Search NASA⌕ Search

SEARCH · Search NASA

Results for “EMBANKMENTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Thermal–moisture dynamics of embankments with asphalt pavement in permafrost regions of central Tibetan Plateau

Subsurface moisture content is one of the critical factors that control the thermal dynamics of embankments. However, information on the subsurface moisture movement and distribution in embankments is still limited. To better understand the coupled water and heat transport within embankments, subsurface temperature and moisture of an asphalt pavement highway were extensively measured from 2009 to 2011. Collected data indicate that pure heat conduction is the overall main mechanism of heat transport in the embankment and heat convection plays a relatively unimportant role in heat transport. The results also indicate that subsurface moisture and temperature dynamics in the asphalt layer is strongly related to the rainfall events, while the subsurface moisture content below the road base course maintains relatively constant. Rainfall in summer leads to rapid cooling of the subsurface soil. Our results suggest that frequent and small rainfall events favour the thermal stability of the embankment due to the loss of latent heat of water evaporation. Moisture migration during freezing still occurred in the gravel fill and the water infiltrated into the active layer during thawing period. Freezing-induced water migration may result in the increase in water content of the embankment and the decrease in compactness of gravel fill.

asphalt pavement↗

A simulation-optimization model for Stone column-supported embankment stability considering rainfall effect

Landslide due to rainfall has been and continues to be one of the most important concerns of geotechnical engineering. The paper presents the variation of factor of safety of stone column-supported embankment constructed over soft soil due to change in water level for an incessant period of rainfall. A combined simulation-optimization based methodology has been proposed to predict the critical surface of failure of the embankment and to optimize the corresponding factor of safety under rainfall conditions using an evolutionary genetic algorithm NSGA-II (Non-Dominated Sorted Genetic Algorithm-II). It has been observed that the position of water table can be reliably estimated with varying periods of infiltration using developed numerical method. The parametric study is presented to study the optimum factor of safety of the embankment and its corresponding critical failure surface under the steady-state infiltration condition. Results show that in case of floating stone columns, period of infiltration has no effect on factor of safety. Even critical failure surfaces for a particular floating column length remain same irrespective of rainfall duration.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Risk assessment of engineering diseases of embankment–bridge transition section for railway in permafrost regions

Abstract The embankment–bridge transition section (EBTS) is one of the zones where railway diseases occur frequently in permafrost regions. Disease risk assessment of EBTSs can provide guidance for maintenance. In this study, considering the engineering geological conditions, climate characteristics, and embankment structure types along the Qinghai–Tibet Railway (QTR) as well as based on the disease inventory of the QTR from 2010 to 2019, the logistic regression (LR), support vector machine (SVM), and combination‐weight‐based gay relation analysis (GRA) were used for disease risk assessment of the EBTSs along the QTR in permafrost regions. The results indicate that the LR and SVM models have a better capability for EBTS disease prediction than the GRA model, and the SVM model can select more disease samples in relatively larger regions than the LR model. Based on the SVM and LR models, the risk level of EBTSs is divided into four classes: low‐ (29.9%), moderate‐ (39.6%), high‐ (22.1%), and very high (8.4%) risk. Finally, we selected 272 EBTSs in high‐ and very‐high‐risk classes for key observation during the maintenance of the QTR in permafrost regions. This study provides a reference for the risk assessment of railways built in permafrost regions using data‐driven methods.

Zhang, Saize↗

Evolution of an interfacial crack on the concrete-embankment boundary

Failure of a dam can have subtle beginnings. A small crack or dislocation at the interface of the concrete dam and the surrounding embankment soil initiated by, for example, a seismic or an explosive event can lead to a catastrophic failure of the dam. The dam may ‘self-rehabilitate’ if a properly designed granular filter is engineered around the embankment. Currently, the design criteria for such filters have only been based on experimental studies. We demonstrate the numerical prediction of filter effectiveness at the soil grain scale. This joint LLNL-ERDC basic research project, funded by the Department of Homeland Security’s Science and Technology Directorate (DHS S&T), consists of validating advanced high performance computer simulations of soil erosion and transport of grain- and dam-scale models to detailed centrifuge and soil erosion tests. Validated computer predictions highlight that a resilient filter is consistent with the current design specifications for dam filters. These predictive simulations, unlike the design specifications, can be used to assess filter success or failure under different soil or loading conditions and can lead to meaningful estimates of the timing and nature of full-scale dam failure.

58 GEOSCIENCES↗

Influence of different processing techniques on the mechanical properties of used tires in embankment construction

Use of the processed used tires in embankment construction is becoming an accepted way of beneficially recycling scrap tires due to shortages of natural mineral resources and increasing waste disposal costs. Using these used tires in construction requires an awareness of the properties and the limitations associated with their use. The main objective of this paper is to assess the different processing techniques on the mechanical properties of used tires-sand mixtures to improve the engineering properties of the available soil. In the first part, a literature study on the mechanical properties of the processed used tires such as tire shreds, tire chips, tire buffings and their mixtures with sand are summarized. In the second part, large-scale direct shear tests are performed to evaluate shear strength of tire crumb-sand mixtures where information is not readily available in the literature. The test results with tire crumb were compared with the other processed used tire-sand mixtures. Sand-used tire mixtures have higher shear strength than that of the sand alone and the shear strength parameters depend on the processing conditions of used tires. Three factors are found to significantly affect the mechanical properties: normal stress, processing techniques, and the used tire content.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computational Modeling of Water Infiltration From Ditches Into Roadway Embankments

Ditches are built along roadways to convey the stormwater runoff. They collect the runoff from the pavement and adjacent drainage areas. Water can move freely in a ditch away from the road surface, thus making it safer for the vehicular traffic. South Carolina DOT expressed interest in studying infiltration of water from ditches into roadway embankments. As part of the current design criteria, it is recommended that the road subgrades be 1.0 foot above the design event water surface elevation in the ditch. The distance between the water surface and bottom of the subbase is referred to as “freeboard”. The purpose of this requirement is to lower the risk of pavement damage by moving the flow away from the pavement, containing the captured flow, and conveying flow received from adjacent properties to outfalls. With changes in roadway design standards, larger shoulders and flatter cross-slopes have moved ditches further away from the pavement and the subbase. These changes could allow for a lower freeboard standard without reducing safety margins due to the increased lateral distance from the subbase to the ditch. The objective of this study is to evaluate whether the current SCDOT criterion requiring the roadway subgrade to be 1 ft above the design-event ditch water surface can be relaxed under selected geometric and soil conditions, particularly where larger shoulder widths and flatter side slopes increase horizontal separation between ditch water and pavement structure.

42 ENGINEERING↗

Saline pulse test monitoring with the self‐potential method to nonintrusively determine the velocity of the pore water in leaking areas of earth dams and embankments

A method is proposed to localize preferential fluid flow pathways in porous media on the basis of time‐lapse self‐potential measurements associated with salt tracer injection upstream. This method is first tested using laboratory data. A network of nonpolarizing electrodes located is connected to a highly sensitive voltmeter used to record the resulting electrical field fluctuations occurring over time at the surface of the tank. The transport of the conductive salt plume through the permeable porous materials changes the localized streaming potential coupling coefficient associated with the advective drag of the excess charge of the pore water and is also responsible for a diffusion current associated with the salinity gradient. Monitoring of the electrical potential distribution at the ground surface can be used to localize the pulse of saline water over time and to determine its velocity. This method applies in real time and can be used to track highly localized flow pathways characterized by high permeability. Our sandbox experiment demonstrates the applicability of this new method under well‐controlled conditions with a coarse‐sand channel embedded between fine‐sand banks. A finite element model allows us to reproduce the time‐lapse electrical potential distribution over the channel, but some discrepancies were observed on the banks. Finally, we performed a numerical simulation for a synthetic case study inspired by a recently published field case study. A Markov chain Monte Carlo sampler is used to determine the permeability and the porosity of the preferential fluid flow pathway of this synthetic case study.

54 ENVIRONMENTAL SCIENCES↗

Identification of Water-Saturated Zones in a Protective Hydraulic Earthen Structure by Synchronous Electromagnetic and Seismic Sounding

Results of field experiments in synchronized investigation of the protection embankment of the tailing pond of JSC Kovdor Mining and Processing Plant by means of different wave methods of electromagnetic and seismic sounding are presented. A comparative analysis of the data is carried out by means of which boundaries of zones of different degrees of water saturation of the embankment soils may be reliably established. The ranges of velocity of the electromagnetic wave and range of values of the ratio of the velocities of the longitudinal and transverse elastic wave in the transition from dry dense soil of the embankment to moistened soil right up through water-saturated soil are determined.

42 ENGINEERING↗

Computational Assessment of Hydrodynamic Loads on Rockeries for River Bank Protection

Colorado experienced an extreme flooding event in September of 2013 that ravaged canyon roadways southeast of Estes Park, CO. Central Federal Lands was asked to rebuild SH 34 and CO 43 after the floods. To minimize river encroachments in narrow canyons, roadway fill embankments must be over steepened. Using a rockery to stabilize the roadway embankment rather than traditional vertical, concrete structures was the solution. However, no analytical techniques were available for evaluating the hydraulic stability of such structures. Argonne National Laboratory was employed to estimate the hydrodynamic forces by using advanced, computational fluid dynamics (CFD). An investigation was conducted on a section of a model rockery comprised of large boulders exposed to a variety of hydraulic flow conditions. A repeatable geometric section of a typical rockery structure was modeled and used to create boundaries for the CFD model. The test case matrix covers computer simulations of various rockery and channel geometries. The geometrical parameters taken into account are: rockery height, outside face batter angle of the rockery, rockery base width, river bed width, and the hydraulic parameters are: flow depth, flow velocity, and hydraulic angle of attack. Two failure mechanisms of rockery structures, sliding and overturning, are considered. The existing design equations for both modes are modified by addition of hydrodynamic force terms. The new terms were calculated for a parametric set of geometry and condition variation using the CFD model. Moreover, formulas for dimensionless hydraulic force coefficients are proposed that can be used in the design of new rockeries or in evaluation of existing dry-stack rockeries in river environments.

42 ENGINEERING↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Deep Learning and Photogrammetric Reconstruction for Automated Crack Detection and Dimensional Measurement in Mining Operations

Surface crack detection and dimensional measurement at active mining sites present significant safety and operational challenges. Manual inspection methods are labor-intensive, spatially incomplete, and expose personnel to hazardous environments, while existing automated approaches have been developed primarily for concrete civil infrastructure and have not been validated on the complex, variable surfaces characteristic of mining environments. This dissertation presents an automated pipeline that integrates deep learning semantic segmentation with Structure-from-Motion photogrammetry to detect surface cracks and measure their aperture, length, and vertical displacement from standard RGB imagery acquired during routine Uncrewed Aerial Vehicle (UAV) survey operations, without requiring additional sensor hardware or manual measurement. The pipeline combines a U-Net architecture with an EfficientNet-B0 encoder, pretrained on the SDNET2018 concrete crack dataset and fine-tuned on a mining-specific dataset spanning laboratory concrete specimens, coal refuse impoundment embankments, and post-blast limestone quarry benches. Photogrammetric reconstruction is performed using COLMAP Structure-from-Motion and Multi-View Stereo, with crack segmentation masks projected into the reconstructed point cloud to enable three-dimensional vertical displacement measurement through local plane fitting and bimodal surface detection. The pipeline was validated across 36 controlled laboratory specimens at three imaging distances and four vertical displacement levels, achieving aperture measurement RMSE of 0.047 cm and R² of 0.954, and vertical displacement RMSE of 0.140 cm and R² of 0.966, against independent caliper measurements. Field application at a coal refuse impoundment in southwestern Pennsylvania detected 71 crack components across the embankment crest, with a dominant longitudinal crack exhibiting aperture values reaching 28 cm and a 95th percentile vertical displacement of 35.53 cm, consistent in magnitude and spatial distribution with simultaneously acquired LiDAR-derived estimates. Application across four post-blast limestone quarry bench datasets in California successfully characterized blast-induced fracture networks at ground sampling distances ranging from 0.59 to 1.23 cm/pixel, with detected crack geometries physically consistent with observable surface conditions at each site. The results demonstrate that deep learning-based crack detection and photogrammetric measurement can be integrated into routine UAV inspection workflows at mining sites, providing repeatable, scalable, and quantitative crack characterization across surface types, crack scales, and displacement magnitudes not previously addressed in the literature. The pipeline requires no dedicated surveying equipment beyond the UAV platforms already deployed at mine sites for survey and monitoring purposes, supporting practical adoption within existing operational workflows.

Crack detection, Dimensional Measurement↗

Dose Estimation in Recycling of Decontamination Soil Due to Fukushima NPS Accident as Coastal Levees - 18138

After the Fukushima Nuclear Power Station accident, large quantities of radiocesium-contaminated soil generated from decontamination activities have been stored in the Fukushima prefecture. To complete the final disposal of decontamination soil, the Ministry of the Environment of Japan presented policy to reduce the disposal volume by using low-level decontamination soil as recycled materials. The use will be limited to civil engineering structures in public projects, such as coastal levee and road embankment, and be managed by the public authority. However, there has been no example or safety assessment of recycling of decontamination soil. To contribute to guideline development for the recycling by the Ministry of the Environment, we conducted the safety assessment for recycling of decontamination soil as coastal levee. First, we evaluated additional doses to workers and the public in the case of construction and service of coastal levee based on Japanese construction standards. From the result, the radioactive cesium concentration level of recycled materials, with which all additional doses meet the radiation criterion of 1 mSv/y, was derived to be 6,800 Bq/kg. For general designs of coastal levee in Japan, additional doses to the public in the case of service were below 10 μSv/y with derived radioactivity level. Finally, the radiation safety for collapse of coastal levee caused by natural disasters was evaluated to be on the safe side. With derived radioactivity level, additional doses in the case of disaster were confirmed to be below 1 mSv/y. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of the Long-Term Stewardship of the Remediated Uranium Mining and Milling Sites in Europe - 20079

Uranium mining in Europe began in the ' 40's for civil and military applications. The great majority of the uranium mines have now been closed and are going through the stages of decommissioning and/or rehabilitation. Today, the main uranium producers are outside the EU; only a few mines are still in operation inside the EU. In 2006, the situation of the uranium mines and mill tailings in Europe, identifying the tailings liabilities, their status, the plans for these sites and any associated hazards, was reported to the EC. The legacy of uranium mines and mill tailing disposals in the EU are located mainly in 12 Member States where, in total, 87 tailing objects were identified at 63 sites. The volume of each one of these tailings disposal varies from a few thousand to several tens of million m{sup 3}. The majority of these sites are no longer in operation. More than 40 tailing embankments have already been completely remediated. Approximately 20 are currently being remediated while for the remaining objects, remediation has yet to start. After ten years, and for a few cases where the respective projects have not yet been completed, it seems that most of Europe's uranium mines and milling legacies were remediated according to acceptable environmental standards. Nevertheless, Europe is about to face a new challenge that comes from the concluded remediation projects for which an effective set of measures for coordinated institutional control, known as 'long-term stewardship', is needed including, in most cases, continuous and active maintenance. Moreover, the uncertainty of what will happen to these sites if institutional control fails at some point in time is a major concern. This work presents a summary of the situation and current issues of the uranium mine and mill tailings in Europe and their remediation status. It addresses not only the management of existing uranium mine and mill legacies but also the methods and strategies that have been used to prevent the creation of new future legacy sites from uranium mines still in operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance of Damaged Soil-Concrete Wraparound Dam Sections under Dynamic Loading

Predicting seismic or shock loading damage of the soil-concrete interface where an embankment wraparound dam provides support to the end monoliths in a concrete gravity dam is an inherently challenging three-dimensional coupled problem. We wish to predict formation and growth of a crack between the soil and concrete with a sustained flow of water. Further, we seek to better understand all critical phenomenology of this type of problem such as the potential mitigating and stabilizing role of upstream and downstream filter zone and shell materials. This collaborative research effort will ultimately determine whether advances in computational platforms, constitutive soil models (advances in representing particulates, tension, flow, and hydraulic erosion), and physical testing (advances in centrifuge and flume testing) can be applied successfully to solve this complex problem. Our focus is (1) to develop and validate high fidelity numerical models to investigate crack formation, soil erosion, transport of materials, and stability as part of the erosion process, and deposition within interface cracks; and (2) to investigate the performance of the filter zone materials if an extreme loading event such as an earthquake or shock damages the wraparound section. Our numerical tools include both continuum and discrete approaches. The continuum approach is based on the drift-flux multiphase model where a fluid and a solid are represented as interpenetrating continua and can account for turbulent flow characteristics, particle lift forces due to shear flow, particle collisions, and gravity settling. The discrete particle approach is also applied and is useful when deriving constitutive laws and parameterizations of soil behavior. Different experimental validation studies are under consideration for model validation and calibration. Several case studies for different crack sizes and orientations, particle sizes and environmental hydraulic conditions may be required to confirm the conditions necessary for self-healing or catastrophic growth of a crack. We will present both numerical and experimental findings to date on this effort in light of necessary considerations for further study.

58 GEOSCIENCES↗

4D electrical resistivity tomography for assessing the influence of vegetation and subsurface moisture on railway cutting condition

Instability of slopes, embankments, and cuttings on the railway network is increasingly prevalent globally. Monitoring vulnerable infrastructure aids in geotechnical asset management, and improvements to transport safety and efficiency. Here, we examine the use of a novel, near-real-time Electrical Resistivity Tomography (ERT) monitoring system for assessing the stability of a railway cutting in Leicestershire, United Kingdom. In 2015, an ERT monitoring system was installed across a relict landslide (grassed) and an area of more stable ground on either side (wooded), to monitor changes in electrical resistivity through time and space, and to assess the influence of different types of vegetation on the stability of transportation infrastructure. Two years of 4-Dimensional ERT monitoring results are presented here, and petrophysical relationships developed in the laboratory are applied to calibrate the resistivity models in order to provide an insight into hydrogeological pathways within a railway cutting. The influence of vegetation type on subsurface moisture pathways and on slope stability is also assessed – here we find that seasonal subsurface changes in moisture content and soil suction are exacerbated by the presence of trees (wooded area). This results in shrink-swell behaviour of the clays comprising the railway cutting, resulting in fissuring and a reduction in shear strength, leading to instability. As such, it is proposed that on slopes comprised of expansive soils, grassed slopes are beneficial for stability. Insights into the use of 4-D ERT for monitoring railway infrastructure gained from this study may be applied to the monitoring of critical geotechnical assets elsewhere.

58 GEOSCIENCES↗

Aggregate material formulated with MSWI bottom ash and APC fly ash for use as secondary building material

Highlights: ► A concrete formulation was optimized using Bottom Ash and APC ash. ► 10% of APC ash achieves good compromise between economic and performance aspects. ► The crushed concrete was evaluated as secondary building granular material. ► The environmental behavior allows its use as secondary material. ► The abrasion resistance is not good enough for its use as a road sub-base material. - Abstract: The main goal of this paper is to obtain a granular material formulated with Municipal Solid Waste Incineration (MSWI) bottom ash (BA) and air pollution control (APC) fly ash to be used as secondary building material. Previously, an optimum concrete mixture using both MSWI residues as aggregates was formulated. A compromise between the environmental behavior whilst maximizing the reuse of APC fly ash was considered and assessed. Unconfined compressive strength and abrasion resistance values were measured in order to evaluate the mechanical properties. From these results, the granular mixture was not suited for certain applications owing to the high BA/APC fly ash content and low cement percentages used to reduce the costs of the final product. Nevertheless, the leaching test performed showed that the concentrations of all heavy metals were below the limits established by the current Catalan legislation for their reutilization. Therefore, the material studied might be mainly used in embankments, where high mechanical properties are not needed and environmental safety is assured.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗