Search NASA⌕ Search

SEARCH · Search NASA

Results for “FOOTPRINT REDUCTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Progress on Footprint Reduction at the Hanford Site - 12406

The Department of Energy (DOE) Office of Environmental Management (EM) continues to reduce the footprint of legacy sites throughout the EM complex. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess contaminated facilities, soil and groundwater remediation, and solid waste disposition. All of these initiatives are being accomplished with established technologies in proven regulatory frameworks. Ultimately, completion of these environmental cleanup activities will reduce the monitoring and maintenance costs associated with managing large federal facilities, allowing EM to place more focus on other high priority cleanup efforts and facilitate a successful transition to land-term stewardship of these sites. Through the American Recovery and Reinvestment Act (ARRA) investment, the Department's cleanup footprint has been reduced by 45 percent to date, from 2411 km{sup 2} (931 mi{sup 2}) to 1336 km{sup 2} (516 mi{sup 2}s). With this significant progress on footprint reduction, the Department is on track towards their goal to reduce its overall footprint by approximately 90 percent by 2015. In addition, some areas cleaned up may become available for alternate uses (i.e. recreation, conservation, preservation, industrialization or development). Much of the work to reduce the complex's footprint occurred at the Savannah River Site in South Carolina and the Hanford Site in Washington, but cleanup continues across the complex. Footprint reduction is progressing well at the Hanford Site, supported predominantly through ARRA investment. To date, 994 km{sup 2} (384 mi{sup 2}) (65%) of footprint reduction have been achieved at Hanford, with a goal to achieve a 90% reduction by Fiscal Year 2015. The DOE EM and DOE Richland Operations Office, continue to make great progress to reduce the legacy footprint of the Hanford Site. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess facilities, both contaminated and uncontaminated, waste site cleanup activities, and debris pile removal. All of these activities can be accomplished with proven technologies and within established regulatory frameworks. Footprint reduction goals for Fiscal Year 2011 were exceeded, largely with the help of ARRA funding. As cleanup projects are completed and the total area requiring cleanup shrinks, overall costs for surveillance and maintenance operations and infrastructure services decrease. This work completion and decrease in funding requirements to maintain waste sites and antiquated facilities allows more focus on high priority site missions (i.e. groundwater remediation, tank waste disposition, etc.) and moves Site areas closer to transition from EM to the Legacy Management program. The progress in the Hanford footprint reduction effort will help achieve success in these other important mission areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site Footprint Reduction Results under the American Recovery and Reinvestment Act - 13302

The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, managed and operated by Savannah River Nuclear Solutions. Construction of SRS began in the early 1950's to enhance the nation's nuclear weapons capability. Nuclear weapons material production began in the early 1950's, eventually utilizing five production reactors constructed to support the national defense mission. Past operations have resulted in releases of hazardous constituents and substances to soil and groundwater, resulting in 515 waste sites with contamination exceeding regulatory thresholds. More than 1,000 facilities were constructed onsite with approximately 300 of them considered radiological, nuclear or industrial in nature. In 2003, SRS entered into a Memorandum of Agreement with its regulators to accelerate the cleanup using an Area Completion strategy. The strategy was designed to focus cleanup efforts on the 14 large industrial areas of the site to realize efficiencies of scale in the characterization, assessment, and remediation activities. This strategy focuses on addressing the contaminated surface units and the vadose zone and addressing groundwater plumes subsequently. This approach streamlines characterization and remediation efforts as well as the required regulatory documentation, while enhancing the ability to make large-scale cleanup decisions. In February 2009, Congress approved the American Reinvestment and Recovery Act (ARRA) to create jobs and promote economic recovery. At SRS, ARRA funding was established in part to accelerate the completion of environmental remediation and facility deactivation and decommissioning (D and D). By late 2012, SRS achieved 85 percent footprint reduction utilizing ARRA funding by accelerating and coupling waste unit remediation with D and D of remnant facilities. Facility D and D activities were sequenced and permitted with waste unit remediation activities to streamline regulatory approval and execution. Achieving footprint reduction fulfills the Government's responsibility to address legacy contamination; allows earlier completion of legally enforceable compliance agreement milestones; and enables future potential reuse of DOE resources, including land and infrastructure for other missions. Over the last 3.5 years significant achievements were met that contributed to footprint reduction, including the closure of 41 waste units (including 20 miles of radiologically contaminated stream) and decommissioning of 30 facilities (including the precedent setting in situ closure of two former production reactors, the first in the DOE Complex). Other notable achievements included the removal of over 39,750 cubic meters of debris and 68,810 cubic meters of contaminated soils, including 9175 cubic meters of lead-contaminated soil from a former site small arms testing range and treatment of 1,262 cubic meters of tritium-laden soils and concrete using a thermal treatment system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of MARSSIM and MARSAME Guidance to Footprint Reduction Projects at a DOE Site (LA-UR-15-28730) - 16216

Department of Energy regulations require that potentially contaminated items and materials being released to the public are monitored and that any residual radioactive contamination does not contribute more than 10 μSv/y (1 mrem/y). In footprint reduction and demolition projects, buildings with potential residual contamination must be carefully and systematically surveyed prior to recycling materials or releasing debris for burial in commercial landfills. Multi-agency guidance is available to assure statistically representative sampling of the items and materials, appropriate measurement quality objectives, and valid statistical approaches for release decisions. Additionally, implementing a cost-effective evaluation program for releases requires working closely with regulators and waste generators and developing a technically sound process to account for naturally occurring radioactive material (NORM) in building materials. Los Alamos National Laboratory has successfully implemented the available guidance for footprint reduction projects to help divert clean, recyclable materials from landfills and limit the possibility of mistakenly disposing of NORM as low level waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cultural Resources Monitoring for the Rattlesnake Mountain Combined Community Communications Facility and Infrastructure Cleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, 600 Area, Hanford Site, Washington – HCRC# 2008-600-004

Since 1989, cleaning up the Hanford Site has been the primary mission of the U.S. Department of Energy Richland Operations Office (DOE-RL). One cleanup goal is footprint reduction on the Fitzner/Eberhardt Arid Lands Ecology Reserve (ALE). Footprint reduction includes a variety of activities such as the remediation of waste sites, demolition of abandoned buildings and infrastructure, and removal of equipment and miscellaneous debris items. Footprint reduction on the Rattlesnake Mountain ridgeline also included the construction of the Combined Community Communications Facility (CCCF), which combines all communication towers on Rattlesnake Mountain into a single facility. The proposed footprint reduction activities on ALE were covered in several previously completed cultural resources reviews. Two project areas are especially sensitive to cultural resources----the Rattlesnake Mountain ridgeline, a traditional cultural property (TCP), and Rattlesnake Spring, where several National Register-eligible sites are located. The first cultural resource review for this project found that footprint reduction activities would have an adverse effect on Laliik, the Rattlesnake Mountain TCP, by compromising its spiritual qualities and its visual and natural setting. Through consultation among representatives of DOE, the State Historic Preservation Office, and local tribal groups, a number of mitigation strategies were developed to resolve the adverse effects. These strategies focused on minimizing impacts during the construction and operation of the new CCCF and during demolition and cleanup activities. These stipulations were cemented in a Memorandum of Agreement (MOA), signed by the project stakeholders on July 30, 2009. The MOA required intermittent monitoring by qualified archaeologists during construction of the new communications facility and during demolition and removal of debris and infrastructure. Archaeologists with Pacific Northwest National Laboratory performed archaeological monitoring intermittently from August 12, 2009, through May 5, 2011. This report documents all archaeological monitoring conducted for the ALE footprint reduction project in accordance with stipulations outlined in the MOA.

54 ENVIRONMENTAL SCIENCES↗

Guiding light in bent waveguide superlattices with low crosstalk

Waveguide superlattices with a subwavelength pitch and low crosstalk can significantly increase the waveguide integration density and are beneficial for many chip-scale applications. Bending of such high-density waveguide superlattices is necessary for flexible signal routing. However, tight bending tends to induce high crosstalk between guided modes, as witnessed in multimode waveguide bends. Here we explore the mechanisms of light guiding and coupling in a subwavelength-pitch waveguide superlattice bend and analyze how bending further modifies the already “renormalized” parameters of superlattice modes via various physical effects. Particularly, bending can skew the phase mismatch in a waveguide superlattice, sometimes producing a near phase-matching condition and causing salient crosstalk spikes among non-first-nearest neighbors. Interestingly, a waveguide superlattice with less pristine phase mismatch may be more robust against such skew of phase mismatch and can suppress crosstalk spikes by ~10 dB. Bending with 5–15 μm radii and subwavelength pitches has been demonstrated with crosstalk lower than -19.5 dB. The scaling of the footprint of waveguide superlattice bending is analyzed, and significant footprint reduction can be achieved for chip-scale applications. The rationale for footprint reduction of superlattice bending under crosstalk constraint differs markedly from that of a single waveguide bend.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Production of Biocrude in an Advanced Photobioreactor-Based Biorefinery

Algenol Biotech, the National Renewable Energy Laboratory (NREL), Georgia Institute of Technology, Arizona State University, and Reliance Industries formed a team to advance the state of the art in algal biomass production and downstream processing technologies, with the end goal of a sustainable, economically viable biofuel intermediate (BFI, biocrude) product. The project included examination of high value co-product production as a market entry strategy and for enhancing the economics of a biorefinery for BFI production. The project targeted innovations in biology, operations, and engineering. The goals of the project were: BFI productivity greater than 4,000 gal-BFI/acre-yr on an annualized basis; energy efficient innovations in downstream operations resulting in an energy expenditure less than 10% of the BFI energy content and a carbon footprint reduction of more than 60% compared to fossil alternatives; and a comprehensive Techno-Economic Analysis (TEA) that identifies limiting factors for commercial viability of a photobioreactor (PBR)-based biofuel product. The project achieved the overall objectives. Strain development efforts led to the identification of a strain (Cyanobacterium sp. AB1166) that, relative to the previous best strain (Cyanobacterium sp. AB1), exhibited a ~10% increase in productivity under commercially-relevant cultivation conditions and also resulted in cultures with a >50% reduction in viscosity such that harvesting efficiency was improved; these results represent achievement of key project milestones. Progress was also made at NREL in altering the biochemical composition of algal biomass to improve the yield of BFI produced via HTL. These strain enhancements coupled with improved outdoor cultivation practices, including semi-continuous operation, increased areal biomass productivity by nearly 80% over the established baseline productivity. The annualized productivity achieved (26.8 g/m2-d), paired with HTL conversion yields realized at NREL and RIL (38% ± 2% BFI), translates to 4,100 gal-BFI/acre-yr, exceeding the FY20 BETO goal of 3,700 gal-BFI/acre-yr. Significant progress was also demonstrated in large scale PBR-based production system design, operability, and cost reduction. A 24,000-L production module comprised of 240 interlinked PBRs was constructed and successfully operated outdoors for over one year in Fort Myers, Florida. Aided by a state-of-the-art productivity model, the productivities achieved convincingly demonstrated scalability of laboratory results determined at the mL to L scale to large-scale outdoor operations exceeding 20,000 L. The system was used to cultivate Arthrospira platensis (Spirulina), an industrially-relevant cyanobacterium and source for phycocyanin, an approved blue food colorant that Algenol is developing as a risk reduction strategy for future biofuel projects and as a potential business opportunity. A key project milestone to develop phycocyanin extraction and purification technologies was achieved ahead of schedule, and product samples received positive feedback from potential customers. The production and downstream operations data generated in this project were used to conduct and refine Techno-Economic and Life Cycle Assessments to provide research guidance for reducing the costs and environmental footprint of algal biofuel and co-product manufacturing plants. Several CO 2 supply scenarios for an algal biorefinery were identified as being capable of providing a large (>60%) reduction in carbon footprint in comparison to gasoline. The TEA assessments incorporated detailed comparisons of PBR versus open pond production systems, yielding a 3-fold higher areal productivity for PBRs and suggesting overall production cost parity for the two systems. The progress in this ABY2 project addressed many of the the barriers identified for the Advanced Algal Systems R&D Program and are directly relevant to achieving the established BETO goals associated with large scale biofuel production and cost reduction.

09 BIOMASS FUELS↗

Multifunctional landscapes for dedicated bioenergy crops lead to low-carbon market-competitive biofuels

Switchgrass is a promising feedstock for cellulosic biorefineries, due to its ability to maintain comparatively high biomass yields across a wide range of soil and climatic conditions. However, there is an incomplete understanding of the economic and environmental tradeoffs associated with cultivating switchgrass on low-productivity land for conversion to biofuels. This study surveys prior literature and demonstrates a new integrated assessment framework, including agroecosystem, ecosystem services valuation, technoeconomic, and life-cycle assessment models, to quantify and contextualize the economic and environmental impacts of switchgrass cultivation on marginal land with downstream conversion to biofuels. Monetizing and incorporating the value of ecosystem services, such as improved water quality benefits from nitrate and sediment reductions, climate change mitigation benefits from CO 2 emission reduction, and recreational and pollination benefits from increased biodiversity, the modeled multifunctional landscape reduces the ethanol production cost by 33.3–58.9 cents/$\scriptsize{L}$-gasoline-equivalent ($\$$1.3–2.2/gge). Planting switchgrass in low productivity land improves soil health, resulting in the carbon footprint reduction credit of 12.8–20.2 gCO 2e /MJ. For an improved switchgrass-to-ethanol conversion pathway with the maximum benefits from ecosystem services, the minimum ethanol selling price and carbon footprint of ethanol, respectively, could reach to 31 cents/$\scriptsize{L}$-gasoline-equivalent (47% reduction relative to average gasoline price) and 3 gCO 2e /MJ (97% reduction relative to gasoline). In conclusion, this low carbon renewable ethanol leads to substantial State and/or Federal policy incentives (~$\$$1/$\scriptsize{L}$-gasoline-equivalent) providing a large benefit to biorefinery operators, farmers, and the public as a whole.

09 BIOMASS FUELS↗

The Effects of Compounded Model Size Reductions on Adversarial Robustness

Recent advances in Edge AI and Tiny Machine Learning (TinyML) have enabled the deployment of machine learning models on resource-constrained environments. However, deploying these models on edge devices, such as micro-controllers, requires significant model footprint reduction through a variety of techniques such as quantization, pruning, and clustering. While these optimization methods offer considerable advantages, they potentially introduce AI-related security vulnerabilities, particularly concerning model robustness with respect to adversarial AI attacks. Prior research has extensively examined the impact of quantization on adversarial robustness; however, the effects of alternative reduction techniques and their combinations remain understudied. This paper investigates the impact of model size reduction techniques on adversarial robustness, when applied individually and combined. We utilized Fast Gradient Sign Method (FGSM) and Projected Gradient Descent (PGD) attacks to generate adversarial perturbations for both training and testing data, and then evaluated the models' accuracy under adversarial training conditions. Our findings revealed that reduction techniques generally diminished robustness; although, combining techniques was not found to make robustness any worse than when applied individually. Moreover, specific techniques can potentially enhance resistance to small size perturbations. This research provides insights into the trade-offs between model size reduction and security, establishing a foundation for future investigations into improving adversarial training techniques and methodologies for maintaining robustness while preserving memory footprint benefits.

Austria, Phillipe [ORNL] (ORCID:0000000236223973)↗

HEAVY WATER COMPONENTS TEST REACTOR DECOMMISSIONING

The Heavy Water Components Test Reactor (HWCTR) Decommissioning Project was initiated in 2009 as a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Removal Action with funding from the American Recovery and Reinvestment Act (ARRA). This paper summarizes the history prior to 2009, the major D&D activities, and final end state of the facility at completion of decommissioning in June 2011. The HWCTR facility was built in 1961, operated from 1962 to 1964, and is located in the northwest quadrant of the Savannah River Site (SRS) approximately three miles from the site boundary. The HWCTR was a pressurized heavy water test reactor used to develop candidate fuel designs for heavy water power reactors. In December of 1964, operations were terminated and the facility was placed in a standby condition as a result of the decision by the U.S. Atomic Energy Commission to redirect research and development work on heavy water power reactors to reactors cooled with organic materials. For about one year, site personnel maintained the facility in a standby status, and then retired the reactor in place. In the early 1990s, DOE began planning to decommission HWCTR. Yet, in the face of new budget constraints, DOE deferred dismantlement and placed HWCTR in an extended surveillance and maintenance mode. The doors of the reactor facility were welded shut to protect workers and discourage intruders. In 2009 the $1.6 billion allocation from the ARRA to SRS for site footprint reduction at SRS reopened the doors to HWCTR - this time for final decommissioning. Alternative studies concluded that the most environmentally safe, cost effective option for final decommissioning was to remove the reactor vessel, both steam generators, and all equipment above grade including the dome. The transfer coffin, originally above grade, was to be placed in the cavity vacated by the reactor vessel and the remaining below grade spaces would be grouted. Once all above equipment including the dome was removed, a concrete cover was to be placed over the remaining footprint and the groundwater monitored for an indefinite period to ensure compliance with environmental regulations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A new approach of reduction of carbon dioxide emission and optimal use of carbon and hydrogen content for the desired syngas production from coal

We report this research is designed to make progress in overcoming the challenges through the development of a two-stage coal processing. Specifically, a two-stage process was used to maximize the use of the carbon in coal or increase the carbon monoxide yield or lower carbon dioxide and methane yields. Carbon dioxide-char gasification in the absence of water can generate carbon monoxide with near-zero methane, which is desired to produce high-carbon and low-hydrogen chemicals such as oxalic acid through catalytic carbon monoxide coupling and hydrolysis. The technology is applicable to any coal, although Power River Basin (PRB) coal is used as an example feedstock in this research Also, the sodium-iron catalyst can accelerate not only the reaction kinetics in both stages but also increase the hydrogen/carbon monoxide ratio in the syngas produced in the second stage. In other words, the catalyst is a multifunctional agent, which can not only intensify the overall coal process efficiency but also improve the qualities of the desired syngas products and reduce carbon dioxide emission. Thus, In the 1st stage, the catalysts can significantly reduce the CO 2 -char gasification by as high as 75.00%. In the 2nd stage, the H 2 /CO ratio of ideal syngas is ~2:1 with near-0 CH 4 generation and the CH4 production can be reduced as high as 61.29% for the CO 2 –H 2 O-Char coal gasification. The activation energy for the 2nd stage is reduced by as high as 35.43% than that of raw coal without use Na–Fe catalyst. The overall carbon footprint reduction for the study is reduced by 87.33% in the 1st stage and 96.77% compared to the direct coal combustion.

01 COAL, LIGNITE, AND PEAT↗

Metallic Low-Level Waste (LLW) Handling Options: An Optimal Life cycle-Based Approach for North American Operations - 19413

Daily activities associated with nuclear power plant operations produce large volumes of low-level contaminated waste. During operation, a small percentage of this low-level waste is metallic (< 1% by volume). However, this figure increases materially when a facility is finally decommissioned, with approximately 1000 m{sup 3} of contaminated metal waste generated for every 1 GW decommissioned (13% by volume). With global nuclear decommissioning efforts expected to increase until 2050, the amount of low-level metallic waste generated is expected to increase the global inventory by over an order of magnitude. The high cost of conventional surface storage and burial of radioactive metal, coupled with the projected increase in low-level metallic waste volumes provides strong incentive to identify cost-effective waste management solutions. Surface decontamination and thermal methods are proven options for decontaminating low-level metallic waste. Surface decontamination processes include chemical, electrochemical, or mechanical methods, which are used to remove contamination from exposed layers of metal. Surface decontamination is most effective when metal has low levels of activity localized on the outer layers. When the activity is more uniformly distributed in the metal (or the geometry is complex), alternative methods such as thermal decontamination are required. In the thermal decontamination process, contaminated scrap metal is melted in a furnace and held in a molten state for a period of time while the radioactive material is separated out through gravity. Radioactive material reports to slag which is handled separately, or to the exhaust which is handled using conventional gas handling technologies. Thermal methods of decontamination involving metal melting present an opportunity to reduce long-term storage cost with a reduction in waste volume, along with the opportunity to reuse the decontaminated metal. Methods for dealing with metallic low-level waste from nuclear facilities vary extensively across the globe. The approach employed at any given site may be set by a host of factors ranging from regulatory influence, public perception, local economics, available geology for underground storage and often, precedent established long ago by early operations. This paper examines several low-level metallic waste handling options including techniques for surface decontamination and metal melting, as well as a combination of both. The various methods are categorized according to their suitability for waste characterization and local/global installations. The effectiveness of each option is benchmarked against a range of criteria, including capital and operating costs, environmental impact, overall sustainability and risk management issues. The overall objective of this paper is to develop a methodology for determining the most beneficial low-level metallic waste management strategy for a facility once the quantity, type and nature of the waste is established on a long-term basis. It is the authors' hope that the methodology can be used as a tool to test a facility's current plans (which are primarily focused on long-term storage) and identify areas for optimization with an emphasis on overall cost and environmental footprint reduction. The trend towards long term planning to handle large amounts of contaminated metal, along with obtaining a social license to implement a sustainable waste management solution, are key decision-making variables that will be discussed in relation to the LLW handling options presented in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Central Plateau Cleanup at DOE's Hanford Site - 12504

The discussion of Hanford's Central Plateau includes significant work in and around the center of the Hanford Site - located about 7 miles from the Columbia River. The Central Plateau is the area to which operations will be shrunk in 2015 when River Corridor cleanup is complete. This work includes retrieval and disposal of buried waste from miles of trenches; the cleanup and closure of massive processing canyons; the clean-out and demolition to 'slab on grade' of the high-hazard Plutonium Finishing Plant; installation of key groundwater treatment facilities to contain and shrink plumes of contaminated groundwater; demolition of all other unneeded facilities; and the completion of decisions about remaining Central Plateau waste sites. A stated goal of EM has been to shrink the footprint of active cleanup to less than 10 square miles by 2020. By the end of FY2011, Hanford will have reduced the active footprint of cleanup by 64 percent exceeding the goal of 49 percent. By 2015, Hanford will reduce the active footprint of cleanup by more than 90 percent. The remaining footprint reduction will occur between 2015 and 2020. The Central Plateau is a 75-square-mile region near the center of the Hanford Site including the area designated in the Hanford Comprehensive Land Use Plan Environmental Impact Statement (DOE 1999) and Record of Decision (64 FR 61615) as the Industrial-Exclusive Area, a rectangular area of about 20 square miles in the center of the Central Plateau. The Industrial-Exclusive Area contains the 200 East and 200 West Areas that have been used primarily for Hanford's nuclear fuel processing and waste management and disposal activities. The Central Plateau also encompasses the 200 Area CERCLA National Priorities List site. The Central Plateau has a large physical inventory of chemical processing and support facilities, tank systems, liquid and solid waste disposal and storage facilities, utility systems, administrative facilities, and groundwater monitoring wells. As a companion to the Hanford Site Cleanup Completion Framework document, DOE issued its draft Central Plateau Cleanup Completion Strategy in September 2009 to provide an outline of DOE's vision for completion of cleanup activities across the Central Plateau. As major elements of the Hanford cleanup along the Columbia River Corridor near completion, DOE believed it appropriate to articulate the agency vision for the remainder of the cleanup mission. The Central Plateau Cleanup Completion Strategy and the Hanford Site Cleanup Completion Framework were provided to the regulatory community, the Tribal Nations, political leaders, the public, and Hanford stakeholders to promote dialogue on Hanford's future. The Central Plateau Cleanup Completion Strategy describes DOE's vision for completion of Central Plateau cleanup and outlines the decisions needed to achieve the vision. The Central Plateau strategy involves steps to: (1) contain and remediate contaminated groundwater, (2) implement a geographic cleanup approach that guides remedy selection from a plateau-wide perspective, (3) evaluate and deploy viable treatment methods for deep vadose contamination to provide long-term protection of the groundwater, and (4) conduct essential waste management operations in coordination with cleanup actions. The strategy will also help optimize Central Plateau readiness to use funding when it is available upon completion of River Corridor cleanup projects. One aspect of the Central Plateau strategy is to put in place the process to identify the final footprint for permanent waste management and containment of residual contamination within the 20-square-mile Industrial-Exclusive Area. The final footprint identified for permanent waste management and containment of residual contamination should be as small as practical and remain under federal ownership and control for as long as a potential hazard exists. Outside the final footprint, the remainder of the Central Plateau will be available for other uses consistent with the Hanford Comprehensive Land-Use Plan (DOE 1999), while maintained under federal ownership and control. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multithreaded parallelization of the energy and analytic gradient in the fragment molecular orbital method

The fragment molecular orbital method in GAMESS is parallelized in a multithreaded OpenMP implementation combined with the MPI version of the two-level generalized distributed data interface. The energy and analytic gradient in gas phase and the polarizable continuum model of solvation are parallelized in this hybrid three-level scheme, achieving a large memory footprint reduction and a high parallel efficiency on Intel Xeon Phi processors. The parallel efficiency is demonstrated on the Stampede2 and Theta supercomputers using up to 2048 nodes (262 144 threads).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗