Search NASA⌕ Search

SEARCH · Search NASA

Results for “Galileo mission overview orbital operations design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Galileo Orbital Operations Using the Low-Gain Antenna

A brief overview of the Galileo mission is given. The bulk of this report will focus on the orbital operations design and implementation, beginning with an updated description of the changes being made to both the flight software and ground system. Results of system functional tests of various parts of the design, and descriptions of some of the special test tools developed will also be provided.

Galileo mission overview orbital operations design↗

Galileo System Design for Orbital Operations

In April 1991, Galileo's X-band high gain antenna failed to deploy. An alternate approach which utilizes the spacecraft's S-band low gain antenna was conceived and is in development. This approach will enable the accomplishment of at least 70 percent of Galileo's original scientific objectives. The short development period dictates that the spacecraft system design, the ground data system design, and the operational system scenarios and procedures necessary to conduct the mission be developed concurrently, and places a premium on validating the system designs as early as possible. This paper presents an overview of the Galileo Mission, briefly describes the changes required to implement the orbital phase of the Galileo Mission, and describes the functional model of the end to end system which was developed to support the systems design effort.

Galileo↗

Galileo Mission Science Briefing

The first of two tapes of the Galileo Mission Science press briefing is presented. The panel is moderated by George Diller from the Kennedy Space Center (KSC) Public Affairs Office. The participants are John Conway, the director of Payload and operations at Kennedy; Donald E. Williams, Commander of STS-43, the shuttle mission which will launch the Galileo mission; John Casani, the Deputy Assistant Director of Flight Projects at the Jet Propulsion Lab (JPL); Dick Spehalski, Galileo Project Manager at JPL; and Terrence Johnson, Galileo Project Scientist at JPL. The briefing begins with an announcement of the arrival of the Galileo Orbiter at KSC. The required steps prior to the launch are discussed. The mission trajectory and gravity assists from planetary and solar flybys are reviewed. Detailed designs of the orbiter are shown. The distance that Galileo will travel from the sun precludes the use of solar energy for heat. Therefore Radioisotope heater units are used to keep the equipment at operational temperature. A video of the arrival of the spacecraft at KSC and final tests and preparations is shown. Some of the many science goals of the mission are reviewed. Another video showing an overview of the Galileo mission is presented. During the question and answer period, the issue of the use of plutonium on the mission is broached, which engenders a review of the testing methods used to ensure the safety of the capsules containing the hazardous substance. This video has actual shots of the orbiter, as it is undergoing the final preparations and tests for the mission.

Source record↗

Challenges and Opportunities For Ensuring Entry System Technology Readiness For Ice Giants Probe Missions

The Ice Giants represent a distinct class of planets within our solar system, and appear to be similar to most exoplanets that have been detected thus far. Exploring Ice Giants in our Solar System would allow us to better understand their formation and evolution processes, and thus help establish scientific links to exoplanets. In situ exploration using probes similar to Galileo, along with an orbiter or a relay spacecraft, will require entry followed by deployment of the descent probe containing science instruments into Uranus or Neptune atmosphere. The challenge is not in the deployment of the probe, but in the atmospheric entry prior to deployment. The entry system has to have a capable, robust and efficient ablative thermal protection system (TPS) designed to protect the descent probe from the thermal and mechanical entry loads. Although entries into Ice Giants may not be as demanding as the Galileo entry at Jupiter, the entry environments will be more severe than environments for Mars, Sample Return missions, and Venus, and will therefore require robust TPS. While Galileo Probe’s success, nearly 25 years ago, should give us confidence, the recession data from the Galileo entry informs us that the entry environment was under predicted and the design thickness was barely adequate. The lesson learned from Galileo probe for future Ice Giant missions will require us to be cautious and demand a more robust design. The TPS technology used on Galileo entry system no longer exists due to atrophy of manufacturing processes. Instead of attempting to revive Galileo-legacy TPS technology, NASA invested in a new and innovative TPS called HEEET (Heat-shield for Extreme Entry Environment Technology). HEEET has been matured, and is now ready to support future missions not only to the Ice Giants but also for Venus, high-speed sample return, and Saturn probe missions. This lead talk, intended for the technology section of the workshop, will cover entry, descent, and deployment (EDD), with an emphasis on entry. A brief history of the TPS challenges for extreme entry missions will be given along with a quick overview of the concept of operations for EDD. The development and maturation of HEEET system capability will be described. Data gathered in ground-test facilities in the US will be highlighted to show that the technology is mature and ready for Ice Giant missions. All thermal protection systems carry some risk as a result of ground test limitations and Ice Giant missions present some unique challenges. These challenges are not only technical, but also due to limitations in the currently established manufacturing and integration. In addition, the concerns that arise due to potential for atrophy for future Ice Giant mission a decade or more from now will be analyzed. Plausible avenues for mitigation will be presented. There are two companion planned presentations by Dr. Prabhu and Dr. Hwang will dive deeper in the challenges and opportunities. This intended talk will set the stage for their presentations.

Venkatapathy, Ethiraj↗

Challenges and Opportunities for Ensuring Entry System Technology Readiness for Ice Giants Probe Missions

The Ice Giants represent a distinct class of planets within our solar system, and appear to be similar to most exoplanets that have been detected thus far. Exploring Ice Giants in our Solar System would allow us to better understand their formation and evolution processes, and thus help establish scientific links to exoplanets. In situ exploration using probes similar to Galileo, along with an orbiter or a relay spacecraft, will require entry followed by deployment of the descent probe containing science instruments into Uranus or Neptune atmosphere. The challenge is not in the deployment of the probe, but in the atmospheric entry prior to deployment. The entry system has to have a capable, robust and efficient ablative thermal protection system (TPS) designed to protect the descent probe from the thermal and mechanical entry loads. Although entries into Ice Giants may not be as demanding as the Galileo entry at Jupiter, the entry environments will be more severe than environments for Mars, Sample Return missions, and Venus, and will therefore require robust TPS. While Galileo Probe’s success, nearly 25 years ago, should give us confidence, the recession data from the Galileo entry informs us that the entry environment was under-predicted and the design thickness was barely adequate. The lesson learned from the Galileo probe for future Ice Giant missions will require us to be cautious and demand a more robust design. The TPS technology used on the Galileo entry system no longer exists due to atrophy of manufacturing processes. Instead of attempting to revive Galileo-legacy TPS technology, NASA invested in a new and innovative TPS called HEEET (Heat-shield for Extreme Entry Environment Technology). HEEET has been matured, and is now ready to support future missions not only to the Ice Giants but also for Venus, high-speed sample return, and Saturn probe missions. This lead talk, intended for the technology section of the workshop, will cover entry, descent, and deployment (EDD), with an emphasis on entry. A brief history of the TPS challenges for extreme entry missions will be given, along with a quick overview of the concept of operations for EDD. The development and maturation of HEEET system capability will be described. Data gathered in ground-test facilities in the US will be highlighted to show that the technology is mature and ready for Ice Giant missions. All thermal protection systems carry some risk as a result of ground test limitations and Ice Giant missions present some unique challenges. These challenges are not only technical, but also due to limitations in the currently established manufacturing and integration. In addition, the concerns that arise due to the potential for atrophy for future Ice Giant missions a decade or more from now will be analyzed. Plausible avenues for mitigation will be presented. There are two planned companion presentations by Dr. Prabhu and Dr. Hwang that will dive deeper into the challenges and opportunities. This intended talk will set the stage for their presentations.

Venkatapathy, Ethiraj↗