Search NASA⌕ Search

SEARCH · Search NASA

Results for “EV Charging Infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The Design and Evaluation of Zero Trust Architecture for Electric Vehicle Charging Infrastructure: EVs @ Scale Series on EV Charging Station Cybersecurity

Implementing a zero trust architecture can significantly bolster the security of electric vehicle (EV) charging infrastructure. EV charging infrastructure includes numerous networked interfaces, each of which can present potential vulnerabilities. When these vulnerabilities are exploited, they can compromise the entire system, leading to severe operational and security risks. Zero trust is a security model that operates on the principle of "never trust, always verify," which helps manage the attack surface and limit the scope of any potential compromises. Fundamentally, this model ensures that no entity, whether inside or outside the network, is trusted by default. The design principles of zero trust include continuous verification, strict deny-by-default access controls, and micro-segmentation. Continuous verification ensures that every request is thoroughly checked, regardless of its origin. Strict access controls enforce the principle of least privilege, allowing users and devices only the minimum necessary access to perform their functions. Micro-segmentation involves dividing the network into smaller, isolated segments to prevent lateral movement in case of a breach. In the context of EV charging infrastructure, zero trust can be implemented through various strategies. For example, multi-factor authentication (MFA) can be required for engineers to access the management interfaces and control systems of charging stations. Real-time monitoring and analysis of network traffic can help detect and respond to anomalies. Systems that do not need to communicate with each other can be micro-segmented to enhance security. All communications should adhere to predefined policies to be permitted. Additionally, encrypting communications can protect sensitive information exchanged between chargers and management systems. This paper presents a zero trust architecture specifically designed for EV charging infrastructure. Implementing zero trust not only mitigates risks but also builds a resilient infrastructure capable of withstanding and quickly recovering from cyber threats. The architecture addresses six defined security objectives. A comprehensive test plan is developed to assess the architecture against these objectives, and the results of the evaluation are reported. This approach is essential for maintaining the reliability and integrity of EV charging services in an increasingly interconnected and vulnerable digital landscape. This is the first in a planned series of papers exploring the implementation of zero trust in EV charging infrastructure. Each paper will delve into different aspects and applications of zero trust, highlighting how various work processes and requirements can lead to distinct architectural designs. These architectures will be tailored to address specific security challenges and operational needs within the EV charging ecosystem, ensuring a robust and adaptable security framework.

33 ADVANCED PROPULSION SYSTEMS↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗

Commercial EV Charging Infrastructure: Modeling Concepts & Techniques

This presentation offers an overview of key concepts and techniques for modeling global commercial EV charging infrastructure. We begin by comparing the unique needs of commercial vehicles with those of personal vehicles. Next, we delve into network design topics, including phased deployment of public infrastructure, port sharing across and within fleets, power requirements for en-route charging, and strategies for estimating depot charging availability. Finally, we outline the primary steps NREL follows in conducting an EV charging infrastructure needs assessment.

ADVANCED PROPULSION SYSTEMS,DIRECT ENERGY CONVERSI↗

Modeling Future Demand for EV Charging Infrastructure [Slides]

U.S. climate goals for economy-wide net-zero greenhouse gas emissions by 2050 require rapid decarbonization of the light-duty vehicle fleet and plug-in electric vehicles (EVs) are poised to become the preferred technology for achieving this end. Considerable investments in public and private EV charging infrastructure will be needed to support widespread adoption, however, guidance is lacking on when, where, and what types of chargers will be needed. In this PLMA Load Management Dialogue session, researchers from the National Renewable Energy Laboratory (NREL) discuss findings from a recent quantitative assessment of the charging network requirements to support high penetrations of light-duty EVs by 2030. The study produced multiple detailed network growth trajectories at the national, state, and local levels that serve as a guidepost for future planning. In addition, an overview of NREL's publicly accessible EV infrastructure tools and data sets, designed to support planning and decision-making for EV infrastructure stakeholders, is provided.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CHARGE-MAP: An integrated framework to study the multicriteria EV charging infrastructure expansion problem

The widespread adoption of electric vehicles (EVs) in recent years has necessitated the development of effective charging infrastructures. However, charging infrastructure expansion is a multifaceted problem that requires careful consideration of the existing infrastructure, spatiotemporal distribution of charging demands, power-grid capacity, and budget constraints. Here, to approach this complex problem, we present CHARGE-MAP, a data-driven simulation-optimization framework, focused on ensuring meaningful charging experience for individual EV owners. CHARGE-MAP integrates three modules: an agent-based simulation module that estimates spatiotemporal distribution of charging demands by modeling EV adopter mobility and charging behavior; an optimization module that determines optimal new charging station/charger locations and capacities, while minimizing expected detour distances and wait-times with a limited number of new stations; and a power module that determines how to connect the stations to the power grid while maintaining its stability. Using the state of Virginia (consisting of 95 counties and 38 independent cities) as a case study, our results show that CHARGE-MAP can meet the demand of ~198,600 predicted EVs with 1,305 new public charging stations and 2,164 new chargers. It reduces average detour distances for charging by 66% and wait-times at stations by 72% compared to the existing infrastructure. Furthermore, transformer capacity requirement analysis reveals that only 1.8% of residential transformers require upgrades, while over 80% of commercial charging locations can be supported with modest transformer infrastructure (25 to 50 kVA). This indicates that targeted investments can facilitate cost-effective EV integration. Consequently, CHARGE-MAP provides policymakers and urban planners with crucial data-driven insights for effective EV charging infrastructure expansion. Sign up for PNAS alerts.

charging infrastructure↗

Exploring the Adoption Challenges of Post-Quantum Cryptography in EV Charging Infrastructure

The rapid evolution of electric vehicle (EV) technology and the corresponding growth of the Electric Vehicle Charging Infrastructure (EVCI) brings to light significant cybersecurity concerns, notably in the context of emerging post-quantum computing capabilities. This report, prepared by Pacific Northwest National Laboratory (PNNL) under the U.S. Department of Energy contract, delves into the challenges associated with integrating Post-Quantum Cryptography (PQC) into EVCI to safeguard against potential quantum computing threats. Post-quantum computers will eventually be able to invalidate technologies secured through public key cryptography. As part of this effort, the primary gaps and challenges in the EVCI were investigated with a focus on comparing traditional algorithms against PQC algorithms. One of the notable findings was that the P-521 algorithm was frequently surpassed in performance by PQC algorithms. This document provides a thorough examination of the hurdles the industry can expect when transitioning to PQC within the EVCI, such as interoperability concerns, the computational and memory demands of PQC algorithms, and the organizational readiness for such a transition. It emphasizes the necessity of a forward-thinking approach to cybersecurity, advocating for early and strategic engagement among EVCI stakeholders to ensure a seamless and cost-effective migration to quantum-resistant cryptographic standards. Through this report, the authors aim to catalyze awareness and action among policymakers, industry leaders, and cybersecurity professionals towards fortifying the EVCI against emerging quantum threats, thereby securing the infrastructure essential for the future of electric mobility.

33 ADVANCED PROPULSION SYSTEMS↗

Extreme-scale EV charging infrastructure planning for last-mile delivery using high-performance parallel computing

Here, this paper addresses stochastic charger location and allocation problems under queue congestion for last-mile delivery using electric vehicles (EVs). The objective is to decide where to open charging stations and how many chargers of each type to install, subject to budgetary and waiting-time constraints. We formulate the problem as a mixed-integer non-linear program, where each station-charger pair is modeled as a multiserver queue with stochastic arrivals and service times to capture the notion of waiting in fleet operations. The model is extremely large, with billions of variables and constraints for a typical metropolitan area; even loading the model in solver memory is difficult, let alone solving it. To address this challenge, we develop a Lagrangian-based dual decomposition framework that decomposes the problem by station and leverages parallelization on high-performance computing systems, where the subproblems are solved by using a cutting plane method and their solutions are collected at the master level. We also develop a three-step rounding heuristic to transform the fractional subproblem solutions into feasible integral solutions. Computational experiments on data from the Chicago metropolitan area with hundreds of thousands of households and thousands of candidate stations show that our approach produces high-quality solutions in cases where existing exact methods cannot even load the model in memory. We also analyze various policy scenarios, demonstrating that combining existing depots with newly built stations under multiagency collaboration substantially reduces costs and congestion. These findings offer a scalable and efficient framework for developing sustainable large-scale EV charging networks.

Capacity allocation↗

Sample Cybersecurity Clauses for EV Charging Infrastructure Procurements

This is the final version of PNNL-34373, with sponsor updates. The proposed sample cybersecurity clauses for EVCI procurements are designed to assist in managing the risk of cyberattacks that may degrade the safety, security, and reliability of EVCI. The sample clauses are intended to be tailored and incorporated into procurement specifications for equipment and services related to the National EV Infrastructure Formula Program deployments. Widespread adoption of the sample cybersecurity procurement language will integrate cybersecurity throughout the life cycle of the infrastructure.

33 ADVANCED PROPULSION SYSTEMS↗

Modeling U.S. Light-Duty Demand for EV Charging Infrastructure in 2030

With the support of DOE's Vehicle Technologies Office and the DOE/DOT Joint Office (JO), NREL has applied the EVI-X modeling suite to conduct a National Electric Vehicle Infrastructure Needs Assessment. This report considers a 2030 scenario in which 50% of light-duty sales are electric (including plug-in hybrids), resulting in an on-road stock of 33 million vehicles. We consider the needs of vehicles used for typical daily driving, drivers without access to residential charging, corridor charging supporting long-distance travel, and ride-hailing electrification. We find that a cumulative capital investment of $82 billion in public and private charging infrastructure will be necessary in our baseline scenario (approximately 3x greater than our estimate of planned investments to date). This result is framed as a conservative estimate as the assumed costs include charging equipment and installation but exclude the cost of grid upgrades and distributed energy resources.

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Second Quarter 2023

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the second calendar quarter of 2023 by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with a 2030 infrastructure requirement scenario. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the fourteenth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and National Renewable Energy Laboratory publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Third Quarter 2022

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the third calendar quarter of 2022 (Q3 2022) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with two different 2030 infrastructure requirement scenarios. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the eleventh report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and National Renewable Energy Laboratory (NREL) publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator (Fourth Quarter 2022)

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the fourth calendar quarter of 2022 (Q4 2022) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with two different 2030 infrastructure requirement scenarios. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the twelfth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and National Renewable Energy Laboratory (NREL) publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator (First Quarter 2023)

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the first calendar quarter of 2023 by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with a 2030 infrastructure requirement scenario. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the thirteenth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and National Renewable Energy Laboratory publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Operations and Maintenance for Electric Vehicle Charging Infrastructure in Indian Country

This fact sheet provides an overview of operations and maintenance (O&M) costs, responsibilities, and contracts to help ensure EV charging infrastructure remains functional and reliable in Indian Country. O&M planning is important for Tribes to consider at the beginning of EV charging infrastructure projects to help ensure charger uptime and longevity.

33 ADVANCED PROPULSION SYSTEMS↗

Soft costs and EVSE – Knowledge gaps as a barrier to successful projects

There has been a recent push to increase access to electric vehicle (EV) charging infrastructure. The National Electric Vehicle Infrastructure (NEVI) program, part of the Bipartisan Infrastructure Law (BIL) has made significant funding available for major charging infrastructure projects along state thruways, and many state and local incentives exist for EV owners to install chargers in their homes. However, deployment of these chargers has not kept up with demand, primarily due to issues in project planning, permitting processes, and unforeseen delays. This paper serves as a review of the current understanding of these and other non-hardware costs in EV charging infrastructure projects (collectively known as “soft costs”). We found that soft costs in EV charging infrastructure projects are not well understood. Specifically, there is little agreement on how soft costs should be categorized and tracked, and less agreement still on best practices for controlling these costs and lowering barriers to infrastructure deployment. A broader review of EV charging infrastructure cost analyses shows that these costs can have significant impacts on project outcomes. EV charging infrastructure projects may be able to examine the success of the solar industry in lowering soft costs, and a similar effort may lower project costs significantly. Further work on standardizing and collecting data on EV charging infrastructure costs is required to begin addressing and controlling these costs.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator (Third Quarter 2023)

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE's) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the third calendar quarter of 2023 (Q3 2023) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared to the infrastructure requirement scenario outlined in the National Renewable Energy Laboratory (NREL) report, The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the fifteenth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and NREL publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗