High data rate storage system /engineering models EM-1 and EM-2/ Final report, 5 Mar. 1964 - 31 May 1967
Performance test data on high data rate storage system engineering models, and modifications to Nimbus ground stations
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Performance test data on high data rate storage system engineering models, and modifications to Nimbus ground stations
No abstract available
The Emergency Medical Service (EMS) industry has been the subject of several television and newspaper articles (Harvey and Jensen, 1987) which emphasized the negative aspects, (e.g., fatalities and high accident rates), rather than the life saving services performed. Until recently, the accident rate of the EMS industry has been five times as high as that of other civil helicopters. This high accident rate has been coupled with the dramatic rise in the number of programs. The industry has built from a single service at its inception in 1972, to over 180 in 1987 (Spray, 1987), to the point that 93 percent of the contiguous U.S. is now covered by some type of EMS service. These factors prompted the National Transportation Safety Board (NTSB) to study the accidents that occurred between May 11, 1978 and December 3, 1986 (NTSB, 1988). The NTSB report concluded that 'Sound pilot judgment is central to safe flight operations.' They further stated that '... factors unique to EMS helicopter operations--such as the influence of the mission itself, program competition, and EMS program management perspectives--can drastically influence pilot judgment during the EMS mission.' One of the most difficult decisions that a pilot must make is whether to accept or decline a mission. A pre-flight risk assessment system (SAFE) was developed at NASA-Ames Research Center for civil EMS operations to aid pilots in making this decision objectively. The ability of the SAFE system to predict mission risk profiles was tested at an EMS facility. The results of this field study demonstrated that the usefulness of SAFE was highly dependent on the type of mission flown. SAFE is now being modified so that it can 'learn' with each mission flown. For example, after flying a mission to a particular site, an EMS pilot would input information about this mission into the system, such as new buildings, wires, or approach procedures. Then, the next time a pilot flew a similar mission or one to the same area, this additional information would be taken into account in computing a risk assessment.
The EMS flight environment is unique in today's aviation. The pilots must respond quickly to emergency events and often fly to landing zones where they have never been before . The time from initially receiving a call to being airborne can be as little as two to three minutes. Often the EMS pilot is the only aviation professional on site, they have no operations people or other pilots to aid them in making decisons. Further, since they are often flying to accident scenes, not airports, there is often complete weather and condition information. Therefore, the initial decision that the pilot must make, accepting or declining a flight, can become very difficult. The accident rate of EMS helicopters has been relatively high over the past years. NASA-Ames research center has taken several steps in an attempt to aid EMS pilots in their decision making and situational awareness. A preflight risk assessment system (SAFE) was developed to aid pilots in their decision making, and was tested at an EMS service. The resutls of the study were promising and a second version incorporating the lessons learned is under development. A second line of research was the development of a low cost electronic chart display (ECD). This is a digital map display to help pilots maintain geographical orientation. Another thrust was undertaken in conjunction with the Aviation Safety Reporting System (ASRS). This involved publicizing the ASRS to EMS pilots and personnel, and calling each of the reporters back to gather additional information. This paper will discuss these efforts and how they may positively impact the safety of EMS operations.
The GSFC implementation of an Optical Communication System to demonstrate an operational optical communication link for Orion EM-2. It will serve as a base for providing an operational optical communications capability for future Orion missions. GSFC plans to maintain a development path for the optical communication flight terminal to allow commercialization and implementation on future Orion missions. The Orion optical module part of the optical communications flight terminal and its control electronics have a common architecture with the ILLUMA-T optical terminal provided by GSFC for use on the ISS. The plan is to flow data from Orion through the Optical Communication Fight Terminal to the Optical Communication Ground Terminal and reverse. NASA's Orion spacecraft is an exploratory vehicle designed for longer-duration flights beyond the Moon. Following Orion's Exploration Mission-1 (EM-1), during which the spacecraft will travel beyond the Moon, enter a distant retrograde orbit around the Moon and return to Earth unmanned, Exploration Mission-2 (EM-2) will see a crewed spacecraft complete a slightly different flight path. First crewed test flight of the Orion spacecraft, currently targeting a June 30, 2022 launch. The mission involves: One revolution in Low Earth Orbit (LEO) parking orbit to verify basic Orion systems functionality and deploy solar arrays. A single 42-hour Highly Elliptical Orbit (HEO) intermediate checkout orbit allows characterization of the Orion vehicle system performance prior to committing to a cis-lunar flight. Trans Lunar Injection (TLI) burn using Orion Service Module (SM) main engine, which sends Orion on a lunar flyby and free return. Skip reentry at lunar return velocities to splashdown off the coast of San Diego. Total mission duration is approximately 10 days. EM-2 is the first crewed mission of the Orion Spacecraft that crew brings more video up/downloads, file transfers, and real-time chats with family back home and high-rate communications enables live HD streaming for Crew conferences, Public Affairs Office (PAO) events, and significant mission events. Also still collecting vehicle data on numerous Orion subsystems via Development Flight Instrumentation (DFI) allows large data volume returns sooner for DFI and future science payloads, as opposed to waiting for end-of-mission. O2O is a demonstration of operational utility system tested as a Developmental Test Objective (DTO) and not required to meet mission requirements/success/ Flight Test Objectives (FTO). EM-2 architecture is as close to future mission operational architecture as possible.Orion subsystems (video, DFI, etc.) expected to generate ~250 GB of data in the first 24 hours of flight. Total data generated over the mission estimated to be more than 400 GBUsing S-Band alone, Orion limited to ~ 6GB of data downlink per day. Because of this limitation, Orion is planning to limit live video downlinks on EM-1 in order to downlink high priority fileswith 1 hour/day of Optical Communication, Orion could downlink ~6x more data per day (~ 36GB/day).The optical communication system is capable of multiple data rates up to at least 80 Mbps downlink for the transfer of Orion data to Earth while Orion is operating in the lunar vicinity.
The Emergency Mask (EM) is considered a secondary response emergency Personal Protective Equipment (PPE) designed to provide respiratory protection to the International Space Station (ISS) crewmembers in response to a post-fire event or ammonia leak. The EM is planned to be delivered to ISS in 2012 to replace the current air purifying respirator (APR) onboard ISS called the Ammonia Respirator (AR). The EM is a one ]size ]fits ]all model designed to fit any size crewmember, unlike the APR on ISS, and uses either two Fire Cartridges (FCs) or two Commercial Off-the-Shelf (COTS) 3M(Trademark). Ammonia Cartridges (ACs) to provide the crew with a minimum of 8 hours of respiratory protection with appropriate cartridge swap ]out. The EM is designed for a single exposure event, for either post ]fire or ammonia, and is a passive device that cannot help crewmembers who cannot breathe on their own. The EM fs primary and only seal is around the wearer fs neck to prevent a crewmember from inhaling contaminants. During the development of the ISS Emergency Mask, several design challenges were faced that focused around manufacturing a leak free mask. The description of those challenges are broadly discussed but focuses on one key design challenge area: bonding EPDM gasket material to Gore(Registered Trademark) fabric hood.
Grumman, under contract to the Army Corps of Engineers, completed a System Concept Definition (SCD) study to design a high-speed 134 m/s (300 m.p.h.) magnetically levitated (Maglev) transportation system. The primary development goals were to design a Maglev that is safe, reliable, environmentally acceptable, and low-cost. The cost issue was a predominant one, since previous studies have shown that an economically viable Maglev system (one that is attractive to investors for future models of passenger and/or freight transportation) requires a cost that is about $12.4 M/km ($20 Million per mile). The design is based on the electromagnetic suspension (EMS) system using superconducting iron-core magnets mounted along both sides of the vehicle. The EMS system has several advantages compared to the electrodynamic suspension (EDS) Maglev systems such as low stray magnetic fields in the passenger cabin and the surrounding areas, uniform load distribution along the full length of the vehicle, and small pole pitch for smoother propulsion and ride comfort. It is also levitated at all speeds and incorporates a wrap-around design of safer operation. The Grumman design has all the advantages of an EMS system identified above, while eliminating (or significantly improving) drawbacks associated with normal magnet powered EMS systems. Improvements include larger gap clearance, lighter weight, lower number of control servos, and higher off line switching speeds. The design also incorporates vehicle tilt (plus or minus 9 deg) for higher coordinated turn and turn out speed capability.
The Advanced Life Support (ALS) has used a single number, Equivalent System Mass (ESM), for both reporting progress and technology selection. ESM is the launch mass required to provide a space system. ESM indicates launch cost. ESM alone is inadequate for technology selection, which should include other metrics such as Technology Readiness Level (TRL) and Life Cycle Cost (LCC) and also consider perfom.arxe 2nd risk. ESM has proven difficult to implement as a reporting metric, partly because it includes non-mass technology selection factors. Since it will not be used exclusively for technology selection, a new reporting metric can be made easier to compute and explain. Systems design trades-off performance, cost, and risk, but a risk weighted cost/benefit metric would be too complex to report. Since life support has fixed requirements, different systems usually have roughly equal performance. Risk is important since failure can harm the crew, but it is difficult to treat simply. Cost is not easy to estimate, but preliminary space system cost estimates are usually based on mass, which is better estimated than cost. Amass-based cost estimate, similar to ESM, would be a good single reporting metric. The paper defines and compares four mass-based cost estimates, Equivalent Mass (EM), Equivalent System Mass (ESM), Life Cycle Mass (LCM), and System Mass (SM). EM is traditional in life support and includes mass, volume, power, cooling and logistics. ESM is the specifically defined ALS metric, which adds crew time and possibly other cost factors to EM. LCM is a new metric, a mass-based estimate of LCC measured in mass units. SM includes only the factors of EM that are originally measured in mass, the hardware and logistics mass. All four mass-based metrics usually give similar comparisons. SM is by far the simplest to compute and easiest to explain.
This paper describes how the Orion program is incorporating improvements in the heat shield design and manufacturing processes reducing programmatic risk and ensuring crew safety in support of NASA’s Exploration Missions. The Orion program successfully completed the EFT-1 flight test in 2014 and is currently developing the EM-1 spacecraft to meet the test objectives of an orbital mission to the moon and return to earth in 2019. Lessons learned from the EFT-1 manufacturing and flight test experience are being incorporated into a wide variety of vehicle systems and manufacturing processes to reduce risk to the Orion missions and flight crew. A critical contributor to crew safety is the heat shield that protects the crew capsule during re-entry through the earth’s atmosphere for return from deep space. The first flight test vehicle, EFT-1, was manufactured and tested in the Neil Armstrong Operations and Checkout (O&C) facility at KSC to demonstrate early risk reduction including the functionality of the Thermal Protection Systems (TPS) for capsule safe return to earth. The approach for the EFT-1 heat shield utilized a low risk approach using Apollo heritage design and manufacturing processes using an Avcoat TPS ablator with a honeycomb substrate to provide a one piece heat shield to meet the mission re-entry heating environments. The manufacturing processes used honeycomb cell injection guns which were redeveloped from the Apollo Lunar Program processes to build the EFT-1 heat shield. The completed heat shield was transported across the country by aircraft to the O&C at KSC for installation onto the capsule. The EFT-1 heat shield successfully performed its mission and experienced ~80% of the re-entry velocity (50% heating rate) for a lunar return for an Exploration Mission. The second flight test vehicle is the EM-1 mission which will have additional flight systems installed to fly to the moon and return. Heat shield design and producibility improvements have been incorporated in the EM-1 vehicle to meet deep space mission and programmatic requirements. The design continues to use the Avcoat material, but in a “block” configuration to enable improvements in the application processes as well as additional improvements in the carrier structure design and manufacturing operations. Incorporating flight test results and producibility improvements from EFT-1 for the heat shield system design and processes have improved the thermal protection capability, improved the producibility, and cost for EM-1 flight test.
The Jovian system with its rapid planetary rotation and strong magnetic field presents exciting opportunities for the use of electrodynamic (EM) tethers. Previous analysis for a radial, 10 km length tether demonstrated the possibility of propulsive forces as large as 50 Newtons near the planet. For orbital positions beyond about 2.5 Jovian radii, an EM tether can simultaneously be used for power and increases in the orbital altitude. Although the previous study demonstrated the physical feasibility of EM tether use at Jupiter, it did not address the issues of limited gravity gradient force for tether orientation and the practical use of this technology in an engineered system. This presentation will discuss these issues and current progress in an ongoing science/engineering transitional study.
Requirements for using a space suit during ground testing include providing adequate carbon dioxide (CO2) washout for the suited subject. Acute CO2 exposure can lead to symptoms including headache, dyspnea, lethargy and eventually unconsciousness or even death. Symptoms depend on several factors including partial pressure of CO2 (ppCO2), duration of exposure, metabolic rate of the subject and physiological differences between subjects. The objective of this test was to characterize inspired oronasal ppCO2 in the Rear Entry I-Suit (REI) and the Enhanced Mobility Advanced Crew Escape Suit (EM-ACES) across a range of workloads and flow rates for which ground testing is nominally performed. Three subjects were tested in each suit. In all but one case, each subject performed the test twice to allow for comparison between tests. Suit pressure was maintained at 4.3 psid. Subjects wore the suit while resting, performing arm ergometry, and walking on a treadmill to generate metabolic workloads of approximately 500 to 3000 BTU/hr. Supply airflow was varied at 6, 5 and 4 actual cubic feet per minute (ACFM) at each workload. Subjects wore an oronasal mask with an open port in front of the mouth and were allowed to breathe freely. Oronasal ppCO2 was monitored real-time via gas analyzers with sampling tubes connected to the oronasal mask. Metabolic rate was calculated from the total CO2 production measured by an additional gas analyzer at the air outlet from the suit. Real-time metabolic rate was used to adjust the arm ergometer or treadmill workload to meet target metabolic rates. In both suits, inspired CO2 was primarily affected by the metabolic rate of the subject, with increased metabolic rate resulting in increased inspired ppCO2. Suit flow rate also affected inspired ppCO2, with decreased flow causing small increases in inspired ppCO2. The effect of flow was more evident at metabolic rates greater than or equal to 2000 BTU/hr. Results were consistent between suits, with the EM-ACES demonstrating slightly better CO2 washout than the REI suit, but not statistically significant. Regression equations were developed for each suit to predict the mean inspired ppCO2 as a function of metabolic rate and suit flow rate. This paper provides detailed descriptions of the test hardware, methodology and results, as well as implications for future ground testing in the REI and EM-ACES.
When a space suit is used during ground testing, adequate carbon dioxide (CO2) washout must be provided for the suited subject. Symptoms of acute CO2 exposure depend on partial pressure of CO2 (ppCO2), metabolic rate of the subject, and other factors. This test was done to characterize inspired oronasal ppCO2 in the Rear Entry I-Suit (REI) and the Enhanced Mobility Advanced Crew Escape Suit (EM-ACES) for a range of workloads and flow rates for which ground testing is nominally performed. Three subjects were tested in each suit. In all but one case, each subject performed the test twice. Suit pressure was maintained at 4.3 psid. Subjects wore the suit while resting, performing arm ergometry, and walking on a treadmill to generate metabolic workloads of about 500 to 3000 BTU/hr. Supply airflow was varied between 6, 5, and 4 actual cubic feet per minute (ACFM) at each workload. Subjects wore an oronasal mask with an open port in front of the mouth and were allowed to breathe freely. Oronasal ppCO2 was monitored in real time by gas analyzers with sampling tubes connected to the mask. Metabolic rate was calculated from the total CO2 production measured by an additional gas analyzer at the suit air outlet. Real-time metabolic rate was used to adjust the arm ergometer or treadmill workload to meet target metabolic rates. In both suits, inspired CO2 was affected mainly by the metabolic rate of the subject: increased metabolic rate significantly (P < 0.05) increased inspired ppCO2. Decreased air flow caused small increases in inspired ppCO2. The effect of flow was more evident at metabolic rates . 2000 BTU/hr. CO2 washout values of the EM-ACES were slightly but not significantly better than those of the REI suit. Regression equations were developed for each suit to predict the mean inspired ppCO2 as a function of metabolic rate and suit flow rate. This paper provides detailed descriptions of the test hardware, methodology, and results as well as implications for future ground testing in the REI-suit and EM-ACES.
Exploration Mission-1 (EM-1) is an uncrewed mission that is launching on the Space Launch System (SLS) Block 1 vehicle. This is a critical flight test for the agency's human deep space exploration goals. Exploration Ground Systems (EGS) Quality (SA-F2) is responsible for providing Quality Assurance Surveillance Plans (QASPs) for NASA contracts and facilities. A QASP assures products and services are provided to EGS in accordance with the contract requirements. In order to encapsulate the multiple KSC Safety and Mission Assurance surveillance and audit activities that need to be accomplished specifically for EM-1 Certificate of Flight Reediness (CoFR), a QASP tool needed to be implemented. This tool would be able to intuitively track Work Authorization Documents (WADs) under development by Test Operations Support Contract (TOSC), reviewed and accepted WADs, Government Mandatory Inspection Points (GMIPs), Nonconformances (NCs), Material Review Board (MRB) Status, Corrective Actions, Alterations, Deviations, and Waivers for flight hardware and Ground Support Equipment (GSE). This would help ensure that all SLS EM-1 flight hardware and related GSE surveillances and requirements are being recognized and completed with zero constraints identified for the mission.
The Human Factors and Behavioral Performance Exploration Measures (HFBP-EM) suite includes self-report surveys designed to assess Behavioral Medicine (BMed) and Team risks for future exploration class missions. Survey data was collected during the Human Exploration Research Analog (HERA) Campaign 4 (C4), HERA Campaign 5 (C5), and during SIRIUS19 missions in the Russian Ground Based Experiment Complex, NEK. Crew time in spaceflight analogs and in spaceflight is typically limited. Extensive self-report surveys can be a significant burden to participants and are not operationally acceptable for spaceflight. The purpose of this project was to comprehensively assess the reliability and validity of the standard-length HFBP-EM surveys, identify acceptable short forms to administer during HERA C6, examine initial validation evidence for the proposed short form measures, and identify key measurement gaps in HFBP-EM coverage. In this presentation, we will report reliability and validity metrics of standard form data, describe the proposed new short forms, and present initial psychometric analyses supporting the use of these short forms.
Results of laboratory experiment on Bragg backscatter of 3-cm microwaves by turbulent waves driven by the Farley-Buneman and gradient drift instabilities are reported. It is noted that the study is the third in a series of laboratory experiments performed to test, under controlled conditions, prevalent ideas on EM scattering by equatorial and high-latitude ionospheric waves and irregularities. It is shown through separate backscattering from fast and slow ion beam modes that a beam of EM radiation actually provides, in backscatter, information on the spectral content of the scattering medium.
The problem of estimating the parameters which determine a mixture density is reviewed as well as maximum likelihood estimation for it. A particular iterative procedure for numerically approximating maximum likelihood estimates for mixture density problems is considered. This EM algorithm, is a specialization to the mixture density context of a general algorithm of the same name used to approximate maximum likelihood estimates for incomplete data problems. The formulation and theoretical and practical properties of the EM algorithm for mixture densities are discussed focussing in particular on mixtures of densities from exponential families.
A selective modal scheme is proposed to efficiently analyze the problem of high-frequency (HF) electromagnetic (EM) coupling/penetration into or radiation from open-ended waveguides. This scheme is based on the phenomenon that at sufficiently high frequencies, the modes which contribute most significantly to the fields coupled into the waveguide are those whose modal ray directions are most nearly parallel to the incident-wave direction. This concept is illustrated by calculating the EM radiation and backscattering from open-ended parallel-plate, rectangular, circular, and sectoral waveguide geometries. The calculations use the usual geometrical optics, aperture field, and Ufimtsev edge current techniques. Also included are some measured results which further verify the accuracy of the above computations.
An analytical technique is described for predicting the electromagnetic (EM) scattering by complex obstacles within electrically large open waveguide cavities. This topic is of relevance to EM scattering and EMC type applications. A general open ended waveguide cavity is illustrated and is assumed to be relatively arbitrarily shaped, and the open front end of the cavity is illuminated by an arbitrarily polarized external plane wave field. The interior obstacle is assumed to be located within the cavity near the back end, and it generally contributes significantly to the fields scattered into the exterior by the entire cavity configuration. The present scattering analysis is restricted to within approximately 70 degs from boresight with respect to the open front end; outside of this region, the scattering by the external features of the cavity are generally more significant than from the interior of the cavity. The scattering analysis is composed of two main parts. One analysis is of the coupling of the incident plane wave field, via the open front end using the high frequency ray or beam shooting methods. The other analysis deals with separately obtaining the plane wave scattering characteristics of the interior obstacle. Thus the present analysis represents a hybrid combination of an asymptotic high frequency ray/beam method for tracking the fields through the cavity, together with any suitable method for obtaining a plane wave characterization of the interior obstacle.