At least 19 records

Report on High Energy Arcing Fault Experiments

This report documents an experimental program designed to investigate High Energy Arcing Fault (HEAF) phenomena for medium voltage electrical switchgear containing aluminum conductors. This report covers full-scale laboratory experiments using representative nuclear power plant (NPP) three-phase electrical equipment. Electrical, thermal, and pressure data were recorded for each experiment and documented in this report. This report covers four of the fourteen planned medium voltage electrical enclosure experiments. Subsequent reports will document the additional experiments performed in the future. The experiments were performed at KEMA Labs located in Chalfont, Pennsylvania. The experimental design, setup, and execution were completed by staff from the United States Nuclear Regulatory Commission (NRC), the National Institute of Standards and Technology (NIST), Sandia National Laboratories (SNL) and KEMA. In addition, representatives from the Electric Power Research Institute (EPRI) observed some of the experimental setups and execution. The HEAF experiments were performed on four near-identical units of General Electric metal-clad medium voltage switchgear. The three-phase arcing fault was initiated on the primary cable connection bus. All four experiments used the same system voltage (6.9 kV) but varied the current and duration. Real-time electrical operating conditions, including voltage, current and frequency, were measured during the experiments. Heat fluxes and incident energies were measured with plate thermometers and slug calorimeters at various locations around the electrical enclosures. Internal enclosure pressures were measured during the experiments. The experiments were documented with normal and high-speed videography, infrared imaging, and photography. Insights from the experimental series included timing information related to enclosure breach, event progression, mass loss measurements for electrodes and steel enclosures, peak pressure rise, particle analysis, along with visual and thermal imaging data to better understand and characterize the hazard. These results will be used in subsequent efforts to advance the state of knowledge related to HEAF.

42 ENGINEERING↗

Plasmonic enhanced ultrafast switch.

Ultrafast electronic switches fabricated from defective material have been used for several decades in order to produce picosecond electrical transients and TeraHertz radiation. Due to the ultrashort recombination time in the photoconductor materials used, these switches are inefficient and are ultimately limited by the amount of optical power that can be applied to the switch before self-destruction. The goal of this work is to create ultrafast (sub-picosecond response) photoconductive switches on GaAs that are enhanced through plasmonic coupling structures. Here, the plasmonic coupler primarily plays the role of being a radiation condenser which will cause carriers to be generated adjacent to metallic electrodes where they can more efficiently be collected.

42 ENGINEERING↗

Thermoacoustic Thermometry for Nuclear Reactor Monitoring

On Friday, March 11, 2011, at 2:46pm (Japan Standard Trme), the Tohoku region on the east coast of northern Japan experi­enced what would become known as the largest earthquake in the country's history at magnitude 9.0 on the Richter scale. The Fukushima Daiichi nuclear power plant suffered exten­sive and irreversible damage. Six operating units were at the site, each with a boiling water reactor. When the earthquake struck, three of the six reactors were operating and the others were in a periodic inspection outage phase. In one reactor, all of the fuel had been relocated to a spent fuel pool in the reactor building. The seismic acceleration caused by the earthquake brought the three operating units to an automatic shutdown. Since there was damage to the power transmission lines, the emergency diesel generators (EDG) were automat­ically started to ensure continued cooling of the reactors and spent fuel pools. The situation was under control until the tsunami hit about forty-five minutes later with a maximum wave height of approximately 15 meters, which was three times taller than the sea wall of 5m. The influx of water submerged the EDGs, the electrical switchgear, and dc batteries, resulting in the total loss of power to five of the six reactors. The flooding also resulted in the loss of instrumentation that would have other­ wise been used to monitor and control the emergency. The ugly aftermath included high radiation exposure to operators at the nuclear power plants and early contamina­tion of food supplies and water within several restricted areas in Japan, where high radiation levels have rendered them un­safe for human habitation. While the rest of the story will remain a tragic history, it is this part of the series of unfortunate events that has inspired our research. It has indubitably highlighted the need for a novel sensor and instrumentation system that can withstand similar or worse conditions to avoid future catastrophe and assume damage prevention as quickly as possible. This is the question which we are attempting to answer: Is it possible to implement a self-powered sensor that could transmit data independently of electronic networks while taking advantage of the harsh operating environment of the nuclear reactor?

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Synergistic Smart Fuel For In-pile Nuclear Reactor Measurements

In March 2011, an earthquake of magnitude 9.0 on the Richter scale struck Japan with its epicenter on the northeast coast, near the Tohoku region. In addition to the immense physical destruction and casualties across the country, several nuclear power plants (NPP) were affected. It was the Fukushima Daiichi NPP that experienced the most severe and irreversible damage. The earthquake brought the reactors at Fukushima to an automatic shutdown and because the power transmission lines were damaged, emergency diesel generators (EDGs) were activated to ensure that there was continued cooling of the reactors and spent fuel pools. The situation was being successfully managed until the tsunami hit about forty-five minutes later with a maximum wave height of approximately 15 m. The influx of water submerged the EDGs, the electrical switchgear, and dc batteries, resulting in the total loss of power to the reactors.2 At this point, the situation became critical. There was a loss of the sensors and instrumentation within the reactor that could have provided valuable information to guide the operators to make informed decisions and avoid the unfortunate events that followed. In the light of these events, we have developed and tested a potential self-powered thermoacoustic system, which will have the ability to serve as a temperature sensor and can transmit data independently of electronic networks. Such a device is synergistic with the harsh environment of the nuclear reactor as it utilizes the heat from the nuclear fuel to provide the input power.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Transitioning from Construction to Startup at WTP from a Plant Engineering Perspective - 16461

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a one-of-a-kind facility being designed, built and commissioned for the U.S. Department of Energy by Bechtel National, Inc. and principal subcontractor URS to solidify liquid radioactive waste stored in underground tanks at the Hanford Site. WTP consists of 20 infrastructure facilities and structures, known as Balance of Facilities, designed to support the Plant's four major facilities - Pretreatment Facility, High-Level Waste Vitrification Facility, Low-Activity Waste Vitrification Facility and the Analytical Laboratory. As construction moves toward startup and commissioning, a turnover process facilitates the transition of facilities and systems between organizations. The transition from Construction is initiated by an approved Design Completion List, which documents that design and construction have been completed, and the facility or system is ready for startup testing. Qualified individuals perform an inspection to ensure the facility or system has been constructed per the design during an eight-week engineering walk-down. During this phase in turnover, Plant Engineering personnel are responsible for updating and maintaining the Master Equipment List, developing spare parts recommendations, developing and issuing instrument calibration data sheets, evaluating temporary modifications, and supporting plant operations and maintenance activities. As of 2015, two electrical switchgear buildings and the non-radioactive liquid waste disposal system have been turned over from Construction to Startup. This paper discusses the turnover process, organizational interfaces, and experiences from a Plant Engineering perspective. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Flexible electrical conductors for high-temperature switchgear

Arch-shaped conductors fabricated from flat strips of beryllium oxide dispersion-strengthened copper alloy serve as flexible electrical connectors capable of operating in 1000 deg F temperature range, under vacuum conditions for periods of 10,000 hours or more without failure.

Koutnik, E. A.↗