Technical Needs for Enhancing Risk Monitors with Equipment Condition Assessment for Advanced Small Modular Reactors

Advanced small modular reactors (aSMRs) can provide the United States with a safe, sustainable, and carbon-neutral energy source. The controllable day-to-day costs of aSMRs are expected to be dominated by operation and maintenance costs. Health and condition assessment coupled with online risk monitors can potentially enhance affordability of aSMRs through optimized operational planning and maintenance scheduling.

Advanced Small Modular Reactor↗

An Updated Methodology for Enhancing Risk Monitors with Integrated Equipment Condition Assessment

Small modular reactors (SMRs) generally include reactors with electric output of ~350 MWe or less (this cutoff varies somewhat but is substantially less than full-size plant output of 700 MWe or more). Advanced SMRs (AdvSMRs) refer to a specific class of SMRs and are based on modularization of advanced reactor concepts. Enhancing affordability of AdvSMRs will be critical to ensuring wider deployment, as AdvSMRs suffer from loss of economies of scale inherent in small reactors when compared to large (~greater than 600 MWe output) reactors and the controllable day-to-day costs of AdvSMRs will be dominated by operation and maintenance (O&M) costs. Technologies that help characterize real-time risk are important for controlling O&M costs. Risk monitors are used in current nuclear power plants to provide a point-in-time estimate of the system risk given the current plant configuration (e.g., equipment availability, operational regime, and environmental conditions). However, current risk monitors are unable to support the capability requirements listed above as they do not take into account plant-specific normal, abnormal, and deteriorating states of active components and systems. This report documents technology developments towards enhancing risk monitors that, if integrated with supervisory plant control systems, can provide the capability requirements listed and meet the goals of controlling O&M costs. The report describes research results on augmenting an initial methodology for enhanced risk monitors that integrate real-time information about equipment condition and POF into risk monitors. Methods to propagate uncertainty through the enhanced risk monitor are evaluated. Available data to quantify the level of uncertainty and the POF of key components are examined for their relevance, and a status update of this data evaluation is described. Finally, we describe potential targets for developing new risk metrics that may be useful for studying trade-offs for economic operation while maintaining adequate safety margins.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Technical Report on Preliminary Methodology for Enhancing Risk Monitors with Integrated Equipment Condition Assessment

Small modular reactors (SMRs) generally include reactors with electric output of ~350 MWe or less (this cutoff varies somewhat but is substantially less than full-size plant output of 700 MWe or more). Advanced SMRs (AdvSMRs) refer to a specific class of SMRs and are based on modularization of advanced reactor concepts. AdvSMRs may provide a longer-term alternative to traditional light-water reactors (LWRs) and SMRs based on integral pressurized water reactor concepts currently being considered. Enhancing affordability of AdvSMRs will be critical to ensuring wider deployment. AdvSMRs suffer from loss of economies of scale inherent in small reactors when compared to large (~greater than 600 MWe output) reactors. Some of this loss can be recovered through reduced capital costs through smaller size, fewer components, modular fabrication processes, and the opportunity for modular construction. However, the controllable day-to-day costs of AdvSMRs will be dominated by operation and maintenance (O&M) costs. Technologies that help characterize real-time risk are important for controlling O&M costs. Risk monitors are used in current nuclear power plants to provide a point-in-time estimate of the system risk given the current plant configuration (e.g., equipment availability, operational regime, and environmental conditions). However, current risk monitors are unable to support the capability requirements listed above as they do not take into account plant-specific normal, abnormal, and deteriorating states of active components and systems. This report documents technology developments that are a step towards enhancing risk monitors that, if integrated with supervisory plant control systems, can provide the capability requirements listed and meet the goals of controlling O&M costs. The report describes research results from an initial methodology for enhanced risk monitors by integrating real-time information about equipment condition and POF into risk monitors.

advanced small modular reactor↗

Incorporating Equipment Condition Assessment in Risk Monitors for Advanced Small Modular Reactors

Advanced small modular reactors (aSMRs) can complement the current fleet of large light-water reactors in the USA for baseload and peak demand power production and process heat applications (e.g., water desalination, shale oil extraction, hydrogen production). The day-to-day costs of aSMRs are expected to be dominated by operations and maintenance (O&M); however, the effect of diverse operating missions and unit modularity on O&M is not fully understood. These costs could potentially be reduced by optimized scheduling, with risk-informed scheduling of maintenance, repair, and replacement of equipment. Currently, most nuclear power plants have a “living” probabilistic risk assessment (PRA), which reflects the as-operated, as-modified plant and combine event probabilities with population-based probability of failure (POF) for key components. “Risk monitors” extend the PRA by incorporating the actual and dynamic plant configuration (equipment availability, operating regime, environmental conditions, etc.) into risk assessment. In fact, PRAs are more integrated into plant management in today’s nuclear power plants than at any other time in the history of nuclear power. However, population-based POF curves are still used to populate fault trees; this approach neglects the time-varying condition of equipment that is relied on during standard and non-standard configurations. Equipment condition monitoring techniques can be used to estimate the component POF. Incorporating this unit-specific estimate of POF in the risk monitor can provide a more accurate estimate of risk in different operating and maintenance configurations. This enhanced risk assessment will be especially important for aSMRs that have advanced component designs, which don’t have an available operating history to draw from, and often use passive design features, which present challenges to PRA. This paper presents the requirements and technical gaps for developing a framework to integrate unit-specific estimates of POF into risk monitors, resulting in enhanced risk monitors that support optimized operation and maintenance of aSMRs.

Advanced Small Modular Reactors↗

Prototypic Enhanced Risk Monitor Framework and Evaluation - Advanced Reactor Technology Milestone: M3AT-15PN2301054

This research report summaries the development and evaluation of a prototypic enhanced risk monitor (ERM) methodology (framework) that includes alternative risk metrics and uncertainty analysis. This updated ERM methodology accounts for uncertainty in the equipment condition assessment (ECA), the prognostic result, and the probabilistic risk assessment (PRA) model. It is anticipated that the ability to characterize uncertainty in the estimated risk and update the risk estimates in real time based on equipment condition assessment (ECA) will provide a mechanism for optimizing plant performance while staying within specified safety margins. These results (based on impacting active component O&M using real-time equipment condition information) are a step towards ERMs that, if integrated with AR supervisory plant control systems, can help control O&M costs and improve affordability of advanced reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Improving online risk assessment with equipment prognostics and health monitoring

The current approach to evaluating the risk of nuclear power plant (NPP) operation relies on static probabilities of component failure, which are based on industry experience with the existing fleet of nominally similar light water reactors (LWRs). As the nuclear industry looks to advanced reactor designs that feature non-light water coolants (e.g., liquid metal, high temperature gas, molten salt), this operating history is not available. Many advanced reactor designs use advanced components, such as electromagnetic pumps, that have not been used in the US commercial nuclear fleet. Given the lack of rich operating experience, we cannot accurately estimate the evolving probability of failure for basic components to populate the fault trees and event trees that typically comprise probabilistic risk assessment (PRA) models. Online equipment prognostics and health management (PHM) technologies can bridge this gap to estimate the failure probabilities for components under operation. The enhanced risk monitor (ERM) incorporates equipment condition assessment into the existing PRA and risk monitor framework to provide accurate and timely estimates of operational risk.

active and passive components↗

Technology-Enabled Risk-Informed Maintenance Strategy to Minimize Operation and Maintenance Costs

The domestic fleet of nuclear power plants (NPPs) is facing a unique economic sustainability challenge in today’s energy market due to high total operating costs. One of the major contributors to the total operating cost of an NPP is the operations and maintenance (O&M) budget, which includes labor-intense preventive maintenance (PM) programs. PM programs involve manually performing inspection, calibration, testing, and maintenance of plant assets at periodic frequencies, as well as time-based replacement of assets, irrespective of individual asset condition. This approach, combined with the push to achieve high capacity factors, has resulted in a labor-centric business model. It is time to transition from this labor-centric business model to a technology-centric business model that will enable an optimal maintenance strategy by eliminating unnecessary costs associated with time-based PM activities. To enable this transition, the commercial nuclear industries are utilizing and developing reliable methodologies, based on available state of the art technologies, which facilitate assessing equipment condition and the dynamic risk of failure. The U.S. Department of Energy’s Idaho National Laboratory (INL) under the Light Water Reactor Sustainability (LWRS) Program is partnering with PKMJ Technical Services and Public Service Enterprise Group (PSEG) Nuclear, LLC to develop and demonstrate a deployable risk-informed predictive maintenance strategy to eliminate unnecessary O&M costs for an identified plant system, laying the foundation for scale-up to the entire plant. Recently developed technologies such as advanced wireless and wired sensors, data analytics, and risk assessment methodologies will support this transition. The technology-centric O&M model will result in significant automation and lay the foundation for real-time condition assessment of plant assets, thus enabling condition-based maintenance and enhancing plant safety, reliability, and economics of operation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Methodology for Risk-informed O&M decision making in power plants

Incorporation of real-time component information using equipment condition assessment (ECA) through the development of enhanced risk monitors (ERM) for active components in advanced reactor (AR) and advanced small modular reactor (SMR) designs. We incorporate time-dependent failure probabilities from prognostic health management (PHM) systems to dynamically update the risk metric of interest. This information is used to augment data used for supervisory control and plant-wide coordination of multiple modules by providing the incremental risk incurred due to aging and demands placed on components that support mission requirements.

Source record↗

Summary Describing Integration of ERM Methodology into Supervisory Control Framework with Software Package Documentation; Advanced Reactor Technology Milestone: M4AT-16PN2301052

This project involved the development of enhanced risk monitors (ERMs) for active components in Advanced Reactor (AdvRx) designs by integrating real-time information about equipment condition with risk monitors. Health monitoring techniques in combination with predictive estimates of component failure based on condition and risk monitors can serve to indicate the risk posed by continued operation in the presence of detected degradation. This combination of predictive health monitoring based on equipment condition assessment and risk monitors can also enable optimization of maintenance scheduling with respect to the economics of plant operation. This report summarizes PNNL’s multi-year project on the development and evaluation of an ERM concept for active components while highlighting FY2016 accomplishments. Specifically, this report provides a status summary of the integration and demonstration of the prototypic ERM framework with the plant supervisory control algorithms being developed at Oak Ridge National Laboratory (ORNL), and describes additional case studies conducted to assess sensitivity of the technology to different quantities. Supporting documentation on the software package to be provided to ONRL is incorporated in this report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Methodology and Process for Condition Assessment at Existing Hydropower Plants

Hydropower Advancement Project was initiated by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy to develop and implement a systematic process with a standard methodology to identify the opportunities of performance improvement at existing hydropower facilities and to predict and trend the overall condition and improvement opportunity within the U.S. hydropower fleet. The concept of performance for the HAP focuses on water use efficiency how well a plant or individual unit converts potential energy to electrical energy over a long-term averaging period of a year or more. The performance improvement involves not only optimization of plant dispatch and scheduling but also enhancement of efficiency and availability through advanced technology and asset upgrades, and thus requires inspection and condition assessment for equipment, control system, and other generating assets. This paper discusses the standard methodology and process for condition assessment of approximately 50 nationwide facilities, including sampling techniques to ensure valid expansion of the 50 assessment results to the entire hydropower fleet. The application and refining process and the results from three demonstration assessments are also presented in this paper.

Zhang, Qin Fen↗

Post-hazard condition assessment of nuclear piping-equipment systems: Novel approach to feature extraction and deep learning

Over the past decade, the use of artificial intelligence techniques in the field of health-monitoring has gained significant interest, especially for structures such as building and bridges. However, applications to industrial systems such as equipment-piping systems in nuclear plants have not been explored. Here, in this paper, it is shown that the existing techniques developed for buildings and bridges cannot be extended directly to equipment-piping systems as the response of such systems is governed by multiple localized modes unlike that in buildings and bridges. This paper proposes a new approach that consists of three key aspects: (i) a novel vector of degradation-sensitive features extracted from measured data, (ii) using a deep Artificial Neural Network (ANN) for diagnosis of degradation location and degradation severity, and (iii) consideration of uncertainty in degradation severity when training the ANN. Degradation in piping-equipment systems can occur due to flow-accelerated erosion and corrosion. These locations can potentially exhibit damage such as localized yielding or initiation of cracking due to an external event such as an earthquake. Moreover, such locations can at times go undetected by current inspection techniques. Therefore, a robust framework is needed for detection of degradation after a seismic event. This manuscript proposes a proof-of-concept framework, which utilizes data collected from sensors to generate a deep ANN database for predicting degraded locations and severity in a piping-equipment system. Degradation severity is classified as minor, moderate, and severe. In the suggested methodology, a novel vector of degradation-sensitive features is extracted from the sensor data to train the ANN. A simple piping-equipment system is selected to demonstrate feature extraction as a means to simplify pattern recognition, explore the design and parameters of an ANN, and develop a sensor placement strategy. The effectiveness of the proposed framework is demonstrated on a realistic primary safety system of a two-loop nuclear reactor. It is shown that the proposed post-hazard condition assessment framework is able to detect degraded locations along with the severity levels, including minor degradation, with considerably higher accuracy.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

On Enhancing Risk Monitors for Advanced Small Modular Reactors

Advanced small modular reactors (AdvSMRs) can contribute to safe, sustainable, and carbon-neutral energy production. However, the economics of AdvSMRs suffer from the loss of economy-of-scale for both construction and operation. The controllable day-to-day costs of AdvSMRs are expected to be dominated by operations and maintenance (O&M) costs. These expenses could potentially be managed through optimized scheduling of O&M activities for components, reactor modules, power blocks, and the full plant. Accurate, real-time risk assessment with integrated health monitoring of key active components can support scheduling of both online and offline inspection and maintenance activities.

Advanced SMR↗

Evaluation of Enhanced Risk Monitors for Use on Advanced Reactors

This study provides an overview of the methodology for integrating time-dependent failure probabilities into nuclear power reactor risk monitors. This prototypic enhanced risk monitor (ERM) methodology was evaluated using a hypothetical probabilistic risk assessment (PRA) model, generated using a simplified design of a liquid-metal-cooled advanced reactor (AR). Component failure data from industry compilation of failures of components similar to those in the simplified AR model were used to initialize the PRA model. Core damage frequency (CDF) over time were computed and analyzed. In addition, a study on alternative risk metrics for ARs was conducted. Risk metrics that quantify the normalized cost of repairs, replacements, or other operations and management (O&M) actions were defined and used, along with an economic model, to compute the likely economic risk of future actions such as deferred maintenance based on the anticipated change in CDF due to current component condition and future anticipated degradation. Such integration of conventional-risk metrics with alternate-risk metrics provides a convenient mechanism for assessing the impact of O&M decisions on safety and economics of the plant. It is expected that, when integrated with supervisory control algorithms, such integrated-risk monitors will provide a mechanism for real-time control decision-making that ensure safety margins are maintained while operating the plant in an economically viable manner.

ECA↗

Controlling the State of Machine Tools

Globally, manufacturers make great efforts to maintain the performance of industrial equipment. Developers and researchers are interested in automated approaches to maintaining the performance of equipment, especially at enterprises with high degrees of computerization and comprehensive information systems. In the present work, a new approach is outlined: an autonomous control system for maintaining the condition of metal-cutting machines. This approach is based on prior work in the field and permits maintenance on the basis of autonomous control of the state of machine tools. The structure of a system with the following generalized control functions is presented: decision making; and the issuing of commands on the basis of built-in resources. The formulation of control decisions employs the theory of fuzzy sets and fuzzy logic. By means of the ANFIS fuzzy network system, the autonomy of state control of the machine tool may be assessed. Criticality assessment of the condition of machine tools and their components is important in making decisions as to the setup of systems controlling the condition of equipment at enterprises, with assessment of their efficiency. In the monitoring subsystem, provision is made for assessment of the diagnostic results, prediction, and the generation of control decisions so as to prevent disruptions of machine-tool operation.

42 ENGINEERING↗

Lessons Learned "Establishing an Electrically Safe Work Condition" Specifically related to Racking Electrical Breakers

During low voltage electrical equipment maintenance, a bad breaker was identified. The breaker was racked out from the substation cubicle without following the hazardous energy control process identified in the Integrated Work Document (IWD). The IWD required the substation to be in an electrically safe work condition prior to racking the breaker. Per NFPA 70E requirements, electrical equipment shall be put into an electrically safe work condition before an employee performs work on or interacts with equipment in a manner that increases the likelihood of creating an arc flash. Racking in or out a breaker on an energized bus may increase the likelihood of creating an arc flash dependent on equipment conditions. A thorough risk assessment must be performed prior to performing such a task. The risk assessment determines the risk control measures to be put in place prior to performing the work. Electrical Safety Officers (ESO) can assist in performing risk assessments and incorporating risk control measures.

30 DIRECT ENERGY CONVERSION↗

EVSE Characterization

NextGen Profiles' EVSE characterization efforts explored performance variability in production EVSE through the use of EV emulation equipment and assessed how different operational conditions influence charging behavior. Data were collected at a frequency of 10 Hz from both the EV emulator and EVSE during each charge session and stored in a time-series database for further analysis. As part of the NextGen Profiles project, characterization of high-power EVSE was performed on both conductive and wireless charging infrastructure; however, only conductive charging data are currently included in this repository. This EVSE characterization was performed over a range of DC output currents and voltages, covering both nominal and off-nominal test conditions. This EVSE characterization dataset includes high-power charging data from two types of 350-kW-capable EVSE using liquid-cooled Combined Charging System-1 (CCS1, North American version) cables and connectors. To protect confidentiality, all EVSE metadata are anonymized, and the publicly released datasets are metered at 10-Hz frequency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Availability Assessment Based Case-Sensitive Power System Restoration Strategy

Increasingly frequent severe weather events in recent years threaten the security of power systems and result in major power outages throughout the world. The development of reasonable power system restoration (PSR) solutions is therefore urgently needed to speed up the recovery of the power supply while at the same time steering clear of vulnerable and risky equipment. This paper aims to develop a case-sensitive PSR model for power transmission systems that can adjust restoration solutions according to the evaluated availability of outage equipment in specific blackout scenarios and weather conditions. A novel PSR model that integrates the startup of generating units, formulation of the restoration network, renewable energy sources, and availability assessment of devices is proposed. A reformulated model is also proposed to relieve the computational burden of complex PSR problems. The availability of outage equipment is comprehensively assessed based on historical operating records, fault diagnosis results, and weather conditions. The assessed availability results are sensitive to the characteristics of real blackout cases and will support system operators generate case-sensitive PSR solutions while mitigating the vulnerable equipment. The feasibility and effectiveness of the proposed PSR model and its reformulations are verified through case studies.

availability assessment↗