Search NASA⌕ Search

SEARCH · Search NASA

Results for “Environmental, Requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Environmental requirements management: Maintaining an effective compliance program is key to a robust environmental management system - 15184

CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organisation's ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: - Communicating requirements- Planning work - Maintaining work controls - Maintaining compliance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Requirements Management

CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

Cusack, Laura J.↗

Implementing Environmental Requirements

The purpose of this document is to describe the processes for identifying, communicating, and implementing environmental requirements at the Los Alamos National Laboratory (LANL) for Triad National Security, LLC (Triad). References to LANL or the Laboratory refer to the Department of Energy, National Nuclear Security Administration (DOE/NNSA) managed portion of LANL. References to the Prime Contract refer to the contract between DOE/NNSA and Triad and does not apply to the portion of Technical Area 54 now managed and operated by DOE Environmental Management (EM-LA).

54 ENVIRONMENTAL SCIENCES↗

Impact of Lost Generation at the Glen Canyon Powerplant due to the Environmental Requirements for the Years 2024 to 2027

This report was prepared by Argonne National Laboratory (Argonne) and the National Renewable Energy Laboratory (NREL) in support of an economic and financial analysis conducted for the U.S. Department of Energy’s Western Area Power Administration (WAPA) of the loss in Glen Canyon power generation due to the environmental requirements for the years 2024 to 2027. WAPA markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation (Reclamation). The facilities known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming.

13 HYDRO ENERGY↗

Reuse Permit I-160-02Quality Assurance Project Plan (QAPP) for Required Environmental and Process MonitoringIdaho National Laboratory Materials and Fuels Complex Industrial Waste Ditch and Pond

The purpose of this quality assurance project plan (QAPP) is to describe the technical requirements and quality assurance (QA) activities of the environmental data collection/analyses operations to be performed under Reuse Permit I-160-02, Modification 1 (hereafter ‘permit’). It describes the scope of monitoring, the organization and persons involved, the data quality objectives, the monitoring procedures, and the specific quality control (QC) measures to be employed. All QAPP activities are implemented to determine whether the results of the sampling and monitoring performed are the right type, quantity, and quality to satisfy the requirements of the permit, Section 5.

99 GENERAL AND MISCELLANEOUS↗

Reuse Permit I-161-02 Quality Assurance Project Plan (QAPP) for Required Environmental and Process Monitoring. Idaho National Laboratory Advanced Test Reactor (ATR) Complex Cold Waste Ponds

The Department of Environmental Quality (DEQ) issued Reuse Permit No. I-161-02 (hereafter permit) for the Idaho National Laboratory (INL) Advanced Test Reactor (ATR) Complex Cold Waste Ponds (CWP) on November 20, 2014. Permit Section 3 compliance activity (CA), CA-161-02, requires the permittee to prepare and implement a Quality Assurance Project Plan (QAPP) within 6 months of permit issuance. This QAPP is prepared in accordance with CA-161-02 using a template provided by DEQ.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reuse Permit I-161-02 Quality Assurance Project Plan (QAPP) for Required Environmental and Process Monitoring Idaho National Laboratory Advanced Test Reactor (ATR) Complex Cold Waste Ponds

The Department of Environmental Quality (DEQ) issued Reuse Permit No. I-161-02 (hereafter permit) for the Idaho National Laboratory (INL) Advanced Test Reactor (ATR) Complex Cold Waste Ponds (CWP) on November 20, 2014, with minor Modification 1 effective March 7, 2017. Permit Section 3 compliance activity (CA), CA-161-02, requires the permittee to prepare and implement a Quality Assurance Project Plan (QAPP) within 6 months of permit issuance. This QAPP is prepared in accordance with CA-161-02 using a template provided by DEQ.

99 GENERAL AND MISCELLANEOUS↗

Environmental Flow Requirements from FERC Licenses Across the US

Environmental flow requirements included in Federal Energy Regulatory Commission (FERC) hydropower licenses are important for balancing natural properties and benefits of river ecosystems (e.g., healthy species, recreation, water supply, flood control) supporting hydropower production. In some cases, environmental flow requirements may limit operational flexibility given current operational schemes and make a hydropower plant less able to provide power to the electric grid on demand. Hydropower plants may gain some flexibility as hydropower scheduling time periods are made to be more responsive to the short-term needs of an energy grid increasingly reliant on intermittent renewables. However, many flow requirements focus on the daily, monthly, or seasonal flow fluctuations which matches the time scale of most paradigms linking flow alterations to the health of river ecosystems. This dataset seeks to provide a greater understanding of how flexibility in environmental requirements can be leveraged to create positive outcomes for both the power system and the environment. It contains information on environmental flow requirements from the Protection, Mitigation, and Enhancement section of 50 randomly selected FERC licenses: 25 issued from 1998-2013 that were also included in the ORNL Mitigation Database (Schramm et al. 2015) and 25 issued from 2014-present. The information on environmental flow requirements was extracted from the PM&E section of 50 randomly selected FERC licenses: 25 issued from 1998-2013 that were also included in the ORNL Mitigation Database (Schramm et al. 2015) and 25 issued from 2014-present. The flow requirements were then categorized into flow augmentation categories based on whether the license stated a specific water management purpose for the given requirement called augmentation categories (i.e., fisheries or habitat, recreation or boating, industry, and general or unspecified; Table B). Requirements were also grouped into flow type categories (e.g., minimum flow rate, maximum flow rate, ramping rate). Additional information related to flow requirements such as the augmentation time-period and whether the flow rate was continuous (i.e., condition must be present at all-times) or instantaneous (i.e., condition present at a point in time) was also extracted from the licenses. Some licenses had specific flow requirements based on whether the project was in a wet, dry, or normal water year. If that information was presented in the license, it was also included in the data set. The location within the project was noted, hereafter, zone, in the dataset for flow requirements relating to specific areas of hydropower projects (Dam, Powerhouse, Bypass Reach). Maximum discharge capacities of hydropower facilities were also extracted from both the Existing Hydropower Assets (EHA) data set and the National Inventory of Dams (NID) databases. Each facility was coded with project identification codes from the EHA dataset to facilitate cross-referencing between datasets.

13 HYDRO ENERGY↗

LAW Primary Offgas Process (LOP) and LAW Secondary Offgas/Vessel Vent Process (LVP) System Design Description

This system design description (SDD) defines the technical, functional, and performance requirements of the Low-Activity Waste (LAW) Facility primary offgas process system (LOP) and the LAW Facility secondary offgas/vessel vent process system (LVP). This document details waste treatment requirements, environmental compliance requirements, and authorization basis requirements of the LOP and LVP systems as they are currently known and understood.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low-Activity Waste Melter Process (LMP) System Design Description (Rev. 4)

This system design description (SDD) defines the technical, functional, and performance requirements of the low-activity waste (LAW) melter process system (LMP). This document details the waste treatment requirements, environmental compliance requirements, and authorization basis requirements of the LMP system as they are currently known and understood. This SDD describes the process and functional design requirements of the LMP, including the following: 1) Services and utility requirements, operating materials and supplies, and other external interfaces; 2) Operations limits and design bases; 3) Other criteria and requirements pertinent to the design of the LMP system; 4) Boundaries, system interfaces, and functional description of the LMP system. The LMP system is composed of two LAW melters of the same design with the contingency to add the third. Also included in the LMP system are the pour spouts, which are positioned under the melter discharge chambers of each melter, and the container level detectors. The boundaries, system interfaces, and functional description of the LMP system are provided in Section 2.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An air quality index-based multistage type-2-fuzzy interval-stochastic programming model for energy and environmental systems management under multiple uncertainties

Highlights: • A multistage type-2-fuzzy interval-stochastic programming (MTIP) method is developed. • Air quality index (AQI) is introduced to manage energy and environmental systems. • AQI-MTIP model is formulated and results for Tianjin's EES are generated. • Impacts of environmental requirements on energy systems is analyzed. • Results can provide support for making effective pollutant mitigation policy. In this study, a multistage type-2-fuzzy interval-stochastic programming (MTIP) method is developed, which extends upon the existing multistage stochastic programming (MSP) by allowing uncertainties expressed as probabilistic distributions, interval values and type-2 fuzzy sets to be effectively incorporated within the optimization framework. Through coupling air quality index (AQI) with MTIP, an AQI-MTIP model is formulated for energy and environmental systems (EES) management of Tianjin. A number of scenarios based on changed AQIs are examined to analyze the impacts of environmental requirements on the city's energy system. Results indicate that (i) with the improvement of environmental requirement, utilization of clean energies (especially natural gas) is provoked markedly; (ii) PM{sub 2.5} is the primary pollutant, 64.50% of which should be reduced each period to maintain the city's air quality at a health-safe level. These findings can help decision makers adjust energy structure, make effective mitigation strategy, and gain deep insight into the relationship between energy consumption and environmental requirement.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Predicting environmental mitigation requirements for hydropower projects through the integration of biophysical and socio-political geographies

Uncertainty about environmental mitigation needs at existing and proposed hydropower projects makes it difficult for stakeholders to minimize environmental impacts. Hydropower developers and operators desire tools to better anticipate mitigation requirements, while natural resource managers and regulators need tools to evaluate different mitigation scenarios and order effective mitigation. Here we sought to examine the feasibility of using a suite of multidisciplinary explanatory variables within a spatially explicit modeling framework to fit predictive models for future environmental mitigation requirements at hydropower projects across the conterminous U.S. Using a database comprised of mitigation requirements from more than 300 hydropower project licenses, we were able to successfully fit models for nearly 50 types of environmental mitigation and to apply the predictive models to a set of more than 500 non-powered dams identified as having hydropower potential. The results demonstrate that mitigation requirements have been a result of a range of factors, from biological and hydrological to political and cultural. Furthermore, project developers can use these models to inform cost projections and design considerations, while regulators can use the models to more quickly identify likely environmental issues and potential solutions, hopefully resulting in more timely and more effective decisions on environmental mitigation.

13 HYDRO ENERGY↗

The Greening of a Plutonium Facility through Personnel Safety, Operational Efficiency, and Infrastructure Improvements - 12108

Chemical and metallurgical operations involving plutonium and other hazardous materials account for most activities performed at the Los Alamos National Laboratory's Plutonium Facility (TA-55). Engineered barriers provide the most effective protection from hazardous materials. These safety features serve to protect workers and provide defense in depth against the hazards associated with operations. Although not designed to specifically meet environmental requirements the safety-based design does meet or exceed the requirements of the environmental regulations enacted during and since its construction. TA-55's Waste Services Group supports this safety methodology by ensuring safe, efficient and compliant management of all radioactive and hazardous wastes generated at the TA-55. A key function of this group is the implementation of measures that lower the overall risk of radiological and hazardous material operations. Processes and procedures that reduce waste generation compared to current, prevalent processes or procedures used for the same purpose are identified. Some of these 'Best Practices' include implementation of a chemical control system, elimination of aerosol cans, reduction in hazardous waste, implementation of zero liquid discharge, and the re-cyclization of nitric acid. P2/WMin opportunities have been implemented in the areas of personnel and facility attributes, environmental compliance, energy conservation, and green focused infrastructure expansion with the overall objective of minimizing raw material and energy consumption and waste generation. This increases technical knowledge and augments operational safety. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integrated Project Review (IPR) Program

Environmental Protection and Compliance Division (EPC-DO) owns institutional responsibility for compliance with Federal, State, and local environmental requirements. EPC SMEs want to know about all activities and projects being conducted at the Lab. Our regulatory framework requires LANL customers to use the Integrated Review Tool which includes PRID, EXID, and Siting. SD400 Environmental Management System, Rev 5 states all new/modified work, activities, operations and projects at the Lab must be reviewed for applicable environmental requirements through the IRT.

54 ENVIRONMENTAL SCIENCES↗

Power requirements and environmental impact of a pedelec. A case study based on real-life applications

This paper describes the methodologies to appraise the power requests and environmental analysis of an electrically assisted bicycle under real driving conditions, also containing regulations and technical-science-related aspects. For this purpose, in this study, the on-road test program of an electrically assisted bicycle was executed in the urban area of Naples on different test tracks, so a general assessment about its driving behavior under several driving conditions was performed. The power requirements in different typical riding situations were estimated by a procedure based on the experimental kinematic parameters that characterize the driving dynamics collected during the real-life applications. An environmental analysis was also performed, with a methodology that takes into account the environmental assessment of a moped by measuring the experimental moped exhaust emissions of the regulated pollutants. Starting from the results acquired during the different test samples, besides, an assessment of the electric traction offered by this pedelec on the driving comfort was evaluated for different riding situations. - Highlights: • The power requirements of a pedelec in typical riding conditions were identified. • The estimated electricity consumption for battery recharging was defined. • An environmental valuation of the tested pedelec and of a moped was performed. • Emissions that could be saved utilizing a pedelec instead of a moped were derived.

54 ENVIRONMENTAL SCIENCES↗

Engineered Solutions Group's SMR Containment Cable and Electrical Penetration Assembly System

GAIN Project CRADA Number NFE-21-08839, entitled “SMR Containment Cable and EPA System” was initiated by the partnership of Oak Ridge National Laboratory (ORNL) and Engineered Solutions Group (ESG) to test an ESG-designed Electrical Penetration Assembly and Containment Cabling System Qualified for not only legacy LWR designs, but also Small Modular Reactors designs currently being designed by several different suppliers. This project was undertaken to fill the equipment gap of EPA and Cabling Systems that require much more severe environmental requirements than legacy plant applications present due to their smaller containment volumes that result in high energy densities compared to legacy designs. This high energy density results in severe accident environments and more severe normal operating conditions as well. We developed two approaches to qualify Electrical Penetration Assembly (EPA) and Containment Cabling Systems for SMRs and Advanced Reactors. We take into consideration the more severe environmental parameters found with SMR designs. The system will need to meet a qualification test program addressing wear/cyclic aging, potential radiation exposure, thermal aging, vibration aging, thermal cycling, seismic qualification, electrical fault testing (per IEEE 317) and accident simulation. The equipment must meet the requirements of 10CFR50.49, GDC 50 in 10CFR50 Appendix A, and 10CFR50 Appendix J. NRC Regulatory Guides (RGs) identify an acceptable way of meeting regulatory requirements. RGs frequently endorse a standard for meeting these requirements. Specific to this review, equipment would be qualified in accordance with the following IEEE Standards. • IEEE 317-2013 (Electrical Penetration Assemblies), which is endorsed by RG 1.63, Rev. 3, • IEEE 323-2003 and the more current IEC/IEEE 60780-323 (Environmental Qualification of 1E Equipment) which is endorsed by RG 1.89. IEEE 323-2003 is endorsed by RG 1.209, • IEEE 344-2020 (Seismic Qualification. The 2013 version endorsed by RG 1.100, Rev. 4, with exceptions), • IEEE 383-2015 (Electrical Cables) (which is endorsed by RG 1.189 Rev. 4 and the -2003 version endorsed by RG 1.211 rev. 0), • IEEE 572-2019 (Electrical Connectors and Assemblies), which is endorsed by 1.156 Rev 1, and • [IEEE 1202 (endorsed by RG 1.189) would normally be applicable but the advanced cable designs are impervious to this cable flame test.] The primary goal of such a program is to provide an EPA design that can meet the qualification requirements for all legacy light water reactor plants currently operating as well as new plant designs including light water Small Modular Reactors. Thus, these requirements are applicable to plants licensed under 10CFR50 and 10CFR52. Other reactor designs may be evaluated, and this test system and qualification method applied to those applications if the requirements would satisfy the requirements of the intended plant. A secondary benefit of this work is to document some of the history and background in these requirements as there have been recent delays in an SMR licensing process due to NRC Requests for Additional Information in this subject matter area.

42 ENGINEERING↗