Search NASA⌕ Search

SEARCH · Search NASA

Results for “Enabling Extreme Real-Time Grid Integration of Solar Energy (ENERGISE)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

U.S. Department of Energy (DOE) Enabling Extreme Real-Time Grid Integration of Solar Energy (ENERGISE) Project: Multiday and Intraday Energy Availability Product [Slides]

This presentation will provide an overview of the development of a Multi-Day Energy Availability Product under the DOE ENERGISE project, conducted in collaboration with Southwest Power Pool (SPP), the National Laboratory of the Rockies, Polaris, and the Electric Power Research Institute (EPRI). Existing market clearing processes are limited to day-ahead and real-time horizons, which may result in insufficient pricing signals and compensation for resource availability over multi-day timeframes (e.g., incentives for fuel procurement and energy-limited resource preparedness). This effort aims to develop a new market product and associated clearing process to value and procure resource energy availability over a multi-day horizon. The team will present progress to date and solicit advisory group feedback on proposed methodologies and preliminary findings.

14 SOLAR ENERGY↗

Enhanced Control, Optimization, and Integration of Distributed Energy Applications (ECO-IDEA)

With support from the U.S. Department of Energy Solar Energy Technologies Office, the National Renewable Energy Laboratory (NREL) partnered with Xcel Energy, Schneider Electric, Varentec, and Electric Power Research Institute (EPRI) to meet the goals of the Enabling Extreme Real-Time Grid Integration of Solar Energy (ENERGISE) program. This project developed and validated an innovative data-enhanced hierarchical control architecture that enables the efficient, reliable, resilient, and secure operation of future distribution systems with a high penetration of distributed energy resources like solar energy. The architecture enables a hybrid control approach where a centralized control layer is complemented by distributed control algorithms for solar inverters and autonomous control of grid edge devices. It is fully interoperable and includes all the cybersecurity aspects necessary for reliable and secure system operation. The hybrid approach can seamlessly integrate multiple voltage-regulation technologies, both at central and grid-edge levels, which enables reliable and efficient system operation in the face of unpredictable conditions. The overarching goal of the Eco-Idea project is to develop, validate, and deploy a unique and innovative Data-Enhanced Hierarchical Control (DEHC) architecture that comprehensively addresses the formidable challenges associated with proliferation of high penetration of distributed PV such as reverse power flows, transients from variability of PV systems, feeder load balancing, and voltage stability. These issues are exposing the weaknesses of existing grid operations and controls - including, but not limited to, lack of grid situational awareness, heuristic and slow-acting control actions, latency of control for emergency situations, and points of failure in communications. The proposed architecture will comprehensively resolve the deficiencies of current operational settings - where monitoring and control solutions proposed across industry and academia may not be interoperable and may not coexist in the same system - and will enable an efficient, reliable, resilient, and secure operation of future distribution systems with penetration of solar energy well beyond current limits. The DEHC architecture was developed and validated rigorously through hardware-in-loop simulations in the laboratory environment and deployed on the field.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Insights from PPL's DERMS Implementation

PPL Electric Utilities’ Keystone Solar Future Project (KSFP) is part of the U.S. Department of Energy’s Office of Energy Efficiency and Renewables, Energy Enabling Extreme Real-time Grid Integration of Solar Energy (ENERGISE) grant. The three-year project, beginning in October, 2017, funded an innovative pilot program to develop and evaluate a technology platform and framework for managing high levels of distributed energy resources (DER), and improving future DER interconnection. The KSFP aimed to bridge gaps between existing and future technology, including Distributed Energy Resource Management Systems (DERMS), by monitoring, managing, and optimizing a system with high penetration of solar and other DER. Specifically, the project worked to make Demand Management Systems (DMS) applications, devices, and real-time communications technology DER-aware to allow for advanced applications for utility operations. Here, by installing and implementing a DERMS, project designers transformed how DERs interact with PPL’s distribution system, offering learnings and results worth sharing industry-wide.

Leader, Jared↗