Search NASA⌕ Search

SEARCH · Search NASA

Results for “F REACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

F Reactor Inspection

Workers from Mission Support Alliance, LLC., removed the welds around the steel door of the F Reactor before stepping inside the reactor to complete its periodic inspection. This is the first time the Department of Energy (DOE) has had the reactor open since 2008. The F Reactor is one of nine reactors along the Columbia River at the Department's Hanford Site in southeastern Washington State, where environmental cleanup has been ongoing since 1989. As part of the Tri-Party Agreement, the Department completes surveillance and maintenance activities of cocooned reactors periodically to evaluate the structural integrity of the safe storage enclosure and to ensure confinement of any remaining hazardous materials. "This entry marks a transition of sorts because the Hanford Long-Term Stewardship Program, for the first time, was responsible for conducting the entry and surveillance and maintenance activities," said Keith Grindstaff, Energy Department Long-Term Stewardship Program Manager. "As the River Corridor cleanup work is completed and transitioned to long-term stewardship, our program will manage any on-going requirements."

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Effective delayed neutron fraction measurement in the critical VENUS-F reactor using noise techniques

This paper present the measurements of VENUS-F kinetic parameters using the Rossi-Alpha methods. The VENUS-F reactor is a zero-power reactor based in Mol, Belgium at SCK-CEN where the fuel is made of metallic enriched uranium with pure lead in order to simulate the behavior of lead fast reactor. The reactor can be operated under critical when it is coupled with GENEPI-3C. At the beginning of 2014, a measurement campaign was performed in order to estimate the kinetics parameters. In this paper, two measurements are analyzed at two different powers (approximately 2 W and 30 W) with 7 different fission chambers (with a 235-U deposit that varies from 1 g to 10 mg). All the correlation functions needed for the Rossi-Alpha method have been built for each possible set of two detectors in each configuration and values obtained from those functions for the effective delayed neutron fraction are then compared. The absolute necessity to operate at very low power is presented. The final value for the effective delayed neutron fraction is finally estimated to be 730 pcm ± 11 pcm and the prompt neutron generation time is estimated to be equal to 0,041 μseconds ± 0.04 μsec. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Kinetic parameters of the GUINEVERE reference configuration in VENUS-F reactor obtained from a pile noise experiment using Rossi and Feynman methods

A pile noise measurement campaign has been conducted by the CEA in the VENUS-F reactor (SCK-CEN, Mol Belgium) in April 2011 in the reference critical configuration of the GUINEVERE experimental program. The experimental setup made it possible to estimate the core kinetic parameters: the prompt neutron decay constant, the delayed neutron fraction and the generation time. A precise assessment of these constants is of prime importance. In particular, the effective delayed neutron fraction is used to normalize and compare calculated reactivities of different subcritical configurations, obtained by modifying either the core layout or the control rods position, with experimental ones deduced from the analysis of measurements. This paper presents results obtained with a CEA-developed time stamping acquisition system. Data were analyzed using Rossi-α and Feynman-α methods. Results were normalized to reactor power using a calibrated fission chamber with a deposit of Np-237. Calculated factors were necessary to the analysis: the Diven factor was computed by the ENEA (Italy) and the power calibration factor by the CNRS/IN2P3/LPC Caen. Results deduced with both methods are consistent with respect to calculated quantities. Recommended values are given by the Rossi-α estimator, that was found to be the most robust. The neutron generation time was found equal to 0.438 ± 0.009 μs and the effective delayed neutron fraction is 765 ± 8 pcm. Discrepancies with the calculated value (722 pcm, calculation from ENEA) are satisfactory: -5.6% for the Rossi-α estimate and -2.7% for the Feynman-α estimate. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cleanup Verification Package for the 118-F-8:4 Fuel Storage Basin West Side Adjacent and Side Slope Soils

This cleanup verification package documents completion of remedial action, sampling activities, and compliance with cleanup criteria for the 118-F-8:4 Fuel Storage Basin West Side Adjacent and Side Slope Soils. The rectangular-shaped concrete basin on the south side of the 105-F Reactor building served as an underwater collection, storage, and transfer facility for irradiated fuel elements discharged from the reactor.

100F Area↗

Cleanup Verification Package for the 118-F-1 Burial Ground

This cleanup verification package documents completion of remedial action for the 118-F-1 Burial Ground on the Hanford Site. This burial ground is a combination of two locations formerly called Minor Construction Burial Ground No. 2 and Solid Waste Burial Ground No. 2. This waste site received radioactive equipment and other miscellaneous waste from 105-F Reactor operations, including dummy elements and irradiated process tubing; gun barrel tips, steel sleeves, and metal chips removed from the reactor; filter boxes containing reactor graphite chips; and miscellaneous construction solid waste.

100F Area↗

The Evolution of LTS at DOE's Hanford Site

Hanford's Long-Term Stewardship (LTS) Program has evolved from a small, informal process, with minimal support, to a robust program that provides comprehensive transitions from cleanup contractors to long-term stewardship for post-cleanup requirements specified in the associated cleanup decision documents. The LTS Program has the responsibility for almost 100,000 acres of land, along with over 200 waste sites and will soon have six cocooned reactors. Close to 2,600 documents have been identified and tagged for storage in the LTS document library. The program has successfully completed six consecutive transitions over the last two years in support of the U.S. DOE Richland Operations Office's (DOE-RL) near-term cleanup objectives of significantly reducing the footprint of active cleanup operations for the River Corridor. The program has evolved from one that was initially responsible for defining and measuring Institutional Controls for the Hanford Site, to a comprehensive, post remediation surveillance and maintenance program that begins early in the transition process. In 2013, the first reactor area -- the cocooned 105-F Reactor and its surrounding 1,100 acres, called the F Area was transitioned. In another first, the program is expected to transition the five remaining cocooned reactors into the program through using a Transition and Turnover Package (TTP). As Hanford's LTS Program moves into the next few years, it will continue to build on a collaborative approach. The program has built strong relationships between contractors, regulators, tribes and stakeholders and with the U.S. Department of Energy's Office of Legacy Management (LM). The LTS Program has been working with LM since its inception. The transition process utilized LM's Site Transition Framework as one of the initial requirement documents and the Hanford Program continues to collaborate with LM today. One example of this collaboration is the development of the LTS Program's records management system in which, LM has been instrumental. The development of a rigorous data collection and records management systems has been influenced and built off of LMs success, which also ensures compatibility between what Hanford's LTS Program develops and LM. In another example, we are exploring a pilot project to ship records from the Hanford Site directly to LM for long-term storage. This pilot would gain program efficiencies so that records would be handled only once. Rather than storage on-site, then shipment to an interim Federal Records Center in Seattle, records would be shipped directly to LM. The Hanford LTS Program is working to best align programmatic processes, find efficiencies, and to benchmark site transition requirements. Involving the Hanford LTS Program early in the transition process with an integrated contractor and DOE team is helping to ensure that there is time to work through details on the completed remediation of transitioning areas. It also will allow for record documentation and storage for the future, and is an opportunity for the program to mature through the experiences that will be gained by implementing LTS Program activities over time.

54 ENVIRONMENTAL SCIENCES↗

Cleanup Verification Package for the118-F-2 Burial Ground

This cleanup verification package documents completion of remedial action, sampling activities, and compliance with cleanup criteria for the 118-F-2 Burial Ground. This burial ground, formerly called Solid Waste Burial Ground No. 1, was the original solid waste disposal site for the 100-F Area. Eight trenches contained miscellaneous solid waste from the 105-F Reactor and one trench contained solid waste from the biology facilities.

100F Area↗

Remaining Sites Verification Package for the 120-F-1 Glass Dump Waste Site, Waste Site Reclassification Form 2008-028

The 120-F-1 waste site consisted of two dumping areas located 660 m southeast of the 105-F Reactor containing laboratory equipment and bottles, demolition debris, light bulbs and tubes, small batteries, small drums, and pesticide contaminated soil. It is probable that 108-F was the source of the debris but the material may have come from other locations within the 100-F Area. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

100F Area↗

Remaining Sites Verification Package for the 100-F-26:15 Miscellaneous Pipelines Associated with the 132-F-6, 1608-F Waste Water Pumping Station, Waste Site Reclassification Form 2007-031

The 100-F-26:15 waste site consisted of the remnant portions of underground process effluent and floor drain pipelines that originated at the 105-F Reactor. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

100-F-26:15 Miscellaneous Pipelines↗

Exploratory development of a glass ceramic automobile thermal reactor

This report summarizes the design, fabrication and test results obtained for glass-ceramic (CER-VIT) automotive thermal reactors. Several reactor designs were evaluated using both engine-dynamometer and vehicle road tests. A maximum reactor life of about 330 hours was achieved in engine-dynamometer tests with peak gas temperatures of about 1065 C (1950 F). Reactor failures were mechanically induced. No evidence of chemical degradation was observed. It was concluded that to be useful for longer times, the CER-VIT parts would require a mounting system that was an improvement over those tested in this program. A reactor employing such a system was designed and fabricated.

Gould, R. E.↗

Hydrogen production by water decomposition using a combined electrolytic-thermochemical cycle

A proposed dual-purpose power plant generating nuclear power to provide energy for driving a water decomposition system is described. The entire system, dubbed Sulfur Cycle Water Decomposition System, works on sulfur compounds (sulfuric acid feedstock, sulfur oxides) in a hybrid electrolytic-thermochemical cycle; performance superior to either all-electrolysis systems or presently known all-thermochemical systems is claimed. The 3345 MW(th) graphite-moderated helium-cooled reactor (VHTR - Very High Temperature Reactor) generates both high-temperature heat and electric power for the process; the gas stream at core exit is heated to 1850 F. Reactor operation is described and reactor innards are illustrated. A cost assessment for on-stream performance in the 1990's is optimistic.

Farbman, G. H.↗

The GUINEVERE experiment: First PNS measurements in a lead moderated sub-critical fast core

The GUINEVERE (Generation of Uninterrupted Intense Neutrons at the lead Venus Reactor) experimental program is dedicated to the study of Accelerator Driven System reactivity monitoring. It was partly carried out within the EUROTRANS integrated project (EURATOM FP6). GUINEVERE consists in coupling the fast core of the VENUS-F reactor (SCK-CEN, Mol (Belgium)), composed of enriched uranium and solid lead, with a T(d,n) neutron source provided by the GENEPI-3C deuteron accelerator. This neutron source can be operated in several modes: pulsed mode, continuous mode and also continuous mode with short beam interruptions (the so called 'beam trips'). In the past, the key questions of the reactivity control and monitoring in a subcritical system were studied in the MUSE experiments (1998-2004). These experiments highlighted the difficulty to determine precisely the reactivity with a single technique. This led to investigate a new strategy which is based on the combination of the relative reactivity monitoring via the core power to beam current relationship with absolute reactivity cross-checks during programmed beam interruptions. Consequently, to determine the reactivity, several dynamical techniques of reactivity determination have to be compared. In addition, their accuracy for absolute reactivity determination must be evaluated using a reference reactivity determination technique (from a critical state: rod drop and MSM measurements). The first sub-critical configuration which was studied was around k{sub eff} = 0.96 (SCI). Pulsed Neutron Source experiments (PNS) were carried out. The neutron population decrease was measured using fission chambers in different locations inside the core and the reflector. Neutron population time decrease was analyzed using fitting techniques and the Area Method Results obtained for the SCI reactivity will be shown, discussed and compared to the reference value given by the MSM method. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

AFRRI TRIGA Reactor Neutron and Gamma Dose Characterization Preliminary Results

Integral Experiment Request (IER) 484 is part of a series of dose characterization and nuclear accident dosimeter (NAD) exercises performed under the Department of Energy (DOE) Nuclear Criticality Safety Program (NCSP). The Armed Forces Radiobilogy Research Institute (AFRRI) 1.1 MW Training, Research, Isotopes, General Atomics (TRIGA) Mark-F reactor is the third facility to undergo a dose study to establish reference dose values. A preliminary measurement was performed earlier this year, where a variety of foils were irradiated and activation gamma rays were measured using a high-purity germanium (HPGe) detector. The data was taken and analyzed to calculate the neutron spectrum in the irradiation facility. This paper will present preliminary results of the neutron dose measured. The characterization of the AFRRI dose field is planned in August.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The FREYA project at VENUS-F - the next step towards MYRRHA

The VENUS-F reactor is a fast, zero-power research reactor. Since 2009 it has used 30% wt. metallic uranium as fuel and solid lead as reflector and coolant simulator. It can also be coupled to a particle accelerator with a neutron producing target and make up a subcritical Accelerator Driven System (ADS). Within the currently ongoing FREYA project, the main tasks being investigated are the validation of online reactivity monitoring of an ADS, the validation of nuclear data and neutronic codes, and the experimental characterization of fast critical and subcritical cores representative for MYRRHA. MYRRHA will be an ADS demonstrator with the option to be operated in critical mode too. So far the only critical core at VENUS-F was assembled using 97 fuel assemblies, each of them consisting of 9 U and 16 Pb rodlets. The core was thoroughly characterized: flux traverses, spectral indices, control rod worth, delayed neutron parameters were measured and compared with Monte Carlo and deterministic calculations. A sensitivity study was also performed focusing on the influence of material impurities, positioning uncertainties, structures and detectors around the core. It was a simple core without any perturbations in the active zone. In the next critical cores that are planned to be investigated in 2015 and 2016, additional elements will be introduced in order to become more representative for MYRRHA. As MYRRHA will use MOX fuel, oxygen will be added into the following core. This will be done by introducing Al{sub 2}O{sub 3} into the fuel assemblies. New fuel assemblies have been already made and are ready to be loaded. Each consists of 13 U, 8 Pb, and 4 Al{sub 2}O{sub 3} rodlets. The new critical core will consist of approximately 40 such fuel assemblies and will be loaded in January 2015. The first results of the characterization measurements will be presented. Additionally, it is planned to investigate coolant void effects. As MYRRHA will be a rather complex system using a number of in-pile sections and heterogeneous elements inside and around the active zone, the next cores will be step by step modified by loading new materials and perturbations with the aim to assemble a MYRRHA mock-up. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Long-Term Stewardship at Hanford - 17023

The Hanford Site's Long-Term Stewardship (LTS) Program is responsible for 220 square miles of the Site's River Corridor, which includes 1,527 waste sites, 6 Manhattan Project Era production reactors that have been placed in interim safe storage, and 46 miles of Columbia River shoreline. More than 24,000 cleanup and historic documents have been identified, indexed, and tagged in the LTS records and document libraries. The LTS program, operated by the Mission Support Alliance, LLC (MSA) manages and provides surveillance and maintenance of facilities and institutional controls and all associated monitoring to ensure continued protectiveness of human health and the environment. Since 2010, through collaborative efforts with DOE and its prime contractors, land in 14 geographic areas and six cocooned reactor facilities were transitioned (mid-contract) from the River Corridor Closure Contractor to the LTS program. This accomplishment relied heavily on Site contractors and DOE working together to address challenges. Other stakeholders were informed of LTS progress through the Hanford LTS web site, presentations, and briefings. Hanford's LTS program is responsible for ensuring the protectiveness of cleanup remedies and the management of institutional controls once cleanup objectives have been achieved. LTS accomplishes this by adhering to post-cleanup requirements specified in the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Resource Conservation and Recovery Act of 1976 (RCRA) cleanup decision documents. The LTS program conducted inspection and surveillance and maintenance (S and M) activities of the cocooned 105-F Reactor in October 2014 and the other five reactors in 2015 and 2016. Reactor entries and internal inspections typically are conducted at 5-year intervals to assess the condition of the structures and evaluate potential deterioration of the reactor core, shield walls, and roof. The cocooning process is designed to protect the reactor for 75 years while radioactive decay continues, ultimately making the structures safe for demolition and removal. The results of the recent 5-year inspections allowed DOE to negotiate an extended 10-year inspection cycle, which led to a $5 million avoidance in lifecycle inspection costs. Hanford's LTS program is successfully shifting from a program focused on transitioning land and waste sites to a program focused on data management and S and M activities for those buildings and waste sites within the program. This paper will highlight the accomplishments and collaborative efforts in addressing the challenges faced by Hanford's LTS program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cleanup Verification Package for the 118-F-6 Burial Ground

This cleanup verification package documents completion of remedial action for the 118-F-6 Burial Ground located in the 100-FR-2 Operable Unit of the 100-F Area on the Hanford Site. The trenches received waste from the 100-F Experimental Animal Farm, including animal manure, animal carcasses, laboratory waste, plastic, cardboard, metal, and concrete debris as well as a railroad tank car.

100-F Experimental Animal Farm↗