Search NASASearch

SEARCH · Search NASA

Results for “EPIC Buildings”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Energy Program Innovation Cluster for Equity and Health in Grid-Interactive Efficient Buildings (Final Technical Report)

The EPIC Buildings program was created to target Central New York’s (CNY) Energy Program Innovation Cluster, focused on developing energy hardware innovations for next-generation grid-interactive efficient buildings (GEB). The goals of the program were to establish and grow a sustainable regional innovation cluster for GEB in CNY and support the ambitious transition to achieve net-zero emissions by 2050.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

PVmapper

The goal of this project is to be a simple yet reliable EPICS name server that works seamlessly in any existing EPICS environment. It aims to build on original EPICS ideology of self discovering environment, but consolidating broadcast traffic for reduced resources footprint.

Vodopivec, Klemen

EPICS for small-scale laboratories with Python soft IOCs

While the Experimental Physics and Industrial Control System (EPICS) is widely used at large laboratories for slow controls and instrumentation, the deployment of a full EPICS installation can be difficult, with a steep learning curve to new users. Taking advantage of the pythonSoftIOC module, we developed an EPICS slow controls implementation for Jefferson Lab's Hall B cryotarget written entirely in Python and based on software IOCs that communicate with instruments over Ethernet. Here, this system ran successfully, interfacing with Jefferson Lab's full EPICS network, and we offer it as an example of the capabilities of pythonSoftIOC to build lightweight, yet robust and flexible instrumentation platforms that would be easily adapted for use at a small-scale laboratory. University groups can use these examples to build complete slow controls systems, from device communication to data archiving and display, using open-source, mature EPICS tools and student-friendly Python as an alternative to expensive and proprietary systems such as LabVIEW.

Computing

Closeout Report of BNL LDRD 23-050 A Second EIC Detector: Physics Case and Conceptual Design

This document is the closeout report for LDRD 23-050, a type-A LDRD project awarded in FY2022 under the title “ A Second EIC Detector: Physics Case and Conceptual Design ”. The project was motivated by the strong interest within the EIC community in a second general-purpose detector and interaction region, and by the recognition that such a detector is essential to fully exploit the scientific potential of the EIC over its multi-decade lifetime. The key goals of the LDRD were to (i) strengthen the case for a second EIC detector, building on the arguments already articulated in the community Yellow Report, (ii) provide a realistic detector concept that is complementary to the current project detector, ePIC, in terms of physics reach, precision, and control of systematics, and (iii) broaden the overall physics program of the EIC facility. Since a possible second detector is expected to be realized with a delay of several years relative to the first detector, the project explicitly aimed at identifying technologies that are not yet sufficiently mature for ePIC but could be deployed on the later timescale of a second detector, thereby providing genuine complementarity and room for innovation. LDRD 23-050 provided support for two postdoctoral researchers and partial support for several BNL staff members, and the effort ramped up in mid-2023. Work was carried out in close collaboration with colleagues from the EIC project, the Cold QCD and STAR groups at BNL, and with substantial input from members of the EIC User Group and the ePIC Collaboration as reflected in the author list. Over the period from October 2022 through September 2025, this team developed and refined a physics program tailored to a second detector, translated the resulting physics requirements into detector-level performance targets, and explored multiple conceptual detector layouts capable of meeting these targets within the constraints of the second interaction region. The expected outcome, as stated in the original proposal, was a document detailing the physics potential and requirements of a second EIC detector, accompanied by a comprehensive conceptual detector design and an outline of the remaining R&D needed to bring the relevant technologies to maturity. The present report summarizes the progress that has been achieved toward these goals. It consolidates the physics studies, detector concepts, and technology assessments developed under this LDRD and places them in the broader context of worldwide detector R&D. While the evolving priorities of the EIC project and the substantial community effort required to design and construct ePIC naturally limited the scope of EIC-wide activities toward a second detector during this period, the work documented here is intended to provide a foundation and a point of reference for future efforts. Whatever form a second EIC detector may ultimately take, we hope that this report will serve as a useful guide for colleagues who continue to advance this program in the near- and mid-term future.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS

Controls Status for Fermilab’s PIP-II Project

Testing of Cryomodule first articles at PIP-II's on-site Cryomodule Test Facility (CMTF), where EPICS based controls are already being used, has been invaluable to the project. In addition to validating hardware and controls components, it has provided opportunities to build buy-in and illicit meaningful feedback early-on. A device naming convention has also been significantly refined with an internal working group and the PIP-II integration team. Compressed air and Process Control Water (PCW) systems have been installed, and operations has been engaged in Phoebus display development in preparation for a transition to operations for these systems by 2026. Cryoplant hardware has been put in place, and collaboration between controls and PIP-IIs cryo group for IOC and display development is well underway for commissioning of cryoplant systems to begin early 2026. The project has also received beneficial occupancy of the High-Bay Building in October 2025, keeping us on schedule for Warm Front End commissioning to begin in 2027.

Crisp, Dan [Fermilab]

Launch Alaska Transportation and Energy Accelerator (LATEA)

The Launch Alaska Transportation and Energy Accelerator (LATEA), funded through the U.S. Department of Energy Office of Technology Commercialization’s Energy Program for Innovation Clusters (EPIC),advanced deployment of innovative and efficient transportation and energy technology in Alaska from October 2021 through June 2025. The project was designed to leverage Launch Alaska’s accelerator model to identify, recruit, and support transportation technology companies with novel solutions to market needs while building the stakeholder networks, demonstration opportunities, and institutional capacity necessary to accelerate commercialization in one of the most challenging operating environments in the United States.

08 HYDROGEN

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]

Controls Status of Fermilab's PIP-II Project

The Fermilab Proton Improvement Project II (PIP-II) is building a new Super Conducting Linear Accelerator (SCL) accelerating protons to 800 MeV for injection into the rest of the FNAL beam complex. Key progress since the last status report given at ICALEPCS includes the adoption of modern DevOps practices with continuous integration and GitOps-based deployments, commissioning of EPICS-based systems at the Cryomodule Test Facility, and integration of a Virtual Accelerator framework for application development ahead of installation. In parallel, web-based applications using Dart and Flutter have matured, providing secure, unified access to both EPICS and legacy ACNET data. Data acquisition and timing systems have also evolved. This paper presents the current state of controls, emphasizing these recent developments and outlining upcoming milestones as PIP-II approaches commissioning of its cryoplant in 2026 and the Warm Front End in 2027.

Crisp, D. B. [Fermilab]

Redesign of the Timeline Generator at Fermilab using a web-based Flutter application, GraphQL API and an IOC

The control system at Fermilab is undergoing an evolution with a shift towards web-based applications with connections to the EPICS infrastructure. The Timeline Generator (TLG) is an application that serves to coordinate events across the lab using different timing links. These links include the Tevatron clock (TCLK), a 10 MHz serial link with events encoded at 20Hz and Machine Data (MDAT), a communication link with states encoded at 720Hz. This paper covers the redesign of the major components of the TLG. This includes a web-based Flutter application for building timelines. A placement service is in use that has a GraphQL interface and uses a timeline input to compute a schedule of events and states. The Flutter application sends this computed schedule to the TLG IOC via a GraphQL interface to the Data Pool Manager (DPM). The TLG IOC runs on an Arria FPGA, the Accelerator Clock Generator (ACLK-GEN), which is responsible for writing the events and states on to the different timing links.

Carmichael, Linden [Fermilab]

Redesign of the Timeline Generator at Fermilab using a web-based Flutter Application, GraphQL API and an IOC

Redesign of the Timeline Generator at Fermilab using a web-based Flutter application, GraphQL API and an IOC ABSTRACT = The control system at Fermilab is undergoing an evolution with a shift towards web-based applications with connections to the EPICS infrastructure. The Timeline Generator (TLG) is an application that serves to coordinate events across the lab using different timing links. These links include the Tevatron clock (TCLK), a 10 MHz serial link with events encoded at 20Hz and Ma-chine Data (MDAT), a communication link with states encoded at 720Hz. This paper covers the redesign of the major components of the TLG. This includes a web-based Flutter application for building timelines. A placement service is in use that has a GraphQL interface and uses a timeline input to compute a schedule of events and states. The Flutter application sends this computed schedule to the TLG IOC via a GraphQL interface to the Data Pool Manager (DPM). The TLG IOC runs on an Arria FPGA, the Accelerator Clock Generator (ACLK-GEN), which is responsible for writing the events and states on to the different timing links.

Carmichael, Linden [Fermilab]

RFSoC based digital low level RF control firmware and software suite (mimo_llrf) v1.0

It features a framework of a firmware and software architecture in support of building a digital low-level RF control system for accelerators, where precised digital RF generation and measurement are needed across many RF channels. It primarily supports the Xilinx RFSoC chips (xczu48dr, xczu47dr, xczu29dr) and their evaluation boards (zcu208, zcu216), for a highly integrated solution enabling the need for synchronous low-level RF systems, including: multi-tile synchronization, external reference for sampling clocks, deterministic delay, aligned NCO phase for digital mixers, and built-in EPICS IOC.

Du, Qiang [Lawrence Berkeley National Laboratory (