At least 19 records

CARA Devolution ESMO Pilot Program

Information regarding the current effort ongoing with CARA to determine the steps needed to have a mission move away from being supported by CARA, otherwise referred to as Devolving/Devolution. Information regarding the working group established to undertake this effort, documents agreed that needed to be written and plans for a parallel operations period. The communication between ESMO and CARA during the Parallel Operations period will be as the following: – A daily email will be sent from ESMO to CARA describing each HIE that is being actively planned and worked, and the action that ESMO is planning on taking – A weekly email will be sent from ESMO to CARA listing the progress toward achieving the parallel operations success criteria – The CARA team will remain on distribution for ESMO HIE communications and CAM invitations associated with DAMs/RMMs during the parallel operations period – At a minimum, 2 members of the CARA team will be in attendance at all ESMO planning and review discussions – A monthly email will be sent from ESMO to CARA with the HIE metrics • During parallel operations, ESMO will contact NASA Headquarters to report any redDevolution Working Group laid out and completed all steps needed to begin parallel operations • Parallel Ops for ESMO began on 11/26 (CARA in shadow mode only) • Any lessons learned from parallel ops will be folded back into documents/templates • Hope to achieve all success criteria < 6 months • Decision for permanent devolution will be based on completion of parallel ops and other future documentation creation (CARA Standard and Handbook, etc) and reviews (ORR) event which is less than 2 days from TCA, including the proposed remediation, on an as-needed daily basis flow using SpaceTrack to send and receive data

ESMO pilot devolution program

Making Debris Avoidance Decisions for ESMO's EOS Mission Set

The presentation will cover the aspects of making debris risk decisions from the NASA Mission Director's perspective, specifically for NASA Earth Science Mission Operations (ESMO) Earth Observing System (EOS) mission set. ESMO has been involved in analyzing potential debris risk conjunctions with secondary objects since the inception of this discipline. Through the cumulated years of experience and continued exposure to various debris scenarios, ESMO's understanding of the problem and process to deal with this issue has evolved. The presentation will describe the evolution of the ESMO process, specifically as it relates to the maneuver execution and spacecraft risk management decision process. It will briefly cover the original Drag Make-Up Maneuver, several day, methodical manually intensive, ramp up waive off approach, to the present day more automated, pre-canned onboard command, tools based approach. The presentation will also cover the key information needed to make debris decisions and challenges in doing so while still trying to meet science goals, constellation constraints and manage resources. A slide or two at the end of the presentation, will be devoted to discussing what further improvements could be helpful to improve decision making and future process improvement plans challenges.

debris

Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

maneuver

ESMO's Approach to CARA Devolution

This presentation attempts to provide a walk-through of how ESMO prepared/is preparing to handle the situation should CARA no longer support day to day operations.

Devolution

CARA Devolution: ESMO Pilot Program/Parallel Operations

This presentation attempts to provide a walk-through of how ESMO prepared/is preparing to handle the situation should CARA no longer support day to day operations, with specific updates regarding the parallel operations period (6 month test).

Mantziaras, Dimitrios

External Impact Effects on Operational Availability ESMO Experience

Presentation to support a Summit/TIM with various Stakeholders (Ground and Flight) to perform a GAP analysis associated with ground and spacecraft maintenance, maintainability, and availability activities in order to identify missing Agency planning and guidance materials.

Simulation

Development of a Nonlinear Probability of Collision Tool for the Earth Observing System

The Earth Observing System (EOS) spacecraft Terra, Aqua, and Aura fly in constellation with several other spacecraft in 705-kilometer mean altitude sun-synchronous orbits. All three spacecraft are operated by the Earth Science Mission Operations (ESMO) Project at Goddard Space Flight Center (GSFC). In 2004, the ESMO project began assessing the probability of collision of the EOS spacecraft with other space objects. In addition to conjunctions with high relative velocities, the collision assessment method for the EOS spacecraft must address conjunctions with low relative velocities during potential collisions between constellation members. Probability of Collision algorithms that are based on assumptions of high relative velocities and linear relative trajectories are not suitable for these situations; therefore an algorithm for handling the nonlinear relative trajectories was developed. This paper describes this algorithm and presents results from its validation for operational use. The probability of collision is typically calculated by integrating a Gaussian probability distribution over the volume swept out by a sphere representing the size of the space objects involved in the conjunction. This sphere is defined as the Hard Body Radius. With the assumption of linear relative trajectories, this volume is a cylinder, which translates into simple limits of integration for the probability calculation. For the case of nonlinear relative trajectories, the volume becomes a complex geometry. However, with an appropriate choice of coordinate systems, the new algorithm breaks down the complex geometry into a series of simple cylinders that have simple limits of integration. This nonlinear algorithm will be discussed in detail in the paper. The nonlinear Probability of Collision algorithm was first verified by showing that, when used in high relative velocity cases, it yields similar answers to existing high relative velocity linear relative trajectory algorithms. The comparison with the existing high velocity/linear theory will also be used to determine at what relative velocity the analysis should use the new nonlinear theory in place of the existing linear theory. The nonlinear algorithm was also compared to a known exact solution for the probability of collision between two objects when the relative motion is strictly circular and the error covariance is spherically symmetric. Figure I shows preliminary results from this comparison by plotting the probabilities calculated from the new algorithm and those from the exact solution versus the Hard Body Radius to Covariance ratio. These results show about 5% error when the Hard Body Radius is equal to one half the spherical covariance magnitude. The algorithm was then combined with a high fidelity orbit state and error covariance propagator into a useful tool for analyzing low relative velocity nonlinear relative trajectories. The high fidelity propagator is capable of using atmospheric drag, central body gravitational, solar radiation, and third body forces to provide accurate prediction of the relative trajectories and covariance evolution. The covariance propagator also includes a process noise model to ensure realistic evolutions of the error covariance. This paper will describe the integration of the nonlinear probability algorithm and the propagators into a useful collision assessment tool. Finally, a hypothetical case study involving a low relative velocity conjunction between members of the Earth Observation System constellation will be presented.

McKinley, David P.

A Virtual Mission Operations Center - Collaborative Environment

Development of technologies that enable significant reductions in the cost of space mission operations is critical if constellations, formations, federations and sensor webs, are to be economically feasible. One approach to cost reduction is to infuse automation technologies into mission operations centers so that fewer personnel are needed for mission support. But missions are more culturally and politically adverse to the risks of automation. Reducing the mission risk associated with increased use of automation within a MOC is therefore of great importance. The belief that mission risk increases as more automation is used stems from the fact that there is inherently less direct human oversight to investigate and resolve anomalies in an unattended MOC. The Virtual Missions Operations Center - Collaborative Environment (VMOC-CE) project was launched to address this concern. The goal of the VMOC-CE project is to identify, develop, and infuse technology to enable mission operations between onsite operators and on-call personnel in geographically dispersed locations. VMOC-CE enables missions to more readily adopt automation because off-site operators and engineers can more easily identify, investigate, and resolve anomalies without having to be present in the MOC. The VMOC-CE intent is to have a single access point for all resources used in a collaborative mission operations environment. Team members will be able to interact during spacecraft operations, specifically for resolving anomalies, utilizing a desktop computer and the Internet. Mission operations management can use the VMOC-CE as a tool to participate in and monitor status of anomaly resolution or other mission operations issues. In this paper we present the VMOC-CE project, system capabilities and technologies, operations concept, and results of its pilot in support of the Earth Science Mission Operations System (ESMOS).

Medina, Barbara

Establishment and Implementation of a Close Approach Evaluation and Avoidance Process for Earth Observing System Missions

In the fall of 2004, the Earth Science Mission Operations Project tasked the Goddard Space Flight Center (GSPC) Flight Dynamics Analysis Branch with establishment of a process to protect the high-value Earth Observing System (EOS) missions (Terra, Aqua, and Aura) from close approaches with space debris and other orbiting objects. An agreement between GSFC and the United States Strategic Command was put in place so that close approach predictions would be routinely generated. This paper describes the ESMO conjunction assessment process for the EOS satellites. Process details, including tools and algorithms developed, are discussed. Particular details for a predicted close approach between Terra and a piece of space debris that resulted in the execution of a debris avoidance maneuver are included. This close approach example is described in detail fiom the first screening identification through execution of the mitigation maneuver to illustrate both the process and lessons learned fiom its implementation.

Newman, Lauri

Status of the NASA Robotic Mission Conjunction Assessment Effort

This viewgraph presentation discusses NASA's processes and tools used to mitigate threats to NASA's robotic assets. The topics include: 1) Background; 2) Goddard Stakeholders and Mission Support; 3) ESC and TDRS Mission Descriptions; 4) TDRS Conjunction Assessment Process; 5) ESMO Conjunction Assessment Process; 6) Recent Operations Experiences; 7) Statistics Collected for ESC Regime; and 8) Current and Future Analysis Items.

Newman, Lauri Kraft

EDOS Data Capture for ALOS

In 2008, NASA's Earth Sciences Missions Operations (ESMO) at Goddard Space Flight Center (GSFC) directed the Earth Observing System Data Operations System (EDOS) project to provide a prototype system to assess the feasibility of high rate data capture for the Japan Aerospace Exploration Agency's (JAXA) Advanced Land Observing Satellite (ALOS) spacecraft via NASA's Tracking and Data Relay Satellite System (TDRSS). The key objective of this collaborative effort between NASA and JAXA was to share science data collected over North and South America previously unavailable due to limitations in ALOS downlink capacity. EDOS provided a single system proof-of-concept in 4 months at White Sands TDRS Ground Terminal The system captured 6 ALOS events error-free at 277 Mbps and delivered the data to the Alaska Satellite Facility (ASF) within 3 hours (May/June '08). This paper describes the successful rapid prototyping approach which led to a successful demonstration and agreement between NASA and JAXA for operational support. The design of the operational system will be discussed with emphasis on concurrent high-rate data capture, Level-O processing, real-time display and high-rate delivery with stringent latency requirements. A similar solution was successfully deployed at Svalbard, Norway to support the Suomi NPP launch (October 2011) and capture all X-band data and provide a 30-day backup archive.

McLemore, Bruce

Operational Collision Avoidance

This presentation will describe the early days of the EOS Aqua and Aura operational collision avoidance process. It will highlight EOS debris avoidance maneuvers, EOS high interest event statistic and A-Train systematic conjunctions and conclude with future challenges. This is related to earlier e-DAA (tracking number 21692) that an abstract was submitted to a different conference. Eric Moyer, ESMO Deputy Project Manager has reviewed and approved this presentation on May 6, 2015

collision avoidance

EOS Aura Mission Status

This PowerPoint presentation will discuss EOS Aura mission and spacecraft subsystem summary, recent and planned activities, inclination adjust maneuvers, propellant usage lifetime estimate. Eric Moyer, ESMO Deputy Project Manager-Technical (code 428) has reviewed and approved the slides on April 30, 2015.

propellant usage

International Earth Science Constellation Mission Operations Working Group September 27-29, 2016 Aqua Spring 2017 IAM Series

This Aqua Spring 2017 IAM Series powerpoint presentation will be presented at the MOWG meeting in Albuquerque, NM. Topics to be discussed are: recap Aqua 2016 IAM campaign maneuver results and post 2016 IAM MLT evolution; current DMU strategy; 2017 IAM campaign dates and planning; Aqua latest lifetime MLT team predictions. Susan Good is a contractor who supports David Tracewell in code 595 therefore this is being routed through 595. Eric Moyer, ESMO Deputy Project Manager-Technical has reviewed and approved this presentation.

Constellation

EOS Terra: EOS DAM Automation Constellation MOWG

Brief summary of the decision factors considered and process improvement steps made, to evolve the ESMO debris avoidance maneuver process to a more automated process. Presentation is in response to an action item/question received at a prior MOWG meeting.

Constellation MOW

Mission Status for Earth Science Constellation MOWG Meeting at KSC: EOS Aura

This will be presented at the Earth Science Constellation Mission Operations Working Group (MOWG) meeting at KSC (Kennedy Space Center) in December 2017 to discus EOS (Earth Observing System) Aura status. Reviewed and approved by Eric Moyer, ESMO (Earth Sciences Mission Operations) Deputy Project Manager.

Earth Science Constellatio

Aqua/Aura Inclination Adjust Maneuver Series Spring 2018 Planning

This will be presented at the International Earth Science Constellation Mission Operations Working Group meeting on December 6-8, 2017 to discuss the Aqua/Aura Spring 2018 Inclination Adjust Maneuver series planning. Presentation has been reviewed and approved by Eric Moyer, ESMO (Earth Science Mission Operations) Deputy Project Manager.

MOW