Search NASA⌕ Search

SEARCH · Search NASA

Results for “FERC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Comprehensive Database of Environmental Mitigations Extracted from FERC-Licensed Hydropower Projects Using Artificial Intelligence Techniques, 1998-2023

This dataset provides a comprehensive inventory of environmental mitigation measures required by Federal Energy Regulatory Commission (FERC) licensed hydropower facilities from 461 licenses that were issued from 1998 to 2023. These licenses constitute 446 of the 1015 FERC projects that were active at the end of 2023. 17,612 mentions of environmental mitigations were identified and categorized in 128 unique categories. Mitigations were identified using a Natural Language Processing (NLP) approach, specifically with a Bidirectional Encoder Representations from Transformer (BERT) model. Model-derived results were then reviewed and updated by a subject matter expert as needed. This dataset introduces important enhancements to previous efforts to inventory environmental mitigations, such as including associated license text for each mitigation, tracking the number of instances a mitigation was identified within a license, and providing improved location information. These enhancements significantly expand the dataset's utility, offering greater analytical capabilities and ensuring reproducibility. The dataset is downloadable as a zip file containing the metadata and dataset files.

Ruggles, Thomas [Oak Ridge National Laboratory (OR↗

Hydropower Capital and O&M Costs: An Exploration of the FERC Form 1 Data

This report explores the potential for using responses from the Federal Energy Regulatory Commission’s (FERC’s) “Electric Utility Annual Report,” also known as FERC Form 1, as a cost database for conventional and pumped storage hydropower (PSH). The report outlines the process used to compile an easy-to-access database from the original FERC Form 1 data and discusses the historical cost/performance data. The steps for developing the database include downloading the annual FoxPro files from the FERC website (FERC, 2020), reading them into an Excel format, and reconciling naming issues across years, repeated entries, and shared assets, among others. The cleaned and compiled Form 1 database is available on Oak Ridge National Laboratory’s (ORNL’s) HydroSource website. For this report, the compiled Form 1 database was linked to two other hydropower databases, the National Inventory of Dams and the ORNL Existing Hydropower Assets, that provide additional information on the characteristics and other features of plants in the Form 1 data. Explorations of the plant characteristics, performance, capital costs, and operation and maintenance (O&M) cost data in the combined database were presented separately for conventional hydropower and PSH projects. Form 1 has several advantages as a hydropower cost database. First, the cost data is reported directly by plant owners. Second, Form 1 provides cost breakdowns of capital and operating costs for large conventional and PSH plants enabling more detailed tracking of hydropower costs compared with typical total cost estimates. Third, although the Form 1 data is not reported by all operational hydropower plants in the United States, the available data represents a wide range of plant characteristics and a sizable proportion of the hydropower fleet (61% of PSH plants and 22% of conventional hydropower plants by capacity). The lower proportion of the conventional hydropower fleet is because Form 1 reporting requirements apply only to private utilities that meet given size thresholds, leaving out federally owned facilities and many smaller hydropower plants. Overall, the Form 1 cost database represents a unique, publicly available database on hydropower asset capital and O&M costs. This report leads to a compiled database for the reporting years 1994 to 2020 that helps resolve issues with accessibility and use of the FERC Form 1 data by hydropower plant owners, project developers, technology developers, and regulators.

13 HYDRO ENERGY↗

FERC order 2222 & DER policy and implementation report - January 2026

The January 2026 FERC 2222 Tracker Report provides an overview of the progress and challenges in the implementation of FERC Order 2222, emphasizing the critical need for state-level action to address gaps in DERA/EDC communication protocols. The report highlights the importance of reliable communication between electric distribution companies (EDCs) and DER aggregators (DERAs) for seamless market operations, noting the absence of specific directives from FERC and RTO/ISO compliance filings. Key discussions include the operational coordination required to manage DER operations within aggregated markets, the potential use of tools like DER Registries for efficient data exchange, and the implications of non-performance due to communication issues. While steps are being taken at the state level, such as ongoing policy development and bi-monthly webinars for stakeholder education, no states have fully developed coordination frameworks as of early 2026. The report underscores the growing role of states and local regulators in defining these protocols and ensuring effective coordination amidst the complex dynamics of distributed energy resources (DERs) integration into wholesale markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FERC Order No. 2222 and Considerations for Distributed Wind

The Federal Energy Regulatory Commission (FERC) issued Order No. 2222 in October 2020. The rule directs Regional Transmission Organizations and Independent System Operators (ISOs) to amend their tariffs and participation models to accommodate heterogeneous distributed energy resource (DER) aggregations in the wholesale energy markets that they operate, including capacity, energy, and ancillary service markets. The Commission issued the rule to better capture the benefits provided by DERs deployed in the United States, whose use has been expanding rapidly. The Commission defines DERs as “any resource located on the distribution system, any subsystem thereof or behind a customer meter,” including but not limited to “electric storage resources, distributed generation, demand response, energy efficiency, thermal storage, and electric vehicles and their supply equipment.” The rule aims to increase DER participation in wholesale markets by allowing the creation of DER aggregations, in which multiple DERs that are too small to meet minimum capacity requirements for wholesale markets individually would be able to participate in markets as a single unit. As of June 20, 2023, all ISOs have filed initial compliance plans and a number have begun implementation. Compliance dates range from 2024 to 2029, with Midcontinent ISO having the latest date of compliance proposed for 2029. Southwest Power Pool still has an outstanding date, having no final order yet from FERC, but a target date of the third quarter of calendar year 2025. The rule, which is technology agnostic and requires ISOs to create participation plans that accommodate different DERs, provides an opportunity for distributed wind market expansion. In addition, distributed wind can bring benefits to heterogenous DER aggregations. These benefits include resource diversity (i.e., a complementary generation profile to other types of distributed generation), its small footprint and ability to be co-located with load, and its potential to provide frequency response, voltage support, and black start services, among other ancillary services. This report provides a status update on FERC Order No. 2222, the current state of ISO compliance, and information relevant to the distributed wind industry as DER aggregators and other stakeholders expand their participation to wholesale energy markets.

17 WIND ENERGY↗

Environmental Flow Requirements from FERC Licenses Across the US

Environmental flow requirements included in Federal Energy Regulatory Commission (FERC) hydropower licenses are important for balancing natural properties and benefits of river ecosystems (e.g., healthy species, recreation, water supply, flood control) supporting hydropower production. In some cases, environmental flow requirements may limit operational flexibility given current operational schemes and make a hydropower plant less able to provide power to the electric grid on demand. Hydropower plants may gain some flexibility as hydropower scheduling time periods are made to be more responsive to the short-term needs of an energy grid increasingly reliant on intermittent renewables. However, many flow requirements focus on the daily, monthly, or seasonal flow fluctuations which matches the time scale of most paradigms linking flow alterations to the health of river ecosystems. This dataset seeks to provide a greater understanding of how flexibility in environmental requirements can be leveraged to create positive outcomes for both the power system and the environment. It contains information on environmental flow requirements from the Protection, Mitigation, and Enhancement section of 50 randomly selected FERC licenses: 25 issued from 1998-2013 that were also included in the ORNL Mitigation Database (Schramm et al. 2015) and 25 issued from 2014-present. The information on environmental flow requirements was extracted from the PM&E section of 50 randomly selected FERC licenses: 25 issued from 1998-2013 that were also included in the ORNL Mitigation Database (Schramm et al. 2015) and 25 issued from 2014-present. The flow requirements were then categorized into flow augmentation categories based on whether the license stated a specific water management purpose for the given requirement called augmentation categories (i.e., fisheries or habitat, recreation or boating, industry, and general or unspecified; Table B). Requirements were also grouped into flow type categories (e.g., minimum flow rate, maximum flow rate, ramping rate). Additional information related to flow requirements such as the augmentation time-period and whether the flow rate was continuous (i.e., condition must be present at all-times) or instantaneous (i.e., condition present at a point in time) was also extracted from the licenses. Some licenses had specific flow requirements based on whether the project was in a wet, dry, or normal water year. If that information was presented in the license, it was also included in the data set. The location within the project was noted, hereafter, zone, in the dataset for flow requirements relating to specific areas of hydropower projects (Dam, Powerhouse, Bypass Reach). Maximum discharge capacities of hydropower facilities were also extracted from both the Existing Hydropower Assets (EHA) data set and the National Inventory of Dams (NID) databases. Each facility was coded with project identification codes from the EHA dataset to facilitate cross-referencing between datasets.

13 HYDRO ENERGY↗

Distributed Wind and Impacts of FERC Order No. 2222 Implementation

In September of 2020, FERC issued Order No. 2222, directing ISOs to adjust their long-standing tariffs and participation models to enable the operation of distributed energy resource (DER) aggregators in wholesale energy markets. The rule sought to bring wholesale markets under its jurisdiction up to speed with existing expansion of DERs across the United States and to capture the potential benefits that these technologies can provide. This report describes the implementation of FERC Order No. 2222 and the compliance plans that have been submitted so far, attempt to understand the potential impact the rule may have on distributed wind, and provide opportunities for future work to analyze and encourage deployment under these policy conditions. There is an information gap for the type of market interactions distributed wind may have or how it could be best deployed in DER aggregations under future market conditions. There is significant potential for profitable deployment of distributed wind in states that are served by ISOs and covered under Order No. 2222. Distributed wind and other DERs provide local energy that does not need to travel those distances and avoids the losses typically associated with long-distance energy transmission. Deployment of distributed wind can benefit communities that exist away from large load centers by providing local, clean, and affordable energy. Aggregating DERs that include distributed wind could provide these benefits across multiple far-ranging communities if they have access to participate in wholesale markets. A new baseline valuation of distributed wind in areas covered by Order No. 2222 is required to accurately gauge where it is profitable and how it can compete or complement existing or future DER deployment, including as part of an aggregate.

17 WIND ENERGY↗

FERC Order 2222 DER Policy and Implementation Report - November 2025

The FERC Order 2222 DER Policy and Implementation Report delivers bi-monthly updates on policy and implementation activities related to FERC Order 2222 across the United States. This report is made available on the FERC2222.org website for stakeholder access.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FERC order 2222 & DER policy and implementation report: May 2025

FERC and several states took action on distributed energy resource (DER) policy, the implementation of virtual power plants (VPPs), and FERC Order 2222 in the last several months. A summary of the actions is listed below.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ORNL Hydropower Cost Database Extract from FERC Form-1

The ORNL FERC Form 1 Hydropower Cost Database Extract is a cleaned and compiled version of the hydropower component of the Federal Energy Regulatory Commission’s (FERC) Electric Utility Annual Report, also known as Form-1. The database includes conventional and pumped storage hydropower plants owned by non-federal major utilities that submitted the Form 1 data from 1994-2020, representing about 22% of existing conventional hydropower capacity and 61% of pumped storage capacity. The database includes the escalation factors and describes the methods used to scale costs to a common data year, as well as tables of identifiers necessary to link the hydropower plants to two other relevant databases, the National Inventory of Dams and the ORNL Existing Hydropower Assets database. This database provides historical capital and operating costs for three schedules/classes defined in Form 1: Large Hydro, Pumped Storage Hydro, and Small Hydro. The Large Hydro and Pumped Storage Hydro data include cost items, such as land, structures, facilities, etc.

13 HYDRO ENERGY↗

Maximizing Demand Flexibility with Buildings and FERC 2222

In 2020, the Federal Energy Regulatory Commission (FERC) approved a rule, Order 2222, that requires market operators to create pathways enabling distributed energy resource aggregators (DERAs) to compete in all regional organized wholesale electric markets. The goal is to encourage various forms of distributed energy resources (DERs) to participate in electricity markets in a way that would enhance competition, encourage innovation, and drive down costs for consumers. In this document, we briefly discuss how FERC Order 2222 affects the opportunities for participation in electricity markets for building owners and operators, the role of aggregators, and the involvement of buildings in the electricity market.

demand flexibility↗

Impact of FERC Order 2222 on DER Participation Rules in US Electricity Markets

Electricity markets in the bulk grid are beginning to implement market mechanisms that support the procurement of flexible capabilities from wide range of technologies, including distributed energy resources (DERs). The flexibility of these resources will help counterbalance supply uncertainties from large-scale integration of variable renewable generation. To encourage development of distributed and aggregated market participants, FERC Order 2222 was issued in September 2020 to require each Independent System Operator (ISO) in the US to implement rules that enable broader participation from aggregations of DERs in the bulk market. The following paper first describes the generic design of ISO markets before introducing the new market participation rules that ISOs have proposed for compliance with Order 2222. The paper then describes how software performance issues may continue to affect the eligibility requirements and offer structures for DER aggregations participating in ISOs, noting that continued research on computational methods may help reduce burdens for DER integration. The prospects for transmission and distribution system coordination is second major issue discussed, which will require minor changes to existing processes in the short term. In the longer term, there is more opportunity for more wide-ranging reforms, such as the development of a Distribution System Operator (DSO) framework. Newly proposed market rules may affect how Transactive Energy Systems (TES) will help facilitate efficient formation of DER aggregations and operation of the individual DERs within an aggregation. Within the TES context, the challenge is to fully understand how resource eligibility and operational and planning coordination methods will affect the design and implementation of TES.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transforming Regional Transmission Planning: FERC Order 1920 Explained [Slides]

This presentation presents the key topics from FERC Order 1920: Building for the Future Through Electric Regional Transmission Planning and Cost Allocation. It breaks down and summarizes the main reforms from the regulation including comments from diverse perspectives on how the new rules may be implemented. This presentation can serve as a resource for diverse stakeholders including policymakers, utilities, industry, and researchers who seek to understand how the new ruling may impact regional transmission planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Primer on FERC Order No. 2222: Insights for International Power Systems

The U.S. Federal Energy Regulatory Commission (FERC) Order No. 2222 is heralded as a landmark rule on distributed energy resources (DER). Issued in September 2020, it is specifically designed for organized wholesale power markets. The rule is nonbinding for utilities that have not chosen to join an organized wholesale power market. This primer, which analyzes the order, focuses on potential insights for similar changes in the international power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FERC Licensing Proceeding Environmental Study Determination Letter

This dataset summarized the back-and-forth of study submittals and issuances from Aldrovandi et al. (2021) for seven licensed hydropower projects presented as case studies in Aldrovandi et al. (2021), leveraging information from six of the seven case study projects documented in Pracheil et al. (2019), Sci Tot Env 687: 1245-1260. This information was mined from documents containing information on environmental studies conducted for US federal hydropower licensing. Documents included were found in the FERC eLibrary and was summarized and presented in Aldrovandi et al. (2021). A description of the types of documents used in this dataset can be found in Aldrovandi et al. (2021).

13 HYDRO ENERGY↗

FERC Licensing Proceeding Environmental Study Life Cycle

This dataset summarized the back-and-forth of study submittals and issuances from Aldrovandi et al. (2021) for seven licensed hydropower projects presented as case studies in Aldrovandi et al. (2021), leveraging information from six of the seven case study projects documented in Pracheil et al. (2019), Sci Tot Env 687: 1245-1260. This information was mined from documents containing information on environmental studies conducted for US federal hydropower licensing. Documents included were found in the FERC eLibrary and was summarized and presented in Aldrovandi et al. (2021). A description of the types of documents used in this dataset can be found in Aldrovandi et al. (2021).

13 HYDRO ENERGY↗

Basin-Wide Approaches to Hydropower Licensing

This presentation summarizes findings from a 2020 NREL technical report including the FERC relicensing process for non-federal hydropower projects, analyzes FERC-licensed projects with license expiration dates from 2018-2037, discusses FERC's authority to coordinate license terms of hydropower projects within a shared river basin and provides basin-wide case studies and considerations to hydropower relicensing. In the United States there are 1,043 active FERC-licensed hydroelectric projects with a total capacity of 56,097 MW. Of those, 647 with a total capacity of 21,870 MW have license expiration dates from 2018-2037. The expected workload in conjunction with the time, cost, and complexity associated with issuing a single new license has led to initiatives that aim to increase the efficiency of the relicensing process. Federal and state regulators and licensees in California, Maine, New York, and Wisconsin have begun to develop approaches to look at hydropower relicensing as part of a larger system - a river basin. These basin-wide approaches seek to coordinate different stages of the relicensing process for multiple projects at the same time. The goal of these basin-wide approaches is to increase the efficiency of the relicensing process and allow for a more comprehensive analysis of the cumulative impacts of the projects within the basin. These innovative approaches to relicensing could also reduce the workload for regulators and costs associated with relicensing. This presentation discusses some of the findings from the Basin-wide Approaches to Hydropower Relicensing: Case Studies and Considerations including a summary of the key considerations for the FERC relicensing process for non-federal hydropower projects, key findings from the analysis of FERC-licensed projects with license expiration dates from 2018-2037, discusses FERC's authority to coordinate license terms of hydropower projects within a shared river basin and provides basin-wide case studies and considerations to hydropower relicensing.

basin-wide↗