Search NASA⌕ Search

SEARCH · Search NASA

Results for “FEASIBILITY STUDIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Multnomah County Hydrokinetic Feasibility Study: Final Feasibility Study Report

HDR has completed a study of the technical, regulatory, and economic feasibility of installing hydrokinetic turbines under the Morrison, Broadway, and Sellwood bridges. The primary objective of installing hydrokinetic turbines is a demonstration of in-stream hydrokinetic technologies for public education and outreach. Due to the low gradient of the Lower Willamette and the effects of the tide, velocities in the area in consideration are simply not high enough to economically support a commercial installation. While the velocities in the river may at times provide enough energy for a commercial turbine to reach capacity, the frequency and duration of high flow events which provide suitable velocities is not sufficient to support a commercial hydrokinetic installation. We have observed that over an 11 year period, daily average velocities in the Lower Willamette exceeded a nominal cut-in speed of 0.75 m/s only 20% of the time, leaving net zero power production for the remaining 80% of days. The Sellwood Bridge site was estimated to have the best hydrokinetic resource, with an estimated average annual production of about 9,000 kWh. The estimated production could range from 2,500 kWh to 15,000 kWh. Based on these energy estimates, the amount of revenue generated through either a power purchase agreement (PPA) or recovered through net metering is not sufficient to repay the project costs within the life of the turbine. The hydrokinetic resource at the Morrison and Broadway Bridges is slightly smaller than at the Sellwood Bridge. While the Broadway and Morrison Bridges have existing infrastructure that could be utilized, the project is not expected to generate enough revenue to repay the investment. Despite low velocities and energy production, the sites themselves are favorable for installation of a demonstration or experimental project. With high public interest in renewable energy, the possibility exists to develop a hydrokinetic test site which could provide developers and scientists a location to temporarily deploy and test hydrokinetic devices, and also function as an educational tool for the general public. Bridge piers provide an excellent pre-existing anchor point for hydrokinetic devices, and existing infrastructure at the Morrison and Broadway Bridges may reduce installation costs. Opportunity exists to partner with local universities with engineering and environmental interest in renewable energy. A partnership with Portland State University's engineering school could provide students with an opportunity to learn about hydrokinetics through senior design projects. Oregon State University and University of Washington, which are partnered through the Northwest National Marine Renewable Energy Center (NNMREC) to study and test hydrokinetic technology, are also relatively local to the site. In addition to providing an opportunity for both public and private entities to learn technically about in-stream kinetics, this approach will encourage grant funding for outreach, education, and product development, while also serving as a positive community relations opportunity for the County and its partners.

13 HYDRO ENERGY↗

SU-E-J-208: Feasibility Study On Using Small Plastic Phantoms for Auditing Radiation Output of MR-Linac Systems

Purpose: To study feasibility of using small plastic phantoms designed for conventional linac output auditing to measure the output of MR-Linac systems. Methods: For simulations, the CT scan of an IROC(formerly RPC) acrylic block phantom designed for 8 MV beams was imported in a research version of the treatment planning system (Monaco). Dose delivered to three TLDs in the block was calculated with a Monte Carlo algorithm and a beam model based on an MR-linac prototype with and without a magnetic field (B=1.5T). In a large mathematical water phantom, the same beam was used to calculate dose in full scatter conditions. The block factor (F) was calculated as the ratio of the average dose to the block TLDs to the dose at the reference point in the mathematical phantom. For experimental measurement, four IROC blocks were irradiated with the MR-linac prototype, and data were analyzed by IROC. Results: The F factor without a B field was 1.053. When a B field was applied, it changed the dose distribution in the block, especially on the edges. With a B field parallel to the long axes of the TLD, F was 1.038. However, with a perpendicular B field, F factor increased slightly to 1.075. In the IROC report, the output determined with two blocks parallel to the B field was 2.3% higher than the output by the two blocks perpendicular to the B field. The average of all four blocks was within 2% of machine output measured with an ion chamber. Conclusion: It may be feasible to expand the utility of the acrylic block phantoms for radiation output auditing from conventional linacs to MR-linacs. However, the scatter correction factor can change due to the B field and its orientation to the block. More symmetric phantom designs may be less prone to mistakes. We acknowledge research support from Elekta.

60 APPLIED LIFE SCIENCES↗

Acoustic treatment of the NASA Langley 4- by 7-meter tunnel: A feasibility study

A feasibility study for upgrading the NASA Langley 4- by 7-Meter Tunnel so that it may be used for aeroacoustic research related to helicopters is described. The requirements for noise research leading to the design of the next generation of helicopters impose a set of acoustic test criteria that no existing wind tunnel in the United States can presently meet. Included in this feasibility study are the following considerations: (1) an evaluation of general wind-tunnel requirements and desired tunnel background noise levels for helicopter aeroacoustic research; (2) an assessment of the present acoustic environment for testing model rotors; (3) a diagnostic investigation of tunnel background noise sources and paths; (4) acoustic treatment options for tunnel background noise reduction and a trade-off study between these options; (5) an engineering feasibility assessment of the selected option; and (6) an integrated analysis of study components and recommendations of treatment for an approach to meet the tunnel background noise reduction goal. It is concluded that the Langley 4- by 7-Meter Tunnel is a fundamentally suitable facility for helicopter aeroacoustic research. It is also concluded that acoustic treatment of this facility for meeting the required tunnel background noise goal can be accomplished technically at reasonable risk and cost.

Yu, J. C.↗

The North Dakota integrated carbon storage complex feasibility study

Here, the Energy & Environmental Research Center is investigating the feasibility of safely, permanently, and economically storing 50 million tonnes of CO 2 in central North Dakota, United States, over a 25-year operational period, should a business case for CO 2 storage emerge. The study is part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory CarbonSAFE initiative and addresses the technical and nontechnical challenges of commercially deploying a CO 2 storage project. Evaluation of cores from two stratigraphic test wells demonstrate that the Broom Creek Formation (sandstone) is an excellent candidate for the geologic storage of CO 2 and the overlying Opeche Formation a competent cap rock.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Burke County wheat feasibility study

A feasibility study was conducted to determine whether wheat could be distinguished from other small grain crops in a selected spring wheat growing area in Burke County, North Dakota using a maximum likelihood classification program and ERTS 1 multispectral band scanner data. ERTS 1 data scenes were selected from passes made on June 5, 1973 and June 23, 1973. The Univac 1108 computer and the LARSYS pattern recognition software package were used in performing the classification. Results of the analysis are provided.

Kunkel, W. A.↗

An airport wind shear detection and warning system using Doppler radar: A feasibility study

A feasibility study was conducted to determine whether ground based Doppler radar could measure the wind along the path of an approaching aircraft with sufficient accuracy to predict aircraft performance. Forty-three PAR approaches were conducted, with 16 examined in detail. In each, Doppler derived longitudinal winds were compared to aircraft measured winds; in approximately 75 percent of the cases, the Doppler and aircraft winds were in acceptable agreement. In the remaining cases, errors may have been due to a lack of Doppler resolution, a lack of co-location of the two sampling volumes, the presence of eddy or vortex like disturbances within the pulse volume, or the presence of point targets in antenna side lobes. It was further concluded that shrouding techniques would have reduced the side lobe problem. A ground based Doppler radar operating in the optically clear air, provides the appropriate longitudinal winds along an aircraft's intended flight path.

Mccarthy, J.↗

Muon Muon Collider: Feasibility Study

A feasibility study is presented of a 2 + 2 TeV muon collider with a luminosity of L = 10{sup 35} cm{sup -2}s{sup -1}. The resulting design is not optimized for performance, and certainly not for cost; however, it does suffice - we believe - to allow us to make a credible case, that a muon collider is a serious possibility for particle physics and, therefore, worthy of R and D support so that the reality of, and interest in, a muon collider can be better assayed. The goal of this support would be to completely assess the physics potential and to evaluate the cost and development of the necessary technology. The muon collider complex consists of components which first produce copious pions, then capture the pions and the resulting muons from their decay; this is followed by an ionization cooling channel to reduce the longitudinal and transverse emittance of the muon beam. The next stage is to accelerate the muons and, finally, inject them into a collider ring wich has a small beta function at the colliding point. This is the first attempt at a point design and it will require further study and optimization. Experimental work will be needed to verify the validity of diverse crucial elements in the design. Muons because of their large mass compared to an electron, do not produce significant synchrotron radiation. As a result there is negligible beamstrahlung and high energy collisions are not limited by this phenomena. In addition, muons can be accelerated in circular devices which will be considerably smaller than two full-energy linacs as required in an e{sup +} - e{sup -} collider. A hadron collider would require a CM energy 5 to 10 times higher than 4 TeV to have an equivalent energy reach. Since the accelerator size is limited by the strength of bending magnets, the hadron collider for the same physics reach would have to be much larger than the muon collider. In addition, muon collisions should be cleaner than hadron collisions. There are many detailed particle reactions which are open to a muon collider and the physics of such reactions - what one learns and the necessary luminosity to see interesting events - are described in detail. Most of the physics accesible to an e{sup +} - e{sup -} collider could be studied in a muon collider. In addition the production of Higgs bosons in the s-channel will allow the measurement of Higgs masses and total widths to high precision; likewise, t{bar t} and W{sup +}W{sup -} threshold studies would yield m{sub t} and m{sub w} to great accuracy. These reactions are at low center of mass energy (if the MSSM is correct) and the luminosity and {Delta}p/p of the beams required for these measurements is detailed in the Physics Chapter. On the other hand, at 2 + 2 TeV, a luminosity of L {approx} 10{sup 35} cm{sup -2}s{sup -1} is desirable for studies such as, the scattering of longitudinal W bosons or the production of heavy scalar particles. Not explored in this work, but worth noting, are the opportunities for muon-proton and muon-heavy ion collisions as well as the enormous richness of such a facility for fixed target physics provided by the intense beams of neutrinos, muons, pions, kaons, antiprotons and spallation neutrons. To see all the interesting physics described herein requires a careful study of the operation of a detector in the very large background. Three sources of background have been identified. The first is from any halo accompanying the muon beams in the collider ring. Very carefully prepared beams will have to be injected and maintained. The second is due to the fact that on average 35% of the muon energy appears in its decay electron. The energy of the electron subsequently is converted into EM showers either from the synchrotron radiation they emit in the collider magnetic field or from direct collision with the surrounding material. The decays that occur as the beams traverse the low beta insert are of particular concern for detector backgrounds. A third source of background is e{sup +} - e{sup -} pair creation from {mu}{sup +} - {mu}{sup -} interaction. Studies of how to shield the detector and reduce the background are addressed in the Detector Chapter. Polarization of the muons allows many very interesting measurements which are discussed in the Physics Chapter. Unlike the electron collider in which the electron beam is highly polarized and the positron beam unpolarized, both muon beams may be partially polarized. It is necessary to select forward moving muons from the pion's decay and thus reduce the available number of muons and hence the luminosity. The necessary machine technology needed to achieve such a collider is discussed in the Option Chapter; at the moment it is not part of our point design, although such capability would almost certainly be incorporated into an actual device.

43 PARTICLE ACCELERATORS↗