Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Feasibility of remote sensing for detecting thermal pollution. Part 1: Feasibility study. Part 2: Implementation plan

A feasibility study for the development of a three-dimensional generalized, predictive, analytical model involving remote sensing, in-situ measurements, and an active system to remotely measure turbidity is presented. An implementation plan for the development of the three-dimensional model and for the application of remote sensing of temperature and turbidity measurements is outlined.

Veziroglu, T. N.

Geosynchronous Microwave Atmospheric Sounding Radiometer (MASR) antenna feasibility study. Volume 3: Antenna feasibility

Antenna systems capable of operating with a multichannel microwave radiometer intended for mapping severe storm activity over patches on the surface of the earth 750 km square were compared. These systems included a paraboloidal reflector with an offset focal point feed, and a symmetrical Cassegrain reflector system. Both systems are acceptable from the point of view of beam efficiency, however, from the point of view of maintaining the required positional accuracies and surface tolerances, as well as from the point of view of manufacturability, cost effectiveness, and technical risk, the symmetrical Casegrain was selected as the preferred configuration. Performance characteristics were calculated and a mechanical design study was conducted to provide estimates of the technical risk, costs, and development time required for the construction of such an antenna system.

Villeneuve, A. T.

Feasibility of using a knowledge-based system concept for in-flight primary flight display research

A study was conducted to determine the feasibility of using knowledge-based systems architectures for inflight research of primary flight display information management issues. The feasibility relied on the ability to integrate knowledge-based systems with existing onboard aircraft systems. And, given the hardware and software platforms available, the feasibility also depended on the ability to use interpreted LISP software with the real time operation of the primary flight display. In addition to evaluating these feasibility issues, the study determined whether the software engineering advantages of knowledge-based systems found for this application in the earlier workstation study extended to the inflight research environment. To study these issues, two integrated knowledge-based systems were designed to control the primary flight display according to pre-existing specifications of an ongoing primary flight display information management research effort. These two systems were implemented to assess the feasibility and software engineering issues listed. Flight test results were successful in showing the feasibility of using knowledge-based systems inflight with actual aircraft data.

Ricks, Wendell R.

FBI fingerprint identification automation study. AIDS 3 evaluation report. Volume 4: Economic feasibility

The results of the economic analysis of the AIDS 3 system design are presented. AIDS 3 evaluated a set of economic feasibility measures including life cycle cost, implementation cost, annual operating expenditures and annual capital expenditures. The economic feasibility of AIDS 3 was determined by comparing the evaluated measures with the same measures, where applicable, evaluated for the current system. A set of future work load scenarios was constructed using JPL's environmental evaluation study of the fingerprint identification system. AIDS 3 and the current system were evaluated for each of the economic feasibility measures for each of the work load scenarios. They were compared for a set of performance measures, including response time and accuracy, and for a set of cost/benefit ratios, including cost per transaction and cost per technical search. Benefit measures related to the economic feasibility of the system are also presented, including the required number of employees and the required employee skill mix.

Mulhall, B. D. L.

The feasibility of a high-altitude aircraft platform with consideration of technological and societal constraints

The feasibility of remotely piloted aircraft performing year around missions at an altitude of 70,000 feet is determined. Blimp and airplane type vehicles employing solar-voltaic, microwave, or nuclear propulsion systems were considered. A payload weighing 100 pounds and requiring 1000 watts of continuous power was assumed for analysis purposes. Results indicate that a solar powered aircraft requires more solar cell area than is available on conventional aircraft configurations if designed for the short days and high wind speeds associated with the winter season. A conventionally shaped blimp that uses solar power appears feasible if maximum airspeed is limited to about 100 ft/s. No viable airplane configuration that uses solar power and designed to withstand the winter environment was found. Both a conventionally shaped blimp and airplane appear feasible using microwave power. Nuclear powered aircraft of these type are also feasible. Societal attitudes toward the use of solar power in high altitude aircraft appear favorable. The use of microwave power for this purpose is controversial, even though the ground station required would transmit power at levels comparable to existing satellite communications stations.

Graves, E. B.

A 30/20 GHz FSS feasibility study

The near term feasibility of direct-to-subscriber services were determined using the 30/20 GHz Fixed Satellite Service (FSS) frequency bands. Those technologies which need to be further developed before such a system can be implemented, were identified. To determine this feasibility, dozens of potential applications were examined for their near-term viability, and the subscriber base of three promising applications were estimated. The system requirements, terminal design, and satellite architecture were all investigated to determine whether a 30/20 GHz FSS system is technically and economically feasible by mid-1990s. It was concluded that such a system is feasible, although maturation of some technologies is needed. This system would likely consist of one or two multibeam satellites serving hub/spoke networks of simple user terminals and more complex, mutli-channel terminals of the service providers. Rain compensation would be accomplished non-adaptively through the use of coding, nonuniform satellite TWT power that is a function of a beam's anticipated downlink fading, and signal regeneration of traffic to the wettest climate regions. It was estimated that a potential market of almost two million users could exist in in the mid-1990s time frame for home banking and financial services via Ka-band satellites.

Source record

Florida Tech CubeSat Experiment Feasibility Study

CubeSats are a relatively new type of satellite. Smaller than long-term (5+ year life expectancy) satellites, these pico-satellites are comparatively cheap, small (10x10x10 cm), and are very versatile. Universities world-wide are using CubeSats to conduct a variety of experiments in space without the need for a large experimental platform. Today CubeSats are considered to be one of the most effective ways to send a small payload into space and has attracted the attention of many educational and non-profit organizations. As this pico-satellite model continues to gain penetration into the satellite build and launch industry, it is expected that more governmental, educational, and commercial interests will emerge. As an example, more of the space-related items of high interest to the National Science Foundation may be tackled with a CubeSat platform resulting in lower life cycle costs than traditional satellite options. NASA LSP, in cooperation with the Florida Institute of Technology, has initiated a feasibility study to investigate the technical aspects of measuring and transferring vibration, acceleration, temperature, and video data from a CubeSat to NASA Hanger AE on Cape Canaveral Air Force Station (CCAFS) a.k.a. Kennedy Space Center (KSC). This report provides a technical feasibility analysis to determine whether-or-not a specific set of NASA/LSP requirements can be accomplished. Our approach has been to provide a "notional" component layout to determine the feasibility of the NASA/LSP stakeholder requirements. The notional layout is used to consider component level technical issues such as size, weight, & power (SWaP), bandwidth, and other critical technical parameters. Even though the notional components may satisfy the stated requirements and thereby demonstrate feasibility, the notional layout is NOT considered a design since no component optimization and design trade-off analysis has taken place. This activity should be accomplished in an appropriate design phase that is outside of the scope of this effort.

Arrasmith, William W.

Partition-based Feasible Integer Solution Pre-computation for Hybrid Model Predictive Control

For multiparametric mixed-integer convex programming problems such as those encountered in hybrid model predictive control, we propose an algorithm for generating a feasible partition of a subset of the parameter space. The result is a static map from the current parameter to a suboptimal integer solution such that the remaining convex program is feasible. Convergence is proved with a new insight that the overlap among the feasible parameter sets of each integer solution governs the partition complexity. The partition is stored as a tree which makes querying the feasible solution efficient. The algorithm can be used to warm start a mixed integer solver with a real-time guarantee or to provide a reference integer solution in several suboptimal MPC schemes. The algorithm is tested on randomly generated systems with up to six states, demonstrating the effectiveness of the approach.

Bayard, David S.

Demonstration of the feasibility of automated silicon solar cell fabrication

A study effort was undertaken to determine the process, steps and design requirements of an automated silicon solar cell production facility. Identification of the key process steps was made and a laboratory model was conceptually designed to demonstrate the feasibility of automating the silicon solar cell fabrication process. A detailed laboratory model was designed to demonstrate those functions most critical to the question of solar cell fabrication process automating feasibility. The study and conceptual design have established the technical feasibility of automating the solar cell manufacturing process to produce low cost solar cells with improved performance. Estimates predict an automated process throughput of 21,973 kilograms of silicon a year on a three shift 49-week basis, producing 4,747,000 hexagonal cells (38mm/side), a total of 3,373 kilowatts at an estimated manufacturing cost of $0.866 per cell or $1.22 per watt.

Taylor, W. E.

A feasibility study of orbiter flight control experiments

The results of a feasibility study of orbiter flight control experiments performed are summarized. Feasibility studies were performed on a group of 14 experiments selected from a candidate list of 35 submitted to the study contractor by the flight control community. Concepts and requirements were developed for the 14 selected experiments and they were ranked on a basis of technical value, feasibility, and cost. It was concluded that all the selected experiments can be considered as potential candidates for the Orbiter Experiment program, which is being formulated for the Orbiter Flight Tests and subsequent operational flights, regardless of the relative ranking established during the study. None of the selected experiments has significant safety implications and the cost of most was estimated to be less than $200K.

Geissler, W. H.

Acoustic treatment of the NASA Langley 4- by 7-meter tunnel: A feasibility study

A feasibility study for upgrading the NASA Langley 4- by 7-Meter Tunnel so that it may be used for aeroacoustic research related to helicopters is described. The requirements for noise research leading to the design of the next generation of helicopters impose a set of acoustic test criteria that no existing wind tunnel in the United States can presently meet. Included in this feasibility study are the following considerations: (1) an evaluation of general wind-tunnel requirements and desired tunnel background noise levels for helicopter aeroacoustic research; (2) an assessment of the present acoustic environment for testing model rotors; (3) a diagnostic investigation of tunnel background noise sources and paths; (4) acoustic treatment options for tunnel background noise reduction and a trade-off study between these options; (5) an engineering feasibility assessment of the selected option; and (6) an integrated analysis of study components and recommendations of treatment for an approach to meet the tunnel background noise reduction goal. It is concluded that the Langley 4- by 7-Meter Tunnel is a fundamentally suitable facility for helicopter aeroacoustic research. It is also concluded that acoustic treatment of this facility for meeting the required tunnel background noise goal can be accomplished technically at reasonable risk and cost.

Yu, J. C.

Assessment of the advantages and feasibility of a nuclear rocket for a manned Mars mission

The feasibility of rebuilding and testing a nuclear thermal rocket (NTR) for the Mars mission was investigted. Calculations indicate that an NTR would substantially reduce the Earth-orbit assemble mass compared to LOX/LH2 systems. The mass savings were 36 and 65% for the cases of total aerobraking and of total propulsive braking respectively. Consequently, the cost savings for a single mission of using an NTR, if aerobraking is feasible, are probably insufficient to warrant the NTR development. If multiple missions are planned or if propulsive braking is desired at Mars and/or at Earth, then the savings of about $7 billion will easily pay for the NTR. Estimates of the cost of rebuilding a NTR were based on the previous NERVA program's budget plus additional costs to develop a flight ready engine. The total cost to build the engine would be between $4 to 5 billion. The concept of developing a full-power test stand at Johnston Atoll in the Pacific appears very feasible. The added expense of building facilities on the island should be less than $1.4 billion.

Howe, Steven D.

Feasibility of mapping solution properties during the growth of protein crystals

This paper summarizes the feasibility of using optical techniques for mapping the convection, temperature, and solute concentration in the solution around a growing protein crystal. Convection can be mapped by a variety of techniques which measure either refractive index differences, displacements, velocity, or solute optical absorption. For protein crystal growth, however, ordinary schlieren and interferometric techniques are marginally sensitive and most displacement marking techniques unsuitable; therefore, phase-concentration by the absorption-interferometric technique appears to be quite feasible for protein solutions because of their low dn/dC. Finally, the monitoring of protein crystal growth rates appears to be feasible by double-exposure holography or birefringence.

Shlichta, P. J.

Titan III Feasibility for HL-20 Prototype Missions

A set of studies was performed to investigate the feasibility of using the Titan III launch vehicle to launch an unmanned prototype HL-20 personnel launch system and, potentially, operational HL-20 missions. The launch of an HL-20 spacecraft on a Titan III poses a unique set of concerns, primarily because the lifting body vehicle is carried on top of the Titan vehicle without a fairing. The Titan III/HL-20 feasibility study addressed the primary vehicle issues of performance, aerodynamics, loads, control and stability, launch availability, and vehicle configuration for the launch of an unmanned HL-20 prototype vehicle. Titan launch operations, launch site systems, and facilities were assessed to determine HL-20 operations compatibility. Additional studies determined the potential launch opportunity and window capabilities of the Titan III for the operational HL-20 mission and the existing Titan III's reliability. The feasibility study determined that the Titan III system, with minor changes, is compatible with the HL-20 vehicle and mission. It could provide nearly daily launch windows for a rendezvous with Space Station Freedom. Titan III reliability, when combined with the HL-20 launch escape system, provides a sufficiently high probability of crew survival to support its consideration as the primary vehicle for HL-20 operational missions.

Benson, Scott W.

Precipitation measurement using SIR-C: A feasibility study

A precipitation detection and measurement experiment is planned for the SIR-C/X-SAR mission. This study was conducted to determine under what conditions an off-nadir experiment is feasible. The signal-to-clutter ratio, the signal-to-noise ratio, and the minimum detectable rain rate were investigated. Available models, used in previous studies, were used for the surface clutter and the rain echo. The study also considers the attenuation of the returns at X band. It was concluded that an off-nadir rain-measurement experiment is feasible only for rain rates greater than 10 mm/hr for look angles greater than 60 deg. For the range of look angles 5 less than theta(sub 1) less than 50, the rain rate required is very high for adequate signal-to-clutter ratio, and hence the feasibility of the experiment.

Ahamad, Atiq

Physiological Anatomical Rodent Experiment (PARE) .04 feasibility test 2

The objective of this feasibility study was to subject pregnant rats of the same age, strain, and size that will be utilized in a shuttle flight experiment to all flight conditions except the unique microgravity of space flight and determine the feasibility of the proposed experimental design to meet the experimental objectives. The study utilized facilities at NASA, Ames Research Center, Moffett Field, CA to subject the rats to the gravitational stresses of a simulated shuttle launch and simulated shuttle landing. One hundred pregnant rats were received on gestation day (G) 2 (day 1 = day of vaginal sperm) and on G7, eighty rats were laparotomized to determine the condition of pregnancy and allow assignment to test groups. The five test groups (N=10 each group) were as follows: Group 1, Nominal Flight; Group 2, Laparotomy Control; Group 3, Hysterectomy Control; Group 4, Vivarium Control; Group 5, Delayed Recovery. On G9, animals in groups 1,2,3, and 5 were subjected to a shuttle launch simulation. On G18, groups 1,2, and 3 were subjected to a shuttle landing simulation and on this same day groups 1 and 2 were subjected to unilateral hysterectomy to obtain fetuses and placentas for evaluation. Fetal crown-rump length and fetal weight of the Nominal Flight group was significantly less than the Laparotomy Control group, but placentas were similar. On G20, group 5 was subjected to a shuttle landing simulation and on this day this group received a unilateral hysterectomy and fetuses and placentas were weighed. Animals in all groups were allowed to go to term and all animals delivered between 06:00 hours G22 and 18:00 hours G23. After delivery, a blood sample was taken from each experimental dam, and they were euthanized and the thymus and adrenal glands weighed. The thymus weight from all experimental group dams was decreased relative to the Vivarium Control group but adrenal glands and hormone values in dam plasma was similar in all groups. Pups from experimental groups were tattooed for identification, the anogenital distance of male pups was measured, and all pups placed with foster dams and litter sizes were standardized to 10. There was no difference in anogenital distances between male pups from different test groups. Pups delivered from Delayed Recovery animals were smaller than pups delivered from Nominal Flight animals. On neonatal day 7, all pups were euthanized and pup adrenal glands and thymus weighed. There was no difference in weights of thymus and adrenal glands in pups euthanized at neonatal day 7. Collectively, these data confirm the feasibility of the experimental design to meet objectives of the studies proposed for shuttle flight.

Burden, Hubert W.