Search NASA⌕ Search

SEARCH · Search NASA

Results for “Enterprise modeling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A Discrete Event Simulation Approach to Nuclear Arms Enterprise Modeling and Analysis

We overview a discrete event simulation of an arms control enterprise developed to familiarize individuals with the challenges of verification and monitoring at the enterprise level. We will review the design of the simulation applied to a notional country’s nuclear arms enterprise. This simulation models how these nuclear weapons move over their lifetime from deployment, storage, maintenance, and dismantlement. With this output information, we then characterize the “ground truth” of the enterprise. Next, based on these data, we built a sophisticated analysis engine designed to provide treaty monitoring and verification information to support partner country inspectors and their evaluation. This tool was designed to be used as a game, enabling teams to compete on developing the best inspection plan to determine if the host country is complying with the conceptual treaty developed for this effort.

Pulliam, Rachel M.↗

Parallel computing in enterprise modeling.

This report presents the results of our efforts to apply high-performance computing to entity-based simulations with a multi-use plugin for parallel computing. We use the term 'Entity-based simulation' to describe a class of simulation which includes both discrete event simulation and agent based simulation. What simulations of this class share, and what differs from more traditional models, is that the result sought is emergent from a large number of contributing entities. Logistic, economic and social simulations are members of this class where things or people are organized or self-organize to produce a solution. Entity-based problems never have an a priori ergodic principle that will greatly simplify calculations. Because the results of entity-based simulations can only be realized at scale, scalable computing is de rigueur for large problems. Having said that, the absence of a spatial organizing principal makes the decomposition of the problem onto processors problematic. In addition, practitioners in this domain commonly use the Java programming language which presents its own problems in a high-performance setting. The plugin we have developed, called the Parallel Particle Data Model, overcomes both of these obstacles and is now being used by two Sandia frameworks: the Decision Analysis Center, and the Seldon social simulation facility. While the ability to engage U.S.-sized problems is now available to the Decision Analysis Center, this plugin is central to the success of Seldon. Because Seldon relies on computationally intensive cognitive sub-models, this work is necessary to achieve the scale necessary for realistic results. With the recent upheavals in the financial markets, and the inscrutability of terrorist activity, this simulation domain will likely need a capability with ever greater fidelity. High-performance computing will play an important part in enabling that greater fidelity.

97 MATHEMATICS AND COMPUTING↗

A Qualitative Readiness-Requirements Assessment Model for Enterprise Big-Data Infrastructure Investment

In the last three decades, there has been an exponential growth in the area of information technology providing the information processing needs of data-driven businesses in government, science, and private industry in the form of capturing, staging, integrating, conveying, analyzing, and transferring data that will help knowledge workers and decision makers make sound business decisions. Data integration across enterprise warehouses is one of the most challenging steps in the big data analytics strategy. Several levels of data integration have been identified across enterprise warehouses: data accessibility, common data platform, and consolidated data model. Each level of integration has its own set of complexities that requires a certain amount of time, budget, and resources to implement. Such levels of integration are designed to address the technical challenges inherent in consolidating the disparate data sources. In this paper, we present a methodology based on industry best practices to measure the readiness of an organization and its data sets against the different levels of data integration. We introduce a new Integration Level Model (ILM) tool, which is used for quantifying an organization and data system s readiness to share data at a certain level of data integration. It is based largely on the established and accepted framework provided in the Data Management Association (DAMA-DMBOK). It comprises several key data management functions and supporting activities, together with several environmental elements that describe and apply to each function. The proposed model scores the maturity of a system s data governance processes and provides a pragmatic methodology for evaluating integration risks. The higher the computed scores, the better managed the source data system and the greater the likelihood that the data system can be brought in at a higher level of integration.

Big data↗

Value Modeling for Enterprise Resilience

Abstract. The idea that resilience is a tangible, measureable, and desirable system attribute has grown rapidly over the last decade beyond is origins in explaining ecological, physiological, psychological, and social systems. Operational enterprise resilience requires two types of measurement. First, the system must monitor various operational conditions in order to respond to disruptions. These measurements are part of one or more observation, orientation, decision, and action (OODA) loops The OODA control processes that implement a resilience strategy use these measurements to provide robustness, rapid recovery and reconstitution. In order to assess the effectiveness of the resilience strategy, a different class of measurements is necessary. This second type consists of measurements about how well the OODA processes cover critical enterprise functions and the hazards to which the enterprise is exposed. They allow assessment of how well enterprise management processes anticipate, mitigate, and adapt to a changing environment and the degree to which the system is fault tolerant. This paper nominates a theoretical framework, in the form of definitions, a model, and a syntax, that accounts for this important distinction, and in so doing provides a mechanism for bridging resilience management process models and the many proposed cyber-defense metric enumerations.

Henderson, Dale L.↗

Intrinsic Uncertainties in Modeling Complex Systems.

Models are built to understand and predict the behaviors of both natural and artificial systems. Because it is always necessary to abstract away aspects of any non-trivial system being modeled, we know models can potentially leave out important, even critical elements. This reality of the modeling enterprise forces us to consider the prospective impacts of those effects completely left out of a model – either intentionally or unconsidered. Insensitivity to new structure is an indication of diminishing returns. In this work, we represent a hypothetical unknown effect on a validated model as a finite perturbation whose amplitude is constrained within a control region. We find robustly that without further constraints, no meaningful bounds can be placed on the amplitude of a perturbation outside of the control region. Thus, forecasting into unsampled regions is a very risky proposition. We also present inherent difficulties with proper time discretization of models and representing inherently discrete quantities. We point out potentially worrisome uncertainties, arising from mathematical formulation alone, which modelers can inadvertently introduce into models of complex systems.

Cooper, Curtis S.↗

A National Strategy for Advancing Climate Modeling

Climate models are the foundation for understanding and projecting climate and climate-related changes and are thus critical tools for supporting climate-related decision making. This study developed a holistic strategy for improving the nation's capability to accurately simulate climate and related Earth system changes on decadal to centennial timescales. The committee's report is a high level analysis, providing a strategic framework to guide progress in the nation's climate modeling enterprise over the next 10-20 years. This study was supported by DOE, NSF, NASA, NOAA, and the intelligence community.

54 ENVIRONMENTAL SCIENCES↗

Scope Complexity Options Risks Excursions (SCORE) Version 3.0 Mathematical Description.

The purpose of the Scope, Complexity, Options, Risks, Excursions (SCORE) model is to estimate the relative complexity of design variants of future warhead options. The results of this model allow those considering these options to understand the complexity tradeoffs between proposed warhead options. The core idea of SCORE is to divide a warhead option into a well- defined set of scope elements and then estimate the complexity of each scope element against a well understood reference system. The uncertainty associated with estimates can also be captured. A weighted summation of the relative complexity of each scope element is used to determine the total complexity of the proposed warhead option or portions of the warhead option (i.e., a National Work Breakdown Structure code). The SCORE analysis process is a growing multi-organizational Nuclear Security Enterprise (NSE) effort, under the management of the NA- 12 led Enterprise Modeling and Analysis Consortium (EMAC), that has provided the data elicitation, integration and computation needed to support the out-year Life Extension Program (LEP) cost estimates included in the Stockpile Stewardship Management Plan (SSMP).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Scope Complexity Options Risks Excursions (SCORE) Factor Mathematical Description.

The purpose of the Scope, Complexity, Options, Risks, Excursions (SCORE) model is to estimate the relative complexity of design variants of future warhead options, resulting in scores. SCORE factors extend this capability by providing estimates of complexity relative to a base system (i.e., all design options are normalized to one weapon system). First, a clearly defined set of scope elements for a warhead option is established. The complexity of each scope element is estimated by Subject Matter Experts (SMEs), including a level of uncertainty, relative to a specific reference system. When determining factors, complexity estimates for a scope element can be directly tied to the base system or chained together via comparable scope elements in a string of reference systems that ends with the base system. The SCORE analysis process is a growing multi-organizational Nuclear Security Enterprise (NSE) effort, under the management of the NA-12 led Enterprise Modeling and Analysis Consortium (EMAC). Historically, it has provided the data elicitation, integration, and computation needed to support the out-year Life Extension Program (LEP) cost estimates included in the Stockpile Stewardship Management Plan (SSMP).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Illuminating the Role of Women at the Department of Energy National Laboratories

The early contributions of female researchers such as Marie Curie and Lisa Meitner to physics—and ultimately to the Manhattan Project—have been widely recognized and documented. In addition, numerous historical accounts have revealed the significant impacts of other female scientists, engineers, and technologists during the Manhattan Project. Despite the strong role of women in the Manhattan Project, the momentum has not continued into the present day, as reflected by the current demographics of the Department of Energy (DOE) National Laboratories. Although the overall U.S. workforce is about 50% female, the workforce at the DOE National Labs is only about 30% female. The statistics for technical management and research staff at the DOE National Labs are even more dire; women make up only about 18% of these ranks in contrast to the percentages of women in computer science (25%) and physical science (39%) in the U.S. workforce. These current statistics are not the desired state for the DOE National Labs and contrast sharply with the long history of accomplishments by women at the Labs. We believe the DOE National Labs should lead the charge on diversity and inclusion (D&I) and serve as a model enterprise for bringing women into our scientific and technical workforce.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Carnac for Emulytics (HPC Annual Report V.1.0)

Carnac, located at Sandia's California site, is an institutional cluster for Emulytics that provides security researchers with resources to model enterprise computer networks and evaluate how resilient they are from attacks. While multiple Emulytics cluster computers have been built at Sandia, Carnac is the first system that was developed as an institutional resource that can be shared among different groups with disparate requirements.

97 MATHEMATICS AND COMPUTING↗

PROACTIVE Focus Area 4: Structured Decision Metrics Analysis (Final Report)

A structured decision metrics analysis was developed as one of the tasks under PROACTIVE’s Focus Area 4 (FA4) and used structured decision metrics for processes, items, and facilities (PIF) to determine the efficacy of an M&V system in meeting treaty goals and technical objectives. The method starts with the functional decomposition of a “treaty” with the M&V system overlaid on it. A Functional Decomposition Rubric (FDR) for each PIF is used to determine a score ranging from 0 (weak) to 4 (strong) for assurance, security, and burden. The individual scores are combined to provide an overall Verification System Score (VSS) which assesses the overall verification system’s suitability given goals; scores for each step of the process are also given. The outcome of the evaluation is to identify needs or modifications to the enterprise model, verification system, or proposed testbed capabilities. VeriScore was used to evaluate FA4’s Spiral 0 exercise; those results are included in this report. The VeriScore and FDR framework can also be used in a non-treaty environment, as any goal/objective/method structure will work, thus expanding its applicability beyond traditional arms control structures.

99 GENERAL AND MISCELLANEOUS↗