Search NASA⌕ Search

SEARCH · Search NASA

Results for “Fourth Quarter”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Applied Meteorology Unit (AMU) Quarterly Report - Fourth Quarter FY-09

This report summarizes the Applied Meteorology Unit (AMU) activities for the fourth quarter of Fiscal Year 2009 (July - September 2009). Tasks reports include: (1) Peak Wind Tool for User Launch Commit Criteria (LCC), (2) Objective Lightning Probability Tool. Phase III, (3) Peak Wind Tool for General Forecasting. Phase II, (4) Update and Maintain Advanced Regional Prediction System (ARPS) Data Analysis System (ADAS), (5) Verify MesoNAM Performance (6) develop a Graphical User Interface to update selected parameters for the Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLlT)

Bauman, William↗

Applied Meteorology Unit (AMU) Quarterly Report Fourth Quarter FY-04

This report summarizes the Applied Meteorology Unit (A MU) activities for the fourth quarter of Fiscal Year 2004 (July -Sept 2004). Tasks covered are: (1) Objective Lightning Probability Forecast: Phase I, (2) Severe Weather Forecast Decision Aid, (3) Hail Index, (4) Shuttle Ascent Camera Cloud Obstruction Forecast, (5) Advanced Regional Prediction System (ARPS) Optimization and Training Extension and (5) User Control Interface for ARPS Data Analysis System (ADAS) Data Ingest.

Bauman, William↗

Applied Meteorology Unit (AMU) Quarterly Report - Fourth Quarter FY-10

Three AMU tasks were completed in this Quarter, each resulting in a forecast tool now being used in operations and a final report documenting how the work was done. AMU personnel completed the following tasks (1) Phase II of the Peak Wind Tool for General Forecasting task by delivering an improved wind forecasting tool to operations and providing training on its use; (2) a graphical user interface (GUI) she updated with new scripts to complete the ADAS Update and Maintainability task, and delivered the scripts to the Spaceflight Meteorology Group on Johnson Space Center, Texas and National Weather Service in Melbourne, Fla.; and (3) the Verify MesoNAM Performance task after we created and delivered a GUI that forecasters will use to determine the performance of the operational MesoNAM weather model forecast.

Bauman, William↗

Applied Meteorology Unit (AMU) Quarterly Report Fourth Quarter FY-13

Ms. Shafer completed the task to determine relationships between pressure gradients and peak winds at Vandenberg Air Force Base (VAFB), and began developing a climatology for the VAFB wind towers; Dr. Huddleston completed the task to develop a tool to help forecast the time of the first lightning strike of the day in the Kennedy Space Center (KSC)/Cape Canaveral Air Force Station (CCAFS) area; Dr. Bauman completed work on a severe weather forecast tool focused on the Eastern Range (ER), and also developed upper-winds analysis tools for VAFB and Wallops Fl ight Facility (WFF); Ms. Crawford processed and displayed radar data in the software she will use to create a dual-Doppler analysis over the east-central Florida and KSC/CCAFS areas; Mr. Decker completed developing a wind pairs database for the Launch Services Program to use when evaluating upper-level winds for launch vehicles; Dr. Watson continued work to assimilate observational data into the high-resolution model configurations she created for WFF and the ER.

Bauman, William↗

Applied Meteorology Unit (AMU) Quarterly Report Fourth Quarter FY-14

Ms. Crawford completed the final report for the dual-Doppler wind field task. Dr. Bauman completed transitioning the 915-MHz and 50-MHz Doppler Radar Wind Profiler (DRWP) splicing algorithm developed at Marshall Space Flight Center (MSFC) into the AMU Upper Winds Tool. Dr. Watson completed work to assimilate data into model configurations for Wallops Flight Facility (WFF) and Kennedy Space Center/Cape Canaveral Air Force Station (KSC/CCAFS). Ms. Shafer began evaluating the a local high-resolution model she had set up previously for its ability to forecast weather elements that affect launches at KSC/CCAFS. Dr. Watson began a task to optimize the data-assimilated model she just developed to run in real time.

Applied Meteorology Unit↗

Idaho National Laboratory Site Environmental Surveillance Program: Fourth Quarter 2022

This report for the fourth quarter of 2022 contains results from the INL Site environmental surveillance program’s monitoring of the U.S. Department of Energy’s Idaho National Laboratory (INL) Site’s Onsite, Boundary and Offsite location environment, October 1 through December 31, 2022. All sample types (media) and the sampling schedule followed during 2022 are listed in Appendix A. This report contains results for the following sample types: • Air, including particulate air filters, charcoal cartridges, and atmospheric moisture, • Quarterly composites, • Precipitation, • Drinking and surface water, • Milk, • Potatoes, • Soil, • Large game animals, • Waterfowl, and • OSLDs.

99 GENERAL AND MISCELLANEOUS↗

Results for the Fourth Quarter Calendar Year 2018 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2018 (CY18) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter CY18 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the TTQAP for the Tank 50 Saltstone task.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Fourth Quarter Calendar Year 2020 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2020 (CY20) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter CY20 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals per Task 2 from the SRR request, will be obtained semi-annually for the 1QCY21 and 3QCY21 Tank 50 samples. However, data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals for this current 4QCY20 Tank 50 sample will be obtained and documented per the special analysis associated with the vault classification sample as described in the associated TTQAP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Fourth Quarter Calendar Year 2022 Salt Solution Sample for Performance Assessment Analyses

In this Technical Report, the chemical and radionuclide contaminant results from the fourth quarter calendar year 2022 salt solution sample for Performance Assessment (PA) analyses are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste to Tank 50 and the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the salt solution sample was obtained. The chemical and radionuclide contaminant results from the characterization of the fourth quarter calendar year 2022 sampling of salt solution sent to Z area were requested by SRMC personnel via a Technical Task Request (TTR). Details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is the TTR deliverable relating Salt Solution Analysis from the SRMC request.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗