Search NASA⌕ Search

SEARCH · Search NASA

Results for “EBIS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Enriched Background Isotope Study (EBIS): Analysis of 14C-Enriched Carbon Cycle in Soils and Litter at Forested Oak Ridge and AmeriFlux Sites, 2001-2011

These data provide a record of the multi-year, multi-institutional Enriched Background Isotope Studies (EBIS) projects that ran from 2000 through 2011. Elevated levels of 14C enriched CO2 in the air and soil atmosphere as well as leaf, stem, and root tissues were observed on the Oak Ridge Reservations (ORR) during the summer of 1999, and were attributed to local incinerator activities on and/or near the ORR (Trumbore et al. 2002). The isolated enrichment of the background levels of 14C in local forest ecosystem represented a unique opportunity to study unresolved carbon cycling processes such as the contribution of leaf versus root litter contributions to soil carbon accumulation, the rate of vertical transport of carbon into deep soil storage pools, and the differential contribution of physicochemical versus faunal driven processes to soil carbon cycling and sequestration. Leaf litter from the local enriched forest was transplanted to selected sites on the ORR and to selected AmeriFlux study sites to study soil C cycling across a range of soils and climates. The EBIS research projects provide data on C flux from litter sources to mineral soil sinks for United States eastern hardwood forests necessary for testing process hypotheses and judging efficacy of soil C cycling models. Experimental results from this study are being used to parameterize and refine existing carbon dynamics models, the quantification of the long-term fate of ecosystem carbon inputs and as a means to judge the potential for ecosystem carbon sequestration via enhance litter inputs to soil. EBIS observations support conclusions that intra- and inter-annual soil carbon cycling in hardwood forest soils should be characterized as a least a two-compartment system where surface leaf-litter and belowground root turnover represent primary carbon sources for organic-layer and mineral-soil carbon cycles, respectively. EBIS experiments were conducted to complete enriched litterfall maniplations in upland forests on Ultisol and Inceptisol soils of the Oak Ridge Reservation, Oak Ridge, Tennessee. We also collected additional14C-enriched materials for new experimental applications, and applied those materials to multiple AmeriFlux sites over a range of climatic, edaphic and biological conditions. The research provided data for addressing DOE's goal of understanding mechanisms controlling C flux, and for the improvement of models to be applied to policy discussions regarding the safe levels of greenhouse gases for the earth's system. There are 5 data files provided in comma separated (*.csv) format for vegetation, field litter, soil and air [C] and C isotope data from the EBIS studies and associated environmental data.

54 ENVIRONMENTAL SCIENCES↗

EBIS Beam Intensity Online Optimization with GPTune and Offline Analysis with XGBoost

The application of machine learning techniques to accelerator research has led to significant breakthroughs in optimization strategies. This paper presents a pioneering study using a novel machine learning algorithm, GPTune, to optimize beam intensity by adjusting parameters in the EBIS injection and extraction beam lines. Our research demonstrates substantial improvements, achieving a remarkable 22% and 70% increase in beam intensity at two separate measurement locations.

43 PARTICLE ACCELERATORS↗

The 2023 Gold Run in the Injectors

RHIC Run 23 used Gold beam from Tandem with an AGS extraction energy of 9.8 GeV. The same basic setup, 8 single bunch transfers from the Booster and a 12-6 merge in the AGS to provide 4 bunches at extraction, had been used before to deliver Tandem Au to RHIC. But in those cases, it was used for low energy runs (3.85 GeV in 2021 and 5.75 GeV in 2020) where extraction was below transition energy (7.9 GeV). Tandem beam was used for this run because the intensity and stability of EBIS Au did not meet the requirements for RHIC. Physics was first declared in RHIC on May 22 nd and on August 1 st the run was cut short by about 2 months due to a major failure in RHIC. Prior to the advent of EBIS as the preinjector in 2012, 9.8 GeV Tandem Au was regularly delivered to RHIC but the setup in the Booster and AGS was quite different: Four Booster transfers of 6 bunches each were merged into 4 bunches using a 24-12-4 merge scheme. The supercycle length was 6.0 sec before June 29 th when it was extended to 6.6 sec to accommodate EBIS commissioning. The Tandem, Booster, and AGS were on user 1 for the 9.8 GeV setup. Some work with EBIS Au 32+ took place on EBIS, Booster, and AGS user 5 using the standard 9.8 GeV injector setup with a 4 to 1 merge in Booster and a 6-3-1 type merge in AGS. The Siemens motor generator was used for the entire run. An intensity limit of 8.0e9 Au 77+ ions in the AGS was in effect during the run to protect the J7 plunging stripping foil and the Copper absorber of the AGS beam dump. This corresponds to a merged bunch intensity limit of 2.0e9 Au 77+ ions for 4 equal intensity bunches. The per bunch intensity limit can be increased to 2.67e9 by reducing the number of BtA transfers from 8 to 6. There was also a Booster Late intensity limit of 16e9 Au ions in effect to protect the BtA stripping foil from damage due to overheating. Lowering the number of transfers also makes this limit less of a constraint. BtA foil 5, which was installed in 2020 and had not been used regularly prior to this run was used all run and showed no obvious signs of deterioration. In May, a Tandem Au 3.85 GeV setup from 2021 was also re-established on AGS user 2. It was used for APEX on May 24 and July 26. Initial work with 3.85 GeV beam was on May 19. Proton beam was also set up during the run and extracted to W dump on July 10. It was used for APEX on July 12. Although the OPPIS source was used the AGS setup was without snakes.

43 PARTICLE ACCELERATORS↗

Portfolio Management

Enterprise Business Information Services Division (EBIS) supports the Laboratory and its functions through the implementation and support of business information systems on behalf of its business community. EBIS Five Strategic Focus Areas: (1) Improve project estimating, planning and delivery capability (2) Improve maintainability and sustainability of EBIS Application Portfolio (3) Leap forward in IT Leadership (4) Comprehensive Talent Management (5) Continuous IT Security Program. Portfolio Management is a strategy in which software applications are managed as assets

Information Technology Applications↗

Renewable Energy at NASA's Johnson Space Center

NASA's Johnson Space Center has implemented a great number of renewable energy systems. Renewable energy systems are necessary to research and implement if we humans are expected to continue to grow and thrive on this planet. These systems generate energy using renewable sources - water, wind, sun - things that we will not run out of. Johnson Space Center is helping to pave the way by installing and studying various renewable energy systems. The objective of this report will be to examine the completed renewable energy projects at NASA's Johnson Space Center for a time span of ten years, beginning in 2003 and ending in early 2014. This report will analyze the success of each project based on actual vs. projected savings and actual vs. projected efficiency. Additionally, both positive and negative experiences are documented so that lessons may be learned from past experiences. NASA is incorporating renewable energy wherever it can, including into buildings. According to the 2012 JSC Annual Sustainability Report, there are 321,660 square feet of green building space on JSC's campus. The two projects discussed here are major contributors to that statistic. These buildings were designed to meet various Leadership in Energy and Environmental Design (LEED) Certification criteria. LEED Certified buildings use 30 to 50 percent less energy and water compared to non-LEED buildings. The objectives of this project were to examine data from the renewable energy systems in two of the green buildings onsite - Building 12 and Building 20. In Building 12, data was examined from the solar photovoltaic arrays. In Building 20, data was examined from the solar water heater system. By examining the data from the two buildings, it could be determined if the renewable energy systems are operating efficiently. Objectives In Building 12, the data from the solar photovoltaic arrays shows that the system is continuously collecting energy from the sun, as shown by the graph below. Building 12 has two solar inverters, located on the second floor, that collected the data from the solar photovoltaic arrays. The data displayed here is the total energy produced by the system. These are cumulative amounts, so the last point on the graph shows all of the energy collected from the system since the start of its operation. The data shown here was manually collected from the solar inverters. However, the data is also automatically recorded through EBI. Through analysis of both sets of data it was determined that the EBI data was faulty. For example, from the manually collected data it can be determined that a total of 73 kWh of energy was collected between the dates of 1/16/2014 – 1/22/2014. The EBI data reports that approximately 17800 kWh of energy was collected during the same time frame. Not only does this exceed the time frame examined, but it also exceeds the total energy collected from the start of collection as recorded from the inverters. This leads to the belief that there is a malfunction with the automatic recording of the energy. In Building 20, data was examined from the solar water heater dating back many months and found that the pump for the solar water heater system was not operating properly, as exhibited in the graph shown below. The pump operates on a solar energy system, meaning that it collects energy throughout the day from the sun. Because of this, the system would stop operating shortly after the sun set because of a lack of sunlight. At that point, the graph should show a zero flow rate, but as exhibited in the graph below, that is not the case. It is clearly shown that the pump is continuously operating, even during the night. It was also observed that the majority of the time the pump would not turn on at all, despite good weather conditions. This led to the conclusion that the pump is malfunctioning, and needs to be examined and fixed.

McDowall, Lindsay↗

Optically pumped polarized 3 He ++ ion source development for RHIC/EIC

The proposed polarized 3 He ++ acceleration in RHIC and the future Electron-Ion Collider will require about 2×10 11 ions in the source pulse. A new technique had been proposed for production of high intensity polarized 3 He ++ ion beams. It is based on ionization and accumulation of the 3 He gas (polarized by metastability-exchange optical pumping and in the 5T high magnetic field) in the existing Electron Beam Ion Source (EBIS). A novel 3 He cryogenic purification and storage technique was developed to provide the required gas purity. An original gas refill and polarized 3 He gas injection to the EBIS long drift tubes, (which serves as the storage cell) were developed to ensure polarization preservation. An infrared laser system for optical pumping and polarization measurements in the high 3–5 T field has been developed. The 3 He polarization 80–85% (and sufficiently long ~30 min relaxation time) was obtained in the “open” cell configuration with refilling valve tube inlet and isolation valve closed. The development of the spin-rotator and 3 He 4 He absolute nuclear polarimeter at 6 MeV 3 He ++ beam energy is also presented here in this work.

43 PARTICLE ACCELERATORS↗

Progress of the laser ion source upgrade (LION2) for RHIC and NSRL program at Brookhaven National Laboratory

At Brookhaven National Laboratory (BNL), the LION2 ion source is being constructed to replace an existing laser ion ablation ion source (LIS) at the EBIS facility, which provides heavy ion beams of multiple ion species for the operation of NASA Space Radiation Laboratory (NSRL) and Relativistic Heavy Ion Collider (RHIC). The LION1 ion source currently provides singly charged ions of Li, B, C, O, Al, Si, Ca, Ti, Fe, Cu, Zr, Nb, Ag, Tb, Ta, W, Au, Bi, and Th with a rapid-species-change capability. An electron beam ion source, Extended-EBIS captures, confines, and ionizes the ions to high charge state, suitable for injection and acceleration by an RFQ accelerator. Typically, single pulses of the LIS ion species for NSRL are changed sequentially during Galactic Cosmic Ray experiments, while multiple pulses of a given ion beam are provided quasi-simultaneously for RHIC. LION2 will have the same capability of the rapid-species-change with improved beam performance and reliability. LION2 is being constructed in a remote assembly location and is expected to finish in December 2023. The removal of LION1 and installation of LION2 is planned during the December 2023 or summer 2024 shutdown.

43 PARTICLE ACCELERATORS↗

Building a FAIR data ecosystem for incorporating single-cell transcriptomics data into agricultural genome to phenome research

Introduction The agriculture genomics community has numerous data submission standards available, but the standards for describing and storing single-cell (SC, e.g., scRNA- seq) data are comparatively underdeveloped. Methods To bridge this gap, we leveraged recent advancements in human genomics infrastructure, such as the integration of the Human Cell Atlas Data Portal with Terra, a secure, scalable, open-source platform for biomedical researchers to access data, run analysis tools, and collaborate. In parallel, the Single Cell Expression Atlas at EMBL-EBI offers a comprehensive data ingestion portal for high-throughput sequencing datasets, including plants, protists, and animals (including humans). Developing data tools connecting these resources would offer significant advantages to the agricultural genomics community. The FAANG data portal at EMBL-EBI emphasizes delivering rich metadata and highly accurate and reliable annotation of farmed animals but is not computationally linked to either of these resources. Results Herein, we describe a pilot-scale project that determines whether the current FAANG metadata standards for livestock can be used to ingest scRNA-seq datasets into Terra in a manner consistent with HCA Data Portal standards. Importantly, rich scRNA-seq metadata can now be brokered through the FAANG data portal using a semi-automated process, thereby avoiding the need for substantial expert curation. We have further extended the functionality of this tool so that validated and ingested SC files within the HCA Data Portal are transferred to Terra for further analysis. In addition, we verified data ingestion into Terra, hosted on Azure, and demonstrated the use of a workflow to analyze the first ingested porcine scRNA-seq dataset. Additionally, we have also developed prototype tools to visualize the output of scRNA-seq analyses on genome browsers to compare gene expression patterns across tissues and cell populations. This JBrowse tool now features distinct tracks, showcasing PBMC scRNA-seq alongside two bulk RNA-seq experiments. Discussion We intend to further build upon these existing tools to construct a scientist-friendly data resource and analytical ecosystem based on Findable, Accessible, Interoperable, and Reusable (FAIR) SC principles to facilitate SC-level genomic analysis through data ingestion, storage, retrieval, re-use, visualization, and comparative annotation across agricultural species.

Genetics & Heredity↗

Evaluating and optimizing horticultural regimes in space plant growth facilities

In designing innovative space plant growth facilities (SPGF) for long duration space flight, various limitations must be addressed including onboard resources: volume, energy consumption, heat transfer and crew labor expenditure. The required accuracy in evaluating on board resources by using the equivalent mass methodology and applying it to the design of such facilities is not precise. This is due to the uncertainty of the structure and not completely understanding the properties of all associated hardware, including the technology in these systems. We present a simple criteria of optimization for horticultural regimes in SPGF: Qmax = max [M x (EBI)2/(V x E x T], where M is the crop harvest in terms of total dry biomass in the plant growth system; EBI is the edible biomass index (harvest index), V is volume occupied by the crop; E is the crop light energy supply during growth; T is the crop growth duration. The criterion reflects directly on the consumption of onboard resources for crop production. c2004 COSPAR. Published by Elsevier Ltd. All rights reserved.

NASA Discipline Life Support Systems↗

Comparison of exact and approximate formulas for the Mott correction to energy loss of relativistic heavy ions

A comparison is conducted between an exact numerical calculation and two approximate analytic expressions for the Mott correction to energy loss of heavy ions. A complete tabulation of the Mott correction is presented together with a comparison of some of the approximate expressions for the Mott correction due to Ahlen (1978) and Morgan and Eby (1973). Comparison is made with results of an experimental calibration of the HEAO-3 Heavy Cosmic Ray experimental chambers at the Bevalac.

Eby, P. B.↗

In situ effective pumping speed measurements as a tool for non-evaporable getter activation and saturation monitoring

We have developed method of in situ effective pumping speed measurements based on injecting finite gas pulse into a vacuum volume and subsequent recording of pressure response using a Residual Gas Analyzer (RGA). The pressure burst caused by injected gas pulse falls exponentially in time and the exponential coefficient of such pressure decay is proportional to total effective pumping speed of all vacuum pumps acting on vacuum chamber volume. The effective pumping speed can be extracted from the dependence of injected gas species pressure vs time recorded by an RGA. Non-Evaporable Getters (NEGs) are widely used in multiple ultra and extremely high vacuum devices and applications during the last several decades. Areas of NEG applications were recently expanded into vacuum devices with relatively high-pressure levels (up to 10 -7 Torr) by the invention of high capacity ZAO NEG which can be operated at elevated temperatures. The intrinsic property of all NEG-based vacuum pumps is the reduction of their pumping speed, called “NEG saturation”, after an extended period of operation. Typical time interval for such process can span from about a month and up to a few years depending on NEG type, vacuum level of NEG pump operation, and residual gas content. After that, the NEG pump will require a re-activation cycle to restore its pumping speed close to the initial value. For many applications it is difficult to realize what is the current pumping speed of NEG pump is and when the pump should be re-activated. A method for in situ effective pumping speed measurements developed in this study can be used as a tool for NEG-based pump activation and saturation monitoring. Application of such an approach to monitor pumping status of NEG pumps was utilized and will be continually used at Extended EBIS which was recently developed and commissioned for Relativistic Heavy Ion Collider (RHIC) and future Electron Ion Collider (EIC). The results obtained during commissioning are presented and discussed.

43 PARTICLE ACCELERATORS↗

Community recommendations on cryoEM data archiving and validation

In January 2020, a workshop was held at EMBL-EBI (Hinxton, UK) to discuss data requirements for the deposition and validation of cryoEM structures, with a focus on single-particle analysis. The meeting was attended by 47 experts in data processing, model building and refinement, validation, and archiving of such structures. This report describes the workshop's motivation and history, the topics discussed, and the resulting consensus recommendations. Some challenges for future methods-development efforts in this area are also highlighted, as is the implementation to date of some of the recommendations.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Stripping Foils at the RHIC Injectors: A History

Stripping foils are used throughout Collider-Accelerator Department to strip ions of unwanted electrons. This is done in stages throughout the complex to optimize the transmission of particles. For polarized protons, they are injected into the AGS Booster as H-, and then stripped to H+. For ions from the tandem source, there are two stripping foils: one at the center and the other at the end of the tandem. The tandem foils will not be covered in this document. For ions out of the EBIS source, there is no use of stripping foils upstream of injection into the Booster. All ions that are not fully stripped in Booster are stripped further in the Booster to AGS (BTA) transfer line stripping foil assembly. Finally, any ions that are not fully stripped in the AGS are either stripped in the AGS to RHIC transfer line stripping foil, or as they are being dumped in the AGS by the plunging stripping foil (PSF) dependent on the particles intensity and charge. The BTA foil is the workhorse of the complex, having to provide the desired charge state of ions as light as O, and as heavy as Uranium. Optimizing the stripping efficiency to the desired charge state, while minimizing the energy lost and emittance growth from transiting the foil, requires careful consideration of the foil materials and thicknesses. This paper serves an overview of stripping foils at C-AD, with a review of foils from the construction of the AGS Booster to now.

43 PARTICLE ACCELERATORS↗

Helions below |Gγ| = 10.5 in AGS

Polarized helion collisions are part of the Electron Ion Collider physics program. The required intensity at collision is 1.2×10 11 at 70% polarization. The EBIS source is expected to provide 2×10 11 helions/bunch at 80% polarization. To reach the EIC requirements, the AGS at extraction will need 1.5×10 11 helions/bunch and negligible polarization loss. A critical point for polarization loss in the injectors is the AGS injection energy, which can occur at either |Gγ| = 7.5 or |Gγ| = 10.5. Injection at |Gγ| = 7.5 will result in 80% beam loss and 2.5% polarization up to |Gγ| = 10.5.

43 PARTICLE ACCELERATORS↗

The 2024 Run in the Injectors

The injectors provided polarized protons to RHIC for most of Run 24. That was followed by 3 weeks of Gold at 9.8 GeV/n using Tandem. Physics with PP was first declared on May 1 st and the PP portion of the run ended on Sept. 30 th . The standard BU4/AU4 setup was used for most of it. Although, from Sept. 7 th to 30 th the AGS skew quad setup (BU4/AU6) was used instead. More work was done on the Split/Merge setup (BU3/AU3) initially developed in Run 22. A two Linac pulse setup was also developed this run (BU4/AU2). As far as PP work in the injectors goes this note will focus on the standard, Split/Merge, and Two Linac pulse setups. The 9.8 GeV/n Tandem Au setup was essentially the same as in Run 23. The injector setup for Helium-3 from EBIS (BU7/AU7), which was used for an APEX study in RHIC on August 7 th , will be covered as well.

43 PARTICLE ACCELERATORS↗