Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation expansion problem (GEP)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

IDAES Enterprise: Generation Expansion Planning with Enhanced Requirements for Capacity Adequacy Under Renewable Intermittency

Achieving net zero carbon emissions likely requires future power systems to integrate new, flexible energy technologies to accommodate higher levels of capacity from variable renewable energy sources. To determine the optimal deployment of new electricity capacity and to study the likelihood of deployments of new energy technologies, an expansion planning model has been developed as part of the IDAES-Enterprise suite of grid models. The Generation Expansion Planning (GEP) model is a multi-period model in which investment decisions occur yearly, and a Unit Commitment (UC) problem is examined on an hourly timescale. To reduce computational complexity of the GEP model, the UC problem is solved for average “representative days” which leaves out extreme, but relatively common, scenarios in which low renewable generation occurs, leaving the system with inadequacy in capacity. The IDAES-Enterprise GEP model has been modified to include these extreme scenarios while keeping the model reasonably tractable. Specifically, a lazy constraint technique was implemented to check for capacity adequacy on an hourly basis over a large data set of aligned load-wind-solar profiles. As a vast majority of the capacity constraints will not be violated, the technique lowers computational expense by searching for violated capacity constraints over an “iterative manner,” adding those infeasible constraints back into the model. Results on a test case of the Southwest Power Pool shows that the lazy constraint technique significantly reduces retirements and increases installments of natural gas combined cycles and flexible natural gas units. It also reduces some retirements of coal units. These modifications provide a more reasonable estimation of required dispatchable power generation capacity to ensure feasibility during peak net load.

Liu, Peng↗

Recent advances and challenges in optimization models for expansion planning of power systems and reliability optimization

Optimization models for expansion planning of power systems aim to determine capacities, investment timing, and location of power systems to satisfy the power demands while minimizing the total cost. The models have become complex in recent years to reflect both regulations on conventional energy sources and the increasing penetration of renewable energy sources (RES). This paper reviews the basic concepts and optimization models for expansion planning of power systems. We first explain the definition and features of generation expansion planning (GEP), transmission expansion planning (TEP), and generation and transmission expansion planning (GTEP). To address the computational challenges of large-scale expansion planning problems, we review several simplifications including temporal and spatial aggregation, and decomposition methods. This paper also addresses power system reliability defined as the probability of satisfying the load demand while withstanding failures of components. Finally, the goal of this paper is to provide a research overview, discuss trends in expansion planning of power systems, and suggest directions for future research.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗