Search NASASearch

SEARCH · Search NASA

Results for “Exhaust emissions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Advanced Non-Intrusive Instrumentation for Propulsion Engines

Changes in engine technology such as higher temperatures, higher tip speeds, new metal/composite/ceramic materials together with radical changes in design philosophy will require amongst other prerequisites the ability to measure and to monitor key internal gas and structural characteristics. The symposium papers presented non-intrusive measurement and analysis technologies in the following categories: Laser Point Measurements (11); Absorption and Infrared Techniques (4); Paints - Surface Sensors (6); Laser Induced Fluorescence (6); Mechanical (7); Films (5); Laser Planar Measurement (9); and a Keynote Address.

Propulsion

Power and particle exhaust in the ST-E1 fusion power plant

Power exhaust challenges and potential solutions for a 5 m major radius, low-aspect ratio burning tokamak have been explored. 1D edge plasma models have been used to screen for access to detachment using short and long outer divertor legs in double and single null configurations, using Ar as the primary impurity and assuming tungsten plasma-facing components (PFCs). These show that detachment access can be accessed for all but the most conservative assumptions on scrape-off layer (SOL) width and power, but that trade-offs will be required between magnet engineering and the size of the acceptable window of as-yet uncertain plasma parameters. SOLPS-ITER was used to further model selected plasma scenarios, confirming that Ar seeding can be used to achieve dissipative divertor scenarios with peak deposited heat fluxes below 15 MWm -2 . Initial scoping of first wall loads and positioning of limiters has been carried out, showing the feasibility of protecting the breeding blanket wall during steady state without impeding tritium breeding. Initial PFC technology selection is also presented, identifying this as a critical area where further work is needed to find an attractive solution for helium-cooled PFCs that can handle high heat fluxes without excessive power requirements. Key questions and trade-offs for concept development have been identified, including: how to achieve high radiation for reduction of SOL power without core performance degradation; whether power exhaust can be well-controlled in a double null plasma; mechanical design and materials challenges of high-heat flux PFCs; and control of material erosion, redeposition and tritium retention.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Bypass heat exchanger configuration to reroute core flow

A turbine engine assembly includes a heat exchanger that is in thermal communication with an exhaust gas flow. A bypass passage is provided that is configured to selectively route at least a portion of the exhaust gas flow around the heat exchanger in response to a predefined engine operating condition.

Terwilliger, Neil

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

2005 NASA Seal/Secondary Air System Workshop

The 2005 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA’s new Exploration Initiative program aimed at exploring the Moon, Mars, and beyond; (ii) Overview of the NASA-sponsored Propulsion 21 Project; (iii) Overview of NASA Glenn’s seal project aimed at developing advanced seals for NASA’s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts including tip clearance control, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Several organizations presented development efforts aimed at developing faster clearance control systems and associated technology to meet future engine needs. The workshop also covered several programs NASA is funding to develop technologies for the Exploration Initiative and advanced reusable space vehicle technologies. NASA plans on developing an advanced docking and berthing system that would permit any vehicle to dock to any on-orbit station or vehicle. Seal technical challenges (including space environments, temperature variation, and seal-on-seal operation) as well as plans to develop the necessary “androgynous” seal technologies were reviewed. Researchers also reviewed tests completed for the shuttle main landing gear door seals.

Hypersonic

Radiative divertor detachment and impurity transport with nitrogen and neon seeding in KSTAR H-mode plasmas

Achieving core-edge compatible divertor detachment is a critical requirement for stable operation in future fusion devices. This study compares nitrogen and neon seeding in KSTAR H-mode plasmas with carbon walls, combining experiments and SOLPS-ITER modelling to evaluate their radiative dissipation and core-edge compatibility. Experimentally, N seeding achieved stronger divertor detachment, with larger reductions in target particle and heat fluxes, a higher divertor radiation fraction, and a lower core radiation fraction than Ne. In contrast, Ne seeding triggered a significant rise in core radiation followed by H–L back transitions, limiting the maximum total radiated power fraction to roughly half that of N. SOLPS-ITER simulations reproduced the experimental trends and revealed that the better core-edge compatibility of N arises from its higher divertor retention in addition to its higher cooling factor. The relative positions of the stagnation points of impurity poloidal velocity and ionization sources did not explain the different divertor compression. Instead, in the present modelling, the higher impurity parallel particle flux, resulting from the higher parallel impurity velocity, explains the stronger nitrogen impurity compression in the divertor region. The parallel temperature distribution with N was more favourable for achieving higher impurity parallel velocity than with Ne, because the impurity velocity is governed by modifications of the main ion flow due to friction and thermal forces, both of which strongly depend on the temperature. Ultimately, this behaviour is attributed to the strongly divertor-localized radiation of N. These results demonstrate that N is more effective than Ne in achieving radiative divertor detachment while maintaining low core contamination in KSTAR, consistent with observations in other present tokamaks.

KSTAR

The Canadian Galactic Emission Mapper (CGEM) A Cosmic Microwave Foreground Experiment

The Canadian Galactic Emission Mapper (CGEM) is a 4-meter single-dish radio telescope located at the Dominion Radio Astrophysical Observatory (DRAO) in Penticton, Canada. CGEM is designed to map polarized Galactic synchrotron emission across the entire northern sky at 8-10 GHz with 1 MHz frequency resolution and ∼ 0.5 degree angular resolution. Its goal is to obtain high-fidelity, low-noise maps of polarized Galactic synchrotron radiation, at frequencies where synchrotron dominates, in order to provide a reliable template for CMB B−mode foreground cleaning. We will show on sky performance of CGEM’s single-pixel azimuthally-symmetric telescope, its coherent, dual-polarized radiometer, and show maps made from commissioning data from the first few months of operation.

Cosmic microwave background

Correlating Impacts of Injected Fuels on Carbon Emissions in Blast Furnace with Computational Fluid Dynamics Modeling

A major challenge for steelmaking is the reduction of CO 2 emissions. In this regard, the blast furnace (BF) is critical due to the high associated CO 2 levels. This investigation assesses the impact of tuyere‐injected fuels on BF CO 2 emissions. Specifically, computational fluid dynamics results obtained previously at Purdue University Northwest are analyzed to obtain CO 2 emissions when natural gas (NG), syngas, hydrogen, or hydrogen/NG are injected. CO 2 emissions are compared with those produced when 95 kg of NG/thm is injected. Among these scenarios, the largest CO 2 reduction occurs when 102 kg of syngas/thm (COG feedstock #1) is injected at 973 K, reducing CO 2 by 190.6 kg thm −1 . The largest CO 2 reduction obtained with NG occurs when 130 kg thm −1 is injected at 600 K, reducing emissions by 65 kg thm −1 . H 2 injection also reduces CO 2 , but requires careful adjusting to reach stable operation. For instance, injecting 35 kg of H 2 /thm reduces CO 2 by 52 kg thm −1 . Increasing gaseous injection rates can significantly reduce CO 2 emissions, with fuel preheating providing an addendum, but high injection rates can lead to unstable operation. Furthermore, results show a correlation between CO 2 emissions and average temperature of shaft region for multiple fuels and injection conditions.

Metallurgy & Metallurgical Engineering

A fully light-driven approach to separate carbon dioxide from emission streams

Carbon capture from industrial point sources is an essential component of the global effort to mitigate climate risks. However, traditional approaches require significant energy input—often provided, counterproductively, by fossil fuel combustion. Using sunlight directly as the energy source would significantly improve the energy efficiency of carbon capture processes. Herein, we report the first fully visible-light-driven CO 2 separation system, in which carbon capture is achieved via the photoenolization/addition reaction of inexpensive 2-methylbenzophenone with CO 2 , and CO 2 release is realized through an intramolecular photodecarboxylation reaction. Finally, this system operates isothermally, works with natural sunlight, and facilitates CO 2 removal from natural gas flue emissions, providing a blueprint for other non-thermal chemical separations.

Ahmad, Bayu I. Z. [Cornell Univ., Ithaca, NY (Unit

Technoeconomic and Emissions Analysis of the Hybrid Redox Process for the Production of Acetic Acid with CO 2 Utilization

The production of oxygenated hydrocarbons, such as acetic acid, using captured CO 2 is a promising pathway to reduce greenhouse gas emissions in the chemical industry. The use of a chemical looping‐based hybrid redox process (HRP) is proposed to convert CO 2 and natural gas into separate CO and syngas streams that can be used to produce various commodity oxygenates, while allowing the beneficial utilization of captured CO 2 . Here, a detailed technoeconomic analysis of HRP applied to the production of acetic acid is presented. Emissions and energy analyses show the ability of HRP to lower the CO 2 emissions for acetic acid synthesis by 74% compared to a conventional steam and autothermal reforming route. HRP also offers a potential 34% reduction in capital costs. Compared to a dry reforming based acetic acid production route, HRP has the potential for significantly lower costs. If integrated with a low carbon energy source, HRP has the potential to achieve a negative emission of greenhouse gas (‐0.50 kg CO 2 per kg acetic acid).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH

Localizing the non-thermal X-ray emission of PSR J2229+6114 from its multi-wavelength pulse profiles

Context.Pulsars are detected over the whole electromagnetic spectrum, from radio wavelengths up to very high energies, in the GeV-TeV range. While the radio emission site for young pulsars is well constrained to occur at altitudes about several percent of the light-cylinder radius andγ-ray emission is believed to be produced in the striped wind, outside the light cylinder, the non-thermal X-ray production site remains unknown. Aims.The aim of this Letter is to localize the non-thermal X-ray emission region based on a multi-wavelength pulse profile fitting for PSR J2229+6114, which stands as a particularly good candidate given its high X-ray brightness. Methods.Based on the geometry deduced from the joint radio andγ-ray pulse profiles, we fixed the magnetic axis inclination angle and the line-of-sight (LoS) inclination angle. However, we left the region of X-ray emission unlocalized, setting it somewhere between the surface and the light cylinder. We localized this region and its extension by fitting the X-ray pulse profile as observed by the NICER,NuSTAR, and RXTE telescopes in the ranges of 2–7 keV, 3–10 keV, and 9.4–22.4 keV, respectively. Results.We constrained the non-thermal X-ray emission to arise from altitudes between 0.2 r L and 0.55 r L wherer L is the light-cylinder radius. The magnetic obliquity is approximatelyα ≈ 45° −50° and the LoS inclination angle isζ ≈ 32° −48°. Conclusions.This Letter is among the first works to offer a tight constraint on the location of non-thermal X-ray emission from pulsars. We plan to apply this procedure to several other promising candidates to confirm this new result.

Astronomy & Astrophysics