Search NASA⌕ Search

SEARCH · Search NASA

Results for “General Service Administration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

General Services Administration Reclamation Yard, SWMU 010, 2021 Groundwater Monitoring Report

This report presents a summary of the groundwater monitoring activities that occurred in November and December 2021 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consists of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume are tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. The activities presented in this report include two field events: (1) November 2021 – PCB/VOA Plume groundwater sampling via Direct Push Technology – 70 groundwater samples were collected from 10 locations at varying intervals; and (2) December 2021 – Site-wide semi-annual water level measurements of 54 monitoring wells, redevelopment of 5 monitoring wells, and sampling of 35 monitoring wells. Results for the PCB/VOA plume demonstrated COCs have not rebounded since the 2018 source removal, with groundwater cleanup target levels (GCTLs) exceeded in the 10-30 ft. below ground surface interval only. In the Chlorinated VOC plume area, there were no detections of COCs above a GCTL for at least the second consecutive sampling event for the sampled wells. Cleanup objectives have been met, and it is recommended that VOC monitoring be discontinued. Underground injection control parameters will continue to be monitored in three wells until those analytes return to background concentrations.

GSA Reclamation Yard↗

General Services Administration Reclamation Yard (SWMU 010) 2020-2021 Groundwater Monitoring Report

This report presents a summary of the groundwater monitoring activities that occurred from October 2020 through June 2021 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consists of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume are tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. The activities presented in this report include four field events: (1) October 2020 – Chlorinated VOC Plume groundwater sampling via Direct Push Technology (DPT) – 68 groundwater samples were collected from 14 locations at varying intervals; (2) December 2020 – Site-wide semi-annual water level measurements of 52 monitoring wells and sampling of 39 monitoring wells; (3) May 2021 – Chlorinated VOC Plume monitoring well installation – two monitoring wells were installed and screened from 10 to 20 feet below land surface (bls); and (4) May/June 2021 – Site-wide semi-annual water level measurements of 53 monitoring wells and sampling of 40 monitoring wells. Results showed substantial reduction of both plumes. Conclusions and recommendations are presented.

VOC↗

Shallow Soil Polychlorinated Biphenyl Site Assessment Report: General Services Administration Reclamation Yard Solid Waste Management Unit 010

This report presents a summary of the shallow soil polychlorinated biphenyl (PCB) site assessment activities that occurred from December 2020 through July 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit (SWMU) 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, three separate shallow soil plumes, known as the Northeast Shallow Soil PCB Plume, Southeast Shallow Soil PCB Plume, and West Shallow Soil PCB Plume, were identified for this site. The activities presented in this report include seven field events conducted between December 2020 and July 2022, which include shallow soil sample collection in the Northeast, Southeast, and West Shallow Soil PCB Plumes. AECOM Technical Services, Inc., personnel collected 330 soil samples from 118 boring locations. The samples were collected at 0.5-foot depth intervals to various depths based on analytical results and depth to groundwater. The soil samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. Several soil samples had PCB concentrations above the State of Florida Direct Exposure Residential and Industrial Soil Cleanup Target Levels (SCTLs), and two soil samples had PCB concentrations above the State of Florida Leachability for Groundwater. No soil borings were located beneath impervious surfaces, such as concrete or asphalt. The current Land Use Control Implementation Plan (LUCIP) covers PCBs in soils above the residential SCTL, which includes the paved areas.

soil assessment↗

General Services Administration Reclamation Yard Solid Waste Management Unit 010: 2022 Groundwater Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the groundwater monitoring activities that occurred in September and October 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consist of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume were tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. Groundwater monitoring for VOCs in the Chlorinated VOC Plume area was discontinued following the December 2021 annual monitoring event. Annual groundwater monitoring for underground injection control (UIC) parameters continues for both the PCB/VOA Plume and the Chlorinated VOC Plume areas. The activities presented in this report include one field event: September and October 2022, which includes sitewide semi-annual water level measurements of 55 monitoring wells, redevelopment of all monitoring wells listed in the sampling plan, and groundwater sampling of 28 monitoring wells. The sampling and analysis demonstrated that the PCB/VOA plume is not expanding and is significantly reduced compared to before a 2018 source removal interim measure. Recommendations are made for the 2023 groundwater monitoring program.

groundwater↗

Building ControlScore: General Service Administration Office Building Deployment

Improvements to building control systems can lead to energy savings and increased occupant comfort. In an optimized system, process variables such as air temperature will closely follow their desired setpoints and avoid excess energy use. Typically, experts must manually inspect individual control loops to identify poor performance and opportunities for improvement. However, this approach is difficult in modern buildings that have a prohibitively large number of controllers. To address this issue, Pacific Northwest National Laboratory (PNNL) created the ControlScore concept, which takes operating data from the many controllers within a building and generates standardized scores for each loop on a scale of 0 to 10 (a score of 0 indicates poor control, a score of 10 indicates good control). PNNL applied the Building ControlScore application to all available data from a General Services Administration office building within the period of January 1, 2023, to March 9, 2023. The building scored a 4.7 overall, with all 74 of the building’s loops fitting a roughly normal distribution centered around 5. These results indicate that the analyzed systems have below-average performance with room for improvement, especially in the poorly scored systems. Airflow loops tended to have much lower scores than zone temperature loops. The lowest and highest performing systems in the building section were identified, as were all loops with a score less than 1. While the ControlScore identifies loops and systems that aren’t meeting their designated setpoints, it does not indicate the cause of those issues. For example, consider a supply air terminal unit’s airflow loop that received a low score due to it delivering less air than specified by the setpoint. The lower-than-desired airflow could be due to equipment limitations (e.g., the terminal unit or duct serving is too small to accommodate that airflow), malfunctioning equipment (e.g., a stuck damper or bad sensor), or something else entirely. The ControlScore does not diagnose problems it simply identifies the symptoms that can be explored and addressed by building operators.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Blueprint for Integrating Grid-Interactive Efficient Building (GEB) Technologies into U.S. General Services Administration Performance Contracts

This document provides recommended strategies for increasing implementation of grid-interactive efficient building (GEB) measures in federal performance contracts. This document outlines distributed energy resource screening processes, contractual considerations for GEB technologies within performance contracts, and guidance for integration of GEB analysis procedures and technologies into each phase of a performance contract.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION,↗

NASA records retention schedules: Procedures governing the retention, retirement, and destruction of agency records

This handbook sets forth the minimum retention periods of official records of NASA. Its provisions are applicable to NASA Headquarters and all field installations. This revised edition has been correlated to the NASA Uniform Files Index (UFI) (NHB 1442.1B), the General Records Schedules produced by the National Archives and Records Administration (NARA), and has been enlarged in scope to cover Privacy Act Systems of Records and record series previously omitted. Guidance is provided in the areas of record retirement, transfer, and retrieval from Federal Record Centers (FRC) and disposal actions. Included are provisions for making changes to these schedules by addition of new items or revision of current items. The NASA Records Retention Schedules (NRRS) were approved for NASA use by NARA, the General Services Administration, and the General Accounting Office.

Benita A Cooper↗

FAST: Continuing the Focus on Data Quality

This presentation provides an overview of fiscal year 2019 federal motor vehicle fleet data, collected at the individual vehicle level during the fall of 2019, how the the collecting project has reviewed that information for potential quality issues, how the quality of this year's data submission compare to the prior year, and recommendations for federal agencies in their efforts to continue to improve the quality of their submissions. This presentation will be given at the January 2020 FedFleet training event, hosted by the US General Services Administration in Washington, DC. The information is collected through the Federal Automotive Statistical Tool (FAST) project. FAST is a Web-based information system managed by the US Department of Energy, the US General Services Administration, and the Energy Information Administration. FAST is used to collect information about the fleet of motor vehicles used and managed by the Federal government. FAST is developed and maintained by DOE's Idaho National Laboratory (INL).

99 GENERAL AND MISCELLANEOUS↗

Blowdown Recovery System for Cooling Tower Water Treatment

From 2014-2017, the U.S. General Services Administration's (GSA's) average nationwide water rates increased 41%. Rapidly escalating costs, mandated water-reduction targets, and the fact that an average of 28% of commercial office building water use is associated with heating and cooling led the GSA Green Proving Ground program to select alternative water treatment technologies for in-field validation. This report summarizes the latest alternative water treatment evaluation completed in 2022 - a Blowdown Recovery System for Cooling Tower Water Treatment. This Green Proving Ground program project assessed the performance of an alternative water treatment system provided by Aqualogix for treating cooling tower blowdown at the Lloyd D. George U.S. Courthouse in Las Vegas, Nevada.

13 HYDRO ENERGY↗

Machine Learning Based Metamodel for Faster Life Cycle Assessment of Large Portfolio of Buildings

Managing a large portfolio of buildings involves decisions on reuse, retrofit, renovation, rehabilitation, and new construction, influenced by trade-offs between performance metrics such as cost, time, and operational flexibility over the building's life cycle. Traditional life cycle assessment tools for evaluating these metrics can be labor- and compute-intensive, requiring extensive data and modeling for each building. Metamodels (or surrogate models) using machine learning have been explored as faster alternatives, but training these models has been hindered by the limited availability of comprehensive data on key life cycle metrics. Recent advancements in machine learning, particularly deep learning techniques like zero-shot and few-shot learning, allow models to learn from sparse or limited data. We propose a machine learning-based metamodel that leverages these techniques for rapid estimation of key building life cycle metrics. This presentation will cover the model architecture, data collection, training, and validation processes, along with an ongoing case study applied to a large portfolio of buildings. We will discuss the model's performance in terms of accuracy, compute time, limitations, and its potential for expanding to additional life cycle metrics. This data-driven approach offers a promising direction for the rapid evaluation of large building portfolios.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Long-Term Groundwater Monitoring Report Industrial Area Kennedy Space Center, Florida

This report presents the 2023 groundwater sampling results from the National Aeronautics and Space Administration (NASA) Industrial Area (IA) Long-Term Monitoring (LTM) activities. Due to the project contract ending in 2023, this report presents one year of LTM activities instead of the two-year timeframe presented in previous reports. The NASA IA LTM Program includes the following 12 sites: - Ransom Road Landfill (RRLF) – Solid Waste Management Unit (SWMU) 003 - Building M7-0505 Treatment Tank Area (M505) – SWMU 039 - Operations and Checkout Building (O&C) – SWMU 076 - Vertical Processing Facility (VPF) – SWMU 077 - Environmental Health Facility (EHF) – SWMU 079 - Kennedy Athletic, Recreation, and Social Park 1 (KARS Park 1) – SWMU 084 - Engineering Development Laboratory (EDL) – SWMU 085 - Launch Equipment Test Facility (LETF) – SWMU 091 - Mobil Service Station (MOBIL) – SWMU 093 - General Services Administration Seized Property (GSSP) – SWMU 095 - Space Station Processing Facility (SSPF) – SWMU 098 - Fuel Storage Area #1 Underground Storage Tank [Building 1044] (FSA1) – Potential Release Location (PRL) 157 Sampling events for the IA LTM Program are conducted seasonally during the dry and wet seasons, which occur in May and November, respectively. The sites in the NASA IA LTM Program are sampled on annual, biennial, or 5-year sampling frequencies based on historical trends. The current sampling frequencies for the NASA IA LTM sites are as follows: - FSA1 is sampled annually, alternating between wet and dry seasons. - GSSP is sampled annually during the wet season. - Seven sites are sampled biennially, alternating between the wet and dry seasons (RRLF, M505, O&C, VPF, LETF, MOBIL, and SSPF). - EHF and EDL are sampled biennially during the wet season. - KARS Park 1 is sampled once every 5 years.

remediation↗

2021-2022 Long-Term Groundwater Monitoring Report Industrial Area Kennedy Space Center, Florida

This report presents the groundwater sampling results from the National Aeronautics and Space Administration (NASA) Industrial Area (IA) 2021-2022 Long-Term Monitoring (LTM) activities and results of the 2023 DPT activities at three of the sites. The NASA IA LTM Program includes the following 14 sites: - Ransom Road Landfill (RRLF) – Solid Waste Management Unit (SWMU) 003 - Orsino Storage Yard (ORSY) – SWMU 004 - Building M7-0505 Treatment Tank Area (M505) – SWMU 039 - Hypergol Maintenance Facility Hazardous Waste South Staging Area (HMF South) – SWMU 070 - Operations and Checkout Building (O&C) – SWMU 076 - Vertical Processing Facility (VPF) – SWMU 077 - Environmental Health Facility (EHF) – SWMU 079 - Kennedy Athletic, Recreation, and Social Park 1 (KARS Park 1) – SWMU 084 - Engineering Development Laboratory (EDL) – SWMU 085 - Launch Equipment Test Facility (LETF) – SWMU 091 - Mobil Service Station (MOBIL) – SWMU 093 - General Services Administration Seized Property (GSSP) – SWMU 095 - Space Station Processing Facility (SSPF) – SWMU 098 - Fuel Storage Area #1 Underground Storage Tank (UST) [Building 1044] (FSA1) – Potential Release Location (PRL) 157 Groundwater levels were gauged at each site during the 2021 and 2022 LTM field activities. Sampling events for the IA LTM Program are conducted seasonally during the dry and wet seasons, which occur in May and November, respectively. The sites in the NASA IA LTM Program are sampled on annual, biennial, or 5-year sampling frequencies based on historical trends. Due to contract transitions and monitoring well installations, 2021 dry season activities were conducted during September 2021, while dry season activities for 2022 resumed in May 2022.

groundwater↗

Automated Air Sealing Demonstration: Denver Federal Center Building 40

This project aimed to demonstrate building airtightness achieved by automated air sealing in a commercial building setting. The automated air sealing demonstrated in this project uses a modified blower door to pressurize and distribute the sealing aerosol to achieve the required building airtightness. To demonstrate this technology, Building 40 at the Denver Federal Center, a federally owned campus under the jurisdiction, custody and control of the U.S. General Services Administration (GSA), was selected for testing (Figure 2). This building is currently undergoing several retrofit projects, including increasing insulation, installing high-performance windows, and adding advanced equipment, control systems, and automated air sealing. This demonstration project involved installing automated air sealing and measuring the improvements in the building's airtightness. The automated air sealing was installed over two days by AeroBarrier, the vendor. An external blower door test contractor measured the airtightness of the demonstration space before and after air sealing. The new airtightness value and the percentage increase in airtightness were used to evaluate the energy savings potential of automated air sealing. These airtightness values were used to compute the energy savings and CO 2 emissions reduction for different climate zones, building types, and initial airtightness conditions. In addition, the heating, ventilation and air conditioning (HVAC) load reduction attributable to the reduced building air leakage was studied. This study included research to determine the cost and time reduction of automated air sealing. Finally, the automated air sealing performance was evaluated qualitatively using a focus group discussion that included GSA and Bristol, the general contractor. The installation has shown the demonstration site, with a floor size of 4,462 ft 2 , air leakage has reduced by more than 50% in less than 7 hours, including preparation, site sealing, and cleanup. The performance objectives were classified as quantitative or qualitative based on the evaluation metrics used to assess the project’s success. The key performance objectives for this project were the level of airtightness achieved, the time and cost required to perform the sealing, and the HVAC load reduction attributable to air sealing. Table 1 shows the quantitative performance objectives.

42 ENGINEERING↗

Resilient U.S. Land Ports of Entry

The continued operation of Land Ports of Entry (LPOE), managed by the Customs and Border Protection (CBP) and General Services Administration% is vital to the U.S. economy and security. Border faculties are included in the Department of Homeland Security (DHS) Government Facilities Sector2, one of the 16 critical infrastructures "whose assets, systems, and networks, whether physical or virtual, are considered so vital to the United States that their incapacitation or destruction would have a debilitating effect on security, national economic security, national public health or safety, or any combination thereof.'" Specifically, disruptions to the flow of border crossing traffic, in the form of closures or increased border crossing wait times, impact the economy and security of all countries involved. This paper describes a process for analyzing and improving the resilience of U.S. Land Ports of Entry. For LPOE, the team believes that energy resilience is the primary objective due to the complete reliance on the e-manifest system and the increasing use of Multi-Energy Portals (MEPs). Emanifests are part of CPB's Automated Commercial Environment (ACE). They document several key pieces of information about cargo vehicles wishing to cross the border into the United States and are submitted before arriving at the port. Vehicles can be flagged for more invasive inspection based on the content of the e-manifest. MEPs are a non-intrusive inspection (NII) technology used to scan the contents of the cargo. Together MEPs and ACE serve an important role in aiding CBP with their mission to protect "the public from dangerous people and materials", and "enabling legitimate trade and travel.'" To analyze resilience of a port, the team would need to understand the port's current energy usage, which systems depend on energy and what backup systems exist, and any emergency operation plans that dictate how systems are operated in the event of a power outage. The team would also need to determine the design basis threats (DBTs) for the LPOE which could include natural disasters, manmade events, and accidents. The magnitudes of the DBTs are calculated and are then translated to expected impacts on the infrastructure and systems at the port. With this information gathered, existing LPOE models developed here at Sandia National Laboratories could be extended to support decisions about resilience. Current models are implemented in FlexSim, a 3rd party discrete event simulator. FlexSim provides 3-D visuals of physical layout that can reveal valuable insights, allows input to be variable (e.g. time it takes to interact with the CBP officer at primary inspection can vary) so that a whole range of possibilities can be captured in the results, and can be used to collect user-defined output metrics. Current LPOE models focus on cargo vehicle traffic, and process changes caused by the installation of new drive-through MEPs. Extending them to address resilience questions would require the addition of key pieces of information learned during the resilience analysis including critical systems, failure rates, and process changes for when failures occur. The primary output metric for current models is border crossing wait time. Additional metrics would also be added to the model to gain a more complete understanding of impacts related to resilience, for example, MEP scan rate. Once complete, the model could be used to analyze the effectiveness of mitigation strategies representing some future state.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Continuous Monitoring and Partial Water Softening for Cooling Tower Water Treatment

Cooling towers are an integral component of many refrigeration systems, providing comfort or process cooling across a broad range of applications. They are the point in the system where heat is dissipated to the atmosphere through the evaporative cooling process. Cooling towers are commonly found in industrial applications and are also often used in water-cooled chilled water plants in medium to large commercial buildings. Continuous monitoring and partial water softening for cooling towers used in medium to large commercial buildings are the focus of this paper. Cooling towers consume large amounts of water. Cooling tower-related water consumption is one of largest potable water loads within buildings in the United States, with substantial building water use associated with heating and cooling. Regional water shortages have highlighted a need to reduce water consumption; the U.S. General Services Administration (GSA) and Executive Order 13834 place priority on reducing water consumption. This priority has fueled interest in the identification, investigation, and potential broad deployment of cost-effective opportunities to reduce water use, such as alternative water treatment (AWT) technologies for cooling towers. Traditional water treatment approaches use chemicals to extend the ability of the water to hold scaling minerals in suspension, minimize corrosion, and prevent biological growth. This treatment protects the chillers and cooling tower equipment; however, even when chemicals are used regularly, a certain percentage of condenser water must be drained and made up with fresh water to maintain system water quality parameters. In addition, the use of chemicals sometimes creates a waste disposal issue and can cause building owners to incur additional fees, such as disposal or wastewater charges. To manage cooling tower water treatment, GSA typically contracts with a company specializing in conventional chemical maintenance for a fixed fee. While there are many types and vendors of AWT systems, this project assesses the effectiveness of one technology provided by Aqualogix. This system is a chilled water plant monitoring and control system aimed at optimizing system performance by reducing the blowdown occurrences used to remove mineral build-up. The technology consists of two components – continuous programmable logic control (PLC) monitoring and side-stream filtration with partial water softening. PLC monitoring calculates cycles of concentration (CoC) and determines the optimum amount of blowdown water required to satisfy all water chemistry requirements. Side-stream filtration removes suspended matter and improves biocide efficacy while precisely dispensing softened water to achieve optimal makeup water hardness. Unlike other AWT systems evaluated by GSA to date, this system does not replace the legacy treatment system but is used in addition to chemical water treatment. The vendor claims their technology will reduce water consumption, water discharge, and maintenance costs. The AWT system evaluated in this demonstration is a commercialized technology. Given its commercialized state, the system evaluated in this report is at a Technology Readiness Level 9 according to National Aeronautics and Space Administration (NASA) definitions.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Federal Workplace Charging Program Guide

This report serves as a program guide to support federal agencies in developing their own policy documents for workplace charging. It provides suggested language that agencies can incorporate into their own policies to define requirements for charging privately owned vehicles (POVs) on government-owned or leased property. The Fixing America's Surface Transportation Act authorizes the U.S. General Services Administration (GSA) and other federal agencies to install, operate, and maintain electric vehicle supply equipment (EVSE) for POVs in parking areas used by federal employees and authorized users, and it requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment. This guide offers details for agency facility managers, transportation personnel, employees, and vendors regarding the charging of electric vehicles (EVs) for use by employees and personnel at government-owned and leased buildings. This guide describes the requirements associated with federal agencies providing EV charging in publicly accessible sites. The policy also describes when and how fees may be imposed to cover costs of electricity, as well as EVSE units and installations in various scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗