Overview of DOE Grid Modernization Lab Consortium (GMLC) and Details on GMLC 1.2.3 (Testing Network and Open Library).
Abstract not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
This is the final project report for the Grid Modernization Laboratory Consortium (GMLC) Resilient Distribution System (RDS) Citadels project. The primary goal of this GMLC project was to increase the operational flexibly of power systems by engaging microgrids distributedly, coordinated using consensus algorithms. The primary goal was successfully achieved. The primary goal was divided into three areas: Implement peer-to-peer control between microgrid controllers using the Open Field Message Bus (OpenFMB) approach; Develop and implement consensus algorithms on commercially available hardware that allows a group of microgrids to distributedly implement operational controls; Develop the architectures and controls to enable groups of microgrids to coordinate their operations to support the bulk power system during abnormal events, and end-use loads in the event the bulk power systems fail.
The GMLC project is built upon the results of pioneering research funded by the U.S. Department of Energy (DOE) and conducted by the National Renewable Energy Laboratory (NREL)—in collaboration with the Electric Power Research Institute and the University of Colorado—on active power controls (APC) by wind power during 2013–2016. The studies detailed in the first APC by wind power project have shown tremendous promise for the potential for wind power plants to provide APC. The goal of this project was to continue the previous work and develop and validate coordinated controls of APC by wind generation, short-term energy storage, and large industrial motor drives for providing various types of ancillary services to the grid and minimizing loading impacts on wind turbines (e.g., drivetrains), thereby reducing operation-and-maintenance (O&M) costs and subsequently reducing the cost of energy generated by wind power. This work used the $30 million, multiyear DOE investments and the unique characteristics of NREL’s existing National Wind Technology Center test site, including a combination of multimegawatt utility-scale wind turbine generators, a 1-MW/1-MWh battery energy storage system (BESS), industrial variable-frequency motor drives, a 1-MW solar photovoltaic (PV) array, and a 7-MVA controllable grid interface. This combination of technologies allows for the optimization, testing, and demonstration of various types of APC by wind power in coordination with other generation sources (including regenerative loads) and energy storage to allow for enhancing or, in some cases, substituting the APC services by wind power and reducing impacts on wind turbine component life and thus increasing the availability and reliability of the power supply from wind
Test systems play an important role in power systems analysis and are used extensively for a wide range of purposes like reliability analysis, production cost modeling, studying the impacts of load shifting, and many more. These test systems have continued to evolve over the years to keep pace with changing system compositions due to technology and policy changes. In this work, we apply the Regional Energy Deployment System (ReEDS) model, a large-scale capacity expansion model (CEM), on the nodal RTS-GMLC system to perform capacity expansion of the bus-level test system. This work both demonstrates that a large-scale CEM can successfully be applied to nodal systems, and that the CEM can allow a test system to be evolved to meet desired criteria. The process allowed the coupling of CEM data not available in the test system (such as capital costs) with test system data to provide plausible system evolutions in line with scenario specifications.
This presentation provides an overview of the U.S. Department of Energy's Grid Modernization Laboratory Consortium (GMLC) efforts to provide customized technical support specific to state public utility commissions (PUCs), specifically on the integration of distributed energy resources (DERs). The goals are to increase awareness of existing materials and support to help state PUCs move forward on DER interconnection activities, to help participants make connections to colleagues with similar challenges (and solutions), and to help the GMLC/National Renewable Energy Laboratory project team understand context and implementation challenges.
This is the final project report for the Grid Modernization Laboratory Consortium (GMLC) Resilient Distribution System (RDS) project titled “Increasing Distribution System Resiliency using Flexible DER and Microgrid Assets Enabled by OpenFMB”. The primary goal of this project was to increase the resiliency of distribution systems at utilities around the nation by deploying flexible operating strategies that engage end-use assets as a resource.
Distribution system model calibration is a key enabling task for incipient failure identification within the distribution system. This report summarizes the work and publications by Sandia National Laboratories on the GMLC project titled “Incipient Failure Identification for Common Grid Asset Classes”. This project was a joint effort between Sandia National Laboratories, Lawrence Livermore National Laboratory, National Energy Technology Laboratory, and Oak Ridge National Laboratory. The included work covers distribution system topology identification, transformer groupings, phase identification, regulator and tap position estimation, and the open-source release and implementation of the developed algorithms.
This document reports on the Grid Modernization Laboratory Consortium effort to identify gaps in standards for the interconnection and interoperability of distributed energy resources (DERs). The project extended a 3-year period from 2017 to 2019. Under the work plan, the team identified standards and test procedures related to interconnection and interoperability, grouped under the broad headings of their primary applicable technology domain: automotive, responsive loads, photovoltaic inverters, inverter-based energy storage, machine-based DERs, and microgrids. The team then conducted a gap analysis by comparing the current standards to the expected future requirements needed for specific grid services. Overall, gaps could be any activity needed to harmonize requirements among standards development organizations, minimize conflicting requirements among technology domains, or streamline conformance test procedures.
The need for slow dynamics models of renewable resources in cascade modeling essentially arises from the challenges associated with the increased use of solar and wind electric power. Indeed, the main challenge is that the power produced by wind and sunlight is not consistent; thus, renewable energy resources tend to have variable output power on many different timescales, including the timescales that a cascade unfolds.
Abstract not provided.
This report describes how electrical utilities with residential, industrial, commercial and government customers make decisions using Data Analytics (DA) applications and discusses how OpenFMB was leveraged to share that data among disparate types of devices for DA. OpenFMB is a data standard developed by utilities for distributed communication and control of power system assets. Here we explored how OpenFMB can be used for sharing analytics and what those analytics could be for a set of representative grid devices. A review of DA applications performed by electrical utilities and customers is presented. An overview of how the testbed we used was built and configured is summarized. Several experiments which were carried out to explore the capabilities of OpenFMB alongside other data sharing mechanisms for gathering sensor measurements and sharing analytics is also discussed. And finally a comparison of OpenFMB and LBNL’s SPARK framework is summarized. Today’s electrical utilities focus on monitoring the real-time customer consumptions, offering new real-time tariff models based on customer usage habits (rewards and punishments), providing energy peak during peak load times (plan energy generation and distribution), improving the load management for transformers and power lines, and controlling the energy and grid resources efficiently. On the other hand, the DA applications for residential customers are based on modifying the customer electricity usage habit to save money, making accurate and timely decisions for electrical billing. However, the DA applications for industrial, commercial and government customers focus on creating efficient programs to improve the environmental condition (reducing CO₂ emission), developing better load forecasting for industrial and/or commercial activities. In this project, a testbed was built to explore how the OpenFMB framework can be used to distribute data among various types of representative grid edge devices. Micro PMUs (Phasor Measurement Unit) were used to collect and transmit data to an OpenPDC server alongside relays with a framework configured with a system using OpenFMB to collect and transmit data. The testbed was composed of a physical asset based on a 60 Hz AC radial power system constructed using SI-GRID components. The power system consisted of a 3-phase 14 volts line-to-ground (24 volts line-to-line) power source, three 3-phase line emulators, a programmable resistive load bank, two smart relays, two micro PMUs, and a (SCADA) and Phasor Data Concentrator (PDC) computer. This testbed configuration allowed us to perform breaker operation tests collecting data from the micro PMUs and from the relays’ sensors. During the micro PMU breaker operation tests we collected the measured and estimated fundamental voltages, currents, frequency as well as the total true, reactive and apparent power. The displacement power factor from two micro PMUs located in parallel power lines was also used. The software steps for the implementation of the Synchrophasor system are explained in detail in this report. The setting (1-2-3) and data collection (4-5) phases were performed with a free download open source software. In the setting phase, the micro PMUs were set (1), the data stream for each micro PMU was validated, and the connection and configuration files were created (2). The PDC computer was set using the connection and configuration files of the micro PMUs (3). In the data collection phase, the binary data from the micro PMUs was collected (4), and the binary data files of the micro PMUs was converted to analyze the test results (5). OpenFMB was configured to use protocol translators to read Modbus and transform the reading into the OpenFMB data model to be read for DA applications.Our experiments showed that by leveraging the OpenFMB data model and the micro PMUs together we could obtain better situational awareness of network faults, which in some cases could lead to failures in the system and would be less perceivable otherwise. For example, in one experiment the fundamental RMS current angle, and the fundamental displacement power factor (estimated by the ratio between the measured real and apparent total power) had a disturbance at the micro PMU connected to the beginning of the parallel power line because the breaker was opened without the operators or SCADA system’s knowledge, and no current was available. Based on the breaker state scenarios and micro PMU locations, the DA applications using the current angle and displacement power factor from the micro PMUs should be studied in detail to avoid a non-desired measurement that could affect the decision from the DA. Also, the sample rates for PMU, Relay and micro PMU devices were compared. The DA application improved the control and operation between the electrical utilities and their customers (residential, industrial, transportation, commercial and government). The higher the sample rate, the better the quality of the measurement for DA estimations.
Recognizing that electric grid challenges can differ by geographical regions across the US, the Department of Energy (DOE) created a pioneer regional partnership to provide technical assistance to stakeholders facing grid modernization challenges. The southeast regional teams will transfer technologies developed under DOE auspices to stakeholders for testing, evaluation, and market validation. Regional members will help define critical challenges and pave the way for transition of technologies to the commercial sector. Using the depth and expertise at Oak Ridge National Laboratory, Savannah River National Laboratory, University of Tennessee’s CURENT, CAPER and the Clemson 20 MVA Electrical Grid Laboratory—along with critical industry partners, such as Duke Energy, TVA, Southern Company, EPB, and Santee Cooper—the Southeast Regional Consortium team will conduct collaborative research to advance the state of the grid in the Southeast region and improve power system resiliency to enhance responsiveness, enable faster restoration of power, and increase distributed energy resource (DER) concentrations. This report provides details of the technical research and demonstration projects accomplished by Oak Ridge National Laboratory (ORNL) as part of the Southeast Regional Consortium. Specifically, ORNL analyzed the application of optical current and voltage measurements impedance relays which would enable step distance protection to be deployed on distribution systems. This would improve the precision of determining the geographic location of faults, increase network topology flexibility, and allow bi-directional power flow. Next, ORNL deployed time sensitive networking technology on the EPB fiberoptic data network to study the impact of increased sensor traffic on existing supervisory control and data acquisition data. The deterministic latency and high bandwidth were demonstrated by remotely inspecting a substation using a drone with full HD streaming video operated at the EPB Control Center. Finally, a new application-based communication and control system developed at ORNL call CSEISMIC was tested for future deployment on the EPB Control Center microgrid using a hardware-in-the-loop testbed that was also developed at ORNL. The controller was able to successfully optimize ancillary service when the microgrid is connected to the distribution network. The seamless islanding, resynchronization, and reconnection of the microgrid was also demonstrated through the testing.
NREL hosted this workshops to help state public utility commissions (PUCs) understand the materials and support available to assist in distributed energy resource (DER) interconnection activities. This workshop focused on "Modern DER Capabilities and Deployment Concerns" and included four speakers, whose material will be posted at https://www.nrel.gov/grid/ieee-standard-1547/workshops.html. The slides in this deck were for the facilitator to provide context to the attendees, as well as additional resources on the topics discussed.
This presentation is part of a panel session at the IEEE ISGT conference on Grid Modernization Initiative projects. This segment of the panel session provides a brief overview of a Hawaii Regional Partnership project focusing grid frequency support from distributed resources on the fastest time scales.
Abstract not provided.