously idled Cold War-era buildings to treat and repackage both on- and off-site generated radioactive and hazardous wastes. And lastly, Fluor Idaho is using one-of-a-kind equipment to protect waste management personnel as they undertake their work to meet cleanup commitments that the Department of Energy (DOE) made to the state of Idaho. Such applications, although developed for Idaho's wastes, have the potential to benefit other facilities within the DOE Complex. Engineers and fabricators have teamed up to develop truly unique devices made of specialized metals, like stainless steel alloys, and more readily available materials such as Lexan. All waste types that Fluor Idaho manages daily - spent nuclear fuel, both high- and low-level wastes, and both remote-handled (RH) and CH-TRU - benefit from these innovations. Without question, the greatest number of specialized equipment, processes, and worker-protection technologies developed are for the retrieving, characterizing, repackaging, and shipping of TRU wastes, which makes sense considering the INL Site stores the most TRU waste in the DOE Complex. On the CH-TRU retrieval front, crews are using specially modified Gradall excavators to protect workers while they exhume Rocky Flats Plant wastes that were sent to Idaho in the 1950's and 1960's and buried in a shallow landfill. The excavators are supplied with extra Lexan windows to protect operators from the potential for flying debris during exhumation. On-board supplied air, pumped into the cab, and individual air supplies protect workers from inhalation hazards. Also on-board infrared cameras allow operators to detect heat generating from reactive metals at the dig face. At the Advanced Mixed Waste Treatment Facility (AMWTP), Brokk robotic arm operators use a 'super clam' claw, designed and built at the INL Site, on the remotely operated heavy equipment to size-reduce waste boxes, drums, concrete, and metal containing TRU constituents. The super clam is so powerful and dexterous that operators can crush a 55-gallon drum into the size of a basketball, but also delicately turn the pages of a magazine. Boxes too large to be sized at the AMWTP's box-lines are sent to the Accelerated Retrieval Project VII facility to be sized by Waste Management personnel. Such waste boxes, which sometimes contain 'flighty' plutonium-238 material, have forced the project to employ a heavily ventilated and filtered interior tent. Not all technologies developed for the Waste Management program are high-technology; in fact, one piece of equipment is so simple it's literally ingenious. Operators who inspect and repackage RH-TRU inside a hot cell at the Idaho Nuclear Technology and Engineering Center (INTEC) needed a backup plan in case the hot cell port couldn't be closed in the event of a power outage. Engineers and fabricators collaborated to develop a port cover actuator mechanism, which allows operators to open and close the cell's hatch cover with nothing more than a cordless drill. Also at INTEC, Maintenance Shop fabricators developed a Lexan container or 'pig' suitable for shielding neutron-emitting TRU waste sources. Lexan was chosen as the preferred shielded container material for this special type of waste because neutrons are best shielded with materials containing lots of hydrogen, such as plastics, which are composed of carbon and hydrogen molecules. Once approved for shipment, the high-activity waste will be loaded into specialty casks and shipped to WIPP for permanent disposal. Although all these technologies and processes were initially developed for resolving challenges at the INL Site, their applications could be far-reaching. Like the INL Site, many other facilities in the DOE Complex manage, treat, store, and ship TRU, low-and high-level wastes, and spent nuclear fuel. The technologies and processes developed in Idaho protect Waste Management personnel as they undertake their work, but these benefits could be utilized by other facilities and personnel doing similar work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Structural Characterization of the 216-Z-9 Crib Prior to Decontamination and Demolition Using Robot Crawler and High Resolution Photography

The Department of Energy, Richland Operations Office is preparing to conduct a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) removal action for the decontamination and demolition of the above-grade mining structures and equipment at the 216-Z-9 Crib. An investigation of the condition of the mining complex was initiated to determine constraints necessary for safely conducting the removal of the buildings. While crib headspace chemical analysis and nondestructive analysis of the interior of the buildings was completed to address radiological contamination concerns, the primary concern regarding the removal of the above-grade structures located on the crib cover involves determining the loading capacity and structural integrity of the crib cover slab. Additional concerns included headspace gases and radionuclide contamination. Until the structural analysis was completed, loading limits on the crib cover had been restricted. Photographic documentation revealed the loss of protective tiles and acid resistant coating from the underside of the cover raising a question of concrete stability. The investigation relied heavily on the use of high resolution photography with high intensity lighting for photographic documentation of the underside of the crib cover, followed by structural analysis of the documentation by a team of qualified engineers. Deployment of a robot crawler with attached camera and positioning of a fixed camera were integral to this structural characterization effort. Results of the photographic documentation were of sufficient quality to allow for bounding decisions to be made regarding the loading of the crib cover while performing the demolition of the mining structures (glovebox, excavator, bucket) and the associated buildings. The 216-Z-9 Crib, also known as the 216 Z-9 Recuplex CAW (CA column waste) Waste Disposal Cavern, the Z-9 Trench and the Z-9 Crib was constructed as an engineered trench with an open area beneath a concrete slab. The crib is located near the Plutonium Finishing Plant (PFP) facility, at the Hanford Nuclear Reservation in Eastern Washington State. The crib was used as a disposal site for effluent chemical and radiological wastes from the recovery of uranium and plutonium through extraction or RECUPLEX process, a method that recovered uranium and plutonium from liquid and solid wastes and scraps from other PFP processes. During its operating life, from 1955 through 1962, the Z-9 Crib received liquid wastes totaling approximately four million liters, or one million gallons. Analyses of the crib soil in seven locations to a depth of up to two meters (six feet) beneath the crib floor indicated that the plutonium content of the crib soil ranged from 50 to 150 kg (the highest concentration measured was 34.5 g/L of soil). While performing the structural evaluation of the crib cover, additional characterization information was obtained on the radiological and chemical conditions of the crib and structures. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A study experiment of auto idle application in the excavator engine performance

The purpose of this study was to analyze the effect of applying auto idle to excavator engine performance, such as machine unitization and fuel consumption in Excavator. Steps to be done are to modify the system JA 44 and 67 in Vehicle Electronic Control Unit (V-ECU). The modifications will be obtained from the pattern of the engine speed. If the excavator attachment is not operated, the engine speed will return to the idle speed automatically. From the experiment results the auto idle reduces fuel consumption in excavator engine.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Out of the sandbox - cohesive dragline planning

Since 1983, Southern Illinois University Carbondale (SIUC), through the Coal Research Center in Carterville, Illinois, has been engaged in operator, engineer, supervisor and manager training in the foundations, plan formulation, iteration and improvement in efficiency of dragline planning and operations. 3d-Dig is a 3-D modeling package used in SIUC's training program to simulate digging and dumping from truck-shovel, dozer-push and dragline operations. SIUC has a scale model dragline and dragline simulator available to assist course attendees with standard dig progressions and optimizing operator technique. 1 fig., 6 photos.

01 COAL, LIGNITE, AND PEAT↗

Like no other, Kemmerer keeps on trucking

Despite its unique challenges, production at Chevron Mining's western Wyoming mine is increasing. The 1,200 foot deep pits consecutively terrace down (more similar to the open pits used in hard rock mining), exposing multiple splitting seams of varying coal qualities. The seams dip from 17 to 22{sup o} and vary in thickness from five to 80 feet or more. Generally three different pits, all of changing coal properties, are worked. The coal is blended to meet specific specifications. The article describes operations at the mine and its transport, once blended, to the nearby Naughton power station or by haul truck to the Elkol tipple. Employment at the mine, with its good safety record, is discussed.

01 COAL, LIGNITE, AND PEAT↗