At least 19 records

EVI-X Electric Vehicle Infrastructure Toolbox

The Electric Vehicle Infrastructure Toolbox offers resources for estimating charging infrastructure needs and associated electrical demands based on user-defined electric vehicle adoption scenarios. For more information and additional resources, see the full EVI-X modeling suite of electric vehicle charging infrastructure analysis tools.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

National Electric Vehicle Infrastructure Formula Program (NEVI) Brief for State Public Utility Commissions

The National Electric Vehicle Infrastructure (NEVI) Formula Program (NEVI program) is a funding opportunity for all 50 U.S. states, the District of Columbia, and Puerto Rico, established by the Bipartisan Infrastructure Law (BIL). The NEVI program instructs states to “strategically deploy electric vehicle (EV) charging infrastructure and to establish an interconnected network to facilitate data collection, access, and reliability.” The NEVI program allocates more than $\$$5 billion to states from Fiscal Year (FY) 2022 to 2026 on a formula basis. NEVI funds are available to private entities, including utilities, to build EV Supply Equipment (EVSE)1 and associated EV grid infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

National Electric Vehicle Infrastructure Formula Program Annual Report: Plan Year 2022-2023

The National Electric Vehicle Infrastructure (NEVI) Formula Program provides nearly $5 billion over 5 years to help states, the District of Columbia, and Puerto Rico (hereafter referred to as “states”) create a network of fast EV charging stations along designated Federal Highway Administration (FHWA) Alternative Fuel Corridors (AFCs), with emphasis along the Interstate Highway System. The first-year deployment plans were submitted to and reviewed by the Joint Office and FHWA and certified by FHWA in September 2022. To support the rollout of the NEVI Formula Program, the Joint Office has been providing technical assistance to the states since February 2022 and has developed DriveElectric.gov to serve as the front door for federal efforts to build out a national charging network. This report summarizes the key activities of the Joint Office in relation to the NEVI program and provides an individual and collective overview of the first-year deployment plans. The Joint Office will utilize the summary of these plans to inform program improvement and future technical assistance activities to support the states as they begin to implement their EV charging infrastructure.

33 ADVANCED PROPULSION SYSTEMS↗

National Electric Vehicle Infrastructure Formula Program (ANNUAL REPORT | PLAN YEAR 2023–2024)

The 2021 Infrastructure Investment and Jobs Act, also known as the Bipartisan Infrastructure Law (BIL), invests $\$$7.5 billion to build out a national electric vehicle (EV) charging network and created the Joint Office of Energy and Transportation (Joint Office) to “study, plan, coordinate, and implement issues of joint concern between the two agencies.” The BIL represents a historic effort to electrify the U.S. transportation system, which has significant potential to reduce U.S. greenhouse gas emissions and help tackle the climate crisis. The U.S. transportation sector accounts for one-third of the nation’s greenhouse gas emissions—the largest share of all primary sectors, including electricity production, industry, commercial and residential, and agriculture. The National Electric Vehicle Infrastructure (NEVI) Formula Program, one of the BIL funding programs, was launched in February 2022, providing nearly $\$$5 billion over 5 years to help states, the District of Columbia, and Puerto Rico (hereafter referred to as “states”) create a network of EV charging stations beginning with designated Federal Highway Administration (FHWA) Alternative Fuel Corridors (AFCs), with an emphasis on the Interstate Highway System. The funding is made available to the states in allocations each year pending FHWA certification of the state’s annual deployment plan. The NEVI program is in its third year, so there's a lot to celebrate. As of July 2024, 39 states have released solicitations for their NEVI programs and eight states have opened their first NEVI-funded stations (61 ports in total), which have already powered thousands of charging sessions for EV drivers across America. Additional stations are in the pipeline with more than 2,500 additional ports having been awarded or conditionally awarded by the states. All states released their Fiscal Year (FY) 2024 deployment plan updates to reflect the new minimum requirements and guidance, and several states added newly designated EV AFCs in their FY 2024 deployment plan updates, bringing the total AFC network of EV corridors to more than 81,000 miles.

33 ADVANCED PROPULSION SYSTEMS↗

EVI-RoadTrip™: Electric Vehicle Infrastructure for Road Trips [SWR-22-17]

The EVI-RoadTrip™ tool offers high-resolution refueling network design and analysis to inform electric vehicle (EV) charging infrastructure development for road trips or long-distance travels. EVI-RoadTrip helps infrastructure planners, analysts, and decision makers evaluate EV energy consumption and corresponding charging demands along the routes-between origin and destination. It considers the projected location and characteristics of charging stations, potential electric grid impacts, and required infrastructure improvements. Strategically located charging stations for long-distance travel are critical to enabling the widespread adoption of EVs by allowing them to travel further beyond city or town boundaries. Sophisticated analysis and planning can identify the points (e.g., corridors) that may require increased availability of EV charging stations to support electrified road trips.

Wood, Eric↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

EVI-EnSitePy (Electric Vehicle Infrastructure – Energy Estimation and Site Optimization Tool in Python) [EVI-X Modeling Suite] [SWR-25-07]

EVI-EnSitePy is a comprehensive agent-based tool designed for the analysis and design of high-power charging sites, encompassing a wide array of site agents including Electric Vehicles (EVs), chargers, energy storage units (ESS), renewable energy resources (DER), and loads. This versatile tool offers diverse functionalities and a modular modeling approach, allowing detailed configuration of agents based on power ratings, port numbers, energy capacities, demand requirements, charger interfaces, and flexibility to customize the tool for project specific goals. By simulating agent interactions and employing various metrics, EVI-EnSitePy enables the assessment of site performance, exploration of energy management systems (EMS), and implementation of innovative EV charging policies. Utilizing EV charge schedules and arrival states, the tool performs thorough charging site simulations, with outputs consisting of agent and site-level power profiles and statistical metrics. Employing a tree graph structure, EVI-EnSitePy supports nested site structures and power distribution modeling. The tool's ability to generate charging schedules deterministically or via stochastic analysis further enhances its versatility. Through its features and capabilities, EVI-EnSitePy offers a powerful platform for informed decision-making in the realm of high-power charging site design and operation.

Jackson, Derek [National Renewable Energy Laborato↗

Challenges to Rural Service Transformers on Increased Electric Vehicle Charging Infrastructure

As Electric Vehicle (EV) electric charging demand increases so to does the corresponding load requirements for charging the vehicles. The expansion of power distribution assets is therefore a critical issue to address on whether rural service transformers can handle the increase in EV load demand. Large-scale EV deployment is likely to cause problems in the localized distributions systems bringing challenges such as increased load demand, increased system losses, and additional voltage drops. This paper investigates how rural service transformer resiliency plays an important role in these challenges. EV charging can create new load peaks exceeding the service transformer's rated capacity, thereby accelerating equipment aging. EV charging can also both positively and negatively affect transformer aging. The core purpose of this paper is to investigate that change in service life of rural service transformers.

Mukherjee, Srijib↗

Consequence-Driven Cybersecurity for High-Power Electric Vehicle Charging Infrastructure

Cybersecurity of high-power charging infrastructure for electric vehicles (EVs) is critical to the safety, reliability, and consumer confidence in this publicly accessible technology. Cybersecurity vulnerabilities in high-power EV charging infrastructure may also present risks to broader transportation and energy-infrastructure systems. Here, this paper details a methodology used to analyze and prioritize high-consequence events that could result from cybersecurity sabotage to high-power charging infrastructure. The highest prioritized events are evaluated under laboratory conditions for the severity of impact and the complexity of cybersecurity manipulation. Mitigation solutions and strategies are presented to secure the vulnerabilities that potentially lead to high-consequence events. These mitigations can be immediately implemented by industry or executed during the design stage.

25 ENERGY STORAGE↗

Implementation Guide for Minimum Required Error Codes in Electric Vehicle Charging Infrastructure

With the growing adoption of Electric Vehicles (EVs), there is an increasing need for a reliable EV charging infrastructure. To help meet this need, the report “Recommendations for Minimum Required Error Codes for Electric Vehicle Charging Infrastructure,” recommends a set of minimum required error codes (MRECs) and their functional and responsibility classification. Charger manufacturers, charging station operators, EV manufacturers, and other stakeholders in the North American market are encouraged to uniformly adopt the MRECs to enhance EV charging error reporting, interpretation, and diagnostics. This document serves as a guide to enable uniform implementation of the MRECs using the Open Charge Point Protocol (OCPP).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure

With the support of DOE's Vehicle Technologies Office and the DOE/DOT Joint Office (JO), NREL has applied the EVI-X modeling suite to conduct a National Electric Vehicle Infrastructure Needs Assessment. This report considers a 2030 scenario in which 50% of light-duty sales are electric (including plug-in hybrids), resulting in an on-road stock of 33 million vehicles. We consider the needs of vehicles used for typical daily driving, drivers without access to residential charging, corridor charging supporting long-distance travel, and ride-hailing electrification. We find that a cumulative capital investment of $82 billion in public and private charging infrastructure will be necessary in our baseline scenario (approximately 3x greater than our estimate of planned investments to date). This result is framed as a conservative estimate as the assumed costs include charging equipment and installation but exclude the cost of grid upgrades and distributed energy resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator (Third Quarter 2023)

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE's) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the third calendar quarter of 2023 (Q3 2023) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared to the infrastructure requirement scenario outlined in the National Renewable Energy Laboratory (NREL) report, The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the fifteenth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and NREL publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Fourth Quarter 2023

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE's) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the fourth calendar quarter of 2023 (Q4 2023) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared to the infrastructure requirement scenario outlined in the National Renewable Energy Laboratory (NREL) report, The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the sixteenth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and NREL publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Second Quarter 2024

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE's) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the second calendar quarter of 2024 (Q2 2024) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared to the infrastructure requirement scenario outlined in the National Renewable Energy Laboratory (NREL) report, "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure" (https://www.nrel.gov/docs/fy23osti/85654.pdf). This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the 18th report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and NREL publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: First Quarter 2024

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE's) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the first calendar quarter of 2024 (Q1 2024) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared to the infrastructure requirement scenario outlined in the National Renewable Energy Laboratory (NREL) report, "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure" (https://www.nrel.gov/docs/fy23osti/85654.pdf). This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the 17th report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and NREL publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗