Search NASA⌕ Search

SEARCH · Search NASA

Results for “Future Plans”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Experimental progress and future plans on spherical tokamak, QUEST

QUEST (Q-shu university experiment with steady state spherical tokamak) aims at effective plasma current start-up and stable maintenance of plasma discharge. To solve the inherent problems in a spherical tokamak (ST) arising from insufficient space for placing the inductive center solenoid, electron cyclotron current drive (ECCD) and transient coaxial helicity injection (T-CHI) are implemented as a non-inductive plasma start-up method in QUEST. Efficient ECCD assisted by energetic electrons could be achieved. By combining control of the wave injection angle and application of a negative toroidal electric field, the bulk electron temperature could be raised up to 1 keV due to selective wave power absorption in the bulk electrons. The plasma current of over 50 kA contained within the closed flux surface could be obtained with a floating single biased electrode placed on lower divertor plates for T-CHI. Long-pulse operations on QUEST are impeded frequently due to wall saturation and subsequent density runaway caused by fuel particle imbalance. Since 2014, a unique tool called the ‘hot wall’ has been implemented to overcome the imbalance. The hot wall has a capability to regulate its surface temperature using a heater and two water cooling channels. With the help of the hot wall, 6 h discharges were obtained in 2020. Cooling down of the surface of the hot wall was significantly effective in recovering the wall pumping and was useful to extend the pulse duration. Augmentation of the toroidal magnetic field, B T up to 0.5 T from 0.25 T and a continuous wave (CW) gyrotron of 28 GHz are planned for QUEST in the near future. As raising B T provides a fundamental resonance of electron cyclotron waves (ECWs) with 28 GHz, more effective plasma current start-up and heating will be performed. Long-pulse operations with higher plasma parameters are expected.

QUEST↗

Overview of the KSTAR experiments and future plan

The Korea Superconducting Tokamak Advanced Research (KSTAR) device has recently entered a new phase of operation following the installation of a tungsten mono-block divertor, providing a unique platform to investigate high-performance, long-pulse plasma scenarios for future reactors. The 2023–2024 experimental campaigns demonstrated significant progress in commissioning the tungsten divertor, developing plasma operation scenarios, and achieving real-time control. Comparative studies revealed increased core radiation losses and associated performance degradation relative to the carbon divertor environment. Alleviation strategies, such as optimized neutral beam injection timing, boron powder seeding, and impurity control through gas puffing, were shown to reduce tungsten accumulation and extend high-performance phases, including record H-mode operation exceeding 100 s. International collaboration enabled the first demonstration of high poloidal beta scenarios with an internal transport barrier on KSTAR. Advances in control included upgraded real-time resonant magnetic perturbation schemes and disruption forecasting. Furthermore, divertor detachment control using a new surrogate-model-based approach with real-time radiation imaging demonstrated active impurity and heat flux management. Supported by enhanced heating, current drive, and diagnostic systems, these achievements offer valuable insights into tungsten impurity behavior, transport physics, and control strategies for future reactors including ITER. Planned upgrades toward a full-tungsten wall and ITER-aligned real-time plasma control will further establish KSTAR as a leading experimental platform for developing operational scenarios required to achieve steady-state, burning plasma conditions.

KSTAR↗

The Spectroscopic Classification of Astronomical Transients (SCAT) Survey: Overview, Pipeline Description, Initial Results, and Future Plans

Here, we present the Spectroscopic Classification of Astronomical Transients (SCAT) survey, which is dedicated to spectrophotometric observations of transient objects such as supernovae and tidal disruption events. SCAT uses the SuperNova Integral-Field Spectrograph (SNIFS) on the University of Hawai’i 2.2 m (UH2.2m) telescope. SNIFS was designed specifically for accurate transient spectrophotometry, including absolute flux calibration and host-galaxy removal. We describe the data reduction and calibration pipeline including spectral extraction, telluric correction, atmospheric characterization, nightly photometricity, and spectrophotometric precision. We achieve ≲5% spectrophotometry across the full optical wavelength range (3500–9000 Å) under photometric conditions. The inclusion of photometry from the SNIFS multi-filter mosaic imager allows for decent spectrophotometric calibration (10%–20%) even under unfavorable weather/atmospheric conditions. SCAT obtained ≈640 spectra of transients over the first 3 yr of operations, including supernovae of all types, active galactic nuclei, cataclysmic variables, and rare transients such as superluminous supernovae and tidal disruption events. These observations will provide the community with benchmark spectrophotometry to constrain the next generation of hydrodynamic and radiative transfer models.

79 ASTRONOMY AND ASTROPHYSICS↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

ProtoDUNE-SP's Performance, Physics status, and Future Plans

The ProtoDUNE-SP detector is a single-phase liquid argon time projection chamber measuring$ 7.2 \times 6.1 \times 7.0 m^3$ in active volume. It is designed as a test bed and full-scale prototype for the elements of the first far detector module of the Deep Underground Neutrino Experiment (DUNE). Located at the CERN Neutrino Platform, the detector was exposed to a tagged and momentum-analyzed particle beam with momentum settings ranging from 0.3 GeV/c to 7 GeV/c and collected more than four million beam events. Additionally, the detector operated for approximately two years, continuously collecting cosmic ray events. We present the performance of the detector which has met or surpassed the specifications set for the DUNE far detector. The status of physics analyses including hadron-Ar cross sections and measurements of liquid argon properties will be summarized. Talk will conclude with plans for the coming Run2 with ProtoDUNE-HD (horizontal drift).

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Low-energy H- beam injectors for particle accelerators: upgrade requirements, challenges and future plans [Slides]

High brightness, negative hydrogen ion sources are used extensively in large, accelerator-based, user facilities operating worldwide. Negative hydrogen beams have become the preferred means of filling circular accelerators and storage rings as well as enabling efficient extraction from cyclotrons. Much larger beams of H- ions are also utilized for neutral beams injection into fusion machines and will be discussed in a separate companion presentation. Some of the accelerator facilities include the US Spallation Neutron Source (SNS), Japan Proton Accelerator Research Complex (J-PARC), Rutherford Appleton Laboratory (RAL-ISIS), Los Alamos Neutron Science Center (LANSCE), Fermi National Accelerator Laboratory (FNAL), Brookhaven National Laboratory (BNL), the CERN LHC injector, the Chinese Spallation Neutron Source (CSNS) as well as numerous installations of D-Pace (licenced by TRIUMF) ion sources used mainly with cyclotrons. Many facilities are currently working on various improvement / upgrade projects, both in the near and long term, which are driving further development of their ion source and LEBT (Low Energy Beam Transport) and, in some cases, their overall front end injector system. This report will first provide a simple description of each facilities existing ion source and LEBT and summarize the operational parameters which are currently being routinely injected into their accelerators. Next, the parametric goals of each of the facilities upgrade projects are specified as well as development efforts currently underway to meet these requirement and improvement goals. It is hoped that that this work will not only capture the current state-of-the-art of worldwide H- beam injectors and clarify the research goals and efforts of the community in general but will also encourage further inter laboratory collaborations.

43 PARTICLE ACCELERATORS↗

The Fuel Motion Monitoring System at TREAT - Current Status and Future Plans

An important component of the United States Nuclear Fuel Safety Transient Testing Program, the Fuel Motion Monitoring System (FMMS) at Idaho National Laboratory's Transient Reactor Test Facility (TREAT) is fast-neutron hodoscope capable of imaging the location, movement, and relocation of nuclear fuel experiments under simulated transient accident conditions. The FMMS was refurbished in parallel with the TREAT restart program starting in 2014, restoring 96-channels of fast-neutron detection. Since returning to operation in 2017 the FMMS has supported many fuel safety experiments supporting accident tolerant fuel development, light-water reactor safety, space thermal nuclear propulsion fuel development, and advanced reactor research and development. In Phase 2 of the FMMS restoration. work is now under way to expand the FMMS' field-of-view by adding an additional 96 channels of fast neutron detectors to the system's hodoscope, along with an expanded data acquisition system and associated transient timing electronics. An overview of the FMSS system and its fast-neutron detectors will be presented along with examples of current FMMS imaging performance and associated information.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Geophysical Constraints on Decarbonized Systems—Building Spatio-Temporal Uncertainties into Future Electricity Grid Planning

Future electricity grids will be characterized by the high penetration of renewables to support the decarbonization process. Yet, this transition will further expose grids to a broad spectrum of geophysical forces, such as weather and climate, land and space, minerals and materials. Understanding their role is thus important to support the grid decarbonization process. Here, we synthesize the current body of knowledge on the relationship between geophysical constraints and electricity grid planning. Additionally, we show that there have been promising advances in the data, methods, and modelling tools needed to incorporate the effect of geophysical constraints on demand, resource availability, and grid operations. There are, however, multiple research avenues that deserve further attention. More system-specific and finer-scale analyses are necessary to better understand how spatio-temporal variability---and associated uncertainty---in geophysical forces affect grid planning. Moreover, we need a broader focus on the multi-sectoral implications of grid decarbonization efforts, so as to limit the risk of unintended consequences. Importantly, all these efforts are challenged by the computational requirements of existing power system models, which often limit our ability to characterize uncertainty, scale analyses across larger domains, or study the multi-sector implications of grid expansion decisions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]↗

Real time computations of cryogenic He properties

The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC and provide protons to the remainder of the existing accelerator complex. The new LINAC consists of a warm front end, 23 superconducting RF cryomodules, and a beam transfer line to the existing complex. The cryomodules (CMs) are to be tested at Fermilab's CryoModule Test Facility (CMTF).An important measurement in cryogenic testing is the heat load of each CM. Traditionally, at Fermilab, these measurements were made collecting archived data offline and analyzing it. The new control system for PIP-II is being developed with the EPICS (Experimental Physics and Industrial Control System) framework, which allows us to compute the heat load in real time using the HePak library.We are exploring other $He$ properties, such as flow, where flow meters are not available, which can also be calculated in real time and fed back to the cryogenics engineers.This paper details the real time heat load calculation and $He$ flow software developed for CM testing at CMTF, as well as the first results from the prototype HB650 CM. Future plans for 2-phase $LHe$ flow will also be outlined.

Hanlet, Pierrick [Fermilab]↗

BEAST DB: Grand-Canonical Database of Electrocatalyst Properties

We present BEAST DB, an open-source database comprised of ab initio electrochemical data computed using grand-canonical density functional theory in implicit solvent at consistent calculation parameters. The database contains over 20,000 surface calculations and covers a broad set of heterogeneous catalyst materials and electrochemical reactions. Calculations were performed at self-consistent fixed potential as well as constant charge to facilitate comparisons to the computational hydrogen electrode. This article presents common use cases of the database to rationalize trends in catalyst activity, screen catalyst material spaces, understand elementary mechanistic steps, analyze the electronic structure, and train machine learning models to predict higher fidelity properties. Users can interact graphically with the database by querying for individual calculations to gain a granular understanding of reaction steps or by querying for an entire reaction pathway on a given material using an interactive reaction pathway tool. BEAST DB will be periodically updated, with planned future updates to include advanced electronic structure data, surface speciation studies, and greater reaction coverage.

database↗

APOLLO: a facility-scale differentiable virtual accelerator at Fermilab FAST/IOTA

As the design complexity of modern accelerators grows, there is more interest in using advanced simulations that have fast execution time or yield additional insights like gradients. The FAST/IOTA facility has been working on implementing and experimentally validating an end-to-end digital twin that is both fast and gradient-aware, allowing for rapid prototyping of new software and experiments with minimal beam time costs. Our framework integrates physics and ML codes for linac and ring simulation through a set of generic interfaces between surrogate and physics-based sections. To reproduce device inputs and outputs, system state is exposed as a deterministic event loop in a specialized discrete event simulator architecture. Because Fermilab is undergoing control system transition, several APIs were implemented as final user interfaces - a fully asynchronous EPICS soft IOC, a gRPC-based Data Pool Manager (DPM), and legacy ACNET protocols. We discuss implementation details as well as challenges handling live data assimilation and future plans to extend modelling to main complex proton accelerators like PIPII and Booster.

Kuklev, Nikita [Fermilab]↗