Search NASASearch

SEARCH · Search NASA

Results for “Execution Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Advanced Fuels Campaign Execution Plan

The Advanced Fuels Campaign (AFC) Execution Plan details the strategy, mission, scope, and goals—both near-term and long-term—along with the structure and organization of nuclear fuels and materials research, development, and demonstration (RD&D) activities within the Fuel Cycle Technologies (FCT) program. The FCT program, tasked by the U.S. Department of Energy (DOE), employs a science-based approach to advance fuel technologies. This approach integrates theory, experiments, and multi-scale modeling and simulation (M&S) to develop a predictive understanding of fuel fabrication processes and fuel/cladding performance under irradiation, moving beyond traditional empirical methods. The long-term goals of the AFC are guided by the AFC Strategic Plan and align with the DOE Office of Nuclear Energy (NE) Roadmap [1], which outlines a multi-decade vision for demonstrating and qualifying advanced fuel forms to support diverse fuel cycle options. Near-term goals focus on enhancing accident tolerant fuels (ATF) for Light Water Reactors (LWR), a significant challenge that demands balancing immediate objectives with ongoing progress toward advanced reactor missions. Accelerating the traditional fuel qualification process to meet ATF objectives is another critical challenge. A detailed set of 5-year goals, summarized below, has been developed in line with the overarching science-based fuel development approach: • Advanced LWR Fuel Technologies: By 2027, support the development of advanced LWR fuel technologies with improved performance and enhanced accident tolerance. This includes high burnup (HBu), low enriched uranium (LEU)+, coated cladding, and doped fuel, aimed at complementing industry-led significant LWR uprates and plant refurbishments. • Tristructural Isotropic (TRISO) Fuel: Achieve qualification by 2028 and develop improved designs for emerging markets. • Metal Fuel: Achieve qualification by 2028 and develop improved designs for emerging markets. • Molten Salt Fuel: By 2027, deploy a robust program that enables fuel salt qualification technologies needed to support fuel salt research and development (R&D), focusing on emergent needs to derisk fuel salt production and utilization in advanced reactors. • Long-Term ATF: Develop fuel technologies that enable significant power uprates (~50%) in refurbished or new LWRs while optimizing fissile material utilization and waste disposal. The 5-year milestones in the AFC Execution Plan are contingent on an assumed budget. This Execution Plan will be updated annually to reflect actual funding profiles as budget guidance becomes available, ensuring milestones are adjusted accordingly. In summary, the AFC Execution Plan presents a comprehensive strategy to advance nuclear fuel technologies through a science-based approach, addressing both near-term and long-term goals while adapting to funding realities.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS

SiC cladding R&D execution plan

To advance the development of accident-tolerant fuel cladding for light-water reactors, the Advanced Fuels Campaign actively addresses the R&D gap between the specialized technological progress in SiC-based composite materials, led by industrial partners, and the fundamental scientific understanding of material behavior under reactor operating conditions. The laboratory activities are systematically organized based on the Development Strategy document, which outlines critical barriers to the use of SiC composites in nuclear energy applications for the coming decade and beyond. To complement the strategy, this execution plan specifies a detailed year-by-year work package and establishes key milestones for assessing progress in technological advancement. This plan has been formulated in collaboration with principal investigators at national laboratories, stakeholders, and industry partners with the goal of closing technology gaps and readying SiC-based cladding technologies for full-scale commercial testing. The research conducted at the national laboratories is categorized into three primary subjects: (1) addressing challenges associated with the performance of SiC cladding under normal operating environments, (2) identifying the failure limits of SiC cladding under accident conditions, and (3) modeling fuel performance for SiC cladding systems. Comprehensive laboratory activities integrate the development of advanced modeling tools for SiC-based cladding systems with experimental validation via integrated testing of multiphysics phenomena. This document lays out the laboratory plan to support the development of SiC-based technologies, which have the potential for significant operational and safety benefits for the U.S. nuclear industry. This plan aligns with industry developer needs, relevant Nuclear Energy University Programs, and Nuclear Energy Advanced Modeling and Simulation Programs to ensure SiC cladding technologies are matured as efficiently as possible and will be maintained and updated to accommodate the dynamically evolving progress of development, capability needs, and resource availability.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

STS/Spacelab payload utilization planning study: Executive summary

The planning process recommended to meet the orbital flight requirements for the Space Transportation System and payload development, procurement, operations, and support leading to authorization and funding of STS and payload project activities is described. The rationale and rp primary products of STS utilization planning are summarized along with the implementation of the system. Major recommendations of the study are included.

Source record

Monitored execution of robot plans produced by STRIPS.

We describe PLANEX1, a plan executor for the Stanford Research Institute robot system. The problem-solving program STRIPS creates a plan consisting of a sequence of actions, and PLANEX1 program carries out the plan by executing the actions. PLANEX1 is designed so that it executes only that portion of the plan necessary for completing the task, reexecutes any portion of the plan that has failed to achieve the desired results, and initiates replanning in situations where the plan can no longer be effective in completing the task. The scenario for an example plan execution is given.

Fikes, R. E.

The National Transmission Planning Study: Executive Summary

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI

Planning for Execution Monitoring on A Planetary Rover

A planetary rover will be traversing largely unknown and often unknowable terrain. In addition to geometric obstacles such as cliffs, rocks, and holes, it may also have to deal with non-geometric hazards such as soft soil and surface breakthroughs which often cannot be detected until rover is in imminent danger. Therefore, the rover must monitor its progress throughout a traverse, making sure to stay on course and to detect and act on any previously unseen hazards. Its onboard planning system must decide what sensors to monitor, what landmarks to take position readings from, and what actions to take if something should go wrong. The planning systems being developed for the Pathfinder Planetary Rover to perform these execution monitoring tasks are discussed. This system includes a network of planners to perform path planning, expectation generation, path analysis, sensor and reaction selection, and resource allocation.

Erann Gat

The application of remote sensing to the development and formulation of hydrologic planning models: Executive summary

Methods for the reduction of remotely sensed data and its application in hydrologic land use assessment, surface water inventory, and soil property studies are presented. LANDSAT data is used to provide quantitative parameters and coefficients to construct watershed transfer functions for a hydrologic planning model aimed at estimating peak outflow from rainfall inputs.

Castruccio, P. A.

Osprey Framework v0.2.2

The Alpha Berkeley Framework is a software architecture for building agentic AI systems that coordinate multi-step workflows in scientific and industrial environments. It is based on a plan-first orchestration model, where natural language requests are translated into execution plans with explicit dependencies and optional human approval. The framework includes capability classification, which selects relevant tools on a per-task basis to keep orchestration efficient as the number of available tools grows. It incorporates task extraction methods that compress conversational context and integrate external resources such as databases, APIs, and knowledge bases into structured, machine-readable tasks. Execution is supported by modular services with checkpointing, artifact management, and error handling, allowing workflows to be paused, inspected, and resumed. The system is designed for deployment in production environments, supporting both local and containerized execution as well as integration with HPC clusters. Interfaces include command-line tools, browser-based workflows, and containerized services. The framework has been demonstrated in tutorial examples and deployed at the Advanced Light Source, where it coordinates accelerator control and analysis workflows.

Hellert, Thorsten [Lawrence Berkeley National Labo

Agentic artificial intelligence for multistage physics experiments at a large-scale user facility particle accelerator

We present a language-model-driven agentic artificial intelligence (AI) system to autonomously execute multistage physics experiments on a production synchrotron light source. Implemented at the Advanced Light Source particle accelerator, the system translates natural language user prompts into structured execution plans that combine archive data retrieval, control-system channel resolution, automated script generation, controlled machine interaction, and analysis. In a representative machine physics task, we show that preparation time was reduced by 2 orders of magnitude relative to manual scripting even for a system expert, while operator-standard safety constraints were strictly upheld. Core architectural features, plan-first orchestration, bounded tool access, and dynamic capability selection, enable transparent, auditable execution with fully reproducible artifacts. These results establish a blueprint for the safe integration of agentic AI into accelerator experiments and demanding machine physics studies, as well as routine operations, with direct portability across accelerators worldwide and, more broadly, to other large-scale scientific infrastructures.

Accelerator/storage ring control systems

NREL Validation of S3.2 and S3.3 (CRADA Final Report)

The scope of work for S3.2 and S3.3 validation includes cooperative planning, execution, and analysis of all recommended and agreed-upon test protocols to determine the suitability of the product for long-term deployment of the photovoltaic modules to a broad range of climates. The test plan will be established within two months of project initiation, and NREL will write monthly reports for the duration of the work.

14 SOLAR ENERGY

Implementation of ISEE-3 trajectory control

Control of the trajectory and attitude for the International Sun-Earth Explorer-3 (ISEE-3) spacecraft is performed using an onboard hydrazine propulsion system. This paper describes the spacecraft hardware and operational limitations that were considered in the planning, execution, and evaluation of all ISEE-3 maneuvers performed to date. Propulsion system performance and spacecraft dynamics models as implemented in the maneuver support computer software are described. Examples are presented that show how maneuver goals are achieved while satisfying mission orbit and attitude constraints. Procedures used in the development of maneuver plans are detailed for the second midcourse correction maneuver which typifies maneuver operations in general.

Erickson, J. A.

torch-einshard v1.0

torch-einshard is a Python library for describing local and distributed PyTorch tensor computations with compact, einsum-like notation. Its expressions name logical axes, specify how they are sharded across a PyTorch DeviceMesh, and represent partial reductions. The library automatically performs contractions, permutations, reshaping, splitting, gathering, reduction, reduce-scatter, and repartitioning while preserving autograd. Additional features include sharding-aware FFTs, tensor rolls, halo exchange, sliding windows, 1D–3D convolutions, uneven-shard handling, parameter initialization and gradient management, and cost-based execution planning. It is designed for scientific machine learning and large-model workloads, including tensor-, sequence-, and spatial-parallel MLPs, attention, convolutions, and spectral operations. Compared with manually combining torch.einsum and distributed collectives, torch-einshard expresses both the mathematical operation and data placement in one readable formula. This reduces boilerplate and synchronization errors, keeps forward and backward communication consistent, and allows the library to select optimized collective strategies without changing model code.

Morozov, Dmitriy [Lawrence Berkeley National Labor

Understanding the Costs and Barriers of Residential Electrical Panel and Service Upgrades

Upgrading electrical panels and services in U.S. homes represents a significant barrier to building modernization, imposing considerable costs, delays, and procedural uncertainties on homeowners, contractors, utilities, and building departments. Although cost databases document individual infrastructure activities, they rarely capture the integrated, whole-project perspective required to understand how electrical upgrades are planned, executed, and regulated. Existing research is often geographically constrained, narrowly scoped, or derived from limited samples, leaving significant knowledge gaps unaddressed. This study examines the timelines and costs associated with residential electrical panel and service upgrades using data from a national cross- sectional survey conducted in summer 2025. The survey captured responses from 140 stakeholders across 34 states, including building industry professionals, utility staff, and building department staff. Findings indicate that project duration and cost increase substantially with building size though patterns vary by infrastructure type. Most single-family and small multifamily projects were completed within 30 days, whereas medium and large multifamily buildings show longer and less predictable timelines. Service rating increases modestly extend project duration, but building type and size were the primary determinants of delays. Cost patterns were similar: customer-side equipment and panel replacements scale predictably with building size, while utility-side costs are highly variable, often triggered by threshold-driven infrastructure upgrades such as transformer replacements. Permit fees vary considerably between jurisdictions but generally represent a minor proportion of total project costs. These findings identify electrical upgrades as a significant barrier to residential building costs and highlight the need for improved stakeholder coordination, streamlined permitting, and strategies that reduce upgrade requirements while maintaining safety and code compliance.

Casquero-Modrego, Nuria

Proceedings of the Nimbus Program Review

The Nimbus program review was conducted at the George Washington Motor Lodge and at General Electric Missiles and Space Division, Valley Forge, Pennsylvania, on November 14, 15, and 16, 1962. The purpose of the review was twofold: first, to present to top management of the Goddard Space Flight Center (GSFC), National Aeronautics and Space Administration (NASA) Headquarters, other NASA elements, Joint Meteorological Satellite Advisory Committee (_MSAC), Weather Bureau, subsystem contractors, and others, a clear picture of the Nimbus program, its organization, its past accomplishments, current status, and remaining work, emphasizing the continuing need and opportunity for major contributions by the industrial community; second, to bring together project and contractor technical personnel responsible for the planning, execution, and support of the integration and test of the spacecraft to be initiated at General Electric shortly. This book is a compilation of the papers presented during the review and also contains a list of those attending.

SYSTEMS ANALYSIS

Robot learning and error correction

A model of robot learning is described that associates previously unknown perceptions with the sensed known consequences of robot actions. For these actions, both the categories of outcomes and the corresponding sensory patterns are incorporated in a knowledge base by the system designer. Thus the robot is able to predict the outcome of an action and compare the expectation with the experience. New knowledge about what to expect in the world may then be incorporated by the robot in a pre-existing structure whether it detects accordance or discrepancy between a predicted consequence and experience. Errors committed during plan execution are detected by the same type of comparison process and learning may be applied to avoiding the errors.

Friedman, L.

Simulation of mission timelines for the Spacelab program

The paper describes the structure of the Special Purpose Simulation Language (SPSL) designed to overcome certain problems encountered in the use of the General Purpose Simulation Language (GPSL) when applied to simulation and validation of Spacelab mission timelines. The current analysis system is GROPE (Ground Resource Operations Planning Executive), the main data base models of which are the ground operations model, the mission model, the resource model, and the traffic model. Some of the simulation problem areas are mentioned, and unique features of the SPSL are highlighted.

Roberts, J. S.

Exceedance statistics of accelerations resulting from thruster firings on the Apollo-Soyuz mission

Spacecraft acceleration resulting from firings of vernier control system thrusters is an important consideration in the design, planning, execution and post-flight analysis of laboratory experiments in space. In particular, scientists and technologists involved with the development of experiments to be performed in space in many instances required statistical information on the magnitude and rate of occurrence of spacecraft accelerations. Typically, these accelerations are stochastic in nature, so that it is useful to characterize these accelerations in statistical terms. Statistics of spacecraft accelerations are summarized.

Fichtl, G. H.