Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Toward an electrical power utility for space exploration

Plans for space exploration depend on today's technology programs addressing the novel requirements of space-based enterprise. The requirements for electrical power will be formidable: megawatts in magnitude, reliability for multi-year missions and the flexibility to adapt to needs unanticipated at design time. The reasons for considering the power management and distribution in the various systems from a total mission perspective, rather than simply extrapolating current spacecraft design practice, are discussed. A utility approach to electric power being developed at the Lewis Research Center is described. It integrates requirements from a broad selection of current development programs with studies in which both space and terrestrial technologies are conceptually applied to exploration mission scenarios.

Bercaw, Robert W.↗

Siting solar thermal power experiments

The Small Community Solar Thermal Power Experiment will test a point-focusing, distributed receiver system in a small community, electric utility application. Site planning is becoming increasingly important for solar experiments as well as all kinds of development due to increased competition for desirable sites and increased complexity of regulatory requirements. Siting issues can be categorized as: (1) resources and physical environmental at this site; (2) acquisition, permits and regulations; and (3) development requirements and costs. These issues are addressed with respect to the unique requirements of solar thermal power experiments.

Holbeck, H. J.↗

Electric-Power System Simulator

Shows different combinations of generation, storage, and load components: display, video monitor with keyboard input to microprocessor, and video monitor for display of load curves and power generation. Planning tool for electric utilities, regulatory agencies, and laymen in understanding basics of electric-power systems operation.

Caldwell, R. W.↗

Electric utility acid fuel cell stack technology advancement

The principal effort under this program was directed at the fuel cell stack technology required to accomplish the initial feasibility demonstrations of increased cell stack operating pressures and temperatures, increased cell active area, incorporation of the ribbed substrate cell configuration at the bove conditions, and the introduction of higher performance electrocatalysts. The program results were successful with the primary accomplishments being: (1) fabrication of 10 sq ft ribbed substrate, cell components including higher performing electrocatalysts; (2) assembly of a 10 sq ft, 30-cell short stack; and (3) initial test of this stack at 120 psia and 405 F. These accomplishments demonstrate the feasibility of fabricating and handling large area cells using materials and processes that are oriented to low cost manufacture. An additional accomplishment under the program was the testing of two 3.7 sq ft short stacks at 12 psia/405 F to 5400 and 4500 hours respectively. These tests demonstrate the durability of the components and the cell stack configuration to a nominal 5000 hours at the higher pressure and temperature condition planned for the next electric utility power plant.

Congdon, J. V.↗

Electrical load management at the Goldstone DSN Complex

A Power Load Management Plan was deveoped which utilizes the unique power generating capabilities of the stations to reduce the stress on the local utility's reserve capacity and reduce the cost of electrical power at the stations. The plan has greatly reduced the cost of Goldstone electrical power by completely eliminating the use of commercial power during the local utility's high usage periods each day.

Rayburn, J. C.↗

Hurricane Preparedness and Control Plan

This plan establishes policy and sets forth guidance, responsibilities and procedures utilized by Federal Electric Corp., communications department in support of the KSC Emergency Preparedness Plan, Annex A, Hurricane Control Plan (GP-355) dated 27 May 1971. This plan covers all FEC communications department personnel, facilities, and equipment situated at the Kennedy Space Center that are the responsibility of FEC contract NAS 10-4967.

Source record↗

eVTOL Vehicle-Agnostic Instrument Flight Procedures Test Plan

NASA Advanced Air Mobility National Campaign is researching the utility of electric vertical takeoff and land (eVTOL) advanced air mobility (AAM) instrument flight procedures. The result will be dynamic and tailored procedures that align to the following modus operandi: maximize safety, optimize efficiency, support passenger comfort and minimize acoustics. This is achieved through dynamic airspace procedure design, which is a modular approach to create an airspace construct that customizes procedures to vehicle design and configuration, operation and environmental conditions. The test plan supports different eVTOL platforms and envisioned operations for flight test or simulation and may be leveraged by AAM aircraft manufacturers and operators for any given aircraft, location and operation.

eVTOL test plan↗

Greased Lightning (GL-10) Performance Flight Research: Flight Data Report

Modern aircraft design methods have produced acceptable designs for large conventional aircraft performance. With revolutionary electronic propulsion technologies fueled by the growth in the small UAS (Unmanned Aerial Systems) industry, these same prediction models are being applied to new smaller, and experimental design concepts requiring a VTOL (Vertical Take Off and Landing) capability for ODM (On Demand Mobility). A 50% sub-scale GL-10 flight model was built and tested to demonstrate the transition from hover to forward flight utilizing DEP (Distributed Electric Propulsion)[1][2]. In 2016 plans were put in place to conduct performance flight testing on the 50% sub-scale GL-10 flight model to support a NASA project called DELIVER (Design Environment for Novel Vertical Lift Vehicles). DELIVER was investigating the feasibility of including smaller and more experimental aircraft configurations into a NASA design tool called NDARC (NASA Design and Analysis of Rotorcraft)[3]. This report covers the performance flight data collected during flight testing of the GL-10 50% sub-scale flight model conducted at Beaver Dam Airpark, VA. Overall the flight test data provides great insight into how well our existing conceptual design tools predict the performance of small scale experimental DEP concepts. Low fidelity conceptual design tools estimated the (L/D)( sub max)of the GL-10 50% sub-scale flight model to be 16. Experimentally measured (L/D)( sub max) for the GL-10 50% scale flight model was 7.2. The aerodynamic performance predicted versus measured highlights the complexity of wing and nacelle interactions which is not currently accounted for in existing low fidelity tools.

McSwain, Robert G.↗

Kennedy Space Center's Partnership with Graftel Incorporated

NASA Kennedy Space Center (KSC) has recently partnered with Graftel Incorporated under an exclusive license agreement for the manufacture and sale of the Smart Current Signature Sensor. The Smart Current Signature Sensor and software were designed and developed to be utilized on any application using solenoid valves. The system monitors the electrical and mechanical health of solenoids by comparing the electrical current profile of each solenoid actuation to a typical current profile and reporting deviation from its learned behavior. The objective of this partnership with Graftel is for them to develop the technology into a hand-held testing device for their customer base in the Nuclear Power Industry. The device will be used to perform diagnostic testing on electromechanical valves used in Nuclear Power plants. Initially, Graftel plans to have working units within the first year of license in order to show customers and allow them to put purchase requests into their next year's budget. The subject technology under discussion was commercialized by the Kennedy Space Center Technology Programs and Partnerships Office, which patented the technology and licensed it to Graftel, Inc., a company providing support, instrumentation, and calibration services to the nuclear community and private sector for over 10 years. For the nuclear power industry, Graftel designs, manufacturers, and calibrates a full line of testing instrumentation. Grafters smart sensors have been in use in the United States since 1993 and have proved to decrease set-up time and test durations. The project was funded by Non-Destructive Engineering, and it is felt that this technology will have more emphasis on future vehicles. Graftel plans to market the Current Signature Sensor to the Electric Utility industry. Graftel currently supplies product and services to the Nuclear Power Industry in the United States as well as internationally. Product and services sold are used in non-destructive testing for valves, penetrations and other applications. Graftel also supplies testing services to an industrial customer base. The customer base includes 90 percent of the U.S. Nuclear plants and plants in Brazil, Europe, and Asia. Graftel works internationally with two representative groups and employees and has ten people at the principle location and a group of contract engineers around the country.

Dunn, Carol Anne↗

Innovations for ISS Plug-In Plan (IPiP) Operations

Limited resources and increasing requirements will continue to influence decisions on ISS. The ISS Plug-In Plan (IPiP) supports power and data for utilization, systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Given the fluid launch schedule, the focus of the Plug-In Plan has evolved to anticipate future requirements by judicious development and delivery of power supplies, power strips, Alternating Current (AC) power inverters, along with innovative deployment strategies. A partnership of ISS Program Office, Engineering Directorate, Mission Operations, and International Partners poses unique solutions with existing on-board equipment and resources.

Moore, Kevin D.↗

Evolutionary growth for Space Station Freedom electrical power system

Over an operational lifetime of at least 30 yr, Space Station Freedom will encounter increased space station user requirements and advancing technologies. The space station electrical power system is designed with the flexibility to accommodate these emerging technologies and expert systems and is being designed with the necessary software hooks and hardware scars to accommodate increased growth demand. The electrical power system is planned to grow from the initial 75 kW up to 300 kW. The Phase 1 station will utilize photovoltaic arrays to produce the electrical power; however, for growth to 300 kW, solar dynamic power modules will be utilized. Pairs of 25 kW solar dynamic power modules will be added to the station to reach the power growth level. The addition of solar dynamic power in the growth phase places constraints in the initial space station systems such as guidance navigation and control, external thermal, truss structural stiffness, computational capabilities and storage which must be planned-in in order to facilitate the addition of the solar dynamic modules.

Marshall, Matthew F.↗

Evolutionary growth for Space Station Freedom electrical power system

Over an operational lifetime of at least 30 yr, Space Station Freedom will encounter increased Space Station user requirements and advancing technologies. The Space Station electrical power system is designed with the flexibility to accommodate these emerging technologies and expert systems and is being designed with the necessary software hooks and hardware scars to accommodate increased growth demand. The electrical power system is planned to grow from the initial 75 kW up to 300 kW. The Phase 1 station will utilize photovoltaic arrays to produce the electrical power; however, for growth to 300 kW, solar dynamic power modules will be utilized. Pairs of 25 kW solar dynamic power modules will be added to the station to reach the power growth level. The addition of solar dynamic power in the growth phase places constraints in the initial Space Station systems such as guidance, navigation, and control, external thermal, truss structural stiffness, computational capabilities and storage, which must be planned-in, in order to facilitate the addition of the solar dynamic modules.

Marshall, Matthew Fisk↗

Get the Power You Need, When and Where You Need It Aboard the International Space Station (ISS) Using the ISS Plug-In Plan (IPiP) Requirement Request Process

Trying to get your experiment aboard ISS? You likely will need power. Many enditem providers do. ISS Plug-In Plan (IPiP) supports power and data for science, Payloads (or Utilization), vehicle systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Yet limited resources and increasing requirements continue to influence decisions on deployment of ISS end items. Given the fluid launch schedule and the rapidly- increasing number of end item providers requiring power support, the focus of the Plug-In Plan has evolved from a simple FIFO recommendation to provide power to end item users, to anticipating future requirements by judicious development and delivery of support equipment (cables, power supplies, power strips, and alternating current (AC) power inverters), employing innovative deployment strategies, and collaborating on end item development. This paper describes the evolution of the ISS Program Office, Engineering Directorate, Flight Operations Directorate (FOD), International Partners and the end item provider relationship and how collaboration successfully leverages unique requirements with limited on- board equipment and resources, tools and processes which result in more agile integration, and describes the process designed for the new ISS end item provider to assure that their power requirements will be met.

Moore, Kevin D.↗

Solar power satellite: System definition study. Part 1, volume 1: Executive summary

A study of the solar power satellite system, which represents a means of tapping baseload electric utility power from the sun on a large scale, was summarized. Study objectives, approach, and planning are presented along with an energy conversion evaluation. Basic requirements were considered in regard to space transportation, construction, and maintainability.

Source record↗

40kW Fission Surface Power System (FSPS) Deployability

Continuous power at the kilowatt level will be imperative for future lunar users including crew infrastructure, future science, and in-situ resource utilization (ISRU). The Compass Team explored both 10 kilowatt electric (kWe) and 40 kWe concepts, assuming planned lander and rover capabilities. Both concepts found that a crew pressurized rover chassis, repurposed for deploying reactor power components, could place a fission surface power system (FSPS) at least one kilometer from users. While the 10 kWe fission power system (FPS) could be deployed as a single unit, the 40 kWe system was too large and had to be deployed in multiple trips with the same rover. Key technologies and design approaches included a high-assay low-enriched uranium (HALEU), yttrium hydride (YH) moderated heat pipe reactor, Stirling convertors, deployable radiators based on International Space Station (ISS) designs, and power conversion/transmission at ±2800 volts of direct current (VDC).

Lunar reactor 40kW fission deployable↗

NASA Advanced Reconfigurable Electrified Aircraft Laboratory (AREAL)

The rapid maturation of electrified aircraft and the underlying technologies has outpaced the development of corresponding standards and guidelines. This is especially true with respect to the design and test of high voltage power systems and equipment. To expedite the development of these standards and guidelines, the National Aeronautics and Space Administration (NASA) Revolutionary Vertical Lift Technology (RVLT) Project has designed and built the Advanced Reconfigurable Electrified Aircraft Laboratory (AREAL). AREAL is a 200 kW High Voltage DC (HVDC) test facility that can be reconfigured to test various electrical power system (EPS) architectures and/or different types of Utilization Equipment (UE). This paper will cover AREAL and its capabilities, the testing planned within AREAL, and how the tests performed within AREAL will inform developing HVDC Power System standards, test methods and guidelines, and models.

Aerospace↗

Solar thermal power plants in small utilities - An economic impact analysis

A study was performed to assess the potential economic impact of small solar thermal electric power systems in statistically representative synthetic small utilities of the Southwestern United States. Power supply expansion plans were compared on the basis of present worth of future revenue requirements for 1980-2000 with and without solar thermal plants. Coal-fired and oil-fired municipal utility expansion plans with 5 percent solar penetration were 0.5 percent and 2.25 percent less expensive, respectively, than the corresponding conventional plan. At $969/kWe, which assumes the same low cost solar equipment but no improvement in site development costs, solar penetration of 5 percent in the oil-fired municipal reduced revenue requirements 0.88 percent. The paper concludes that some solar thermal plants are potentially economic in small community utilities of the Southwest.

Bluhm, S. A.↗