Search NASA⌕ Search

SEARCH · Search NASA

Results for “Engineering constraints”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Reconciling Scientific Aspirations and Engineering Constraints for a Lunar Mission via Hyperdimensional Interpolation

Virtually every NASA space-exploration mission represents a compromise between the interests of two expert, dedicated, but very different communities: scientists, who want to go quickly to the places that interest them most and spend as much time there as possible conducting sophisticated experiments, and the engineers and designers charged with maximizing the probability that a given mission will be successful and cost-effective. Recent work at NASA's Jet Propulsion Laboratory (JPL) seeks to enhance communication between these two groups, and to help them reconcile their interests, by developing advanced modeling capabilities with which they can analyze the achievement of science goals and objectives against engineering design and operational constraints. The analyses conducted prior to this study have been point-design driven. Each analysis has been of one hypothetical case which addresses the question: Given a set of constraints, how much science can be done? But the constraints imposed by the architecture team-e.g., rover speed, time allowed for extravehicular activity (EVA), number of sites at which science experiments are to be conducted- are all in early development and carry a great deal of uncertainty. Variations can be incorporated into the analysis, and indeed that has been done in sensitivity studies designed to see which constraint variations have the greatest impact on results. But if a very large number of variations can be analyzed all at once, producing a table that includes virtually the entire trade space under consideration, then we have a tool that enables scientists and mission architects to ask the inverse question: For a given desired level of science (or any other objective), what is the range of constraints that would be needed? With this tool, mission architects could determine, for example, what combinations of rover speed, EVA duration, and other constraints produce the desired results. Further, this tool would help them identify which technology-improvement investments would be likely to produce the largest or most important return. However, the number of variations that need to be considered for such analysis quickly balloons to an unwieldy size. If three variations are considered for each of six constraints-a very modest example-there are a total of 243 variations to consider. If it takes 40 minutes to compute each variation, as it does with HURON, our automated optimization system, then it would take 162 hours or nearly 7 days of round-the-clock computing to calculate the results. Adding further constraints or variations exponentially increases the amount of time that is needed.

Weisbin, Charles R.↗

Landing Site Engineering Constraints

Based upon the lander design, constraints are placed upon the landing site selection process in order to mitigate landing risk and optimize mission performance. Constraints are placed on the landing site latitude, elevation, measured rock abundance and terrain slopes within the landing footprint. Estimated mission lifetime and power availability as a function of landing site latitude will be presented. The dimensions of the landing footprint will be given. Plans for obtaining high resolution MOC images of candidate landing sites will be discussed.

Spencer, D.↗

Mangala Valles as a Potential Landing Site for the Mars Surveyor 2001 Lander

Mangala Valles is an outflow channel in the Memnonia region of Mars. Although its origin is still under debate, most researchers believe they represent some form of catastrophic flood system which occurred early in the evolutionary history of Mars. The scientific objective of the Mars Surveyor Program 2001 (MSP 01) landed mission is to examine the ancient climatic and geologic history of Mars; to characterized surface materials with respect to elemental and mineral composition of rock and soils; to identify the role water may have played with respect to evolutionary history of the surface; to look for samples which may contain possible evidence of ancient life; and to collect and store unaltered samples which may be eventually returned to Earth during a later mission (MSP 05 - 2005). As with the Mars Pathfinder lander, the landing site will depend on several engineering constraints. Preliminary engineering constraints for MSP 01 landing site is that the landing site lies with 30 N and -15 S of the equator (due to solar power limitations) and below 2 km elevation. Both the scientific objectives and the engineering constraints can be accommodated with a Mangala Valles landing site.

Anderson, R.↗

Engineering design constraints of the lunar surface environment

Living and working on the lunar surface will be difficult. Design of habitats, machines, tools, and operational scenarios in order to allow maximum flexibility in human activity will require paying attention to certain constraints imposed by conditions at the surface and the characteristics of lunar material. Primary design drivers for habitat, crew health and safety, and crew equipment are: ionizing radiation, the meteoroid flux, and the thermal environment. Secondary constraints for engineering derive from: the physical and chemical properties of lunar surface materials, rock distributions and regolith thicknesses, topography, electromagnetic properties, and seismicity. Protection from ionizing radiation is essential for crew health and safety. The total dose acquired by a crew member will be the sum of the dose acquired during EVA time (when shielding will be least) plus the dose acquired during time spent in the habitat (when shielding will be maximum). Minimizing the dose acquired in the habitat extends the time allowable for EVA's before a dose limit is reached. Habitat shielding is enabling, and higher precision in predicting secondary fluxes produced in shielding material would be desirable. Means for minimizing dose during a solar flare event while on extended EVA will be essential. Early warning of the onset of flare activity (at least a half-hour is feasible) will dictate the time available to take mitigating steps. Warning capability affects design of rovers (or rover tools) and site layout. Uncertainty in solar flare timing is a design constraint that points to the need for quickly accessible or constructible safe havens.

Morrison, D. A.↗

Spatial Audio on the Web: Or Why Can't I hear Anything Over There?

Auditory complexity, freedom of movement and interactivity is not always possible in a "true" virtual environment, much less in web-based audio. However, a lot of the perceptual and engineering constraints (and frustrations) that researchers, engineers and listeners have experienced in virtual audio are relevant to spatial audio on the web. My talk will discuss some of these engineering constraints and their perceptual consequences, and attempt to relate these issues to implementation on the web.

Wenzel, Elizabeth M.↗

Perceptual Fidelity Versus Engineering Compromises in Virtual Acoustic Displays

Immersive, three-dimensional displays are increasingly becoming a goal of advanced human-machine interfaces. While the technology for achieving truly useful multisensory environments is still being developed, techniques for generating three-dimensional sound are now both sophisticated and practical enough to be applied to acoustic displays. The ultimate goal of virtual acoustics is to simulate the complex acoustic field experienced by a listener freely moving around within an environment. Of course, such complexity, freedom of movement and interactivity is not always possible in a 'true' virtual environment, much less in lower-fidelity multimedia systems. However, many of the perceptual and engineering constraints (and frustrations) that researchers, engineers and listeners have experienced in virtual audio are relevant to multimedia. In fact, some of the problems that have been studied will be even more of an issue for lower fidelity systems that are attempting to address the requirements of a huge, diverse and ultimately unknown audience. Examples include individual differences in head-related transfer functions, A lack of real interactively (head-tracking) in many multimedia displays, and perceptual degradation due to low sampling rates and/or low-bit compression. This paper discusses some of the engineering constraints faced during implementation of virtual acoustic environments and the perceptual consequences of these constraints. Specific examples are given for NASA applications such as telerobotic control, aeronautical displays, and shuttle launch communications. An attempt will also be made to relate these issues to low-fidelity implementations such as the internet.

Wenzel, Elizabeth M.↗

Perceptual Fidelity vs. Engineering Compromises In Virtual Acoustic Displays

Immersive, three-dimensional displays are increasingly becoming a goal of advanced human-machine interfaces. While the technology for achieving truly useful multisensory environments is still being developed, techniques for generating three-dimensional sound are now both sophisticated and practical enough to be applied to acoustic displays. The ultimate goal of virtual acoustics is to simulate the complex acoustic field experienced by a listener freely moving around within an environment. Of course, such complexity, freedom of movement and interactively is not always possible in a "true" virtual environment, much less in lower-fidelity multimedia systems. However, many of the perceptual and engineering constraints (and frustrations) that researchers, engineers and listeners have experienced in virtual audio are relevant to multimedia. In fact, some of the problems that have been studied will be even more of an issue for lower fidelity systems that are attempting to address the requirements of a huge, diverse and ultimately unknown audience. Examples include individual differences in head-related transfer functions, a lack of real interactively (head-tracking) in many multimedia displays, and perceptual degradation due to low sampling rates and/or low-bit compression. This paper discusses some of the engineering Constraints faced during implementation of virtual acoustic environments and the perceptual consequences of these constraints. Specific examples are given for NASA applications such as telerobotic control, aeronautical displays, and shuttle launch communications. An attempt will also be made to relate these issues to low-fidelity implementations such as the internet.

Wenzel, Elizabeth M.↗

Candidate-Landing Sites and Backups for the Mars Surveyor Program in the Schiaparelli. Crater Region

Our Survey area comprises the Sinus Sabeus NW quadrangle that includes most of the Schiaparelli crater and part of the Arabia SW region (3 N to 15 S Lat.) and (0 to 337.5 W long.) and covers all regions that show a potential hydrogeological link with the Schiaparelli impact structure. This area is hereafter defined as the Schiaparelli Crater Region. The Schiaparelli crater region is one of the most documented MOC targets. Up to now, MGS MOC camera took two dozen images at an average of 5m/pxl resolution that not only provide an exceptional insight on the local geology and morphology, but give also key-elements to assess landing safety criteria. In addition, the MOLA topographic profile No. 23 passes through part of the crater basin allowing the adjustment of the elevation as previously known from the Viking mission (USGS I-2125, 1991). Beyond the Mars Polar Lander mission that will land next December, the future missions (2001 APEX, 2003, and 2005) are led by a series of science objectives and engineering constraints that must be considered in order to select landing sites that will fulfill the Surveyor Program's objectives. The search for a sound and safe candidate-site (without ending up with the usual "safe but boring" or "fascinating but too risky" site) is usually limited by the data available to the investigator, by the data accuracy (e.g. poor image resolution, poor altimetry), and the lack of crucial information for science and safety that can be derived from them. The Schiaparelli region provides an exception to this recurrent pattern. We listed the preliminary constraints for landing site selection identified for the Surveyor '01 mission, in terms of safety requirements and data needed and compared them against the existing information and/or data already available for the Schiaparelli region. The engineering constraints of '03 and '05 are not designated yet but, since they are also related to atmospheric density and Lander designs, we will assume that these points will be comparable to '01. The main difference will reside in the rover design, the Rocky-7 class rover being bigger than Marie Curie ('01) will be able to overcome bigger obstacles. We listed then the main objectives of the Surveyor Program and compared them with the potential offered by the Schiaparelli Crater Region to document them. Within the survey area, the Schiaparelli impact crater is 2.5 S/343.3 W (USGS 1-1376, MC-20 NW, 1981) and occupies a significant surface area. The crater has been proposed as a potential candidate-site in the past years. The purpose of this study is to show that, not only the Schiaparelli Crater would be a high-priority target, but that the region where it is located offer several very-high potential back-up sites, all within science and engineering constraints, that make this region probably the most promising candidate area so far.

Cabrol, Nathalie A.↗

Mars Exploration Rover Landing Site Selection

Selection of the landing sites for the Mars Exploration Rovers has involved over 2 years of research and analysis effort that has included the participation of broad sections of the planetary sciences community through a series of open landing site workshops. The effort has included the definition of the engineering constraints based on the landing system, mapping those engineering constraints into acceptable regions and prospective sites, the acquisition of new information from Mars Global Surveyor and Mars Odyssey orbiters, the evaluation of science and safety criteria for the sites, and the downselection and final site selection based on the sites science potential and safety. The final landing sites (Meridiani Planum and Gusev crater) were selected by NASA Headquarters on April 11, 2003, prior to launch in June. This paper presents engineering requirements, and potential landing sites for Mars Exploration Rovers.

M Golombek↗

Selection and Assessment of Predictions of the Mars Pathfinder Landing Site

The successful landing of the Mars Pathfinder spacecraft on Mars allows the review of the process of selecting the landing site and assessing predictions made for the site based on Viking and Earth-based data. Selection of the landing site for Mars Pathfinder was a two-phase process. The first phase took place from October 1993 to June 1994 and involved: initial identification of engineering constraints, definition of environmental conditions at the site for spacecraft design, and evaluation of the scientific potential of different landing sites. This phase culminated with the first "Mars Pathfinder Landing Site Workshop", held at the Lunar and Planetary Institute in Houston, Texas on April 18-19, 1994, in which suggested approaches and landing sites were solicited from the entire scientific community. A preliminary site was selected by the project for design purposes in June 1994. The second phase took place from July 1994 to March 1996 and involved: developing criteria for evaluating site safety using images and remote sensing data, testing of the spacecraft and landing subsystems (with design improvements) to establish quantitative engineering constraints on landing site characteristics, evaluating all potential landing sites on Mars, and certification of the site by the project. This phase included a second open workshop, "Mars Pathfinder Landing Site Workshop II: Characteristics of the Ares Vallis Region and Field Trips in the Channeled Scabland, Washington" held in Spokane and Moses Lake September 24-30, 1995 and formal acceptance of the site by NASA Headquarters. Engineering constraints on Pathfinder landing sites were developed from the initial design of the spacecraft and the entry, descent and landing scenario. The site must be within 5 degrees of the subsolar latitude at the time of landing (15N for maximum solar power and flexible communications with Earth. It also must be below 0 km elevation to enable enough time for the parachute to bring the lander to the proper terminal velocity for landing. The entire landing ellipse, which is 70 km by 200 km due to navigational, ephemeris and atmospheric uncertainties, must be free of steep slopes, scarps and obvious hazards in Viking orbiter images, have acceptable radar reflectivity, moderate rock abundances and have little or no dust. Scientific considerations of the Mars Pathfinder payload and mission indicate that analyses of "grab bag" samples at the mouths of outflow channels can offer a first order assessment of a variety of rock types on Mars. Highland sites offer the advantage of in situ analysis of ancient rocks on Mars that record crustal differentiation and the nature of the early environment. Dark gray sites offer the potential of analyzing unweathered and unoxidized materials. Following a general assessment of the safety of different sites, a preliminary selection of a "grab bag" site was made. This site, Ares Vallis, is near the mouth of an outflow channel that may contain ancient Noachian terrain, Hesperian ridged plains, and reworked channel materials. All potential landing sites on Mars that met basic safety criteria were analyzed in detail. Sites (100 by 200 km target ellipses) were considered safe if they were below 0 km elevation, were free of obvious hazards (high relief surface features) in high-resolution (< 50 m/pixel) Viking orbiter images and had acceptable reflectivity and roughness at radar wavelengths, high thermal inertia, moderate rock abundance, low red to violet ratio, and low albedo. Only 4 sites on Mars met all the above criteria, which included 1995 opposition 3.5 cm delay-Doppler radar data. Complete data were evaluated for 7 sites and the Viking landing sites for comparison for all the above criteria as well as crater abundance, hill and mesa abundance, slopes over meter to kilometer scales, low altitude winds (from global circulation models and slopes), the size-frequency distribution of large rocks, as well as rover trafficability and science potential. Discussion of potential hazards at Ares Vallis using a variety of data sets (including radar) at a second open workshop, indicated this site cannot be shown to be any more hazardous than the Viking landing sites. Field trips to the Channeled Scabland and the Ephrata Fan, analogs for Ares Vallis and the landing site, respectively, provided valuable insight into possible geologic processes and potential surface characteristics. Three sites met all the data requirements and safety criteria for landing Pathfinder. Ares Vallis was selected by the project because it appeared acceptably safe (although it appeared to have greater rock abundances than other sites, its elevation was likely the best known) and offered the prospect of analyzing a variety of rock types expected to be deposited by catastrophic floods, which would enable addressing first-order scientific questions such as differentiation of the crust, the development of weathering products, and the nature of the early martian environment and its subsequent evolution. The selection was reviewed by an external board at a number of meetings and accepted, and the site was approved by NASA Headquarters. Data gathered by the Pathfinder lander' and rover provides the opportunity to test the predictions made for the site in the selection process based on remote observations from Earth, orbit, and the surface. The discussion below is taken from Golombek et al. to which the reader is referred for a more complete discussion and a complete list of references, which are omitted here for brevity. Many characteristics of the landing site are consistent with its being shaped and deposited by the Ares and Tiu catastrophic floods. The rocky surface is consistent a depositional plain comprising semi-rounded pebbles, cobbles and tabular boulders (some of which appear imbricated and/or inclined in the direction of flow) that appear similar to depositional plains in terrestrial catastrophic floods. The Twin Peaks appear to be streamlined hills in lander images, which is consistent with interpretations of larger hills in Viking orbiter images of the region that suggest the lander is on the flank of a broad, gentle ridge trending northeast from Twin Peaks. This ridge, which is the rise to the north of the lander, is aligned in the downstream direction from the Ares and Tiu Valles floods, and may be a debris tail deposited in the wake of the Twin Peaks. Channels visible throughout the scene may be a result of late stage drainage. As predicted by delay-Doppler radar measurements and tracking results, the average elevation of the center of the site was about the same as Viking Lander I relative to the 6.1 mbar geoid. The Doppler tracking and two-way ranging estimate for the elevation of the spacecraft is only 45 in lower than the Viking I Lander and within 100 in of that expected, which is within the uncertainties of the measurements. After landing, surface pressures and winds (5-10 m/s) were found to be similar to expectations based on Viking data, although temperatures were about 10 K warmer. The temperature profile below 50 km was also roughly 20 K warmer. As a result, predicted densities were 5% higher near the surface and up to 40% lower at 50 km but within the entry, descent and landing design margins. The populations of craters and small hills and the slopes of the hills measured in high-resolution (38 m/pixel) Viking orbiter images and the radar derived slopes of the landing site are all consistent with observations of these properties in the lander images. A rocky surface was expected from Viking Infra-Red Thermal Mapper (IRTM) observations and comparisons with the Viking landing sites. The observed cumulative fraction of area covered by rocks with diameters greater than 3 cm and heights greater than 0.5 in (potentially hazardous to landing) at Ares is similar to that predicted by IRTM observations and models of Viking lander and Earth analog rock size-frequency distributions. The IRTM prediction postulated an effective thermal inertia of 30 (10(exp -3) cgs units - cal/cubic cm/s(exp 0.5)/K) for the rock population, but we obtain a slightly different effective thermal inertia for the actual rock population. The validity of interpretations of radar echoes prior to landing are supported by a simple radar echo model, an estimate of the reflectivity of the soil from its bulk density, and the fraction of area covered by rocks. In the calculations, the soil produces the quasi-specular echo and the rocks produce the diffuse echo. The derived quasispecular cross section is comparable to the cross-sections and reflectivities reported for 3.5-cm wavelength observations. The model yields a diffuse echo that is modestly larger than the polarized diffuse echo reported for 3.5-cm wavelength observations. At 12.5-cm wavelength, similar rock populations at Ares and the Viking I site were expected because the diffuse echoes are comparable, but the large normal reflectivities suggests that bulk densities of the soils at depth are greater than those at the surface. We also obtain a fine-component inertia near 8.4 which agrees with the fine-component inertia of 8.7 (in 10(exp -3) cgs units) estimated from thermal observations from orbit by the IRTM; for this estimate, we used a bulk thermal inertia of 10.4 for the landing site, an effective thermal inertia near 40 (10(exp -3) cgs units) for the rock population, and a graphical representation of Kieffer's model. Color and albedo data for Ares suggested surfaces of materials at Ares Vallis would be relatively dust free or unweathered prior to landing compared with the materials at the Viking landing sites. This suggestion is supported by the abundance of relatively dark-gray rocks at Ares and their relative rarity at the Viking landing sites, where rocks are commonly coated with bright red dust. Finally, the 40 km long Ephrata Fan of the Channeled Scabland in Washington state, which was deposited where c

Golombek, M. P.↗

Preliminary Assessment of Mars Exploration Rover Landing Site Predictions

Selection of the Mars Exploration Rover (MER) landing sites took place over a three year period in which engineering constraints were identified, 155 possible sites were downselected to the final two, surface environments and safety considerations were developed, and the potential science return at the sites was considered. Landing sites in Gusev crater and Meridiani Planum were selected because they appeared acceptably safe for MER landing and roving and had strong morphologic and mineralogical indicators of liquid water in their past and thus appeared capable of addressing the science objectives of the MER missions, which are to determine the aqueous, climatic, and geologic history of sites on Mars where conditions may have been favorable to the preservation of evidence of possible pre-biotic or biotic processes. Engineering constraints important to the selection included: latitude (10 N-15 S) for maximum solar power; elevation (<-1.3 km) for sufficient atmosphere to slow the lander; low horizontal winds, shear and turbulence in the last few kilometers to minimize horizontal velocity; low 10-m scale slopes to reduce airbag spinup and bounce; moderate rock abundance to reduce abrasion or stroke-out of the airbags; and a radar-reflective, load-bearing and trafficable surface safe for landing and roving that is not dominated by fine-grained dust. In selecting the MER landing sites these engineering constraints were addressed via comprehensive evaluation of surface and atmospheric characteristics from existing remote sensing data and models as well as targeted orbital information acquired from Mars Global Surveyor and Mars Odyssey. This evaluation resulted in a number of predictions of the surface characteristics of the sites, which are tested in this abstract. Relating remote sensing signatures to surface characteristics at landing sites allows these sites to be used as ground truth for the orbital data, is essential for selecting and validating landing sites for future missions, and is required for correctly interpreting the surfaces and materials globally present on Mars.

Golombek, M.↗

The effect of noise constraints on engine cycle optimization for long-haul transports

Optimum engine cycles were determined for noise levels of 10, 15, and 20 EPNdB below current FAA regulations, using 200-passenger trijet aircraft flying over ranges from 5555 to 10,200 km at cruise speeds of Mach 0.90 and 0.98. The tests showed that the noise constraints imposed compromises on the optimum cycle with resulting economic penalties. The economic penalties, however, could be effectively offset by applying advanced engine technologies.

Antl, R. J.↗