Search NASA⌕ Search

SEARCH · Search NASA

Results for “Galileo Data Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Space and Earth Sciences, Computer Systems, and Scientific Data Analysis Support, Volume 1

This Final Progress Report covers the specific technical activities of Hughes STX Corporation for the last contract triannual period of 1 June through 30 Sep. 1993, in support of assigned task activities at Goddard Space Flight Center (GSFC). It also provides a brief summary of work throughout the contract period of performance on each active task. Technical activity is presented in Volume 1, while financial and level-of-effort data is presented in Volume 2. Technical support was provided to all Division and Laboratories of Goddard's Space Sciences and Earth Sciences Directorates. Types of support include: scientific programming, systems programming, computer management, mission planning, scientific investigation, data analysis, data processing, data base creation and maintenance, instrumentation development, and management services. Mission and instruments supported include: ROSAT, Astro-D, BBXRT, XTE, AXAF, GRO, COBE, WIND, UIT, SMM, STIS, HEIDI, DE, URAP, CRRES, Voyagers, ISEE, San Marco, LAGEOS, TOPEX/Poseidon, Pioneer-Venus, Galileo, Cassini, Nimbus-7/TOMS, Meteor-3/TOMS, FIFE, BOREAS, TRMM, AVHRR, and Landsat. Accomplishments include: development of computing programs for mission science and data analysis, supercomputer applications support, computer network support, computational upgrades for data archival and analysis centers, end-to-end management for mission data flow, scientific modeling and results in the fields of space and Earth physics, planning and design of GSFC VO DAAC and VO IMS, fabrication, assembly, and testing of mission instrumentation, and design of mission operations center.

Estes, Ronald H.↗

The Copernicus project

The Copernicus spacecraft, to be launched on May 4, 2009, is designed for scientific exploration of the planet Pluto. The main objectives of this exploration is to accurately determine the mass, density, and composition of the two bodies in the Pluto-Charon system. A further goal of the exploration is to obtain precise images of the system. The spacecraft will be designed for three axis stability control. It will use the latest technological advances to optimize the performance, reliability, and cost of the spacecraft. Due to the long duration of the mission, nominally 12.6 years, the spacecraft will be powered by a long lasting radioactive power source. Although this type of power may have some environmental drawbacks, currently it is the only available source that is suitable for this mission. The planned trajectory provides flybys of Jupiter and Saturn. These flybys provide an opportunity for scientific study of these planets in addition to Pluto. The information obtained on these flybys will supplement the data obtained by the Voyager and Galileo missions. The topics covered include: (1) scientific instrumentation; (2) mission management, planning, and costing; (3) power and propulsion system; (4) structural subsystem; (5) command, control, and communication; and (6) attitude and articulation control.

Barnstable, Bob↗

Engineering Analysis Subsystem Environment for Spacecraft Engineering Subsystem Mission Operations

The Engineering Analysis Subsystem Environment (EASE) prototype is a collection of computer programs on networked workstations providing a multimission, multisubsystem environment that enables the operation of several spacecraft simultaneously with fewer analysts. Through the use of automated tools, graphical data visualization and information management, EASE has achieved an increase in mission operations productivity. Recently, a database, a trending tool, and a power sequence expansion tool have been added to EASE. This paper discusses these enhancements and provides an update of the operation experience with the realtime Galileo telemetry data.

EASE↗

Monitor and Control of the Deep-Space network via Secure Web

(view graph) NASA lead center for robotic space exploration. Operating division of Caltech/Jet Propulsion Laboratory. Current missions, Voyagers, Galileo, Pathfinder, Global Surveyor. Upcoming missions, Cassini, Mars and New Millennium.

Deep-Space Network communications NCP Data Managem↗

Command and telemetry in autonomous spacecraft design

Some major steps are summarized in the evolution of autonomous design features for planetary exploration spacecraft. The control and data architectures for the Viking, Voyager, and Galileo spacecraft are considered. Telemetry and command capabilities are fundamental features of spacecraft design that have been successfully used for autonomous control. Also discussed is the Autonomous Redundancy and Maintenance Management Subsystem (ARMMS) concept. The software approach to autonomous control provides for modifications to the control process or the addition of new operating features during flight operations.

Turner, P. R.↗

Operation of the Planetary Plasma Interactions Node of the Planetary Data System

Five years ago NASA selected the Planetary Plasma Interactions (PPI) Node at UCLA to help the scientific community locate, access and preserve particles and fields data from planetary missions. We propose to continue to serve for 5 more years. During the first five years we have served the scientific community by providing them with high quality data products. We worked with missions and individual scientists to secure the highest quality data possible and to thoroughly document it. We validated the data, placed it on long lasting media and made sure it was properly archived for future use. So far we have prepared and archived over 10(exp 11) bytes of data from 26 instruments on 4 spacecraft. We have produced 106 CD-ROMs with peer reviewed data. In so doing, we have developed an efficient system to prepare and archive the data and thereby have been able to steadily increase the rate at which the data are produced. Although we produced a substantial archive during the initial five years, we have an even larger amount of work in progress. This includes preparing CD-ROM data sets with all of the Voyager, Pioneer and Ulysses data at Jupiter and Saturn. We will have the Jupiter data ready for the Galileo encounter in December, 1995. We are also completing the Pioneer Venus data restoration. The Galileo Venus archive and radio science data from Magellan will be prepared early in the next period. We are assisting the Small Bodies Node of PDS in the preparation of comet data and will be archiving the asteroid data from Galileo. We will be moving in several new directions as well. We will archive the PPI Node's first Earth based data with data from the International Jupiter Watch and Hubble data taken in support of Ulysses particles and field observations. We will work with the Cassini mission in archive planning efforts. For the inner planets we will begin an archive of Mars data starting with Phobos data and will support the US and Russian Mars missions in the late 1990's. We will restore the Mercury data from Mariner 10 and prepare the lunar data from Clementine in time for the lunar data analysis program in 1995. We will work with the Discovery mission teams to plan their archive and have already started with one, NEAR. Finally we will begin archiving our first heliospheric data from Voyager, Galileo, and Mars observers. We will continue to serve the science community by providing access to the data products. During the past 19 months we have filled nearly 6000 requests for on-line and CD-ROM data. The data delivered directly by the PPI Node has been - 5 x 10(exp 11) bytes. In addition to providing the data, we have provided users with software tools to manage and read the data which are computer, operating system and format independent. We have developed scalable systems so that the same software we use to manage and access the data for the entire PPI Node can be used by individual investigators to manage the data on a single CD-ROM, thereby greatly reducing the software development effort for both the PPI Node and users. We deliver this software with the disks. Recent technical advances have made it possible for us to serve a broader community than before. In the next five year period we plan to extend our outreach to the general public and in particular to increase our support for education. Since planetary plasma data are varied and require expertise in many areas the PPI Node will continue to be distributed. In addition to the primary node at UCLA, the PPI Node has three subnodes with an Outer Planets Subnode at the University of Iowa, an Inner Planets Subnode at UCLA, and a Radio Science Subnode at Stanford University. During the first two years of the renewal period there will be a Radio Astronomy Data Node at GSFC. These organizations will provide scientific expertise on the data, participate in node data selection activities and help with data restoration and mission activities.

Walker, Raymond J.↗

Command and control of unmanned scientific spacecraft

Recent developments in command and control technology for use with the Voyager and the planned Galileo are discussed. These spacecraft each carry more than 10 scientific instruments, many of which are very complex, and these instruments must be able to function with a considerable degree of autonomy because the round-trip light time to the spacecraft in the vicinity of Jupiter and Saturn is too great to permit prompt ground-based management of onboard anomalies or control of some observation programs. Command and control procedures, including data storage procedures, for systems of the two spacecraft are examined.

Gates, C. R.↗

NASA space and Earth science data on CD-ROM

The National Space Science Data Center (NSSDC) is very interested in facilitating the widest possible use of the scientific data acquired through NASA spaceflight missions. Therefore, NSSDC has participated with projects and data management elements throughout the NASA science environment in the creation, archiving, and dissemination of data using Compact Disk-Read Only Memory (CD-ROM). This CD-ROM technology has the potential to enable the dissemination of very large data volumes at very low prices to a great many researchers, students and their teachers, and others. This catalog identifies and describes the scientific CD-ROM's now available from NSSDC including the following data sets: Einstein Observatory CD-ROM, Galileo Cruise Imaging on CD-ROM, International Halley Watch, IRAS Sky Survey Atlas, Infrared Thermal Mapper (IRTM), Magellan (MIDR), Magellan (ARCDR's), Magellan (GxDR's), Mars Digital Image Map (MDIM), Outer Planets Fields & Particles Data, Pre-Magellan, Selected Astronomical Catalogs, TOMS Gridded Ozone Data, TOMS Ozone Image Data, TOMS Update, Viking Orbiter Images of Mars, and Voyager Image.

Towheed, Syed S.↗

Spacecraft computer resource margin management

The conduction of the Project Galileo Orbiter, with 18 microcomputers and the equivalent of 360K 8-bit bytes of memory contained within two major engineering subsystems and eight science instruments, requires that the key onboard computer system resources be managed in a very rigorous manner. Attention is given to the rationale behind the project policy, the development stage, the preliminary design stage, the design/implementation stage, and the optimization or 'scrubbing' stage. The implementation of the policy is discussed, taking into account the development of the Attitude and Articulation Control Subsystem (AACS) and the Command and Data Subsystem (CDS), the reporting of margin status, and the response to allocation oversubscription.

Larman, B. T.↗

Galileo Earth/Moon News Conference

This NASA Kennedy Space Center (KSC) video release (Part 1 of 2) begins with a presentation given by William J. O'Neil (Galileo Project Manager) describing the status and position of the Galileo spacecraft 7 days prior to the Galileo Earth-2 flyby. Slides are presented including diagrams of the Galileo spacecraft trajectory, trajectory correction maneuvers, and the Venus and asteroid flybys. Torrence Johnson (Galileo Project Scientist) follows Mr. O'Neil with an explanation of the Earth/Moon science activities that will be undertaken during the second Galileo/Earth encounter. These activities include remote sensing, magnetospheric and plasma measurements, and images taken directly from Galileo of the Earth and Moon. Dr. Joseph Veverka (Galileo Imaging Team, Cornell University) then gives a brief presentation of the data collected by the first Galileo/Gaspra asteroid flyby. Images sampled from the 57 photographs taken of Gaspra are presented along with discussions of Gaspra's morphology, shape and size, and surface features. These presentations are followed by a question and answer period given for the benefit of scientific journalists whose subjects include overall Galileo spacecraft health, verification of the Gaspra images timeframe, and the condition of certain scientific spacecraft instruments. Part 2 of this video can be retrieved by using Report No. NONP-NASA-VT-2000001078.

Source record↗

Galileo - The Serial-Production AIT Challenge

The Galileo Project is one of the most demanding projects of ESA, being Europe's autarkic navigation system and a constellation composed of 30 satellites. This presentation points out the different phases of the project up to the full operational capability and the corresponding launch options with respect to launch vehicles as well as launch configurations. One of the biggest challenges is to set up a small serial 'production line' for the overall integration and test campaign of satellites. This production line demands an optimization of all relevant tasks, taking into account also backup and recovery actions. A comprehensive AIT concept is required, reflecting a tightly merged facility layout and work flow design. In addition a common data management system is needed to handle all spacecraft related documentation and to have a direct input-out flow for all activities, phases and positions at the same time. Process optimization is a well known field of engineering in all small high tech production lines, nevertheless serial production of satellites are still not the daily task in space business and therefore new concepts have to be put in place. Therefore, and in order to meet the satellites overall system optimization, a thorough interface between unit/subsystem manufacturing and satellite AIT must be realized to ensure a smooth flow and to avoid any process interruption, which would directly lead to a schedule impact.

Ragnit, Ulrike↗

Mission telemetry system monitor: A real-time knowledge-based system

The Galileo Mission Telemetry System (MTS) has a cluster of computer subsystems configured as a star network. The MTS handles the real-time processing of spacecraft telemetry and ground monitor data. Large volumes of status and fault messages are generated as a result of changes in the system environment. These messages are triggered by the conditions that exist on any one particular subsystem or device. The order of message generation is in time sequence and does not always correlate to the function sequence of active processes. A significant number of messages provide context with varying degrees of uncertainty. As such, highly skilled telemetry controllers are required to regularly go through high volumes of messages generated by the MTS to identify, diagnose, and isolate faults. A knowledge-based system prototype is being developed to monitor the Galileo Mission Telemetry System performance. The system design approach features temporal reasoning, uncertainty management, and intelligent graphic user interfaces.

Mouneimne, Samih A.↗

Galileo spacecraft power management and distribution system

The Galileo PMAD (power management and distribution system) is described, and the design drivers that established the final as-built hardware are discussed. The spacecraft is powered by two general-purpose heat-source-radioisotope thermoelectric generators. Power bus regulation is provided by a shunt regulator. Galileo PMAD distributes a 570-W beginning of mission (BOM) power source to a user complement of some 137 load elements. Extensive use of pyrotechnics requires two pyro switching subassemblies. They initiate 148 squibs which operate the 47 pyro devices on the spacecraft. Detection and correction of faults in the Galileo PMAD is an autonomous feature dictated by requirements for long life and reliability in the absence of ground-based support. Volatile computer memories in the spacecraft command and data system and attitude control system require a continuous source of backup power during all anticipated power bus fault scenarios. Power for the Jupiter Probe is conditioned, isolated, and controlled by a Probe interface subassembly. Flight performance of the spacecraft and the PMAD has been successful to date, with no major anomalies.

Detwiler, R. C.↗

25th Space Simulation Conference. Environmental Testing: The Earth-Space Connection

Topics covered include: Methods of Helium Injection and Removal for Heat Transfer Augmentation; The ESA Large Space Simulator Mechanical Ground Support Equipment for Spacecraft Testing; Temperature Stability and Control Requirements for Thermal Vacuum/Thermal Balance Testing of the Aquarius Radiometer; The Liquid Nitrogen System for Chamber A: A Change from Original Forced Flow Design to a Natural Flow (Thermo Siphon) System; Return to Mercury: A Comparison of Solar Simulation and Flight Data for the MESSENGER Spacecraft; Floating Pressure Conversion and Equipment Upgrades of Two 3.5kw, 20k, Helium Refrigerators; Affect of Air Leakage into a Thermal-Vacuum Chamber on Helium Refrigeration Heat Load; Special ISO Class 6 Cleanroom for the Lunar Reconnaissance Orbiter (LRO) Project; A State-of-the-Art Contamination Effects Research and Test Facility Martian Dust Simulator; Cleanroom Design Practices and Their Influence on Particle Counts; Extra Terrestrial Environmental Chamber Design; Contamination Sources Effects Analysis (CSEA) - A Tool to Balance Cost/Schedule While Managing Facility Availability; SES and Acoustics at GSFC; HST Super Lightweight Interchangeable Carrier (SLIC) Static Test; Virtual Shaker Testing: Simulation Technology Improves Vibration Test Performance; Estimating Shock Spectra: Extensions beyond GEVS; Structural Dynamic Analysis of a Spacecraft Multi-DOF Shaker Table; Direct Field Acoustic Testing; Manufacture of Cryoshroud Surfaces for Space Simulation Chambers; The New LOTIS Test Facility; Thermal Vacuum Control Systems Options for Test Facilities; Extremely High Vacuum Chamber for Low Outgassing Processing at NASA Goddard; Precision Cleaning - Path to Premier; The New Anechoic Shielded Chambers Designed for Space and Commercial Applications at LIT; Extraction of Thermal Performance Values from Samples in the Lunar Dust Adhesion Bell Jar; Thermal (Silicon Diode) Data Acquisition System; Aquarius's Instrument Science Data System (ISDS) Automated to Acquire, Process, Trend Data and Produce Radiometric System Assessment Reports; Exhaustive Thresholds and Resistance Checkpoints; Reconfigurable HIL Testing of Earth Satellites; FPGA Control System for the Automated Test of MicroShutters; Ongoing Capabilities and Developments of Re-Entry Plasma Ground Tests at EADS-ASTRIUM; Operationally Responsive Space Standard Bus Battery Thermal Balance Testing and Heat Dissipation Analysis; Galileo - The Serial-Production AIT Challenge; The Space Systems Environmental Test Facility Database (SSETFD), Website Development Status; Simulated Reentry Heating by Torching; Micro-Vibration Measurements on Thermally Loaded Multi-Layer Insulation Samples in Vacuum; High Temperature Life Testing of 80Ni-20Cr Wire in a Simulated Mars Atmosphere for the Sample Analysis at Mars (SAM) Instrument Suit Gas Processing System (GPS) Carbon Dioxide Scrubber; The Planning and Implementation of Test Facility Improvements; and Development of a Silicon Carbide Molecular Beam Nozzle for Simulation Planetary Flybys and Low-Earth Orbit.

Packard, Edward↗

Pioneer Odyssey: Encounter with a Giant

Ancient peoples, perhaps thousands of years ago, undoubtedly conceived the idea of "reaching out" to Jupiter, the largest and most brilliant of the "wandering stars." But for mankind to stretch across the half billion miles to the giant planet of the Solar System many advances in technical and organizational fields of human endeavor had to be made. Outreach to Jupiter did not become a serious possibility until the Pioneer F and G Project was formed by NASA early in 1968. And then man began to design an extension of his senses that would probe the environs of the giant of the Solar System, a truly pioneer odyssey into the virtually unknown regions beyond the orbit of Mars. In the ensuing year. a dedicated and cooperative effort of several thousand people in Govern­ment, university, and private industrial organiza­tions converted the idea into a reality. Less than twelve generations after Galileo first saw the banded disc of Jupiter and the flickering dots of its large satellites in the newly invented telescope, mankind sent a machine to make observations within that Jovian system. The two Pioneer spacecraft for the mission to Jupiter each weighed only about 570 pounds, yet carried eleven highly sophisticated instruments capable of operating unattended for many year in space. The spacecraft consumes less electrical power than a standard 100 watt lamp yet is able to accept instructions from Earth to control numerous operating modes of its scientific payload, process observations from these scientific instruments and format the observations into information usable on Earth. Even more remarkable. the space­craft transmits a radio signal of only 8 watts power - equal to a nightlight - yet the information carried by the radio signal is received back on Earth from a distance of several billion miles. The Pioneer mission could not have been a success without the special engineering, scientific and management organization created for its accomplishment. This organization was rather unique in that it first had to meet a launch date target relatively quickly and then had to function for an extremely long mission operational time, far longer than any previous mission to planets. The first task was thus to organize so that the mission could be planned and the spacecraft designed and fabricated to be ready for launch within a few weeks of a 30-month target for completion. The program also produced an organization that planned mission operations to such detail that more than 16,000 commands were transmitted flawlessly to the distant spacecraft during Jupiter encounter. And each command reached the spacecraft within one second of the planned time despite the more than 90 minutes required for the radio message to travel from Earth to the space­craft and for the spacecraft to return a confirma­tion to controllers back on Earth. The organization for Pioneer also determined the required flight path from Earth to Jupiter with such precision, and controlled the launch vehicle with such accuracy, that 21 months after launch the spacecraft was able to fly behind Jupiter's satellite lo, thereby providing the first measurement that indicated the possibility of a tenuous atmosphere about this large satellite. Finally, the Pioneer organization processed and analyzed each year sufficient information from the spacecraft to fill a book having about 3 million pages and reduced this avalanche of data from space into summaries of manageable size. And all this organization depended on people, consisted of people: the people who really made this whole mission possible. Pioneer has always depended on the dedication of many individuals from many organizations throughout the world to achieve its scientific objectives, and, as evidenced by the success of the Pioneer series, this dependence is completely justified. Relatively few individuals have an opportunity during their lives to participate in such a challenging, historic, pioneering effort; and still fewer are able to enjoy the rewards of such an activity. We who have worked on Pioneer 10 and its sister spacecraft, Pioneer 11, consider ourselves fortunate to be in both classes. For the opportunity we thank the people of the United States of America, who have supported our country's space effort and its spreading of human awareness of a vast and intriguing universe in which our own unique planet Earth is only one of myriads of worlds. This volume describing the mission to Jupiter and its results is one of the many rewards for our effort which we share with you, the reader.

Fimmel, Richard O.↗

Overview of Heatshield for Extreme Entry Environment Technology (HEEET)

The objective of the Heatshield for Extreme Entry Environment Technology (HEEET) projects is to mature a 3-D Woven Thermal Protection System (TPS) to Technical Readiness Level (TRL) 6 to support future NASA missions to destinations such as Venus and Saturn. Destinations that have extreme entry environments with heat fluxes > 3500 W/cm2 and pressures up to 5 atmospheres, entry environments that NASA has not flown since Pioneer-Venus and Galileo. The scope of the project is broad and can be split into roughly four areas, Manufacturing/Integration, Structural Testing and Analysis, Thermal Testing and Analysis and Documentation. Manufacturing/Integration covers from raw materials, piece part fabrication to final integration on a 1-meter base diameter 45-degree sphere cone Engineering Test Unit (ETU). A key aspect of the project was to transfer as much of the manufacturing technology to industry in preparation to support future mission infusion. The forming, infusion and machining approaches were transferred to Fiber Materials Inc. and FMI then fabricated the piece parts from which the ETU was manufactured. The base 3D-woven material consists of a dual layer weave with a high-density outer layer to manage recession in the system and a lower density, lower thermal conductivity inner layer to manage the heat load. At the start of the project it was understood that due to weaving limitations the heat shield was going to be manufactured from a series of tiles. And it was recognized that the development of a seam solution that met the structural and thermal requirements of the system was going to be the most challenging aspect of the project. It was also recognized that the seam design would drive the final integration approach and therefore the integration of the ETU was kept in-house within NASA. A final seam concept has been successfully developed and implemented on the ETU. The structural testing and analysis covers from characterization of the different layers of the infused material as functions of weave direction and temperature to sub-component level testing such as 4pt bend testing at sub-ambient and elevated temperature and culminates in testing of the ETU results from which will validate the structural models developed using the element and sub-component level tests. Given the seam has to perform both structurally and aerothermally during entry a novel 4pt bend test fixture was developed allowing articles to be tested while the front surface is heated with a laser. These tests are being utilized to establish the systems structural capability during entry.A broad range of aerothermal tests (arcjet tests) were performed to develop material response models for predicting the required TPS thickness to meet a missions needs and to evaluate failure modes and establish the capability of the system. The final aspect of the project is to develop a comprehensive Design and Data Book such that a future mission will have the information necessary to adopt the technology. This presentation will provide an overview for each of these areas and argue that HEEET has successfully achieved TRL 6.

HEEET↗

Overview of Heatshield for Extreme Entry Environment Technology (HEEET) Project

The objective of the Heatshield for Extreme Entry Environment Technology (HEEET) projects is to mature a 3-D Woven Thermal Protection System (TPS) to Technical Readiness Level (TRL) 6 to support future NASA missions to destinations such as Venus and Saturn. Destinations that have extreme entry environments with heat fluxes up to 5000 watts per square centimeter and pressures up to 5 atmospheres, entry environments that NASA has not flown since Pioneer-Venus and Galileo. The scope of the project is broad and can be split into roughly four areas, Manufacturing/Integration, Structural Testing and Analysis, Thermal Testing and Analysis and Documentation. Manufactruing/Integration covers from raw materials, piece part fabrication to final integration on a 1-meter base diameter 45-degree sphere cone Engineering Test Unit (ETU). A key aspect of the project was to transfer as much of the manufacturing technology to industry in preparation to support future mission infusion. The forming, infusion and machining approaches were transferred to Fiber Materials Inc. and FMI then fabricated the piece parts from which the ETU was manufactured. The base 3D-woven material consists of a dual layer weave with a high density outer layer to manage recession in the system and a lower density, lower thermal conductivity inner layer to manage the heat load. At the start of the project it was understood that due to weaving limitations the heat shield was going to be manufactured from a series of tiles. And it was recognized that the development of a seam solution that met the structural and thermal requirements of the system was going to be the most challenging aspect of the project. It was also recognized that the seam design would drive the final integration approach and therefore the integration of the ETU was kept in-house within NASA. A final seam concept has been successfully developed and implemented on the ETU and will be discussed. The structural testing and analysis covers from characterization of the different layers of the infused material as functions of weave direction and temperature, to sub-component level testing such as 4-pt bend testing at sub-ambient and elevated temperature. ETU test results are used to validate the structural models developed using the element and sub-component level tests. Given the seam has to perform both structurally and aerothermally during entry a novel 4-pt bend test fixture was developed allowing articles to be tested while the front surface is heated with a laser. These tests are intended to establish the system's structural capability during entry. A broad range of aerothermal tests (arcjet tests) are being performed to develop material response models for predicting the required TPS thickness to meet a mission's needs and to evaluate failure modes. These tests establish the capability of the system and assure robustness of the system during entry. The final aspect of the project is to develop a comprehensive Design and Data Book such that a future mission will have the information necessary to adopt the technology. This presentation will provide an overview and status of the project and describe the status of the tehnology maturation level for the inner and outer planet as well as earth entry sample return missions.

Ellerby, Don↗