293-F Stack Reduction Project

Demoltion of the 293-F Stack. A look at the environmental management at the Savannah River Site. Training and experience benefits for employees and better management of environmental safety.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement of cosmic-ray reconstruction efficiencies in the MicroBooNE LArTPC using a small external cosmic-ray counter

The MicroBooNE detector is a liquid argon time projection chamber at Fermilab designed to study short-baseline neutrino oscillations and neutrino-argon interaction cross-section. Due to its location near the surface, a good understanding of cosmic muons as a source of backgrounds is of fundamental importance for the experiment. We present a method of using an external 0.5 m (L) x 0.5 m (W) muon counter stack, installed above the main detector, to determine the cosmic-ray reconstruction efficiency in MicroBooNE. Data are acquired with this external muon counter stack placed in three different positions, corresponding to cosmic rays intersecting different parts of the detector. The data reconstruction efficiency of tracks in the detector is found to be $\epsilon_{\mathrm{data}}=(97.1\pm0.1~(\mathrm{stat}) \pm 1.4~(\mathrm{sys}))\%$, in good agreement with the Monte Carlo reconstruction efficiency $\epsilon_{\mathrm{MC}} = (97.4\pm0.1)\%$. This analysis represents a small-scale demonstration of the method that can be used with future data coming from a recently installed cosmic-ray tagger system, which will be able to tag $\approx80\%$ of the cosmic rays passing through the MicroBooNE detector.

47 OTHER INSTRUMENTATION↗

Assessment of the Group 5-6 (LB C2, LB S2, LV S1) Stack Sampling Probe Locations for Compliance with ANSI/HPS N13.1 1999

This document reports on a series of tests to assess the proposed air sampling locations for the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Group 5-6 exhaust stacks with respect to the applicable criteria regarding the placement of an air sampling probe. The LB-C2, LV-S1, and LB S2 exhaust stacks were tested together as a group (Test Group 5-6) because the common factor in their design is that the last significant flow disturbance upstream of the air sampling probe is a reduction in duct diameter. Federal regulations( ) require that a sampling probe be located in the exhaust stack according to the criteria of the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities. These criteria address the capability of the sampling probe to extract a sample that represents the effluent stream. The testing on scale models of the stacks conducted for this project was part of the River Protection Project—Waste Treatment Plant Support Program under Contract No. DE-AC05-76RL01830 according to the statement of work issued by Bechtel National Inc. (BNI, 24590-QL-SRA-W000-00101, N13.1-1999 Stack Monitor Scale Model Testing and Qualification, Revision 1, 9/12/2007) and Work Authorization 09 of Memorandum of Agreement 24590-QL-HC9-WA49-00001. The internal Pacific Northwest National Laboratory (PNNL) project for this task is 53024, Work for Hanford Contractors Stack Monitoring. The testing described in this document was further guided by the Test Plan Scale Model Testing the Waste Treatment Plant LB-C2, LB-S2, and LV-S1 (Test Group 5-6) Stack Air Sampling Positions (TP-RPP-WTP-594). The tests conducted by PNNL during 2009 and 2010 on the Group 5-6 scale model systems are described in this report. The series of tests consists of various measurements taken over a grid of points in the duct cross-section at the designed sampling probe locations and at five duct diameters up and downstream from the design location to accommodate potential construction variability. The tests were done only at the design sampling probe location on the scale model of LB-S2 because that ductwork was already constructed. The ANSI/HPS N13.1-1999 criteria and the corresponding results of the test series on the scale models are summarized in this report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Ultra-low magnetization and hysteresis loss in APC Nb 3 Sn superconductors

For the accelerator magnets of the next hadron collider, reducing superconductor persistent-current magnetization is not only important for achieving the desired field quality, but also crucial for its sustainability because the magnetization loss is the major heat load to the magnet cold mass. For conventional Nb 3 Sn conductors this requires reduction of effective subelement size (D eff ). For the restacked-rod-process (RRP ® ) conductors a physical subelement size (D sub ) as small as 35 µm (corresponding to a D eff close to 45 µm) can be reached, but at a significant price in J c . Another way to reduce the magnetization is by introducing artificial pinning centers (APC) using the internal oxidation approach. APC conductors outperform conventional Nb 3 Sn wires in two aspects: 1) higher J c at high fields, and 2) much lower J c and magnetization at low fields (e.g. below 5 T). Here, in this work we explored the fabricability of APC wires with small D sub . A 180-stack APC wire was produced and drawn to 0.7- and 0.5 mm diameters with good quality, with D sub s of 34 and 24 µm (D eff s of 36 and 25 µm), respectively. For the 34 µm-D sub wire, its non-Cu J c is higher than that of an RRP ® wire used for the High-Luminosity Large Hadron Collider (HL-LHC) project above 13 T (e.g. 36% higher at 4.2 K, 18 T), while its non-Cu magnetization at 1 T, ΔM(1 T), is only 29% of the RRP ® wire. Its non-Cu hysteresis loss for a cycle between 1 and 14 T, Q h (1–14 T), is 37% of the RRP ® wire. For the 24 µm-D sub wire, its non-Cu J c surpasses the HL-LHC RRP ® wire above 17.5 T, while its ΔM(1 T) and Q h (1–14 T) are only 17% and 23% of the RRP® wire, respectively. Its non-Cu Q h (±3 T) even meets the specification of the International Thermonuclear Experimental Reactor project.

Xu, X [Fermi National Accelerator Laboratory (FNAL↗