Search NASA⌕ Search

SEARCH · Search NASA

Results for “Factory assembly & integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Cost analysis of hydrogen production by high-temperature solid oxide electrolysis

In this study, we estimate construction and operation costs of gigawatt-scale solid oxide electrolysis (SOE) facilities for producing high purity hydrogen gas from water. Manufacturing and assembly costs for two types of SOE cell stacks are estimated using a detailed design for manufacture and assembly (DFMA®) analysis. Modular balance of plant (BOP) process equipment is designed and sized with Aspen®, and cost estimated using equipment vendor quotes. Factory and on-site assembly and installation costs for SOEC stack and BOP equipment integration into modular SOE process units are calculated using a simplified DFMA® method. Total stack costs on a stack input power (SIP) basis reduce to <$100/kW e DC SIP for >500 MW e DC SIP /year production rates with electrode cermet, interconnects, and high-temperature heat treatments dominating the total cost. Integration of stacks with larger BOP equipment operating at higher pressures offers ~36% cost reduction in total facility capital cost due to an economies of physical scale effect since BOP equipment comprises >50% of facility costs. Optimized H 2 prices decrease from ~$\$$4/kgH 2 to ~$\$$2/kgH 2 for 1 GWe DCSIP facilities using $\$$0.025/kWh electricity price. All costs are reported in 2021 US dollars.

08 HYDROGEN↗

Development of Integrated Mechanical Pods

This presentation highlights early wins, updated progress, and upcoming developments on ‘national-scale shared development platform’ for rapid prototyping, testing and validation of various integrated Mechanical Pod solutions and form factors. Such pod solutions consist of a set of all-electric heat pump mechanical equipment that have integrated functionalities through built-in controls, with heating, cooling, hot water, ventilation (including energy recovery), electrical management, and battery storage within a single package. The presentation draws inspiration from the success of bathroom pods in the US modular construction industry, UK’s efforts with unitizing mechanical systems as ‘utility cupboards’, and VEIC’s early wins in design-build of all-electric Mechanical Pod solutions in Vermont. The presentation includes researchers and partners involved with NREL in Design for Manufacturing and Assembly (DfMA), Virtual Design and Construction (VDC), and digital twin based process optimization modeling of integrated Mechanical Pod solutions. The presentation aims to highlight early wins from such a platform and how various physical and virtual tools are currently being employed as part of NREL’s ongoing multi-year project funded by US DOE. Streamlined procurement, coordination, installation, and O&M of Mechanical Pods such that the majority of work is delegated to the off-site modular factory implies monetary savings. Such a seemingly basic shift in location of the construction process leads to great reduction in complexity, first cost, lead time, and waste, and greater opportunities for innovative compartmentalization and integration of mechanical systems appropriately sized for each apartment or hotel guest room. However, past studies on unitized combination systems show that high installation costs, maintenance issues, challenges with system integration, limitations in existing electrical infrastructure, and lack of architecturally appealing solutions are key barriers. NREL and partners aim to address key barriers through DfMA approach, rapid prototyping and testing, and digital twin process optimization modeling. The presentation is also a call for interested entities to partner with NREL as part of the national-scale development platform, help drive both product and process innovation, and encourage open source sharing of learnings. Learning objectives include (1) learn about the vision of national-scale shared development platform for process-product innovation on integrated mechanical pod solutions and how to get involved, (2) gain an understanding of the components of an all-electric, high performance home, design characteristics and equipment included in an all-electric mechanical pod, integration of mechanical systems within a modular factories’ assembly line, and the system’s commissioning, operation and maintenance. The pre-planning and coordination with the factory and sub-contractors are also highlighted, (3) gain an understanding of using process modeling tools to quantify resource-constrained performance of operations (such as integration of energy efficiency strategies) to manufacture modules of varying design, (4) gain insights on virtual design, rapid prototyping, and emulated testing of various form factors across different climatic conditions. The need for such preliminary testing with open source sharing of learnings will also be highlighted.

30 DIRECT ENERGY CONVERSION↗

Automated Progress Monitoring in Modular Construction Factories Using Computer Vision and Building Information Modeling

Modular construction methods have recently gained interest due to the advantages offered in terms of safety, quality, and productivity for projects. In this method, a significant portion of the construction is performed off-site in factories where modular components are built in different workstations, assembled on the production line, and shipped to the site for installation. Due to the labor-intensive nature of tasks, cycle times in modular construction factories are highly variable, which commonly leads to major bottlenecks and delays in construction projects. To remedy this effect, recent methods rely on sensors such as RFID to monitor the production process, which is reportedly expensive, and intrusive to the work process. Recently, computer vision-based methods have been proposed to track the production process in modular construction factories. However, these methods overlook monitoring the assembly process on the production line. Therefore, this paper presents a method to monitor the assembly process by integrating computer vision-based methods with Building Information Modeling (BIM). The proposed method detects the modular units using object segmentation; superimposes the installation area with the corresponding 2D region using BIM, and identifies the installation of the components using image processing techniques. The proposed method has been validated using surveillance videos captured from a modular construction factory in the US. Successful implementation of the proposed method can lead to timely identification of delays during the assembly process and reduce delays in modular integrated construction projects.

building information modeling↗

Accelerating Optimal Integration of Energy Efficiency Strategies with Industrialized Modular Construction: Preprint

The National Renewable Energy Laboratory's (NREL's) Industrialized Construction Innovation team first introduced the Industrialized Construction Assessment Framework to achieve affordable, net-zero energy (NZE) modular multifamily buildings in the 2020 ACEEE paper "Integrating Energy Efficiency Strategies with Industrialized Construction for our Clean Energy Future." Since then, NREL has continued to drive the ambitious plan to accelerate optimal integration of energy efficiency strategies during industrialized construction with little or no additional cost, labor, and production time. This follow-on paper introduces the Energy in Modular (EMOD) buildings method and presents NREL's research efforts over the last two years in collaboration with industry, including affordable housing partners. NREL has developed an idealized NZE modular multifamily building design that incorporates five energy efficiency strategies well suited for industrialized construction in factories: (1) envelope thermal control, (2) envelope infiltration control, (3) mechanical, electrical, and plumbing systems, (4) smart controls, and (5) solar plus storage. This paper highlights results from leveraging design for manufacturing and assembly principles, testing, and validation pilots with factory partners; demonstrating pod prototypes in test stand at NREL; and performing simulations. Overall, these research efforts address barriers to whole-building system integration, such as poor installation quality of thermal and air barriers; lack of unitized systems for space conditioning, energy recovery and ventilation, and water heating; problematic on-site installation, commissioning, and configuration of controls; and lack of cost-effective integration for grid-friendly design and emerging technologies. Conclusively, the paper delineates next steps for future work with NREL's partners toward developing a transformational pathway for our clean energy future.

affordable housing↗

Shuttle payload processing at KSC

Two basic systems of Shuttle payload and checkout are discussed. The first system is called 'off-line' checkout and checks out payloads or payload segments after they are brought to the launch complex laboratories, as individual units and transfer them to an integration facility where they are assembled into a total Shuttle payload. In this scheme all payload assembly and checkout is performed away from the Orbiter. Any problems concerning the payloads will allow rescheduling another payload for flight and therefore not subjecting the Orbiter to delays in its recycling flow. The second payload processing scheme is the 'on-line' checkout which employs a 'factory to pad' concept. Payloads are delivered directly to the pad, placed in the Payload Changeout Room where they are checked out and integrated and, after completion of servicing, are installed vertically into the Orbiter. A combination of off-line and on-line processing will be used to meet all flight requirements.

Phillips, J. D.↗

Integrating Energy Efficiency Strategies with Industrialized Construction for Our Clean Energy Future: Preprint

NREL’s Industrialized Construction Innovation Team has developed an ambitious plan to accelerate the integration of energy efficiency (EE) strategies with Industrialized Construction (IC). The United States (U.S.) construction industry is beginning to use IC methods to build multifamily apartment buildings to address affordability and labor shortages. Apart from reducing cost of construction and delivery times, the IC method of permanent modular construction has the potential to facilitate the integration of a wide range of EE strategies and advanced controls into such buildings. While there may be unintended EE benefits to IC such as a tighter envelope due to higher construction quality, the process has not been leveraged specifically to enhance EE. NREL aims to claim this missed opportunity and integrate IC benefits with EE as well as advanced controls, distributed energy resources, and grid-friendly design strategies. The paper proposes an ‘IC Assessment Framework’ to achieve affordable zero-energy modular multifamily buildings. Through the selection criteria of Design for Manufacturing and Assembly, the framework aims to distill a broad range of proven EE strategies for site-built into a set of strategies that qualify as easy to integrate for off-site. The output is a Factory Information Model (FIM) that represents a process-based digital twin to enable advanced time-and-motion study, plugs into open source building energy modeling platform (EnergyPlus), and serves as a vital tool facilitating wider adoption of EE integration. Conclusively, the paper delineates next steps for upcoming pilots with NREL’s IC partners towards developing a transformational pathway for our Clean Energy Future.

30 DIRECT ENERGY CONVERSION↗

Impact of Insulation Strategies of Cross-Laminated Timber Assemblies on Energy Use, Peak Demand, and Carbon Emissions

Cross-Laminated Timber (CLT) panels have many structural benefits but do not have much thermal resistance. We have developed a solution to insulate CLT structures that uses high-performance insulation panels that provide R-values up to R40/inch. The CLT panels are made of layers of wood laminates (three, five, seven or more). The solution replaces some of the wood laminates in the CLT production with the insulation panels in a staggered fashion so that the wood laminates maintain contact throughout the panel, ensuring the CLT panel’s structural integrity. The insulated CLT panels have factory-installed water-resistive barriers reducing the installation time by eliminating installing insulation and water-resistive barriers on site. Per simulations, the CLT/insulation panel achieved code-required insulation levels with commonly available insulation materials. The significance of the thermal mass of CLT/insulation hybrid building envelopes was quantified by comparing the whole building energy performance and peak demand of traditional low mass and CLT wall assemblies resulting in up to 7% reduction in peak demand for cooling in Knoxville, TN, in a multifamily building. Buildings contribute over 40 percent of carbon emissions. The proposed CLT/insulation hybrid building envelope addresses both operational and embodied carbon by having high thermal resistances due to the embedded insulation sections and eliminating the use of high embodied carbon materials such as steel and concrete. The carbon benefit is estimated.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Mid-Year Progress Update on ORNL Support for Developing the Guidance for Microreactor Manufacturing Licenses

Factory fueling and assembly, multi-site operation, and the associated transportation of advanced nuclear systems present both new opportunities and challenges for microreactor deployment. These areas have not been demonstrated under Nuclear Regulatory Commission rules and regulations. A goal of the Systems Integration and Analysis technical area under the US Department of Energy Microreactor Program for the current fiscal year is to articulate these challenges and provide industry recommendations. This mid-year progress report describes the progress and some of the contributions to this effort by the Advanced Reactor Engineering and Development section at Oak Ridge National Laboratory. The content provided here is preliminary and may change before being incorporated into a later report, which is expected to be completed in September 2022.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

CIM's bridge from CADD to CAM: Data management requirements for manufacturing engineering

Manufacturing engineering represents the crossroads of technical data management in a Computer Integrated Manufacturing (CIM) environment. Process planning, numerical control programming and tool design are the key functions which translate information from as engineered to as assembled. In order to transition data from engineering to manufacturing, it is necessary to introduce a series of product interpretations which contain an interim introduction of technical parameters. The current automation of the product definition and the production process places manufacturing engineering in the center of CAD/CAM with the responsibility of communicating design data to the factory floor via a manufacturing model of the data. A close look at data management requirements for manufacturing engineering is necessary in order to establish the overall specifications for CADD output, CAM input, and CIM integration. The functions and issues associated with the orderly evolution of computer aided engineering and manufacturing are examined.

Ford, S. J.↗

Monitoring installation of partially occluded subassemblies in modular construction factories using BIM, ray tracing, and computer vision

Modular and offsite construction methods are being increasingly adopted due to the advantages they offer in terms of project completion time, quality, and energy-efficiency. Despite these advantages, the current state of monitoring systems in modular construction factories highly relies on labor-intensive, subjective, and error-prone observational methods. A large body of research has aimed to automate the monitoring process using an array of sensors, such as IMUs and RFIDs, during the past two decades. Recently, computer vision-based methods have gained increasing interest as a non-intrusive technology to monitor the process inside modular construction factories. However, partial occlusion challenges have impeded their practical application on a large scale. This challenge is specifically important for monitoring the installation of subassemblies since they can obstruct the view of the monitoring camera, especially those that enable long-term monitoring like closed-circuit television (CCTV) fixed-view surveillance cameras. Here, this paper aims to address this challenge by proposing a novel computer vision-based method to monitor the installation of new subassemblies inside modular factories in highly occluded scenes. The proposed methodology identifies the subassemblies in the CCTV video footage using computer vision, analyzes the occlusions using BIM and ray casting techniques, and estimates the progress of assembly by comparing the BIM model with the detected subassemblies in the video. The proposed methodology was successfully validated on surveillance videos captured from a volumetric modular construction factory in the U.S., achieving 93% accuracy in identifying the installation of subassemblies. The results from this research show that the integration of BIM and computer vision is a promising method for monitoring the installation processes inside modular factories under severe occlusion.

97 MATHEMATICS AND COMPUTING↗

Software for integrated manufacturing systems, part 1

For several years, a broad, unified approach to programming manufacturing cells, factory floors, and other manufacturing systems has been developed. It is based on a blending of distributed Ada, software components, generics and formal models. Among other things the machines and devices which make up the components, and the entire manufacturing cell is viewed as an assembly of software components. The purpose of this project is to reduce cost, increase the reliability and increase the flexibility of manufacturing software. An overview is given of the approach and an experimental generic factory floor controller that was developed using the approach is described. The controller is generic in the sense that it can control any one of a large class of factory floors making an arbitrary mix of parts.

Naylor, A. W.↗

Transformative Efficiency and Automation in Modular Homes (TEAMH)

This report documents the Transformative Efficiency and Automation in Modular Homes (TEAMH) project, which evaluates the integration of advanced building envelope technologies and automation-assisted modular construction to improve residential energy performance and construction efficiency. The study investigates high-performance insulation systems, including vacuum insulation panels (VIPs), combined with light gauge steel (LGS) modular construction and factory automation. Laboratory testing, whole-building energy modeling across multiple climate zones, and factory demonstrations were conducted to assess thermal performance, energy savings, and production efficiency. Results indicate that upgraded envelope assemblies can achieve up to ~50% heating and ~34% cooling energy savings relative to IECC 2018 code-compliant homes, while automation-assisted construction can reduce wall assembly time by 24%–46% compared to conventional wood framing. The findings demonstrate the potential for scalable, high-performance modular homes that deliver significant energy savings with competitive projected costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

America's Next Great Ship: Space Launch System Core Stage Transitioning from Design to Manufacturing

The Space Launch System (SLS) Program is essential to achieving the Nation's and NASA's goal of human exploration and scientific investigation of the solar system. As a multi-element program with emphasis on safety, affordability, and sustainability, SLS is becoming America's next great ship of exploration. The SLS Core Stage includes avionics, main propulsion system, pressure vessels, thrust vector control, and structures. Boeing manufactures and assembles the SLS core stage at the Michoud Assembly Facility (MAF) in New Orleans, LA, a historical production center for Saturn V and Space Shuttle programs. As the transition from design to manufacturing progresses, the importance of a well-executed manufacturing, assembly, and operation (MA&O) plan is crucial to meeting performance objectives. Boeing employs classic techniques such as critical path analysis and facility requirements definition as well as innovative approaches such as Constraint Based Scheduling (CBS) and Cirtical Chain Project Management (CCPM) theory to provide a comprehensive suite of project management tools to manage the health of the baseline plan on both a macro (overall project) and micro level (factory areas). These tools coordinate data from multiple business systems and provide a robust network to support Material & Capacity Requirements Planning (MRP/CRP) and priorities. Coupled with these tools and a highly skilled workforce, Boeing is orchestrating the parallel buildup of five major sub assemblies throughout the factory. Boeing and NASA are transforming MAF to host state of the art processes, equipment and tooling, the most prominent of which is the Vertical Assembly Center (VAC), the largest weld tool in the world. In concert, a global supply chain is delivering a range of structural elements and component parts necessary to enable an on-time delivery of the integrated Core Stage. SLS is on plan to launch humanity into the next phase of space exploration.

Birkenstock, Benjamin↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

PMR Graphite Engine Duct Development

The objective was to demonstrate the cost and weight advantages that could be obtained by utilizing the graphite/PMR15 material system to replace titanium in selected turbofan engine applications. The first component to be selected as a basis for evaluation was the outer bypass duct of the General Electric F404 engine. The operating environment of this duct was defined and then an extensive mechanical and physical property test program was conducted using material made by processing techniques which were also established by this program. Based on these properties, design concepts to fabricate a composite version of the duct were established and two complete ducts fabricated. One of these ducts was proof pressure tested and then run successfully on a factory test engine for over 1900 hours. The second duct was static tested to 210 percent design limit load without failure. An improved design was then developed which utilized integral composite end flanges. A complete duct was fabricated and successfully proof pressure tested. The net results of this effort showed that a composite version of the outer duct would be 14 percent lighter and 30 percent less expensive that the titanium duct. The other type of structure chosen for investigation was the F404 fan stator assembly, including the fan stator vanes. It was concluded that it was feasible to utilize composite materials for this type structure but that the requirements imposed by replacing an existing metal design resulted in an inefficient composite design. It was concluded that if composites were to be effectively used in this type structure, the design must be tailored for composite application from the outset.

Stotler, C. L.↗

Evolution of integrated panel structural design and interfaces for PV power plants

The evolution of integrated photovoltaic (PV) panel design at ARCO Solar is discussed. Historically, framed PV modules of about 1 x 4-ft size were individually mounted in the field on fixed support structures and interconnected electrically with cables to build higher-power arrays. When ARCO Solar saw the opportunity in 1982 to marry its PV modules with state-of-the-art heliostat trackers developed by ARCO Power Systems, it became obvious that mounting individual modules was impractical. For this project, the framed modules were factory-assembled into panels and interconnected with cables before being mounted on the trackers. Since then, ARCO Solar made considerable progress and gained substantial experience in the design and fabrication of large PV panels. Constraints and criteria considered in these design activities included static and dynamic loads; assembly and transportation equipment and logistics, structural and electrical interfaces, and safety and grounding concerns.

Arnett, J. C.↗

SMR Containment Cable and Electrical Penetration Assembly System

GAIN Project CRADA Number NFE-21-08839, entitled “SMR Containment Cable and EPA System” was initiated by the partnership of Oak Ridge National Laboratory (ORNL) and Engineered Solutions Group (ESG) to test an ESG-designed Electrical Penetration Assembly and Containment Cabling System Qualified for not only SMR technologies, but also Advanced Reactors design. An Electrical Penetration Assembly (EPA) is a component used to allow electrical power and signal conductors as well as optical fiber through the nuclear reactor’s containment structure while maintaining a pressure barrier. The EPA ensures the containment's integrity both during the normal operation and also accident conditions by providing a sealed passage for power and signals. This project was undertaken to fill the equipment gap of EPA and Cabling Systems that require much more severe environmental requirements than legacy plant applications present due to their smaller containment volumes that result in high energy densities compared to legacy designs. This high energy density results in severe accident environments and also more severe normal operating conditions.This document describes cost effective approaches to qualify a unique EPA for Small Modular Reactor (SMR) technologies as legacy LWR EPA technologies will likely have inherent material performance insufficiencies. The DBA profiles for SMRs (and some Advanced Reactor Technologies) are more severe than the legacy qualification requirements making the design of the qualification testing system challenging as the temperatures and pressures can approach the limits permitted by ASME Pressure Vessel Code, as well as accident temperatures exceeding the capability of polymeric gaskets and dielectrics. Small Modular Reactors are designed to have, as the name suggests, modularity which implies sized for factory fabrication and subsequent assembly at the power plant site. SMR containment is much smaller than a legacy Light Water Reactor containment. The containment walls are likely to be comprised of stainless steel. Qualifying Electrical Penetration Assemblies (EPAs) through these steel vessels are of interest in this work. Methods are presented here that discuss critical safety and cost effectiveness for these SMR EPA’s test systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗