Search NASA⌕ Search

SEARCH · Search NASA

Results for “Fossil Fueled Asset”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Integration of Superconducting Magnetic Energy Storage (SMES) Systems Optimized with Second-Generation, High-Temperature Superconducting (2G-HTS) Technology with a Major Fossil-Fueled Asset

Utility companies and fossil fueled generation assets are seeking combinations of “hybrid energy storage” to allow power to be provided in advance of, and to otherwise complement, peaking natural gas-fired generation. American Maglev Technology of Florida Inc. (AMT) learned during the Phase I program based on interactions with NRG Energy (NRG) that energy storage such as superconducting magnetic energy storage (SMES) can qualify as a Black Start unit in most markets, ensuring orderly re-start of grid operations and fossil fueled power plants and serving as an important asset of hybrid energy storage technology. In conjunction with the University of Houston (UH), AMT and NRG are working together to scale up low-cost, high- efficiency, second-generation high-temperature superconducting (2G-HTS) technology for deployment across several markets, with a primary focus on the commercial development of utility grid-scale SMES (g-SMES) systems. Ultimately the program confirmed that the novel g-SMES design can meet the performance and financial requirements of the fossil power plant industry, while exhibiting continuous grid-voltage regulation; cost-effective, peak-hour energy storage with almost infinite life; increased input/output efficiency; and the capability to undergo millions of charging cycles, without degradation, representing a significant improvement over lithium ion and other conventional storage technologies. We believe wide scale deployment of this technology is feasible and practical when compared to the higher life cycle cost and relatively short lifespan of chemical batteries. Based on these findings, the future for deployment of SMES at many fossil-fueled power plants exceeding 100MW capability is bright. Further de-risking g-SMES technology would pave the way for the construction of a subscale prototype. Eventually, scaled-down versions of SMES are expected to be competitive with the multi-billion-dollar lithium-ion market for a wide range of commercial, industrial, and transportation uses. There is long-term potential for commercialization and widespread deployment of this disruptive technology, which would spawn a new worldwide supply chain and create domestic, high-tech manufacturing jobs in the green industry.

20 FOSSIL-FUELED POWER PLANTS↗

Economically Viable Intermediate to Long Duration Hydrogen Energy Storage Solutions for Fossil Fueled Assets

This report was prepared as an account of work sponsored by the Office of Fossil Energy and Carbon Management of U.S. Department of Energy under Funding Opportunity Announcement Number DE-FOA-0002332 “Energy Storage for Fossil Power Generation”. The work aimed to explore and advance an innovative hydrogen energy storage system – the synergistically integrated hydrogen energy storage system (SIHES) – that has the following characteristics: • Compatible with existing or new coal and gas fuel electricity generation units, • best suited for intermediate to long duration energy storage, from 12 hours to weeks even months, and • capable of storing energy at the utility scale – hundreds of MWh to GWh energy storage with power output level in tens to hundreds of MW. Preliminary front-end engineering design (Pre-FEED) studies was carried out to develop and refine a site-specific SIHES as peaking power generation units (so named as HyPeaker) as the first market entry point, to demonstrate both the technical feasibility and the economic viability to integrate the HyPeaker “within the fence” of a fossil power plant. This specific site was TVA’s Johnsonville Combustion Turbine Plant. The HyPeaker was designed and engineered to integrate with a 60MW aeroderivative gas turbine unit already available at TVA’s Johnsonville site. This site-specific HyPeaker consists of an alkaline electrolyzer to produce hydrogen from CO 2 free electricity sources, an innovative low-cost high-pressure hydrogen storage system (Big-Ton) and the aero gas turbine to generate electricity using blend of hydrogen and natural gas. A holistic system level technoeconomic analysis tool specific to HyPeaker was developed to optimize the engineering design of the Johnsonville site-specific HyPeaker for cost and performance. The optimal design and specification of the Johnsonville site-specific HyPeaker are the following: • Alkaline electrolyzer: 3MW • Big-Ton storage vessel: 11,000kg H 2 at 3000psi. • 4-stage diaphragm hydrogen compressor: 55kg-H 2 /hr from 150psi to 3000psi. The HyPeaker is designed to provide sufficient hydrogen for 90% continuous operation of the HyPeaker. All major components have design life of 30 years. The capex of HyPeaker is estimated at $\$$7.1M. This included $\$$1.5M for the electrolyzer, $\$$5.6M for the storage vessel and compressor. The cost of aero gas turbine was included as it is already available at the site. Key findings are: • HyPeaker can be designed, manufactured, installed and integrated with the fossil power plants, with sub-systems and components commercially available on the market today, even when it is scaled up to an order of magnitude larger than the one at the Johnsonville site. HyPeaker is a technologically viable solution to cover a wide range of energy storage duration needs, from daily peaking operation to seasonal shifting for fossil fueled assets. • The cost advantage of SCCV based Big-Ton H 2 storage vessel made it possible to “oversize” the H 2 storage subsystem to achieve overall system level cost optimization. The benefits are two-fold. First, it allows to significantly reduce the capacity and cost of electrolyzer by spreading H 2 production over a much longer period of time when the fuel cost for electricity production is low. Second, it allows to balance the hydrogen production and usage shift over weeks to months to meet the peak demands. As such, the capital cost of HyPeaker system using the Big-Ton was less than half of the cost of a system with today’s steel tube based H 2 storage system. The HyPeaker has even better cost advantage Li-ion battery based energy storage system. The estimated capital cost of Li-Ion battery system would be at $\$$38M, under the same projected 20-year electricity generation profile of the Johnsonville site. This is over 5 times more expensive than the HyPeaker system. • Since industry scale energy storage systems do not have 100% energy conversion and storage efficiency, energy storage systems using fossil fuel generated electricity would increase the CO 2 emission. This is particularly the case for HyPeaker due to its low round trip efficiency. Therefore, a more sensible solution would be to the excessive or curtailed electricity from CO 2 emission free sources such as solar farms, wind farms or nuclear power plants, to produce hydrogen, and integrate them with the HyPeaker. Electricity from TVA’s nuclear power plants was used for the Johnsonville HyPeaker. • The economic viability of HyPeaker is expected to be further improved when global supply chains are taken into consideration. For the same Johnsonville site specific HyPeaker, the capex would be reduced to ~$\$$3.6M from ~$\$$7.1M, and the added LCOE is reduced to ~$\$$85/MWh. With the bipartisan Infrastructure Investment and Jobs Act, the cost of domestically produced HyPeaker sub-systems would be at the level of today’s global suppliers. Since the peaking units generally operate at peak usage period, thereby demanding higher price, the projected $\$$85/MWh LCOE would be within the realm of financial viability for utility operators.

08 HYDROGEN↗

Repurposing Fossil-Fueled Assets For Energy Storage

The annual retirement of U.S. coal-fired electricity generation units (CF-EGU) is at an all-time high and is expected to continue. This loss of reliable baseload generation, combined with predicted growth of variable renewable energy (VRE) generation, is expected to stress grid reliability as the number of load-following resources drops below the experienced load variability. Many regions are already experiencing challenges, and fossil retirement-related warnings by the North American Electric Reliability Corp. are becoming more dire. All CF-EGU retirements pose significant challenges to asset owners, local workforces, and their communities. Repurposing a retiring CF-EGU as a long-duration energy storage plant can address these challenges and offer a suite of additional benefits to asset owners, the grid, and society. This project performed a techno-economic evaluation and assessment of repurposing a Duke Energy fossil-fueled asset (in particular, a coal plant) into an energy storage system by integrating the retiring asset with a Malta long duration Pumped Heat Energy Storage (PHES) system. The project validated the technoeconomic benefits of repurposing retiring coal plants into long-duration energy storage using Malta’s PHES. Key findings for this project are summarized below: (1) Technical: (a) Retiring coal plants (and other steam turbine fossil generation) can be repurposed to enable the clean energy transition using Malta’s technology. (b) For older retiring coal plants, repurposing the site and electrical interconnection for a standalone PHES plant is the most economically favorable option. (c) For newer coal plants where there is also a local peaking capacity need, repowering the steam cycle into a hybrid integration with PHES is attractive. (d) A process was developed to assist fossil generation owners in choosing the best path for each plant’s circumstances. (2) Economic (a) Communities facing economic challenges caused by the retirement of fossil generation would benefit from repurposing the plant as long-duration energy storage using Malta’s PHES. (b) On a $/MW basis, repowering retiring coal units into Malta PHES plants can maintain the same number and types of jobs and economic activity. (c) For a 70% carbon reduction scenario, a 10-hour Malta PHES plant is more economic for the asset owner than similar-power 4-hour batteries. This project showed that repurposing a retiring coal unit into thermal energy storage, by integrating it with a Malta PHES system, makes techno-economic sense. At least two integration options are available, with the optimal solution depending on the coal plant and its location. Repurposing retiring coal plant into energy storage results in economic benefits for the plant owner and local communities.

20 FOSSIL-FUELED POWER PLANTS↗

Titanium-Cerium Electrode-Decoupled Redox Flow Batteries Integrated With Fossil Fuel Assets For Load-Following, Long-Duration Energy Storage

Operation of fossil plants at partial capacity with frequent cycling results in decreased efficiency, increased emissions and increased wear and maintenance. The objective of this project is to advance the integration of a titanium-cerium electrode-decoupled redox flow battery (RFB) system with conventional fossil-fueled power plants through technical and economic system-level studies and component scale-up and R&D. The Ti-Ce chemistry has a pathway to meet the DOE cost targets of $\$$100/kWh and $\$$0.05/kWh-cycle owing to the use of low-cost, earth abundant elemental actives and incorporation of inexpensive carbon felt electrodes and non-fluorinated anion exchange membrane (AEM) separators. The initial unit cell design was scaled up, with some modifications made to improve ease of manufacturing, from 25 cm 2 cell area to 400 cm 2 . Electrochemical tests demonstrated operation at a current density up to 50 mA/cm 2 , which is on par with other commercial RFB offerings. Furthermore, the Ti-Ce technology developed by WashU was evaluated and tested by industrial team partner, Giner, Inc., in their modular 3-cell stack. Several cell design modifications and alternate component material selections were successfully implemented to accommodate this chemistry while reducing polarization and leakage. Results from stack testing show high columbic efficiency and indicate that further optimization of cell compression and components will lead to successful operation of the Ti-Ce ED-RFB over longer duration at the multi-cell stack level. Engineering and cost analysis showed that an RFB system with power output on the order of 100 MW and with a charge/discharge duration of approx. 12 hours is the most cost effective for integration with fossil plants. At this scale, projected cycling of fossil fuel power plants can be significantly reduced. The use of a storage system is shown to reduce the fossil plant standalone cost of electricity by $\$$7/MWh, through increased capacity factor and improved average efficiency, in the scenario of high penetration of renewable power.

20 FOSSIL-FUELED POWER PLANTS↗

Development of an All-Aqueous Thermally Regenerative Redox Flow Battery to Support Fossil Fuel Assets

Low-temperature thermal energy, a largely untapped resource, holds significant promise for large-scale electrical power generation globally. Various stationary sources, including industrial entities and thermal power plants, emit considerable low-temperature heat that currently remains unutilized. This energy is often overlooked because its low temperature renders it unsuitable for efficient power generation using conventional methods. However, current research is exploring diverse technologies capable of converting low-temperature heat into grid-scale power, aiming to enhance grid efficiency, further decarbonization initiatives, and facilitate a shift toward more decentralized power systems. One such innovative technology is the thermally regenerative battery (TRB), noted for its high power and energy densities compared to similar technologies, positioning it as a potential game-changer in power generation. TRBs integrate two scalable and well-established unit operations: a redox flow battery and a distillation column. This integration suggests that once an effective TRB chemistry is established, the pathway to commercialization could be expedited. The copper-based thermally regenerative ammonia battery (Cu aq -TRAB) stands out as the first TRB that circumvents electrodeposition/dissolution reactions, stabilizing Cu(I) and Cu(II) within the electrolyte and maintaining stability of all electroactive species in an aqueous phase. This stabilization has led to improvements in coulombic efficiency, open circuit potential, and copper solubility, thereby enhancing power density, energy density, and overall energy efficiency. Preliminary tests were conducted to determine the effects of various electrolyte species on the performance metrics of the battery, both theoretically and experimentally. These tests revealed that the solubility of copper in the Cu aq -TRAB electrolyte was constrained by the Cu(I)-NH 3 complex. Adjusting the background electrolyte to 5 M NH4Br and the ligand concentration to 4 M NH 3 enabled the copper concentration to reach a maximum of 0.6 M. This modification led to an estimated theoretical maximum energy density of 9.5 Wh L -1 for the Cu aq -TRAB. Additionally, full cell testing indicated a tradeoff between peak power and energy density with varying copper and ammonia concentrations. Increasing the applied current density during discharge linearly raised the average power output, with a minimal reduction in energy density due to a balance between higher ohmic overpotential and reduced time for undesirable ammonia crossover. Furthermore, a comprehensive numerical sensitivity analysis of the complete Cu aq -TRAB system was performed. This analysis aimed to assess how the battery and the distillation column responded to changes in system input parameters, providing insights into optimal research directions for enhancing system performance. The analysis revealed that at room temperature, battery power was significantly more sensitive to ohmic losses than to mass transfer, with reaction rates having minimal impact. This trend continued even at higher temperatures. Also, the thermal energy required for ammonia separation was studied, showing that increased temperatures generally reduced energy requirements, except in low-pressure scenarios above 65 °C. An investigation into membrane performance in the Cu aq -TRAB was undertaken, given the significant impact of ammonia transport control and ohmic losses on system performance. Various membranes were evaluated to identify key performance metrics. Among the tested membranes, Selemion CMVN exhibited the highest performance, with a peak power density of 84 mW cm -2 and average values of 26 ± 6.8 mW cm -2 for power density and 2.9 Wh L -1 for energy density at an applied current density of 50 mA cm -2 . An economic assessment indicated a levelized cost of storage at $410 per MWh under optimal conditions, highlighting the commercial potential of the Cu aq -TRAB when utilizing cost-effective, readily available materials.

25 ENERGY STORAGE↗

Integrated Hydrogen Energy Storage System (IHESS) for Power Generation (Final Report)

GTI Energy partnered with Praxair Inc., a subsidiary of Linde PLC (Praxair), the Center for Electromechanics at the University of Texas at Austin (CEM), Entergy Corporation (Entergy), Quanta Services (Quanta) and Mitsubishi Heavy Industries (MHI) to perform a feasibility study that determines the economic and technical feasibility of low-carbon hydrogen energy storage integrated with a site-specific fossil fuel asset to decarbonize electricity production using the Integrated Hydrogen Energy Storage System (IHESS). The proposed IHESS concept is novel, as it sought to leverage the existing natural gas infrastructure, hydrogen production and pipelines, existing underground hydrogen storage system and power plants in the Gulf Coast region to reduce carbon emissions and generate lowcarbon electricity. This study has shown that IHESS has a promising commercial outlook as the concept leverages existing natural gas infrastructure assets and hydrogen production and storage that are unique to the Texas gulf coast region. A key hurdle with hydrogen supply and transportation has been capital investment. By storing hydrogen in underground storage and delivering it as a fuel source during peak demand using the existing infrastructure minimizes the capital investment. Regional petrochemical producers who are actively seeking opportunities to reduce costs and lower emissions should find the IHESS concept very appealing.

03 NATURAL GAS↗

Energy Storage and Decarbonization Analysis for Energy Regulators: Technical Analysis for the Illinois Commerce Commission

Jurisdictions around the world are enacting and enforcing an increasing number of policies to fight climate change, leading to higher penetration of variable renewable energy (VRE) and energy storage systems (ESSs) in the power grid. One of the biggest challenges associated with this process is the evaluation of the appropriate amount of ESS required to mitigate the variability of the VREs and achieve decarbonization goals of a particular jurisdiction. This report presents methodologies developed and results obtained for determining the minimum amount of ESS required to adequately serve load in a system where fossil fueled generators are being replaced by VREs over the next two decades. This technical analysis is performed by Sandia National Laboratories for the DOE Office of Electricity Energy Storage Program in collaboration with the Illinois Commerce Commission (ICC). The Illinois MISO Zone 4 is used as a case study. Several boundary conditions are investigated in this analysis including capacity adequacy and energy adequacy to determine the quantity of ESS required for MISO Zone 4. Multiple scenarios are designed and evaluated to incorporate the impact of varying capacity values of VREs and on the resource adequacy of the system. Several retirement scenarios involving fossil-fueled assets are also considered. Based on the current plans of new additions and retirements of generating assets, the results of the technical analysis indicate that Illinois MISO Zone 4 will require a significant quantity of ESS to satisfy their electricity demand over the next two decades.

25 ENERGY STORAGE↗

Integrated protonic ceramic electrochemical cell for sustainable energy economy using water-energy nexus framework

Reliance on fossil fuels will continue for the next decades even though there are global pushes away from it to mitigate the overarching climate challenge, most especially by its highest consumers and availability. While there is a hastening global shift away from fossil fuel, integrating its assets into this technology helps limit the risk and future losses of stranded assets and reduce the cost of investment in the new technologies. Moreover, the generation of electricity from intermittent renewable sources like solar and wind has witnessed a significant surge in recent years, leading to a pressing demand for practical energy storage systems. Electrical energy storage is anticipated to play a pivotal role in the future global energy system, facilitating load-leveling operations to support the greater integration of renewable and distributed generation. Reversible electrochemical cells (RECs) offer a promising option for addressing the fossil fuel assets integration and energy storage challenges through the interconversion between electrical and chemical energy and concurrent utilizing carbon emission. In their electrolysis mode, the RECs convert electricity into durable, storable, and portable valuable chemical fuels such as syngas and methane. Conversely, the produced chemical fuels can be used as reactants in the fuel cell mode to generate electricity on demand with minimal (hydrocarbons) or zero when H2 or NH3 is used emissions. However, a challenging goal for this type of technology remains to achieve optimal operation and high roundtrip efficiencies, which has hindered the deployment of previous electrochemical cells. This dissertation demonstrates how reversible protonic ceramic electrochemical cells (RePCECs) can be integrated with fossil fuel power plants and renewable energy sources as a potential energy storage system. In this work, integrated RePCEC systems are designed and examined using computational modeling at scales to determine appropriate system configurations and operating conditions that achieve high roundtrip efficiencies. Cell level design of the PCEC is the first approach, several cells are assembled for the stack level model that is integrated into combined cycle powerplant and solar photovoltaic for the system level model. After critical literature review, this answered the operational and integration research questions proposed to address these challenges. The designed systems perform two functions, utilizing captured CO2 and storing renewable energy through co-electrolysis of steam and CO2. The co-electrolysis reaction involves endothermic water electrolysis and exothermic methanation reaction. To enhance high roundtrip efficiency, there is a need for thermal balance and management in the electrolysis mode. This involves operating the RePCEC stack under conditions that favor methane production to balance out heat needed by water electrolysis, it crucial for the RePCEC system operation. Methanation is enhanced by low temperatures. Leveraging on fabricated BCZYYb-electrolyte RePCEC, the cell model designed revealed that the optimum temperature for methane production is 450℃ at atmospheric pressure. Thus, to achieve optimum system performance, operating in the temperature range 450-525℃ is recommended at the given configuration, combining between the optimum temperature for methane production and temperature for the optimum stack roundtrip efficiency. Configuration with carbon capture system and purge stream is the optimum configuration from the seven conceptualized and evaluated. The modeling outcomes include a thermodynamic examination of integrated RePCEC systems, calibration of cell and stack level models, and steady-state simulation and integration into a 600MW combined cycle power plant retrofitted with two two-stage membrane-based carbon capture system and a wastewater treatment and recovery unit. At 100% powerplant loading, the stack and system roundtrip efficiencies are 72% and 51.37% respectively. Adding a purge stream for produced hydrogen at the system downstream improves the efficiencies to 74 and 55.48% respectively. At atmospheric pressure and 525℃, the system model suggests that a stack roundtrip of 82% is achievable, and overall system efficiency increases by reducing the energy consumption by the balance of plant components for steam generation and storage. Economic analysis of the process gives levelized cost of methane as $2.24/MMBtu lower than the conventional production route that range between $3.46/MMBtu and $9.85/MMBtu. The lifecycle analysis shows that the global warming potential for the production of methane and hydrogen from the RePCEC system is 3.83 kg CO2 eq which is lower than 9.35 kg CO2 eq emission during steam methane reforming for hydrogen production. This answered both the environmental and economic concerns in the raised research question. The proposed RePCEC configuration and analysis carried out in this dissertation to address the surge in renewable energy and challenges with PCEC technology hold significant potential in achieving large-scale energy storage while simultaneously reducing carbon emissions. These advancements, coupled with suitable governmental policies and incentive programs, have the potential to economically disrupt the natural gas industries by using RePCEC systems for methane production, thereby making them more favorable for eventual implementation and commercialization.

25 ENERGY STORAGE↗

Hydrogen Based Energy Storage System for Integration with Dispatchable Power Generator (Phase I Feasibility Study)

This project examined the feasibility of integrating hydrogen generation, storage, and use as a means to decarbonize campus activities while retaining the ability to utilize the existing natural gas fired combined heat and power system installed at the campus of the University of California @ Irvine. Analysis of specific potential sites for the integrated system identified a location adjacent to the existing central plant which resulted in minimization of interconnections. A strategy based on use of commercial electrolyzers and gas storage was identified. Primary technology advancements are required for the gas turbine to accommodate higher levels of hydrogen and the integrated controls. The project indicated challenges for adopting the proposed strategy with the present rates and constraints. The availability of a relatively low-cost biogas resource by the campus already decarbonizes the gas turbine to some extent. In the absence of this resource, procurement of electricity directly from large scale renewable operations could facilitate lower electricity costs. Additional solar resources on campus could also help in this regard. The gas turbine cannot be operated below 50% capacity due to air permit constraints. Using the otherwise curtailed gas turbine operation to generate hydrogen via electrolysis by consuming natural gas is not highly efficient and therefore leads to relatively high costs of electricity returned. Several scenarios demonstrate potential for effective decarbonization, yet most involve lower and lower capacity factor for the legacy gas turbine which is not a good use of the asset. A small gas turbine output with higher efficiency operation would help. As would ability to export electricity to the grid. Certainly current rate structures and operational scenarios are less attractive than other possible future structures which should be pushed for in the future.

03 NATURAL GAS↗

Life cycle analysis of a hydrogen production system based on solid oxide electrolysis cells integrated with different energy and wastewater sources

Hydrogen production via water electrolysis is a promising and evolving technology. The solid oxide electrolysis cell (SOEC) is one of the several technologies for this purpose. They are alternatives to the traditional hydrogen production from fossil fuels to enhance global energy decarbonization. However, in the bid for sustainability and a green economy, these technologies are not free from causing some environmental burdens. Using life cycle assessment (LCA), the greenhouse gas emission and degree of environmental impacts by these technologies can be identified and measured throughout their lifespan. This study addresses how to quantify these CO 2 emission impacts for an electrolytic system with different energy sources. The LCA of a novel integrated hydrogen production SOEC system with energy from solar photovoltaic and bituminous powerplant is performed using simaPro, the leading global LCA solution software. Measuring the environmental impact of the electrolytic operation in terms of weight, the bituminous powerplant poses damage which is, on average 700% more than solar PV. The thermal-to-hydrogen efficiency of the SOEC system is 56%, and a probable 28% reduction in carbon footprint with heat integration. The steam generation and the manufacturing of the SOEC have a very high environmental impact potential on the system. Here, we recommend LCA and net energy analysis is carried out for every new hydrogen technology and adequate comparison to enhance sustainable and green economy.

08 HYDROGEN↗

A novel green hydrogen production using water-energy nexus framework

The transformation of electrical energy to hydrogen via water electrolysis consumes considerable amount of fresh water and a productive use of nontraditional water sources enhances the reliability and resilience of energy and water systems. In this study, we have designed a solid oxide electrolysis cell (SOEC) system which is an evolving hydrogen production technology at high temperatures for water electrolysis. Here, the SOEC uses steam generated from flue gas as its feedstock and is fully integrated with numerous power production units, including coal and natural gas-fired power plants as its energy feedstock. While there is a hasten global shift away from fossil fuel, integrating its asset into this technology helps limit the risk and future losses of stranded assets and reduce the cost of investment in the new technologies. But high capital expenditures and doubt concerning the future cost and efficiency upgrade are obstacles to investing in water electrolysis. Such a detailed Levelized cost of hydrogen and techno-economic analysis is conducted to show the viability and environmental impacts of this novel technology. The results show SOEC efficiency of 97.4 % and 56.3 % as thermal-to-hydrogen efficiency of the system with a daily hydrogen production of 242,400 kg at $2.9–3.5/kg H 2 . The estimates show a positive gain prospect in this technology and techno-economic challenges.

08 HYDROGEN↗

Technology Strategy Assessment: Findings from Storage Innovations 2030 Thermal Energy Storage

The concept of thermal energy storage (TES) can be traced back to early 19th century, with the invention of the ice box to prevent butter from melting. Modern TES development began with building heating and cooling and concentrated solar thermal technologies for power generation in the early 1900s and late 1970s, respectively. TES systems provide many advantages compared with other long-duration energy storage (LDES) technologies, which include low costs, long operational lives, high energy density, synchronous power generation capability with inertia that inherently stabilizes the grid, and the ability to output both heat and electricity. TES Use Cases TES technologies can couple with most renewable energy systems, including wind, photovoltaic, and concentrated solar thermal energy, and can be used for heat-to-heat, heat-to-electricity, electricity-to-heat, and electricity-to-electricity (bidirectional electricity) applications. The three types of TES that have heat as an input or output are grouped together for the purposes of this report. Retrofitting retired thermal power plants can be a potential cost-effective option for TES with electricity output because they both use a similar thermal-to-electricity type of conversion. Additionally, TES can directly serve heat demand for buildings and industrial processes, displacing fossil fuels to achieve broad decarbonization. Bidirectional Electricity Figure 1 shows a bidirectional electricity TES (ETES) architecture that is emerging as a prime technology for LDES at a grid scale. The ETES technology can utilize existing TES technology infrastructures, has no geological limitations (such as mountains and water for pumped storage hydro, underground natural caverns for compressed-air energy storage, etc.), and is capable of deployment anywhere in the United States and the world for broad uses. Particularly, ETES technology can be placed at retired fossil-fueled thermal power plants to reuse decommissioned assets, protect job security in associated communities, and provide resilient and high-inertia (i.e., spinning) power to the grid. Heat Input and Output There also are many ways to integrate TES within heat-to-electricity, heat-to-heat, and electricity-to-heat applications, such as those used in concentrating solar power (CSP), buildings, district heating, and industry process heat applications. These categories can be further classified for low- and high-temperature applications. High-temperature thermal energy storage (HTTES) heat-to-electricity TES applications are currently associated with CSP deployments for power generation. TES with CSP has been deployed in the Southwestern United States with rich solar resources and has proved its value to the electric grid. Electricity-to-heat and heat-to-heat HTTES applications present great potential for decarbonizing energy-intensive industrial process heat applications [8, 9], such as iron ore processing, iron smelting, cement production, glass manufacturing, mineral processing, and chemical production. Some industrial processes require process heat at temperatures > 1,400°C, so HTTES can be utilized to reduce fuel consumption in those processes through fuel, oxidizer, and process material pre-heating. Thermal energy storage for augmenting existing industrial process heat applications makes a much more attractive economic case because the energy penalty due to thermal-to-electric conversion is eliminated. Co-located applications of power production and heat also can add to the value stacking of integrating utility-scale TES; however, these scenarios are very case specific and not practically possible in many cases. These constraints are primarily attributed to the existing infrastructure being designed, developed, and constructed for many decades around the most economically feasible technologies, such as electricity and a selection of fossil fuels for heat input. Low-temperature TES can be utilized for building and district heating and cooling, as well as some process heat applications in electricity-to-heat and heat-to-heat configurations. Lower temperature TES (LTTES) can be added to heat pump equipment (electric input), either directly interacting with the refrigerant in the condenser or evaporator, or through a secondary heat transfer fluid. It also can be integrated in the building envelope or within the ducts of the heating, ventilation, and air conditioning (HVAC) system. Cost-effective integration of TES into buildings adds significant cost, and it is one of the key barriers preventing the commercialization and deployment of TES. The optimal strategy for integrating TES with buildings has yet to be determined for various applications of TES. Nevertheless, thermal storage materials are far less costly per unit of energy stored than electricity storage materials. This means that thermal storage has the potential to reduce the cost to society of energy storage.

25 ENERGY STORAGE↗

Repowering Coal Plants as Pumped Thermal Energy Storage

This conference presentation presents the results from a DOE FE funded study on the integration of a Malta Pumped Heat Energy Storage system with a retiring coal-fired power plant, and the economic benefits to the asset owner and the local community.

20 FOSSIL-FUELED POWER PLANTS↗

Low-Cost Sulfur Thermal Storage for Increased Flexibility and Improved Economics of Fossil-Fueled Electricity Generating Units (Final Report)

The US electric grid relies on conventional fossil fuel power plants for reliable and secure power, but these plants suffer from physical and financial strain due to the influx of inexpensive and variable solar and wind electricity. Conventional power plants need to generate electricity flexibly and on-demand to accommodate these renewable resources on the grid. Integrating a low-cost thermal energy storage (TES) gives fossil assets the ability to regulate their output efficiently and optimize the plant operation to maximize revenue in the wholesale electricity market. Element 16’s TES concept uses sulfur, a byproduct of the oil & gas industry, as the storage media that is 10 times cheaper than molten salt used in commercial two-tank TES technology. In this project, the team completed a detailed feasibility and technoeconomic study establishing the impact, cost and performance of molten sulfur TES system integrated with fossil assets.

20 FOSSIL-FUELED POWER PLANTS↗

Modeling direct air carbon capture and storage in a 1.5 °C climate future using historical analogs

Limiting the rise in global temperature to 1.5 °C will rely, in part, on technologies to remove CO 2 from the atmosphere. However, many carbon dioxide removal (CDR) technologies are in the early stages of development, and there is limited data to inform predictions of their future adoption. Here, we present an approach to model adoption of early-stage technologies such as CDR and apply it to direct air carbon capture and storage (DACCS). Our approach combines empirical data on historical technology analogs and early adoption indicators to model a range of feasible growth pathways. We use these pathways as inputs to an integrated assessment model (the Global Change Analysis Model, GCAM) and evaluate their effects under an emissions policy to limit end-of-century temperature change to 1.5 °C. Adoption varies widely across analogs, which share different strategic similarities with DACCS. If DACCS growth mirrors high-growth analogs (e.g., solar photovoltaics), it can reach up to 4.9 GtCO 2 removal by midcentury, compared to as low as 0.2 GtCO 2 for low-growth analogs (e.g., natural gas pipelines). For these slower growing analogs, unabated fossil fuel generation in 2050 is reduced by 44% compared to high-growth analogs, with implications for energy investments and stranded assets. Residual emissions at the end of the century are also substantially lower (by up to 43% and 34% in transportation and industry) under lower DACCS scenarios. The large variation in growth rates observed for different analogs can also point to policy takeaways for enabling DACCS.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

The path to 2060: Saudi Arabia's long-term pathway for GHG emission reduction

Saudi Arabia, as part of its Saudi Green Initiative, has announced its goal to achieve net zero green-house gas emissions by 2060. This ambitious target underscores the nation's dedication to address-ing climate change. However, there is a significant gap in comprehensive analysis regarding the long-term effects of Saudi Arabia's climate policies and their collective contribution towards the net-zero objective. This study endeavors to bridge this gap through a detailed examination using the GCAM-KSA, a specialized version of the Global Change Analysis Model tailored for Saudi Arabia, employing a multi-sectoral methodology that integrates economic, energy, and land use systems within a coherent framework to assess the impact of climate policies on GHG emissions. Our anal-ysis reveals that reaching net-zero GHG emissions by 2060 is a complex challenge requiring con-certed efforts across all sectors of the economy. While transitioning to low-carbon electricity and improving energy efficiency offer considerable emission reductions, fully decarbonizing the indus-trial and transportation sectors poses a significant hurdle. Our findings suggest that Saudi Arabia must triple its emission reduction commitments in its next Nationally Determined Contributions (NDCs) update to align with its 2060 net-zero goal. Early action and increased ambition could avoid the chances of getting locked into the high emission assets and give enough time to transform the energy system. Furthermore, the adoption and integration of Carbon Dioxide Removal (CDR) tech-nologies are identified as crucial for offsetting residual emissions, especially in sectors that might continue to rely on fossil fuels.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Clemson Hydrogen Combined Heat and Power Storage System

The objective of this project named H2 Orange, was to develop a conceptual design including a technoeconomic study, technology gap assessment and maturation plan, and commercialization plan of a nominal 50-megawatt hours (MWh) hydrogen energy storage system. The project investigated how to optimally size, design and integrate the hydrogen energy storage system with an existing 14.3-megawatt (MW) gas turbine fossil asset supplying thermal power at the Clemson University Combined Heat & Power (CHP) plant.

03 NATURAL GAS↗