SEARCH · Search NASA
Results for “GRAIL Mission”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Preliminary Results on Lunar Interior Properties from the GRAIL Mission
The Gravity Recovery and Interior Laboratory (GRAIL) mission has provided lunar gravity with unprecedented accuracy and resolution. GRAIL has produced a high-resolution map of the lunar gravity field while also determining tidal response. We present the latest gravity field solution and its preliminary implications for the Moon's interior structure, exploring properties such as the mean density, moment of inertia of the solid Moon, and tidal potential Love number k2. Lunar structure includes a thin crust, a deep mantle, a fluid core, and a suspected solid inner core. An accurate Love number mainly improves knowledge of the fluid core and deep mantle. In the future GRAIL will search for evidence of tidal dissipation and a solid inner core.
Properties of the Lunar Interior: Preliminary Results from the GRAIL Mission
The Gravity Recovery and Interior Laboratory (GRAIL) mission [1] has provided lunar gravity with unprecedented accuracy and resolution. GRAIL has produced a high-resolution map of the lunar gravity field [2,3] while also determining tidal response. We present the latest gravity field solution and its preliminary implications for the Moon's interior structure, exploring properties such as the mean density, moment of inertia of the solid Moon, and tidal potential Love number k(sub 2). Lunar structure includes a thin crust, a thick mantle layer, a fluid outer core, and a suspected solid inner core. An accurate Love number mainly improves knowledge of the fluid core and deep mantle. In the future, we will search for evidence of tidal dissipation and a solid inner core using GRAIL data.
Operating the Dual-Orbtier GRAIL Mission to Measure the Moon's Gravity
The GRAIL mission is on track to satisfy all prime mission requirements. The performance of the orbiters and payload has been exceptional. Detailed pre-launch operations planning and validation have paid off. Prime mission timeline has been conducted almost exactly as laid out in the mission plan. Flight experience in the prime mission puts the flight team in a good position for completing the challenges of the extended mission where the science payoff is even greater
Gravity Recovery and Interior Laboratory (GRAIL) Mission: Mission Status and Initial Science Results
The Gravity Recovery and Interior Laboratory (GRAIL) Mission is a component of the NASA Discovery Program. GRAIL is a twin-spacecraft lunar gravity mission that has two primary objectives: to determine the structure of the lunar interior, from crust to core; and to advance understanding of the thermal evolution of the Moon. GRAIL launched successfully from the Cape Canaveral Air Force Station on September 10, 2011, executed a low-energy trajectory to the Moon, and inserted the twin spacecraft into lunar orbit on December 31, 2011 and January 1, 2012. A series of maneuvers brought both spacecraft into low-altitude (55-km), near-circular, polar lunar orbits, from which they perform high-precision satellite-to-satellite ranging using a Ka-band payload along with an S-band link for time synchronization. Precise measurements of distance changes between the spacecraft are used to map the lunar gravity field. GRAIL completed its primary mapping mission on May 29, 2012, collecting and transmitting to Earth >99.99% of the possible data. Spacecraft and instrument performance were nominal and has led to the production of a high-resolution and high-accuracy global gravity field, improved over all previous models by two orders of magnitude on the nearside and nearly three orders of magnitude over the farside. The field is being used to understand the thickness, density and porosity of the lunar crust, the mechanics of formation and compensation states of lunar impact basins, and the structure of the mantle and core. GRAIL s three month-long-extended mission will initiate on August 30, 2012 and will consist of global gravity field mapping from an average altitude of 22 km.
Operating the Dual-Orbiter GRAIL Mission to Measure the Moon's Gravity
NASA's mission to measure the Moon's gravity and determine the interior structure, from crust to core, has almost completed its 3-month science data collection phase. The twin orbiters of the Gravity Recovery and Interior Laboratory (GRAIL) mission were launched from Florida on September 10, 2011, on a Delta-II launch vehicle. After traveling for nearly four months on a low energy trajectory to the Moon, they were inserted into lunar orbit on New Year's Eve and New Year's Day. In January 2012 a series of circularization maneuvers brought the orbiters into co-planar near-circular polar orbits. In February a distant (75- km) rendezvous was achieved and the science instruments were turned on. A dual- frequency (Ka and S-band) inter-orbiter radio link provides a precise orbiter-to-orbiter range measurement that enables the gravity field estimation. NASA's Jet Propulsion Laboratory in Pasadena, CA, manages the GRAIL project. Mission management, mission planning and sequencing, and navigation are conducted at JPL. Lockheed Martin, the flight system manufacturer, operates the orbiters from their control center in Denver, Colorado. The orbiters together have performed 28 propulsive maneuvers to reach and maintain the science phase configuration. Execution of these maneuvers, as well as the payload checkout and calibration activities, has gone smoothly due to extensive pre-launch operations planning and testing. The key to the operations success has been detailed timelines for product interchange between the operations teams and proven procedures from previous JPL/LM planetary missions. Once in science phase, GRAIL benefitted from the payload operational heritage of the GRACE mission that measures the Earth's gravity.
Gravity Recovery and Interior Laboratory (GRAIL) Mission: Status at the Initiation of the Science Mapping Phase
The Gravity Recovery And Interior Laboratory (GRAIL) mission, a component of NASA's Discovery Program, launched successfully from Cape Canaveral Air Force Station on September 10, 2011. The dual spacecraft traversed independent, low-energy trajectories to the Moon via the EL-1 Lagrange point and inserted into elliptical, 11.5-hour polar orbits around the Moon on December 31, 2011, and January 1, 2012. The spacecraft are currently executing a series of maneuvers to circularize their orbits at 55-km mean altitude. Once the mapping orbit is achieved, the spacecraft will undergo additional maneuvers to align them into mapping configuration. The mission is on track to initiate the Science Phase on March 8, 2012.
Gravity Recovery and Interior Laboratory Mission (GRAIL) Orbit Determination
Launched on 10 September 2011 from the Cape Canaveral Air Force Station, Florida, the twin-spacecraft Gravity Recovery and Interior Laboratory (GRAIL) has the primary mission objective of generating a lunar gravity map with an unprecedented resolution via the Ka-band Lunar Gravity Ranging System (LGRS). After successfully executing nearly 30 maneuvers on their six-month journey, Ebb and Flow (aka GRAIL-A and GRAIL-B) established the most stringent planetary formation orbit on 1 March 2012 of approximately 30 km x 90 km in orbit size. This paper describes the orbit determination (OD) filter configurations, analyses, and results during the Trans-Lunar Cruise, Orbit Period Reduction, and Transition to Science Formation phases. The maneuver reconstruction strategies and their performance will also be discussed, as well as the navigation requirements, major dynamic models, and navigation challenges. GRAIL is the first mission to generate a full high-resolution gravity field of the only natural satellite of the Earth. It not only enables scientists to understand the detailed structure of the Moon but also further extends their knowledge of the evolutionary histories of the rocky inner planets. Robust and successful navigation was the key to making this a reality.
Analysis of Phoenix Anomalies and IV and V Findings Applied to the GRAIL Mission
Analysis of patterns in IV&V findings and their correlation with post-launch anomalies allowed GRAIL to make more efficient use of IV&V services . Fewer issues. . Higher fix rate. . Better communication. . Increased volume of potential issues vetted, at lower cost. . Hard to make predictions of post-launch performance based on IV&V findings . Phoenix made sound fix/use as-is decisions . Things that were fixed eliminated some problems, but hard to quantify. . Broad predictive success in one area, but inverse relationship in others.
Analysis of Phoenix Anomalies and IV & V Findings Applied to the GRAIL Mission
NASA IV&V was established in 1993 to improve safety and cost-effectiveness of mission critical software. Since its inception the tools and strategies employed by IV&V have evolved. This paper examines how lessons learned from the Phoenix project were developed and applied to the GRAIL project. Shortly after selection, the GRAIL project initiated a review of the issues documented by IV&V for Phoenix. The motivation was twofold: the learn as much as possible about the types of issues that arose from the flight software product line slated for use on GRAIL, and to identify opportunities for improving the effectiveness of IV&V on GRAIL. The IV&V Facility provided a database dump containing 893 issues. These were categorized into 16 bins, and then analyzed according to whether the project responded by changing the affected artifacts or using as-is. The results of this analysis were compared to a similar assessment of post-launch anomalies documented by the project. Results of the analysis were discussed with the IV&V team assigned to GRAIL. These discussions led to changes in the way both the project and IV&V approached the IV&V task, and improved the efficiency of the activity.
Design of an Extended Mission for GRAIL
The GRAIL extended mission will extend the measurement of the lunar gravity field beyond what was achieved by the primary GRAIL mission this past spring (2012). By lowering the orbits of the two GRAIL spacecraft to less than half the altitude of the primary mission orbits on average, the resolution of the gravity field measurements will be improved by a factor of two, yielding a signicant improvement in our knowledge of the structure of the upper crust of the Moon. The challenges of flying so low and the design which will meet those challenges is presented here.
MPST Software: grl_suppdoc
Due to the nature of the GRAIL mission, the GRAIL Mission Planning and Sequence Team (MPST) is required to generate ground and uplink products faster than ever done before. The existing correct_transmitter_min_dur tool that provides a similar function to grl_suppdoc lacks the ability to operate accurately or quickly enough to support the rapid turnaround required of the GRAIL MPST. The GRAIL MPST was required to build this new tool to facilitate the ground and uplink generation processes to meet a tight sequence development timeline. The grl_suppdoc tool enables the GRAIL MPST to generate automatically Deep Space Network (DSN) transmitter suppressions based on short uplinks that are found in the ground/modeled Predicted Events File (PEF). The grl_suppdoc script automatically generates applicable DSN uplink suppressions in the form of a Spacecraft Activity Sequence File (SASF) to protect the GRAIL project from short DSN uplink windows, which can be cause for operator error at the DSN antennas. Currently, no software exists that provides this functionality at the efficiency required for GRAIL sequence team operations. Compared to a manual process, this script reduces human error and saves considerable man-hours by automating and streamlining the mission planning and sequencing task for the GRAIL mission.
Designing Mission Operations for the Gravity Recovery and Interior Laboratory Mission
NASA's Gravity Recovery and Interior Laboratory (GRAIL) mission, to understand the internal structure and thermal evolution of the Moon, offered unique challenges to mission operations. From launch through end of mission, the twin GRAIL orbiters had to be operated in parallel. The journey to the Moon and into the low science orbit involved numerous maneuvers, planned on tight timelines, to ultimately place the orbiters into the required formation-flying configuration necessary. The baseline GRAIL mission is short, only 9 months in duration, but progressed quickly through seven very unique mission phases. Compressed into this short mission timeline, operations activities and maneuvers for both orbiters had to be planned and coordinated carefully. To prepare for these challenges, development of the GRAIL Mission Operations System began in 2008. Based on high heritage multi-mission operations developed by NASA's Jet Propulsion Laboratory and Lockheed Martin, the GRAIL mission operations system was adapted to meet the unique challenges posed by the GRAIL mission design. This paper describes GRAIL's system engineering development process for defining GRAIL's operations scenarios and generating requirements, tracing the evolution from operations concept through final design, implementation, and validation.
Designing Mission Operations for the Gravity Recovery and Interior Laboratory Mission
The Gravity Recovery and Interior Laboratory (GRAIL) mission has placed two orbiters in a low altitude polar orbit around the moon to study its internal structure. GRAIL mission to the Moon offered unique challenges to operatiotn: (1) operate twin-orbiters in parallel, (2) numerous maneuvers, (3) short, compact mission with six unique phases, and (4) detailed contingency planning required.
Gravity Recovery and Interior Laboratory (GRAIL): Extended Mission and End-Game Status
The Gravity Recovery and Interior Laboratory (GRAIL) [1], NASA s eleventh Discovery mission, successfully executed its Primary Mission (PM) in lunar orbit between March 1, 2012 and May 29, 2012. GRAIL s Extended Mission (XM) initiated on August 30, 2012 and was successfully completed on December 14, 2012. The XM provided an additional three months of gravity mapping at half the altitude (23 km) of the PM (55 km), and is providing higherresolution gravity models that are being used to map the upper crust of the Moon in unprecedented detail.