LANL's Role in the U.S. Fissile Material Disposition Program

The process of Fissile Material Disposition is in part a result of the Advanced Recovery and Integrated Extraction System (ARIES), which is an agreement between the U.S. and Russia to dispose of excess plutonium used to make weapons. LANL is one sight that aides in the process of dismantling, storage and repurposing of the plutonium gathered from dismantled weapons. Some uses for the repurposed plutonium is fuel for commercial nuclear reactors which will provide energy for citizens.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Characterizing Surplus US Plutonium for Disposition - 13199

The United States (US) has identified 61.5 metric tons (MT) of plutonium that is permanently excess to use in nuclear weapons programs, including 47.2 MT of weapons-grade plutonium. Surplus inventories will be stored safely by the Department of Energy (DOE) and then transferred to facilities that will prepare the plutonium for permanent disposition. The Savannah River National Laboratory (SRNL) operates a Feed Characterization program for the Office of Fissile Materials Disposition (OFMD) of the National Nuclear Security Administration (NNSA) and the DOE Office of Environmental Management (DOE-EM). SRNL manages a broad program of item tracking through process history, laboratory analysis, and non-destructive assay. A combination of analytical techniques allows SRNL to predict the isotopic and chemical properties that qualify materials for disposition through the Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF). The research also defines properties that are important for other disposition paths, including disposal to the Waste Isolation Pilot Plant (WIPP) as transuranic waste (TRUW) or to high-level waste (HLW) systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Commercial-Length Nuclear Fuel Post-Irradiation Examination Capabilities at the Oak Ridge National Laboratory

The U.S. Department of Energy Fissile Materials Disposition Program is pursuing disposal of surplus weapons-usable plutonium by reactor irradiation as the fissile constituent of mixed oxide (MOX) fuel. Lead test assemblies (LTAs) have been irradiated for approximately 36 months in Duke Energy s Catawba-1 nuclear power plant. Per the MOX fuel qualification plan, destructive post-irradiation examinations (PIEs) are to be performed on second-cycle rods (irradiated to an average burnup of approximately 42 GWd/MTHM). These LTA bundles are planned to be returned to the reactor and further irradiated to approximately 52 GWd/MTHM. Nondestructive and destructive PIEs of these commercially irradiated weapons-derived MOX fuel rods will be conducted at the Oak Ridge National Laboratory (ORNL) in the Irradiated Fuels Examination Laboratory (IFEL). PIE began in early 2009. In order to support the examination of the irradiated full-length (~3.66 m) MOX fuel rods, ORNL in 2004 began to develop the necessary infrastructure and equipment for the needed full-scope PIE capabilities. The preparations included modifying the IFEL building to handle a commercial spent-fuel shipping cask; procurement of cask-handling equipment and a skid to move the cask inside the building; development of in-cell handling equipment for cask unloading; and design, fabrication, and testing of the automated, state-of-the-art PIE examination equipment. This paper describes these activities and the full-scope PIE capabilities available at ORNL for commercial full-length fuel rods.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Characterizing surplus US plutonium for disposition

The United States (US) has identified 61.5 metric tons (MT) of plutonium that is permanently excess to use in nuclear weapons programs, including 47.2 MT of weapons-grade plutonium. Surplus inventories will be stored safely by the Department of Energy (DOE) and then transferred to facilities that will prepare the plutonium for permanent disposition. The Savannah River National Laboratory (SRNL) operates a Feed Characterization program for the Office of Fissile Materials Disposition (OFMD) of the National Nuclear Security Administration (NNSA) and the DOE Office of Environmental Management (DOE-EM). SRNL manages a broad program of item tracking through process history, laboratory analysis, and non-destructive assay. A combination of analytical techniques allows SRNL to predict the isotopic and chemical properties that qualify materials for disposition through the Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF). The research also defines properties that are important for other disposition paths, including disposal to the Waste Isolation Pilot Plant (WIPP) as transuranic waste (TRUW) or to high-level waste (HLW) systems.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ESTIMATING IMPURITIES IN SURPLUS PLUTONIUM FOR DISPOSITION

The United States holds at least 61.5 metric tons (MT) of plutonium that is permanently excess to use in nuclear weapons programs, including 47.2 MT of weapons-grade plutonium. Surplus inventories will be stored safely by the Department of Energy (DOE) and then transferred to facilities that will prepare the plutonium for permanent disposition. The Savannah River National Laboratory (SRNL) operates a Feed Characterization program for the Office of Fissile Materials Disposition of the National Nuclear Security Administration and the DOE Office of Environmental Management. Many of the items that require disposition are only partially characterized, and SRNL uses a variety of techniques to predict the isotopic and chemical properties that are important for processing through the Mixed Oxide Fuel Fabrication Facility and alternative disposition paths. Recent advances in laboratory tools, including Prompt Gamma Analysis and Peroxide Fusion treatment, provide data on the existing inventories that will enable disposition without additional, costly sampling and destructive analysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Detailed Destructive Post-Irradiation Examinations of Mixed Uranium and Plutonium Oxide Fuel

The United States Department of Energy (DOE) Fissile Materials Disposition Program (FMDP) is pursuing disposal of surplus weapons-usable plutonium by reactor irradiation as the fissile constituent of MOX fuel. Lead test assemblies (LTAs) have been irradiated for approximately 36 months in Duke Energy's Catawba-1 nuclear power plant (NPP). Per the mixed oxide (MOX) fuel topical report, approved by the U.S. Nuclear Regulatory Commission (NRC), destructive post-irradiation examinations (PIEs) are to be performed on second cycle rods (irradiated to an average burnup of approximately 45 GWd/MTHM). The Radiochemical Analysis Group (RAG) at Oak Ridge National Laboratory (ORNL) is currently performing the detailed destructive post-irradiation examinations (PIE) on four of the mixed uranium and plutonium oxide fuel rods. The analytical process involves dissolution of designated fuel segments in a shielded hot cell for high precision quantification of select fission products and actinide isotopes employing isotope dilution mass spectrometry (IDMS) among other analyses. The hot cell dissolution protocol to include the collection and subsequent alkaline fusion digestion of the fuel's acid resistant metallic particulates will be presented. Although the IDMS measurements of the fission products and actinide isotopes will not be completed by the time of the 51st INMM meeting, the setup and testing of the HPLC chromatographic separations in preparation for these measurements will be discussed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Summary of Irradiation Tests of Mixed-Oxide Fuel Prepared with Weapons-Derived Plutonium

Mixed oxide (MOX) test capsules prepared with weapons-derived plutonium have been irradiated to a burnup of 50 GWd/MT. The MOX fuel was fabricated at Los Alamos National Laboratory by a master-mix process and irradiated in the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL). Previous withdrawals of the same fuel have occurred at 9, 21, 30, and 50 GWd/MT. Oak Ridge National Laboratory managed this test series for the Department of Energy's Fissile Materials Disposition Program (FMDP). This paper describes the preparation of the MOX fuel, the equipment desig, and the irradiation history of the test capsules and discusses the significance of the more important observations of the post-irradiation examinations (PIEs). Fuel performance has been excellent and consistent with code predictions and with existing U.S. and Europen experience.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Summary of irradiation tests of mixed oxide fuel prepared with weapons-derived plutonium

Mixed oxide (MOX) test capsules prepared with weapons-derived plutonium were irradiated to a burnup of 50 GWd/MT. The MOX fuel was fabricated at Los Alamos National Laboratory by a master-mix process and irradiated in the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL). Previous withdrawals of the same fuel have occurred at 9, 21, 30, and 40 GWd/MT. Oak Ridge National Laboratory managed this test series for the Department of Energy s Fissile Materials Disposition Program (FMDP). This paper describes the preparation of the MOX fuel, the equipment design, and the irradiation history of the test capsules and discussesthe significance of the more important observations of the post-irradiation examinations (PIEs). Fuel performance has been excellent and consistent with code predictions and with existing U.S. and European experience.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DEVELOPMENT AND DEPLOYMENT OF VACUUM SALT DISTILLATION AT THE SAVANNAH RIVER SITE

The Savannah River Site has a mission to dissolve fissile materials and disposition them. The primary fissile material is plutonium dioxide (PuO{sub 2}). To support dissolution of these materials, the Savannah River National Laboratory (SRNL) designed and demonstrated a vacuum salt distillation (VSD) apparatus using both representative radioactive samples and non-radioactive simulant materials. Vacuum salt distillation, through the removal of chloride salts, increases the quantity of materials suitable for processing in the site's HB-Line Facility. Small-scale non-radioactive experiments at 900-950 C show that >99.8 wt % of the initial charge of chloride salt distilled from the sample boat with recovery of >99.8 wt % of the ceric oxide (CeO{sub 2}) - the surrogate for PuO{sub 2} - as a non-chloride bearing 'product'. Small-scale radioactive testing in a glovebox demonstrated the removal of sodium chloride (NaCl) and potassium chloride (KCl) from 13 PuO{sub 2} samples. Chloride concentrations were distilled from a starting concentration of 1.8-10.8 wt % to a final concentration <500 mg/kg chloride. Initial testing of a non-radioactive, full-scale production prototype is complete. A designed experiment evaluated the impact of distillation temperature, time at temperature, vacuum, product depth, and presence of a boat cover. Significant effort has been devoted to mechanical considerations to facilitate simplified operation in a glovebox.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

APPLICATION OF VACUUM SALT DISTILLATION TECHNOLOGY FOR THE REMOVAL OF FLUORIDE

Vacuum distillation of chloride salts from plutonium oxide (PuO{sub 2}) and simulant PuO{sub 2} has been previously demonstrated at Department of Energy (DOE) sites using kilogram quantities of chloride salt. The apparatus for vacuum distillation contains a zone heated using a furnace and a zone actively cooled using either recirculated water or compressed air. During a vacuum distillation operation, a sample boat containing the feed material is placed into the apparatus while it is cool, and the system is sealed. The system is evacuated using a vacuum pump. Once a sufficient vacuum is attained, heating begins. Volatile salts distill from the heated zone to the cooled zone where they condense, leaving behind the non-volatile materials in the feed boat. The application of vacuum salt distillation (VSD) is of interest to the HB-Line Facility and the MOX Fuel Fabrication Facility (MFFF) at the Savannah River Site (SRS). Both facilities are involved in efforts to disposition excess fissile materials. Many of these materials contain chloride and fluoride salt concentrations which make them unsuitable for dissolution without prior removal of the chloride and fluoride salts. Between September 2009 and January 2011, the Savannah River National Laboratory (SRNL) and HB-Line designed, developed, tested, and successfully deployed a system for the distillation of chloride salts. Subsequent efforts are attempting to adapt the technology for the removal of fluoride. Fluoride salts of interest are less-volatile than the corresponding chloride salts. Consequently, an alternate approach is required for the removal of fluoride without significantly increasing the operating temperature. HB-Line Engineering requested SRNL to evaluate and demonstrate the feasibility of an alternate approach using both non-radioactive simulants and plutonium-bearing materials. Whereas the earlier developments targeted the removal of sodium chloride (NaCl) and potassium chloride (KCl), the current activities are concerned with the removal of the halide ions associated with plutonium trifluoride (PuF{sub 3}), plutonium tetrafluoride (PuF{sub 4}), calcium fluoride (CaF{sub 2}), and calcium chloride (CaCl{sub 2}). This report discusses non-radioactive testing of small-scale and pilot-scale systems and radioactive testing of a small-scale system. Experiments focused on demonstrating the chemistry for halide removal and addressing the primary engineering questions associated with a change in the process chemistry.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DISSOLUTION OF 3013-DE SAMPLE 10-16

The HB-Line Facility has a long-term mission to dissolve and disposition legacy fissile materials. HB-Line dissolves plutonium dioxide (PuO{sub 2}) from K-Area parting support of the 3013 Destructive Examination (DE) program. The PuO{sub 2}-bearing solids originate from a variety of unit operations and processing facilities, but all of the material is assumed to be high-fired (i.e., calcined in air for a minimum of two hours at {ge} 750 C). The Savannah River National Laboratory (SRNL) conducted dissolution flowsheet studies on 3013 DE Sample 10-16 (can R610826), which contains weapons-grade plutonium (Pu) as the fissile material. The dissolution flowsheet study was performed for 4 hours at 108 C on unwashed material using 12 M nitric acid (HNO{sub 3}) containing 0.20 M potassium fluoride (KF). After 4 hours at 108 C, the {sup 239}Pu Equivalent concentration was 32.5 g/L (gamma, 5.0% uncertainty). The insoluble residue comprised 9.88 wt % of the initial bulk weight, and contained 5.31-5.95 wt % of the initial Pu. The residue contained Pu in the highest concentration, followed by tungsten (W). Analyses detected 2,770 mg/L chloride (Cl{sup -}) in the final dissolver solution (3.28 wt %), which is significantly lower than the amount of Cl{sup -} detected by prompt gamma (9.86 wt %) and the 3013 DE Surveillance program (14.7 wt %). A low bias in chloride measurement is anticipated due to volatilization during the experiment. Gas generation studies found approximately 60 mL of gas per gram of sample produced during the first 30 minutes of dissolution. Little to no gas was produced after the first 30 minutes. Hydrogen gas (H{sub 2}) was not detected in the sample. Based on detection limits and accounting for dilution, the generated gas contained < 0.12 vol % H{sub 2}, which is well below the 4.0 vol % flammability limit for H{sub 2} in air. Filtration of the dissolver solution occurred readily. When aluminum nitrate nonahydrate (ANN) was added to the filtered dissolver solution at a 3:1 Al:F molar ratio, and stored at room temperature for 24 hours, the solution filtered approximately 6 times slower than when filtered 30 minutes after ANN addition, requiring 6 minutes to complete compared to 55 seconds for the first filtration. It is likely that the ambient-temperature solubility for ANN was exceeded. A 4-hour dissolution time at a temperature of 108 C in 12 M HNO{sub 3}/0.2 M KF is recommended for dissolution of this material.

08 HYDROGEN↗

ARIES Oxide production Program (Quarterly Report: 2QFY14)

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of the 2nd quarter FY14 is presented in this Executive Summary.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

An Expanding Plug Test Method for Determining Hoop Stress-Strain Curves of Irradiated Nuclear Fuel Cladding

A method, referred to as the expanding plug test method, for determining the roomtemperature hoop stress-strain curves of irradiated nuclear fuel cladding has been developed and applied to evaluate tensile strength and ductility in the hoop direction of clad material irradiated to high neutron fluences. The test utilizes an incompressible plug fitted within a tubular cladding specimen. A cylindrical punch is used to compress the plug axially, which generates a radial displacement that acts upon the inner diameter of the specimen. Position sensors track the radial displacement of the specimen outer diameter as the compression proceeds. An auxiliary compression test of the plug alone is also performed. Using these two sets of data, a procedure was developed to determine the hoop stress in the clad specimen. The development of this simple, cost-effective, highly reproducible test method to determine stressstrain curves in the hoop direction of irradiated clad specimens represents a significant advancement in the mechanical characterization of irradiated cladding. This paper will present an overview of the expanding plug testing technique and will discuss tests performed on irradiated clad specimens to date.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Post-closure Nuclear Criticality Safety Evaluations for Disposition of Criticality Control Overpacks at the Waste Isolation Pilot Plant

The Waste Isolation Pilot Plant (WIPP) is a geological repository in southern New Mexico that provides for disposal of transuranic (TRU) wastes from atomic energy defense activities. The Sandia National Laboratories (Sandia) Report, Consideration of Nuclear Criticality When Disposing of Transuranic Waste at the Waste Isolation Pilot Plant, addresses nuclear criticality safety based on the projected inventory characteristics for the initial compliance certification application of WIPP in 1996. As the inventory, waste forms, and disposal package designs change, revised or new analyses are necessary to demonstrate acceptability for these configurations within the WIPP safety basis and compliance with 10,000-year post-closure standards of the US Environmental Protection Agency (EPA). Saylor and Scaglione evaluated criticality control overpacks (CCOs) in 2017 based on conservative assumptions for post-closure repository structural conditions with resulting effects on containers and container spacing, The Saylor and Scaglione evaluation of CCOs addressed a single waste configuration that represents the Surplus Plutonium Disposition Program’s dilute and dispose waste form and composition. This initial CCO study demonstrated that 50 grams of boron carbide (B 4 C) per CCO is sufficient to ensure post-closure criticality safety based on a well-mixed waste composition, and Oak Ridge National Laboratory (ORNL) subsequently determined that this amount of B 4 C does not require constraints on moisture or plastic present as moderator. The Saylor and Scaglione analysis conservatively assumes repository room closure that eliminates all space between fissile gram equivalent (FGE) 239 Pu masses. The close-packed array was selected based on limited availability of repository salt creep modeling results at that time. In 2019, Brickner provided additional evaluations for pipe overpack containers (POCs), building on the conservative basis provided by Saylor and Scaglione. Brickner’s 2019 analysis made use of new geomechanical data for post-closure spacing that rely on advances in repository modeling as documented in the work by Reedlunn and Bean. This current CCO evaluation for generic waste materials expands on earlier work performed at ORNL and includes evaluation of CCOs across a much broader range of possible waste compositions and geometries. This evaluation is intended to provide input for the required feature, event and process (FEP) screening to determine if post-closure criticality must be included as an event in the 10,000-year regulatory evaluation. As such, the approach to modeling post-closure criticality presented in this report has been coordinated with the Sandia team responsible for FEP screening. The resulting analysis supports disposition of fissile materials in the CCO containing up to 380 FGE 239 Pu and expands conditions acceptable for disposal of fissile material in CCOs. This evaluation builds on the methodology of Saylor and Scaglione and Brickner, using the most recently available geomechanical data for CCO spacing under salt creep compaction scenarios provided by Reedlunn and Bean. The broad range of fissile material configurations analyzed in this report are intended to account for configurations that may occur during the post-closure disposal time period, and it also includes waste configurations that are not physically possible to support analysis of conditions that influence neutron fluence.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗