Search NASA⌕ Search

SEARCH · Search NASA

Results for “Environmental, Requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Analysis of Data in Accordance with Space Flight Mission Environmental Requirements

The Environmental Assurance Program sets forth standards to ensure that all flight hardware is compatible with the environments that will be encountered during a spacecraft mission. It outlines the design, test and analysis, and risk control standards for the mission and certifies that it will survive in any external or self-induced environments that the spacecraft may experience. The Environmental Requirements Document (ERD) is the most important document in the Environmental Assurance Program, providing the design and test requirements for the project's flight system, subsystems, assemblies, and instruments. This summer's project was to assist Environmental Requirements Engineers (ERE's) in completing the Environmental Assurance Program Summary Report for both the Juno Project and Mars Science Laboratory (MSL) Project. The Summary Report is a document summarizing the environmental tests and analyses of each spacecraft at both the assembly and system level. It compiles a source of all relevant information such as waivers and Problem/Failure Reports (PFRs) into a single report for easy reference of how well the spacecraft met the requirements of the project.

Jupiter properties↗

Environmental requirements management: Maintaining an effective compliance program is key to a robust environmental management system - 15184

CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organisation's ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: - Communicating requirements- Planning work - Maintaining work controls - Maintaining compliance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Requirements Management

CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

Cusack, Laura J.↗

Health, safety and environmental requirements for composite materials

The health, safety and environmental requirements for the production of composite materials are discussed. The areas covered include: (1) chemical identification for each chemical; (2) toxicology; (3) industrial hygiene; (4) fire and safety; (5) environmental aspects; and (6) medical concerns.

Hazer, Kathleen A.↗

Implementing Environmental Requirements

The purpose of this document is to describe the processes for identifying, communicating, and implementing environmental requirements at the Los Alamos National Laboratory (LANL) for Triad National Security, LLC (Triad). References to LANL or the Laboratory refer to the Department of Energy, National Nuclear Security Administration (DOE/NNSA) managed portion of LANL. References to the Prime Contract refer to the contract between DOE/NNSA and Triad and does not apply to the portion of Technical Area 54 now managed and operated by DOE Environmental Management (EM-LA).

54 ENVIRONMENTAL SCIENCES↗

Environmental requirements for flat plate photovoltaic modules for terrestrial applications

The environmental test requirements that have been developed for flat plate modules purchased through Department of Energy funding are described. Concurrent with the selection of the initial qualification tests from space program experience - temperature cycling and humidity - surveys of existing photovoltaic systems in the field revealed that arrays were experiencing the following failure modes: interconnect breakage, delamination, and electrical termination corrosion. These coupled with application-dependent considerations led to the development of additional qualification tests, such as cyclic pressure loading, warped mounting surface, and hail. Rationale for the selection of tests, their levels and durations is described. Comparisons between field-observed degradation and test-induced degradation show a positive correlation with some of the observed field effects. Also, the tests are proving useful for detecting design, process, and workmanship deficiencies. The status of study efforts for the development of environmental requirements for field-related problems is reviewed.

Hoffman, A. R.↗

Environmental Requirements and Verification for NASA’s Planned Europa Clipper

NASA’s Jet Propulsion Laboratory (JPL) and its partner are planning a mission to explore an icy moon of Jupiter, Europa. The objective of the planned Europa Clipper mission is to gain insight into the key ingredients for this potentially habitable world. This mission will conduct investigations using a suite of instruments that includes a set of five remote sensing instruments, four in-situ fields and particles instruments, and a two-channel ice-penetrating radar. Among its science objectives are to produce high-resolution images of Europa's surface, determine its composition, look for signs of recent or ongoing activity, measure the thickness of the ice shell, search for subsurface lakes, and determine the depth and salinity of Europa's ocean. Europa Clipper is expected to encounter a very challenging environment, particularly in radiation. This paper provides a comprehensive description of the challenging environments and the environmental requirements that are levied onto the Europa Clipper system design. The mitigations activities being conducted or planned to ensure compliance with the severe environments will be described. Also discussed will be how the environmental requirements are verified and at which level of integration to ensure mission success.

Man, Kin F.↗

Evolution of the NISAR Feed Antenna Design due to Environmental Requirements

NISAR (NASA ISRO SAR, National Aeronautics and Space Administration, Indian Space Research Organization, Synthetic Aperture Radar) is an Earth science project currently in its final development phases at NASA Jet Propulsion Laboratory (JPL) and at ISRO. Due for launch in 2023 it will assess how our planet changes over time by measuring differences in the Earth’s solid surface due to factors like climate change, movement and melting of glaciers, earthquakes, land-slides, deforestation, agriculture and others. The enabling instrument for this mission is a dual band radar (L-Band and S-Band) that feeds a 12m deployable mesh reflector. Given the extreme accuracy needed to perform these measurements from Low Earth Orbit (LEO) some of the most stringent requirements were pushed onto the antenna subsystem to control phase and gain stability over time. In this paper we describe how environmental requirements affected the antenna design and what techniques were used to meet these requirements.

Vacchione, Joseph D.↗

Impact of Lost Generation at the Glen Canyon Powerplant due to the Environmental Requirements for the Years 2024 to 2027

This report was prepared by Argonne National Laboratory (Argonne) and the National Renewable Energy Laboratory (NREL) in support of an economic and financial analysis conducted for the U.S. Department of Energy’s Western Area Power Administration (WAPA) of the loss in Glen Canyon power generation due to the environmental requirements for the years 2024 to 2027. WAPA markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation (Reclamation). The facilities known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming.

13 HYDRO ENERGY↗

Reuse Permit I-160-02Quality Assurance Project Plan (QAPP) for Required Environmental and Process MonitoringIdaho National Laboratory Materials and Fuels Complex Industrial Waste Ditch and Pond

The purpose of this quality assurance project plan (QAPP) is to describe the technical requirements and quality assurance (QA) activities of the environmental data collection/analyses operations to be performed under Reuse Permit I-160-02, Modification 1 (hereafter ‘permit’). It describes the scope of monitoring, the organization and persons involved, the data quality objectives, the monitoring procedures, and the specific quality control (QC) measures to be employed. All QAPP activities are implemented to determine whether the results of the sampling and monitoring performed are the right type, quantity, and quality to satisfy the requirements of the permit, Section 5.

99 GENERAL AND MISCELLANEOUS↗

Reuse Permit I-161-02 Quality Assurance Project Plan (QAPP) for Required Environmental and Process Monitoring. Idaho National Laboratory Advanced Test Reactor (ATR) Complex Cold Waste Ponds

The Department of Environmental Quality (DEQ) issued Reuse Permit No. I-161-02 (hereafter permit) for the Idaho National Laboratory (INL) Advanced Test Reactor (ATR) Complex Cold Waste Ponds (CWP) on November 20, 2014. Permit Section 3 compliance activity (CA), CA-161-02, requires the permittee to prepare and implement a Quality Assurance Project Plan (QAPP) within 6 months of permit issuance. This QAPP is prepared in accordance with CA-161-02 using a template provided by DEQ.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reuse Permit I-161-02 Quality Assurance Project Plan (QAPP) for Required Environmental and Process Monitoring Idaho National Laboratory Advanced Test Reactor (ATR) Complex Cold Waste Ponds

The Department of Environmental Quality (DEQ) issued Reuse Permit No. I-161-02 (hereafter permit) for the Idaho National Laboratory (INL) Advanced Test Reactor (ATR) Complex Cold Waste Ponds (CWP) on November 20, 2014, with minor Modification 1 effective March 7, 2017. Permit Section 3 compliance activity (CA), CA-161-02, requires the permittee to prepare and implement a Quality Assurance Project Plan (QAPP) within 6 months of permit issuance. This QAPP is prepared in accordance with CA-161-02 using a template provided by DEQ.

99 GENERAL AND MISCELLANEOUS↗

Environmental requirements

Engineering models of Venus atmosphere, and application of thermal modeling to spacecraft sterilization

Source record↗