Search NASA⌕ Search

SEARCH · Search NASA

Results for “Frit 625”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Evaluation of a Sulfate Solubility Limit Greater Than 0.65 Weight Percent in Sludge Batch 10 Glasses

Previous laboratory-scale crucible testing with batch chemicals confirmed that the sulfate (SO 4 2- ) limit for Sludge Batch 10 (SB10) was 0.65 weight percent (wt.%) in glass. This limit signifies that 0.65 wt.% SO 4 2- can be retained in the glass without the formation of a sulfate phase. The Defense Waste Processing Facility imposes this constraint in the Material Tracking Program. Based on preliminary calculations to support the Material Tracking Program, it was anticipated that transfer volumes of the monosodium titanate/sludge solids (MST/SS) stream from the Salt Waste Processing Facility (SWPF) may need to be reduced to maintain projected sulfate concentrations below 0.65 wt.% in glass. Savannah River Mission Completion requested that the Savannah River National Laboratory perform additional sulfate testing to determine whether a sulfate solubility limit greater than 0.65 wt.% is feasible for SB10, which could allow for higher transfer volumes of the MST/SS stream. This report documents the results of the testing at higher sulfate concentrations for the glass composition region defined by the most recent SB10 projection (November 2022) and Frits 473 and 625. Frit 473 was recommended for SB10 and Frit 625 was used during SB9 processing and the SB9 to SB10 transition. A total of twenty-one glass compositions were developed based on the expected compositional variables, which include sludge-only (SO) and coupled processing with the SWPF, waste loading (WL), and frit composition. The target sulfate concentrations were varied from 0.65-0.85 wt.% at 32 and 40% WL. Each glass was prepared from reagent grade chemicals and melted at 1150 °C. Visual observations were used to confirm the presence of a sulfate salt phase on the cooled glass surfaces. Representative samples of each glass were submitted for chemical composition analysis by inductively coupled plasma-optical emission spectroscopy and Cs analysis by inductively coupled plasma-mass spectrometry. Overall the majority of mean measured values are consistent with the target values for each major oxide of interest with less than 5% error. The percent errors for the measured SO 4 2- concentrations are generally less than 10%, which is comparable with previous sulfate solubility study measurements and acceptable. Only the SO glasses based on Frit 625 formed a sulfate phase at a 0.80 wt.% SO 4 2- target concentration at both 32 and 40% WL. The remainder of the glasses did not form a sulfate layer. Due to the formation of the sulfate phase, the limit is conservatively set at 0.70 wt.% based on the measured sulfate concentrations of 0.71 wt.% and 0.75 wt.% for these two glasses. None of the SO or coupled operation glasses based on Frit 473 formed a sulfate salt phase, which supports a sulfate limit of 0.80 wt.%. The following SO 4 2- concentration limits are recommended during SO and coupled SB10 processing: (1) 0.70 wt.% during processing with Frit 625, and (2) 0.80 wt.% during processing with Frit 473.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement Acceptance Region (MAR) Assessment Results Based On Sludge Batch 10 Projections from December 2021, February 2022 and August 2022

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 (8B 2 O 3 -8Li 2 O-5Na 2 O-79SiO 2 , in weight percent) was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Due to the lower processing rate of Sludge Batch 9 (SB9), the heel in Tank 40 is anticipated to be greater than 40 inches at the projected start of SB10 processing to meet the upcoming Accelerated Basin Deinventory addition dates in Tank 51 for Sludge Batch 11. In December 2021 and February 2022, Savannah River Remediation System Planning provided updated SB10 Tank 40 blend projections based on heels of 74 inches, 84 inches, 94 inches and 103.4 inches. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In August 2022, SRMC System Planning provided an updated SB10 Tank 40 blend projection with a 76 inch-heel representing Decant Y2 and 60 kilogallons of bearing water inleakage that is anticipated during the Tank 51 to Tank 40 transfer. The objectives of this task were to: • Determine the impact on the operating windows for SO and coupled processing • Determine whether any composition gaps exist between the already completed SB10 variability study and the reprojected SB10 glass composition region • Compare the SB10 reprojected glass composition region to the DWPF PCCS model development and validation ranges to ensure that compositional gaps do not exist between the data sets. This report documents the results of these evaluations. Calculation-based frit assessments were performed using the DWPF PCCS glass property models and their associated MAR constraints. Evaluated parameters for coupled processing included the following transfer volumes per Sludge Receipt and Adjustment Tank batch: 5700 gallons of Tank 40 sludge, 2400-4500 gallons of the SWPF monosodium titanate (MST) and sludge solids stream, and 15,000 gallons of strip effluent. Based on these MAR assessment results, Frit 473 remains viable for SB10 processing. A target waste loading (WL) of 36% is possible for SO operation and single strike (0.4 g/L MST) coupled processing up to 600 mg/L of SB9 insoluble sludge solids at a nominal transfer volume of ~2800 gallons. Increasing the single strike transfer volume to 4500 gallons may reduce the maximum WL below 40%. Operating windows are 12 percentage points for SO processing and 14-16 percentage points for coupled processing. Frit 625 allows for a target WL of 36% and is acceptable for use during the SB9 to SB10 transition to deplete remaining inventory as needed. Operating windows are 8 percentage points for SO processing and 12-14 percentage points for coupled processing. Predictive PCCS evaluations performed at DWPF will provide insight into batch-specific acceptability at desired WLs for compositions having expected oxide ratios during processing versus the extreme vertices (corner points) evaluated in this study. The reprojected SB10 glass composition region generally overlaps the previously evaluated SB10 variability study composition region. Thus, the minor composition shift of these updated SB10 projections indicates that no additional glasses are necessary to demonstrate acceptability relative to the chemical durability of the Environmental Assessment benchmark glass and predictability using the current PCCS models for durability. Based on a comparison of the PCCS model development and validation data to the reprojected SB10 glass composition region, the viscosity and liquidus temperature models will reliably predict SB10 compositions. No additional glasses are necessary to demonstrate predictability of these models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation Of Glass Density to Support the Estimation of Fissile Mass Loadings in Sludge Batch 10 Glasses

Per a directive from the Department of Energy Savannah River Operations Office (DOE-SR) in 2008, the fissile mass loading concentration must remain below 897 g/m 3 in each high-level waste (HLW) glass canister produced by the Defense Waste Processing Facility (DWPF). To support Sludge Batch 5 (SB5) processing, the Savannah River National Laboratory (SRNL) developed a technical basis that facilitates the evaluation of fissile mass loading of the glass product. The calculation is based on the iron (Fe) concentration in the glass as determined by measurements from the Slurry Mix Evaporator acceptability analysis as well as the glass density. In April 2022, a subsequent DOE-SR directive increased the fissile mass loading limit to 2500 g/m 3 beginning with Sludge Batch 11. Thus, the 897 g/m 3 limit still applies to Sludge Batch 10 (SB10) processing. For SB5 through initial Sludge Batch 9 (SB9) processing prior to coupled operation with the Salt Waste Processing Facility (SWPF), SRNL provided DWPF a bounding glass density value that was based on a statistical evaluation of density measurements. To eliminate the need for experimental work, a composition-based density model for HLW glasses was developed at SRNL in 2019. The objective of this report is to present the bounding glass density determined with the composition-based density model for SB10 sludge-only (SO) and coupled processing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Measurement Acceptance Region (MAR) Assessment Results Based on Confirmation Sample Sludge Batch 10 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Glass Density to Support the Estimation of Fissile Mass Loadings in Sludge Batch 10 Glasses

Per a directive from the Department of Energy Savannah River Operations Office (DOE-SR) in 2008, the fissile mass loading concentration must remain below 897 g/m 3 in each high-level waste (HLW) glass canister produced by the Defense Waste Processing Facility (DWPF). To support Sludge Batch 5 (SB5) processing, the Savannah River National Laboratory (SRNL) developed a technical basis that facilitates the evaluation of fissile mass loading of the glass product. The calculation is based on the iron (Fe) concentration in the glass as determined by measurements from the Slurry Mix Evaporator acceptability analysis as well as the glass density. In April 2022, a subsequent DOE-SR directive increased the fissile mass loading limit to 2500 g/m 3 beginning with Sludge Batch 11. Thus, the 897 g/m 3 limit still applies to Sludge Batch 10 (SB10) processing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of the 0.65 Weight Percent Sulfate Solubility Limit for Sludge Batch 10 Based on November 2022 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System glass property models and their associated Measurement Acceptance Region constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗