Search NASA⌕ Search

SEARCH · Search NASA

Results for “ETL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The ETROC2 as the Final Version for CMS Endcap Timing Layer (ETL) Upgrade

The ETROC (Endcap Timing Readout Chip) is being developed for the LGAD-based CMS Endcap Timing Layer (ETL) at HL-LHC. The ETL on each side of the interaction region will be instrumented with a two-disk system of MIP-sensitive LGAD (Low Gain Avalanche Diodes) silicon devices, read out by ETROCs for precision timing measurement with down to ~30 ps timing resolution per track. The ETROC is designed to handle a 16 x 16 pixel cell matrix, with each pixel being 1.3 mm x 1.3 mm to match the LGAD sensor pixel size. The front-end design for preamplifier and discriminator has been specifically optimized for the reduced LGAD signals, with enough flexibilities to meet the ETL specific needs for time resolution, power budget and radiation profile. The ETROC chip is implemented in a commercial 65nm CMOS process. Each channel consists of a preamplifier, a discriminator, a TDC used for TOA (Time Of Arrival) and TOT (Time Over Threshold) measurements, and a memory for data storage and readout. An in-pixel auto threshold calibration is included, along with a self-testing pattern generator. The TOT is used for time-walk correction of the TOA measurement. The detailed hit information (TOA and TOT) from each cell will be read out from a local circular buffer after each Level-1 Accept (about 1 MHz). In addition, a charge injection circuit is implemented to allow for testing and calibration. For more detailed monitoring of the signal pulses, waveform sampling circuits are included for one pixel. The clock distribution is based on a 16x16 H-tree design with a shielding structure to alleviate potential interference. The global peripheral circuits include a PLL, a phase shifter, an I2C slave controller, a fast control block, a global readout, and a data driver along with an efuse and temperature sensor. The ETROC builds event data frames for each L1A selected event and is also capable of providing L1 trigger information for user-defined delayed hits. The main design challenge is how to extract precision timing information from the small LGAD signals in the presence of high irradiation fluence, while keeping the power consumption and digital activity low. The ETL design goal for the time resolution of 50 ps per hit is required to achieve a 35 ps arrival time measurement for a MIP particle, which has its track registered in two ETL disk layers. The LGAD contribution is known to be about 30 ps, this means that the jitter from the ETROC has to be kept below 40 ps. The ETROC2 is the first full size full functionality prototype design fully compatible with the final chip specifications for CMS ETL and now becomes the final version. The ETROC2 chips have been extensively tested. We will present here new testing results including the bump bonding yield improvement study, the time walk correction (TWC) generality study with one pixel TWC applying to all pixels, the final SEU testing using both heavy ion and proton beam, more beam test studies including different sensors, and readiness for the ETROC2 production for CMS ETL upgrade.

Liu, Tiehui [Fermilab] (ORCID:0009000765225605)↗

Scalable open-air deposition of compact ETL TiO x on perovskite for fullerene-free solar cells

We report a scalable, low-temperature TiO x electron transport layer (ETL) produced directly on top of perovskite in an inverted architecture device by an open-air chemical vapor deposition (OA-CVD) process. The OA-CVD pyrolysis of a titanium ethoxide precursor forms a fully inorganic, conformal, and compact TiO x film. The resultant film is mechanically robust and exhibits a fracture toughness 30-fold higher than commonly used fullerene-based ETL films. The TiO x is an effective barrier layer against environmental degradation—unencapsulated devices with the TiO x ETL retain 60% of their initial efficiency after 1000 hours in ambient aging conditions—compared to devices with a fullerene ETL which were inoperable after 144 hours. Inverted architecture devices with an optimized TiO x ETL thickness of 70 nm exhibited high open-circuit voltages of 1.08 V. We comment on the photocatalytic properties of TiO x and the influence of an amorphous film on maximum power point stability.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Scalable Open-Air Deposition of Compact ETL TiOx on Perovskite for Fullerene-Free Solar Cells

We report on a scalable, low-temperature TiOx electron transport layer (ETL) produced directly on top of perovskite in an inverted architecture device by an open-air chemical vapor deposition (OA-CVD) process. The OA-CVD pyrolysis of a titanium ethoxide precursor forms a fully inorganic, conformal, and compact TiOx film. The resultant film is mechanically robust and exhibits a fracture toughness 30-fold higher than commonly used fullerene-based ETL films. The TiOx is an effective barrier layer against environmental degradation—unencapsulated devices with the TiOx ETL retain 60% of their initial efficiency after 1000 hours in ambient aging conditions—compared to devices with a fullerene ETL which were inoperable after 144 hours. Inverted architecture devices with an optimized TiOx ETL thickness of 70nm exhibited high open-circuit voltages of 1.08V. We comment on the photocatalytic properties of TiOx and the influence of an amorphous film on maximum power point stability.

Chen, Justin↗

SU-E-I-62: Reduction of Susceptibility Artifacts by Increasing the Bandwidth (BW) and Echo Train Length (ETL)

Purpose: The aim of this present study is to increase bandwidth (BW) and echo train length (ETL) in Proton Density Turbo Spin Echo (PD TSE) sequences with and without fat saturation (FS) as well as in Turbo Inversion Recovery Magnitude sequences (TIRM) in order to assess whether these sequences are capable of reducing susceptibility artifacts. Methods: We compared 1) TIRM coronal (COR) with the same sequence with increased both BW and ETL 2) Conventional PD TSE sagittal (SAG) with FS with an increased BW 3) Conventional PD TSE SAG without FS with an increased BW 4) Conventional PD TSE SAG without FS with increased both BW and ETL. A quantitative analysis was performed to measure the extent of the susceptibility artifacts. Furthermore, a qualitative analysis was performed by two radiologists in order to evaluate the susceptibility artifacts, image distortion and fat suppression. The depiction of cartilage, menisci, muscles, tendons and bone marrow were also qualitatively analyzed. Results: The quantitative analysis found that the modified TIRM sequence is significantly superior to the conventional one regarding the extent of the susceptibility artifacts. In the qualitative analysis, the modified TIRM sequence was superior to the corresponding conventional one in eight characteristics out of ten that were analyzed. The modified PD TSE with FS was superior to the corresponding conventional one regarding the susceptibility artifacts, image distortion and depiction of bone marrow and cartilage while achieving effective fat saturation. The modified PD TSE sequence without FS with a high (H) BW was found to be superior corresponding to the conventional one in the case of cartilage. Conclusion: Consequently, TIRM sequence with an increased BW and ETL is proposed for producing images of high quality and modified PD TSE with H BW for smaller metals, especially when FS is used.

60 APPLIED LIFE SCIENCES↗

The ETROC Project: Precision Timing ASIC Development for LGAD-based CMS Endcap Timing Layer (ETL) Upgrade

The ETROC (Endcap Timing Readout Chip) is being developed for the LGAD-based CMS Endcap Timing Layer (ETL) at HL-LHC. The ETL on each side of the interaction region will be instrumented with a two-disk system of MIP-sensitive LGAD silicon devices to be read out by ETROCs for precision timing measurement with down to 30 ps timing resolution. The ETROC is designed to handle a 16 x 16 pixel cell matrix, with each pixel cell being 1.3 mm x 1.3 mm to match the LGAD sensor pixel size. Approximately 15% of the sensors near the highest eta region will experience hadron fluence above 1e15 neq/cm² towards end of operation of HL-LHC, resulting in small signal amplitude with LGAD gain reduced to around 10. For this reason, the front-end design for preamplifier and discriminator has been specifically optimized for the reduced LGAD signals, with enough flexibilities to meet the ETL specific needs for time resolution, power budget and radiation profile.

97 MATHEMATICS AND COMPUTING↗

ETROC2 as the Final Version for CMS MTD Endcap Timing Layer (ETL) Upgrade

The ETROC2 is the first full-size full-functionality prototype design fully compatible with the final chip specifications for CMS ETL. The ETROC2 chips have been extensively tested and the results have been presented at IEEE NSS MIC RTSD 2024. We will present here new results including the bump bonding yield improvement study, the time walk correction (TWC) generality study with single pixel TWC applied to all pixels, the final SEU testing results using both heavy ion and proton beam, more beam test studies including different sensors and irradiated sensors, and readiness for the ETROC2 production for CMS ETL upgrade.

Liu, Tie Hui [Fermilab] (ORCID:0009000765225605)↗

The Analog Front-end for the LGAD Based Precision Timing Application in CMS ETL

The analog front-end for the Low Gain Avalanche Detector (LGAD) based precision timing application in the CMS Endcap Timing Layer (ETL) has been prototyped in a 65 nm CMOS mini-ASIC named ETROC0. Serving as the very first prototype of ETL readout chip (ETROC), ETROC0 aims to study and demonstrate the performance of the analog frontend, with the goal to achieve 40 to 50 ps time resolution per hit with LGAD (therefore reach about 30ps per track with two detector-layer hits per track). ETROC0 consists of preamplifier and discriminator stages, which amplifies the LGAD signal and generates digital pulses containing time of arrival and time over threshold information. This paper will focus on the design considerations that lead to the ETROC front-end architecture choice, the key design features of the building blocks, the methodology of using the LGAD simulation data to evaluate and optimize the front-end design. The ETROC0 prototype chips have been extensively tested using charge injection and the measured performance agrees well with simulation. The initial beam test results are also presented, with time resolution of around 33 ps observed from the preamplifier waveform analysis and around 41 ps from the discriminator pulses analysis. A subset of ETROC0 chips have also been tested to a total ionizing dose of 100 MRad with X-ray and no performance degradation been observed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

An FPGA-based readout chip emulator for the CMS ETL detector upgrade

Here, we present an FPGA-based readout chip emulator board for the CMS Endcap Timing Layer (ETL) detector upgrade. The emulator board uses an Intel Cyclone 10 GX FPGA to emulate the digital functions of four Endcap Layer Readout Chips (ETROCs). Based on the actual ETROC design, the firmware is implemented and verified. The emulator board is being used for the ETROC digital design verification and system development.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The ETROC2 prototype for CMS MTD Endcap Timing Layer (ETL) upgrade

The ETROC2 prototype for CMS MTD Endcap Timing Layer (ETL) upgrade 520__ $$aThe Endcap Timing ReadOut Chip (ETROC) is designed to process LGAD signals with time resolution down to about 40-50ps per hit. The ETROC2 is the first full size (16x16) prototype design with the front-end based on and scaled up from the ETROC1 (4x4). The readout designs at pixel and global level and the system interfaces are all new and are compatible with the final chip specifications in terms of functionality. The ETROC2 is intended as a learning chip, as a stepstone to the ETROC3 which is intended as the pre-production design. The ETROC2 design and test results will be presented.

Gong, Datao↗

A Low-Power Time-to-Digital Converter for the CMS Endcap Timing Layer (ETL) Upgrade

We present the design and test results of a Time-to-Digital-Converter (TDC). The TDC will be a part of the readout ASIC, called ETROC, to read out Low-Gain Avalanche Detectors (LGADs) for the CMS Endcap Timing Layer (ETL) of High-Luminosity LHC upgrade. One of the challenges of the ETROC design is that the TDC is required to consume less than 200 W for each pixel at the nominal hit occupancy of 1%. To meet the low-power requirement, we use a single delay line for both the Time of Arrival (TOA) and the Time over Threshold (TOT) measurements without delay control. A double-strobe self-calibration scheme is used to compensate for process variation, temperature, and power supply voltage. The TDC is fabricated in a 65 nm CMOS technology. The overall performances of the TDC have been evaluated. The TOA has a bin size of 17.8 ps within its effective dynamic range of 11.6 ns. The effective measurement precision of the TOA is 5.6 ps and 9.9 ps with and without the nonlinearity correction, respectively. The TDC block consumes 97 W at the hit occupancy of 1%. Over a temperature range from 23 C to 78 C and a power supply voltage range from 1.05 V to 1.35 V (the nominal value of 1.20 V), the self-calibrated bin size of the TOA varies within 0.4%. The measured TDC performances meet the requirements except that more tests will be performed in the future to verify that the TDC complies with the radiation-tolerance specifications.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Well Log ETL tool

This is an executable python script which offers two different conversions for well log data: 1) Conversion from a BoreholeLASLogData.xls model to a LAS version 2.0 formatted XML file. 2) Conversion from a LAS 2.0 formatted XML file to an entry in the WellLog Content Model. Example templates for BoreholeLASLogData.xls and WellLogsTemplate.xls can be found in the package after download.

Good, Jessica↗

A self-certifying FPGA based pixel readout chip test system for CMS ETL upgrade

A flexible self-certifying pixel readout test system for testing the Endcap Timing Read-Out Chip (ETROC) has been developed for the CMS MIP Timing Detector (MTD), part of the upgrade for the HL-LHC. The system includes an FPGA-based (Xilinx KC705) test system that can take data from an emulator or up to four ETROC boards in telescope mode. A python based DAQ system simplifies configuration, calibration, and testing of the chips. The system provides an efficient & reliable solution for testing ETROC (ETROC2 since April 2023 with 16x16 pixels, full-size, full functionality prototype) and can be extended to other readout chips with similar architecture (AIDA integration is currently being explored).

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The ETROC2 prototype for CMS MTD Endcap Timing Layer (ETL) upgrade

The Endcap Timing ReadOut Chip (ETROC) is designed to process LGAD signals with time resolution down to about 40-50ps per hit. The ETROC2 is the first full size (16x16) prototype design with the front-end based on and scaled up from the ETROC1 (4x4). The readout designs at pixel and global level and the system interfaces are all new and are compatible with the final chip specifications in terms of functionality. The ETROC2 is intended as a learning chip, as a stepstone to the ETROC3 which is intended as the pre-production design. The ETROC2 design and test results will be presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Beam test results for the Endcap Timing ReadOut Chip (ETROC2) for the CMS ETL upgrade

The Endcap Timing ReadOut Chip (ETROC) for the Compact Muon Solenoid (CMS) Minimum ionizing particle Timing Detector (MTD) is designed to process Low Gain Avalanche Diode (LGAD) signals with a time resolution of 40-50ps per hit, with 30-35 ps per charged particle using two layer detector. The ETROC2, is the first full size (16x16 pixels) and full functionally design that has been tested in hadron and electron beams at CERN and DESY (Sep 2023 - June 2024). Precision timing studies at these test beams are done using a self-referential beam telescope composed of up to 4 layers/chips. This talk describes the ETROC2 beam telescope and summarizes the performance of the ETROC2 chips bump-bonded to (16x16) Fondazione Bruno Kessler (FBK) and Hamamatsu Photonics K.K. (HPK) LGAD sensors using results from recent test beams. The experiences and lessons learned during the course of these test beams are also detailed in this talk.

Safdari, Murtaza↗

Well Log ETL tool

This is an executable python script which offers two different conversions for well log data: 1) Conversion from a BoreholeLASLogData.xls model to a LAS version 2.0 formatted XML file. 2) Conversion from a LAS 2.0 formatted XML file to an entry in the WellLog Content Model. Example templates for BoreholeLASLogData.xls and WellLogsTemplate.xls can be found in the package after download.

Good, Jessica↗

Large area deposition of low temperature processed SnO 2 as an ETL in inverted perovskite solar cell on flexible ITO-PET based substrate

Tin (IV) oxide (SnO 2 ) is a good electron transport material for perovskite photovoltaics high charge carrier mobility and superior stability Low temperature solution processability of SnO 2 low-cost fabrication lightweight and flexible perovskite solar cells on PET-based substrate Direct deposition of solution-processed SnO 2 on the top of perovskite is challenging solvent in compatibility with the perovskite materials To solve this problem, in this study we: synthesized SnO 2 nanoparticles functionalized them with acetate through ligand exchange allowing their dispersion in anhydrous ethanol

Chapagain, Sashil↗

The ETROC2 prototype for CMS MTD Endcap Timing Layer (ETL) upgrade

The Endcap Timing ReadOut Chip (ETROC) is designed to process LGAD signals with time resolution down to about 40-50ps per hit. The ETROC2 is the first full size (16x16) prototype design with the front-end based on and scaled up from the ETROC1 (4x4). The readout designs at pixel and global level and the system interfaces are all new and are compatible with the final chip specifications in terms of functionality. The ETROC2 is intended as a learning chip, as a stepstone to the ETROC3 which is intended as the pre-production design. The ETROC2 design and test results will be presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Enhancing the performance of the perovskite solar cells by modifying the SnO 2 electron transport layer

The tin oxide (SnO 2 ) electron transport layer (ETL) plays a vital role in the photo-conversion efficiency (PCE) and stability of organic-inorganic perovskite solar cells (PSCs). However, SnO 2 ETL-induced defects such as hydroxyl groups, oxygen vacancies, exposed Sn atoms, and dangling bonds hinder device performance. In this study, rubidium chloride (RbCl) has been used to modify the SnO 2 ETL. Perovskite film formed on the RbCl-modified SnO 2 ETL exhibits improved crystallinity with enlarged grain size and reduced grain boundaries and enhanced optical absorption. Further, the Hall-effect measurements indicate the improved carrier mobility, and the dark J-V curve shows the increment of electrical conductivity for the RbCl-modified SnO 2 ETL. X-ray photoelectron spectroscopy (XPS) results demonstrate the surface defects passivation of the perovskite layer by modifying the SnO 2 ETL. A champion PCE of 19.35% has been achieved for the RbCl-modified SnO 2 ETL-based devices with improved stability, while the control devices with unmodified SnO 2 ETL show a PCE of 17.18%.

14 SOLAR ENERGY↗