Search NASA⌕ Search

SEARCH · Search NASA

Results for “FISH PASSAGE FACILITIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A census of fish passage facilities at US hydropower developments across the conterminous United States

Hydropower provides reliable and secure electricity and contributes significantly to the flexibility and stability of the US electricity grid. Hydropower dams generally are aquatic barriers and hazards to migratory fish in rivers. Fish passage facilities mitigate risks from hydropower to migratory fish, but information on these facilities is incomplete for the conterminous United States (CONUS). Here, we present the first CONUS-scale dataset of fish passage facilities at US hydropower developments in over 30 years. The existence of fish passage facilities (presence or absence) was specified for 1909 hydropower features, 390 of which had at least one facility. Most features had a single passage facility that provided passage in only one direction, with downstream being more common than upstream passage. Bypasses and ladders accounted for 60 % of the fish passage facility types. While we documented 659 fish passage facilities across CONUS, facilities were most common in the New England, Pacific Northwest, Mid-Atlantic, and Great Lakes regions. In general, fish passage facilities were more common at features that were closer to the ocean, at lower elevations, and at shorter dams, but not related to installed electrical generation capacity. Hydrologic sub-basins containing salmonids also contained the largest number of hydropower features, but the proportion of features with passage was generally higher in sub-basins containing multiple migratory taxa. This census provides valuable information on existing fish passage mitigation and is a benchmark to gauge progress toward a modernized hydropower fleet that provides affordable, reliable energy while protecting fishery resources and river ecosystems.

13 HYDRO ENERGY↗

Overview of Fish Passage Facilities at Hydropower Developments across the Conterminous United States

This dataset contains geo-referenced information on the presence and types of fish passage facilities at hydropower developments across the conterminous United States (CONUS) presented in the ORNL Hydropower Fish Passage Database Webmap (https://www.ornl.gov/project/quantifying-national-fish-passage-data/webmap). It was developed through collaborative partnerships with fish passage engineers and biologists at both the US Fish and Wildlife Service (USFWS) and the National Marine Fisheries Service (NMFS), and hydropower experts at the Low Impact Hydropower Institute (LIHI). Information contained within this dataset has been provided by many different sources, including State and Federal resource management agencies, non-governmental organizations, hydropower industry members, and published datasets=. This dataset is intended to provide a high-level overview of the distribution of fish passage infrastructure at hydropower developments across CONUS; a more comprehensive database is anticipated to be released later in 2025. This dataset contains one data file in comma-separate (*.csv) format and the information within it was last updated on 24 March 2025.

13 HYDRO ENERGY↗

Stakeholder Questionnaire on Fish Passage Facilities at U.S. Hydropower Developments

To mitigate the environmental impacts of hydropower dams on fish populations in rivers, fish passage infrastructure may be required by regulatory authorities or recommended by state or federal agencies to allow migratory fish to pass hydropower barriers and complete their life histories. However, information on the location, types, and characteristics of fish passage infrastructure is incomplete at the national scale. This lack of information limits understanding of current fish passage capabilities and hinders efforts to anticipate future passage requirements during project licensing or relicensing. To address this knowledge gap, researchers at Oak Ridge National Laboratory partnered with federal agency and industry stakeholders to create the first national-scale database of fish passage infrastructure at U.S. hydropower developments. As part of this effort, a stakeholder questionnaire was created and deployed to solicit information on fish passage infrastructure, including engineering characteristics, operational schedules, targeted species, and costs. This online questionnaire was designed to allow respondents to provide highly detailed information regarding fish passage capabilities at U.S. hydropower developments as efficiently as possible. The questionnaire improved database coverage and accuracy by providing valuable development- or passage-specific stakeholder knowledge that is not otherwise publicly available. However, questionnaire response rates were low, and stakeholders showed a preference for providing data via the spreadsheet template. This is likely because most stakeholders had high-level knowledge about fish passage existence and type at many features, and few stakeholders had highly detailed, feature-specific knowledge of fish passage infrastructure, cost, operational scheduling, and capabilities. Nonetheless, the development and deployment of the stakeholder questionnaire advanced the project in several fundamental ways, and a similar questionnaire may be valuable for future database expansion via targeted dissemination to stakeholders with confirmed knowledge of detailed fish passage information at specific hydropower projects.

13 HYDRO ENERGY↗

Hydropower Fish Passage Webmap

The National Fish Passage Webmap application provides an environment that allows users to visualize information information on fish passage facility existence, type, and direction at hydropower developments across the conterminous United States. It was developed through collaborative partnerships with fish passage engineers and biologists at both the US Fish and Wildlife Service (USFWS) and the National Marine Fisheries Service (NMFS), and hydropower experts at the Low Impact Hydropower Institute (LIHI). Data on fish passage facilities at hydropower features were compiled from numerous sources including published and non-published datasets, published reports, email communications with federal and state resource managers and hydropower operators, and by extracting information from regulatory documents within the FERC eLibrary. The number of sources for a given feature varied, which occasionally resulted in conflicting information regarding the existence of fish passage facilities or in the type or sub-type of passage technologies. Such discrepancies were reviewed and resolved individually, based on the weight of evidence or, when available, on direct observations from information providers or aerial imagery.

13 HYDRO ENERGY↗

ORNL National Hydropower Fish Passage Database

Fish passage facilities are used to mitigate impacts of hydropower dams to migratory fish in rivers, but information on the location, types, and characteristics of this infrastructure is incomplete at a national scale. Researchers at Oak Ridge National Laboratory (ORNL) partnered with fish passage engineers and hydropower experts from the US Fish and Wildlife Service (USFWS), the National Oceanic Atmospheric Administration’s National Marine Fisheries Service (NOAA NMFS), and the Low Impact Hydropower Institute (LIHI) to create the first national scale database of fish passage infrastructure at US hydropower developments. This database consists of the ORNL_Fish_Passage_Dataset.zip file with 13 individual .csv files that contain information on fish passage facility engineering characteristics, targeted fish species, operational schedule, and costs. which is of great value to a diverse range of stakeholders. This information was collected between December 2023 and July 2025 from project partners, other hydropower stakeholders, online datasets available for download, and a stakeholder questionnaire Information. This data resource addresses a large gap in knowledge of the deployment of fish passage technology and is freely available to members of the hydropower community, including federal and state regulators and resource agencies, non-governmental organizations (NGOs), industry, and other user groups to support project planning and regulatory (re)licensing activities. This database supports the US Department of Energy Water Power Technologies Office objective to develop decision support tools and data resources that improve environmental performance and ensure hydropower’s long-term value to the American public.

Matson, Paul [Oak Ridge National Laboratory (ORNL)↗

National Hydropower Fish Passage Database User's Guide and Methodology

Fish passage facilities are used to mitigate the impacts of hydropower dams on migratory fish in rivers, but information on the location, types, and characteristics of this infrastructure is incomplete at a national scale. Researchers at Oak Ridge National Laboratory partnered with federal agency and industry stakeholders to create the first national-scale database of fish passage infrastructure at U.S. hydropower developments. This database contains information of great value to a broad range of stakeholders; it includes fish passage facility engineering characteristics, targeted fish species, operational schedules, and costs. This data resource addresses a large gap in knowledge of the deployment of fish passage technology and is freely available to members of the hydropower community, including federal and state regulators and resource agencies, non-governmental organizations, industry, and other user groups to support project planning and regulatory (re)licensing activities. This database supports the U.S. Department of Energy Water Power Technologies Office objective to develop decision support tools and data resources that improve environmental performance and ensure hydropower’s long-term value to the American public.

13 HYDRO ENERGY↗

Effects of a Novel Fish Transport System on the Health of Adult Fall Chinook Salmon

Movement past hydroelectric dams and related in-river structures has important implications for habitat connectivity and population persistence in migratory fish. A major problem is that many of these structures lack effective fish passage facilities, which can fragment spawning and rearing areas and negatively impact recruitment. While traditional fish passage facilities (e.g., ladders, trap and haul) can effectively enable fish to pass over barriers, their capital or operational costs can be significant. We evaluated the utility of a novel transport device that utilizes a flexible tube with differential internal air pressure to pass fish around in-river barriers. Three treatments and a control group were tested. In two of the treatments, adult fall Chinook Salmon nearing maturation were transported through the device via two lengths of tube (12 or 77 m) and their injury, stress, and immune system responses and reproductive function were compared to a third treatment where fish were moved by a standard trap and haul method and also to a control group. We observed no significant differences among the treatment or control groups in post-treatment adult survival, injury or stress. Indicators of immune system response and reproductive readiness were also not significantly different among the four groups. Egg survival was significantly different among the groups, but the differences were highly variable within groups and not consistent with the duration of treatment or degree of handling. Taken together, the results suggest the device did not injure or alter normal physiological functioning of adult fall Chinook Salmon nearing maturation and may provide an effective method for transporting such fish around in-river barriers during their spawning migration. Keywords: Whooshh, transport, in-stream barriers, hydropower

effects↗

Umatilla Basin Fish Facilities Operation & Maintenance : Annual Report Fiscal Year 2008.

Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record. Job sites that are covered: Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility. O & M personnel coordinate with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed. The input from ODFW biologists Bill Duke and Ken Loffink, and CTUIR biologist Preston Bronson is indispensable to the success of the project, and is gratefully acknowledged. All tasks associated with the project were successfully completed during the fiscal year 2008 work period of October, 2007 through September, 2008. The project provides operations and maintenance throughout the year on five fish screen sites with a total of thirty-four rotating drum-screens, and four fish ladders in the Umatilla River Basin; additionally, periodic operations and maintenance is performed at holding, acclimation, and spawning sites in the Basin. Three people are employed full-time to perform these tasks. The FY08 budget for this project was $492,405 and actual expenditures were $490,267.01. Selected work activities and concerns: (1) Feed Dam Passage Improvement Project - A project to improve fish passage over the short term at the Feed Canal Diversion Dam site (Umatilla River mile 28.7) was implemented with local U.S. Bureau of Reclamation field office personnel coordinating project activities. Operation and Maintenance Project personnel assisted with labor, materials, and equipment to ensure the project was completed as planned. Discussions are under way to determine feasible alternatives for longer term solutions to passage issues at the site. (2) Three Mile Right (east bank) Facilities - The pump for supplying water to the fish handling facility holding pond was reconstructed successfully to achieve the desired increase in flow output necessary when increased quantities of fish are present. (3) Fish Screen Rehab at Stanfield Canal Diversion - Working with the Washington Department of Fish and Wildlife screen shop personnel, three rotating drum screens at the Stanfield Canal diversion site (Umatilla River mile 33.3) were serviced and overhauled with new bearings, seals, paint, and reinforcing bars. Work was completed, and screens reinstalled prior to water diversions beginning in the spring. (4) O & M personnel performed daily, weekly, and monthly operations and maintenance duties at the screen and ladder sites including, but not limited to, desilting of mud and debris, lubrication of mechanical parts, replacement of screen seals and screen motor components, adjustment of ladder gates, removal of large trees and woody debris deposited during high river flow conditions, servicing of pumps and screens for fish handling operations and sampling studies, in addition to general site clean-up, vegetative control, and security. Crew members responded as needed during evenings and after-hours according to weather conditions, river flows, and fish passage facility needs.

13 HYDRO ENERGY↗

Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

13 HYDRO ENERGY↗

A comparison of metrics to evaluate the effects of hydro-facility passage stressors on fish

Hydropower is the most common form of renewable energy, and countries worldwide are considering expanding hydropower to new areas. One of the challenges of hydropower deployment is mitigation of the environmental impacts including water quality, habitat alterations, and ecosystem connectivity. For fish species that inhabit river systems with hydropower facilities, passage through the facility to access spawning and rearing habitats can be particularly challenging. Fish moving downstream through a hydro-facility can be exposed to a number of stressors (e.g., rapid decompression, shear forces, blade strike and collision, and turbulence), which can all affect fish survival in direct and indirect ways. Many studies have investigated the effects of hydro-turbine passage on fish; however, the comparability among studies is limited by variation in the metrics and biological endpoints used. Future studies investigating the effects of hydro-turbine passage should focus on using metrics and endpoints that are easily comparable. This review summarizes four categories of metrics that are used in fisheries research and have application to hydro-turbine passage (i.e., mortality, injury, molecular metrics, behavior) and evaluates them based on several criteria (i.e., resources needed, invasiveness, comparability among stressors and species, and diagnostic properties). Additionally, these comparisons are put into context of study setting (i.e., laboratory vs. field). Overall, injury and molecular metrics are ideal for studies in which there is a need to understand the mechanisms of effect, whereas behavior and mortality metrics provide information on the whole body response of the fish. The study setting strongly influences the comparability among studies. In laboratory-based studies, stressors can be controlled by both type and magnitude, allowing for easy comparisons among studies. In contrast, field studies expose fish to realistic passage environments but the comparability is limited. Based on these results, future studies, whether lab or field-based, should focus on metrics that relate to mortality for ease of comparison.

fish↗

Evaluation of Howard A. Hanson Dam Juvenile Fish Passage and Survival Study: Downstream Passage and Survival (Acoustic Telemetry) (Task Final Report)

The Downstream Passage and Survival (Acoustic Telemetry) task was one of several tasks for the Evaluation of Howard A. Hanson Dam (HAHD) Juvenile Fish Passage and Survival study. For this task, a juvenile fish passage and survival study was conducted at HAHD from March 10, 2024 through June 27, 2024 for arrays in the HAHD Reservoir and Green River, and through July 9, 2024 for the arrays in the Duwamish River. Fish releases occurred over four times from March through May. Active tag (acoustic telemetry) technology was used to provide biological baseline information for the passage and survival of juvenile Puget Sound (PS) Chinook salmon (Oncorhynchus tshawytscha). Results will be used by biologists, engineers, resource managers, and regional decision-makers to inform the engineering design of the new fish passage facility (FPF) at HAHD. However, hatchery sub-yearling PS Chinook salmon of the appropriate size for tag implantation during the study period (> 95 mm in fork length, Geist et al. 2018) were unavailable. Therefore, yearling Coho salmon (O. kisutch) were used as a surrogate species for this acoustic telemetry study.

13 HYDRO ENERGY↗

Yakima River Basin Fish Passage Phase II Fish Screen Construction, Project Completion Report.

On December 5, 1980, Congress passed the Pacific Northwest Electric Power Planning and Conservation Act (Public Law 96-501). The Act created the Northwest Power Planning Council (now the Northwest Power and Conservation Council). The Council was charged with the responsibility to prepare a Regional Conservation and Electric Power Plan and to develop a program to protect, mitigate, and enhance fish and wildlife including related spawning grounds and habitat on the Columbia River and its tributaries. The Council adopted its Fish and Wildlife Program on November 15, 1982. Section 800 of the Program addresses measures in the Yakima River Basin. The Yakima measures were intended to help mitigate hydroelectric impacts in the basin and provide off-site mitigation to compensate for fish losses caused by hydroelectric project development and operations throughout the Columbia River Basin. The Bonneville Power Administration (BPA) was designated as a major source of funding for such off-site mitigation measures and was requested to initiate discussions with the appropriate Federal project operators and the Council to determine the most expeditious means for funding and implementing the program. The primary measures proposed for rapid implementation in the Yakima River basin were the installation of fish passage and protective facilities. Sec. 109 of The Hoover Power Plant Act of 1984, authorized the Secretary of the Interior to design, construct, operate, and maintain fish passage facilities within the Yakima River Basin. Under Phase I of the program, improvements to existing fish passage facilities and installation of new fish ladders and fish screens at 16 of the largest existing diversion dams and canals were begun in 1984 and were completed in 1990. The Yakima Phase II fish passage program is an extension of the Phase I program. In 1988, the Yakama Nation (YN) submitted an application to amend Sections 803(b) and 1403(4.5) of the Northwest Power and Conservation Council's Columbia River Basin Fish and Wildlife Program to begin preliminary design on the Phase II fish screen program. Based on citizen and agency endorsement, the Council approved the amendment in 1989. The Council authorized BPA to provide funding for Phase II screens through the Fish and Wildlife Program. BPA then asked the Bureau of Reclamation to provide engineering and design expertise to the Phase II projects.

13 HYDRO ENERGY↗

Binary fish passage models for uniform and nonuniform flows

Binary fish passage models are considered by many fisheries managers to be the best 21 available practice for culvert inventory assessments and for fishway and barrier design. 22 Misunderstandings between different binary passage modeling approaches often arise, 23 however, due to differences in terminology, application and presentation. In this paper 24 one-dimensional binary fish passage models are reviewed and refined to clarify their 25 origins and applications. For uniform flow, a simple exhaustion-threshold (ET) model 26 equation is derived that predicts the flow speed threshold in a fishway or velocity barrier 27 that causes exhaustion at a given maximum distance of ascent. Flow speeds at or above 28 the threshold predict failure to pass (exclusion). Flow speeds below the threshold predict 29 passage. The binary ET model is therefore intuitive and easily applied to predict passage 30 or exclusion. It is also shown to be consistent with the distance-maximizing model. The 31 ET model s limitation to uniform flow is addressed by deriving a passage model that 32 accounts for nonuniform flow conditions more commonly found in the field, including 33 backwater profiles and drawdown curves. Comparison of these models with 34 experimental observations of volitional passage for Gambusia affinis in uniform and 35 nonuniform flows indicates reasonable prediction of binary outcomes (passage or 36 exclusion) if the flow speed is not near the threshold flow velocity. More research is 37 needed on fish behavior, passage strategies under nonuniform flow regimes and 38 stochastic methods that account for individual differences in swimming performance at or 39 near the threshold flow speed. Future experiments should track and measure ground 40 speeds of ascending fish to test nonuniform flow passage strategies and to improve model 41 predictions. Stochastic models, such as Monte-Carlo techniques, that account for 42 different passage performance among individuals and allow prediction of the percentage 43 of fish passing would be particularly useful near flow speed thresholds where binary 44 passage models are clearly limited.

13 HYDRO ENERGY↗

Biological Response Models: Predicting Injury and Mortality of Fish During Downstream Passage through Hydropower Facilities

This report describes the U.S. Department of Energy’s HydroPASSAGE project efforts to develop and collect biological response models for integration into the Biological Performance Assessment (BioPA) toolset and the Hydropower Biological Evaluation Toolset (HBET). These models help understand how fish are likely to respond during dam passage when exposed to hydraulic and physical stressors associated with turbines and other hydropower structures. When fish pass through hydropower facilities, they may encounter several stressors, of which the three most common are collision, rapid decompression, and fluid shear. Specialized equipment has been used to develop 99 biological response models for exposure to blade strike, rapid decompression, or fluid shear. The models were gathered from the literature or developed as part of this effort and include models for 31 different species of fish that have various predicted endpoints (i.e., injury or mortality). Among these models, considerable variation in susceptibility to the stressors has been observed from one species to another, and a species’ susceptibility to one stressor does not necessarily indicate similar susceptibility to another. Although several species have been examined, it is still unclear how many other species, which may have different morphological traits, may respond to these stressors, so further examination of the different species is needed. These models can and have been applied in several different cases, often using the BioPA toolset and HBET, to better understand the potential for injury and mortality that may occur during fish passage at hydropower facilities, including specific applications, such as turbine replacement, the installation of new turbines, or changing operations of currently installed turbines. As hydropower is continually developed to meet the electricity needs of society, tools such as HBET and BioPA, used with the integrated biological response models, will aid in the development of technologies and strategies that avoid, minimize, mitigate, or manage environmental effects.

13 HYDRO ENERGY↗

Synthesis of Sensor Fish Data for Assessment of Fish Passage Conditions at Turbines, Spillways, and Bypass Facilities – Phase 1: The Dalles Dam Spillway Case Study

This report summarizes the characterization of spillway passage conditions at The Dalles Dam in 2006 and the effort to complete a comprehensive database for data sets from The Dalles Dam spillway Sensor Fish and balloon-tagged live fish experiments. Through The Dalles Dam spillway case study, Pacific Northwest National Laboratory (PNNL) researchers evaluated the database as an efficient means for accessing and retrieving system-wide data for the U.S Army Corps of Engineers (USACE).

13 HYDRO ENERGY↗

Fish Passage: A New Tool to Investigate Fish Movement: JSATS

A new system is being used to determine fish mortality issues related to hydroelectric facilities in the Pacific Northwest. Called the juvenile salmon acoustic telemetry system (JSATS), this tool allows researchers to better understand fish movement, behavior, and survival around dams and powerhouses.

13 HYDRO ENERGY↗

The effect of rapid and sustained decompression on barotrauma in juvenile brook lamprey and Pacific lamprey: implications for passage at hydroelectric facilities

Fish passing downstream through hydroelectric facilities may pass through hydroturbines where they experience a rapid decrease in barometric pressure as they pass by turbine blades, which can lead to barotraumas including swim bladder rupture, exopthalmia, emboli, and hemorrhaging. In juvenile Chinook salmon, the main mechanism for injury is thought to be expansion of existing gases (particularly those present in the swim bladder) and the rupture of the swim bladder ultimately leading to exopthalmia, emboli and hemorrhaging. In fish that lack a swim bladder, such as lamprey, the rate and severity of barotraumas due to rapid decompression may be reduced however; this has yet to be extensively studied. Another mechanism for barotrauma can be gases coming out of solution and the rate of this occurrence may vary among species. In this study, juvenile brook and Pacific lamprey acclimated to 146.2 kPa (equivalent to a depth of 4.6 m) were subjected to rapid (<1 sec; brook lamprey only) or sustained decompression (17 minutes) to a very low pressure (13.8 kPa) using a protocol previously applied to juvenile Chinook salmon. No mortality or evidence of barotraumas, as indicated by the presence of hemorrhages, emboli or exopthalmia, were observed during rapid or sustained decompression, nor following recovery for up to 120 h following sustained decompression. In contrast, mortality or injury would be expected for 97.5% of juvenile Chinook salmon exposed to a similar rapid decompression to these very low pressures. Additionally, juvenile Chinook salmon experiencing sustained decompression died within 7 minutes, accompanied by emboli in the fins and gills and hemorrhaging in the tissues. Thus, juvenile lamprey may not be susceptible to barotraumas associated with hydroturbine passage to the same degree as juvenile salmonids, and management of these species should be tailored to their specific morphological and physiological characteristics.

13 HYDRO ENERGY↗

Characterization of Gatewell Orifice Lighting at the Bonneville Dam Second Powerhouse and Compendium of Research on Light Guidance with Juvenile Salmonids

The goal of the study described in this report is to provide U.S. Army Corps of Engineers (USACE) biologists and engineers with general design guidelines for using artificial lighting to enhance the passage of juvenile salmonids into the collection channel at the Bonneville Dam second powerhouse (B2). During fall 2007, Pacific Northwest National Laboratory (PNNL) researchers measured light levels in the field at one powerhouse orifice through which fish must pass to reach the collection channel. Two light types were evaluated—light-emitting diode (LED) lights and halogen spot lights. Additional measurements with mercury lamps were made at the PNNL Aquatic Research Laboratory to determine baseline intensity of the current lighting. A separate chapter synthesizes the relevant literature related to light and fish guidance for both field and laboratory studies. PNNL will also review the Corps plans for existing lighting protocol at all of the Portland District projects and help develop a uniform lighting scheme which could be implemented. The specific objectives for this study are to 1. Create a synthesis report of existing lighting data for juvenile salmonid attraction and deterrence and how the data are used at fish bypass facilities. 2. Evaluate current B2 orifice lighting conditions with both LED and halogen sources. 3. Make recommendations as to what lighting intensity, source, and configuration would improve passage at the B2 orifices. 4. Review USACE plans for retrofit of existing systems (to be assessed at a later date).

13 HYDRO ENERGY↗