Summary of Historical Production for Nevada Binary Facilities

The analysis described was initiated to validate inputs used in the US Department of Energy’s (DOE) economic modeling tool GETEM (Geothermal Electricity Technology Evaluation Model) by using publically available data to identify production trends at operating geothermal binary facilities in the state of Nevada. Data required for this analysis was obtained from the Nevada Bureau of Mines and Geology (NBMG), whom received the original operator reports from the Nevada Division of Minerals (NDOM). The data from the NBMG was inputted into Excel files that have been uploaded to the DOE’s National Geothermal Data System (NGDS). Once data was available in an Excel format, production trends for individual wells and facilities could be established for the periods data was available (thru 2009). Additionally, this analysis identified relationships existing between production (temperature and flow rates), power production and plant conversion efficiencies. The data trends showed that temperature declines have a significant impact on power production, and that in some instances operators increased production flow rate to offset power declines. The production trends with time that were identified are being used to update GETEM’s default inputs.

15 GEOTHERMAL ENERGY↗

Crossing the Barriers: An Analysis of Permitting Barriers to Geothermal Development and Potential Improvement Scenarios

Developers have identified many non-technical barriers to geothermal power development, including permitting. Activities required for permitting, such as the associated environmental reviews, can take a considerable amount of time and delay project development. This paper discusses the impacts to geothermal development timelines due to the permitting challenges, including the regulatory framework, environmental review process, and ancillary permits. We identified barriers that have the potential to prevent geothermal development or delay timelines and defined improvement scenarios that could assist in expediting geothermal development and permitting timelines and lead to the deployment of additional geothermal resources by 2030 and 2050: (1) the creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices as well as (2) an expansion of existing categorical exclusions applicable to geothermal development on Bureau of Land Management public lands to include the oil and gas categorical exclusions passed as part of the Energy Policy Act of 2005. We utilized the Regional Energy Deployment System (ReEDS) and the Geothermal Electricity Technology Evaluation Model (GETEM) to forecast baseline geothermal deployment based on previous analysis of geothermal project development and permitting timelines. The model results forecast that reductions in geothermal project timelines can have a significant impact on geothermal deployment. For example, using the ReEDS model, we estimated that reducing timelines by two years, perhaps due to the creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices, could result in deployment of an additional 204 MW by 2030 and 768 MW by 2050 - a 13% improvement when compared to the business as usual scenario. The model results forecast that a timeline improvement of four years - for example with an expansion of existing categorical exclusions coupled with the creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices - could result in deployment of an additional 2,529 MW of geothermal capacity by 2030 and 6,917 MW of geothermal capacity by 2050 - an improvement of 116% when compared to the business as usual scenario. These results suggest that reducing development timelines could be a large driver in the deployment of geothermal resources.

15 GEOTHERMAL ENERGY↗

Geothermal Power Systems Analysis: Outcome of Industry Stakeholders Workshop: Preprint

Geothermal cost and performance evaluation implemented via technoeconomic assessment (TEA) modeling is critical for the Department of Energy (DOE) and other geothermal industry stakeholders in assessing the current state of geothermal technologies and to identify existing hurdles to commercially viable geothermal development. The Geothermal Electricity Technology Evaluation Model (GETEM) is a major TEA tool used in estimating the economic feasibility and levelized cost of energy (LCOE) of conventional hydrothermal systems and enhanced geothermal systems (EGS). Since 2021, GETEM has been transitioning from an intricate spreadsheet model to a user-friendly tool within the System Advisor Model (SAM) developed by the National Renewable Energy Laboratory (NREL). Apart from enabling an expanded visibility of the geothermal model among other renewable resources, having GETEM in SAM has the advantage of simulation automation, better usability, updates tracking, active user inputs/feedback, and extended financial modeling. GETEM is used in developing supply curves for the Annual Technology Baseline (ATB). The ATB data are inputs to the Renewable Energy Potential (reV) and the Regional Energy Deployment System (ReEDS) models. The geothermal module in NREL’s reV model assesses the geothermal energy potential in the conterminous United States by defining the geospatial intersection of geothermal resources with existing grid infrastructure within the constraint of land use characteristics. The ReEDS model is a capacity expansion model used for simulating the long-term build-out and operation of the US generation and transmission system based on current energy costs and policies. To ensure enhanced representation of current industry trends in our model transitions and development, we organized a two-day virtual workshop to elicit geothermal industry stakeholder input and recommendations on our current approaches and assumptions on technoeconomic, resource assessment, and deployment scenarios modeling of geothermal technologies. Participants included developers, operators, investors, regulatory agencies, system modelers, national laboratory researchers, consultants, and other stakeholders. In this workshop, we gained stakeholder insights on current geothermal plant performance (i.e., capacity factors), updated drilling costs and learning curves, and next generation technologies such as closed loop and superhot rock geothermal. Other outcomes from this workshop and its impact on future geothermal development feasibility, resource availability, and capacity expansion studies are compiled and discussed.

Annual Technology Baseline↗

Geothermal Power Systems Analysis: Outcome of Industry Stakeholders Workshop

Geothermal cost and performance evaluation implemented via techno-economic assessment (TEA) modeling is critical for the U.S. Department of Energy (DOE) and other geothermal industry stakeholders in assessing the current state of geothermal technologies and to identify existing hurdles to commercially viable geothermal development. The Geothermal Electricity Technology Evaluation Model (GETEM) is a major TEA tool used in estimating the economic feasibility and levelized cost of energy (LCOE) of conventional hydrothermal systems and enhanced geothermal systems (EGS). Since 2021, GETEM has been transitioning from an intricate spreadsheet model to a user-friendly tool within the System Advisor Model (SAM) developed by the National Renewable Energy Laboratory (NREL). Apart from enabling an expanded visibility of the geothermal model among other renewable resources, having GETEM in SAM has the advantage of simulation automation, better usability, updates tracking, active user inputs/feedback, and extended financial modeling. GETEM is used in developing supply curves for NREL's Annual Technology Baseline (ATB), which provides inputs to the Renewable Energy Potential (reV) and the Regional Energy Deployment System (ReEDS) models. The geothermal module in NREL's reV model assesses the geothermal energy potential in the conterminous United States by defining the geospatial intersection of geothermal resources with existing grid infrastructure within the constraint of land use characteristics. The ReEDS model is a capacity expansion model used for simulating the long-term build-out and operation of the U.S. generation and transmission system based on current energy costs and policies. To ensure enhanced representation of current industry trends in our model transitions and development, we organized a two-day virtual workshop to elicit geothermal industry stakeholder input and recommendations on our current approaches and assumptions on techno-economic, resource assessment, and deployment scenarios modeling of geothermal technologies. Participants included developers, operators, investors, regulatory agencies, system modelers, national laboratory researchers, consultants, and other stakeholders. In this workshop, we gained stakeholder insights on current geothermal plant performance (i.e., capacity factors), updated drilling costs and learning curves, and next-generation technologies such as closed-loop and superhot rock geothermal. Other outcomes from this workshop and its impact on future geothermal development feasibility, resource availability, and capacity expansion studies are compiled and discussed.

annual technology baseline↗

Cost Contributors to Geothermal Power Production

The US Department of Energy Geothermal Technologies Office (DOE-GTO) has developed the tool Geothermal Electricity Technologies Evaluation Model (GETEM) to assess the levelized cost of electricity (LCOE) of power produced from geothermal resources. Recently modifications to GETEM allow the DOE-GTO to better assess how different factors impact the generation costs, including initial project risk, time required to complete a development, and development size. The model characterizes the costs associated with project risk by including the costs to evaluate and drill those sites that are considered but not developed for commercial power generation, as well as to assign higher costs to finance those activities having more risk. This paper discusses how the important parameters impact the magnitude project costs for different project scenarios. The cost distributions presented include capital cost recovery for the exploration, confirmation, well field completion and power plant construction, as well as the operation and maintenance (O&M) costs. The paper will present these cost distributions for both EGS and hydrothermal resources.

15 GEOTHERMAL ENERGY↗

2022 GETEM Geothermal Drilling Cost Curve Update: Preprint

The Geothermal Electricity Technology Evaluation Model (GETEM) is an essential tool for the Department of Energy's (DOE) Geothermal Technology Office (GTO) to understand the performance and cost of technologies it is seeking to improve. This detailed model is used for supply curve analyses, assessing the current economic feasibility and Levelized Cost of Energy (LCOE) of hydrothermal geothermal systems and EGS, and evaluating the potential impact of advanced geothermal technologies. GETEM can be used to estimate the performance and costs of currently available U.S. geothermal power systems. It is also used to estimate the costs of technologies 5 to 20 years in the future, given the direction of potential research, development, and demonstration (RD&D) projects. The model is intended to help GTO determine which proposed RD&D programs and projects might offer the most efficient improvement when using taxpayer funding. The model requires annual updates as well as revisions to reflect the current state of the art. Drilling costs are a significant portion of total geothermal development costs. The current GETEM drilling cost inputs rely on drilling data from 2009 and require an updated analysis of more recent data to ensure they remain representative of current technologies. An updated, more accurate understanding of costs could help the geothermal industry secure project development financing and investment funding and better allow the oil and gas (O&G) industry (both operators and service companies) weigh potential geothermal market participation and customization. This report details recent drilling improvements from the Utah Frontier Observatory for Research in Geothermal Energy (FORGE) and O&G, comparing drilling performance and costs with values in GETEM, particularly the baseline drilling cost curves. Though drilling performance at FORGE has improved significantly, we did not find associated cost decreases that would justify lowering the GETEM baseline cost curves as of now.

API↗

2022 GETEM Geothermal Drilling Cost Curve Update

The Geothermal Electricity Technology Evaluation Model (GETEM) is an essential tool for the U.S. Department of Energy's (DOE) Geothermal Technologies Office (GTO) to understand the performance and cost of technologies it is seeking to improve. This detailed model is used for supply curve analyses, assessing the current economic feasibility and levelized cost of energy (LCOE) of hydrothermal geothermal systems and enhanced geothermal systems (EGS), and evaluating the potential impact of advanced geothermal technologies. GETEM can be used to estimate the performance and costs of currently available U.S. geothermal power systems. It is also used to estimate the costs of technologies 5 to 20 years in the future, given the direction of potential research, development, and demonstration (RD&D) projects. The model is intended to help GTO determine which proposed RD&D programs and projects might offer the most efficient improvement when using taxpayer funding. The model requires annual updates as well as revisions to reflect the current state of the art. Drilling costs are a significant portion of total geothermal development costs. The current GETEM drilling cost inputs rely on drilling data from 2009 and require an updated analysis of more recent data to ensure they remain representative of current technologies. An updated, more accurate understanding of costs could help the geothermal industry secure project development financing and investment funding and better allow the oil and gas (O&G) industry (both operators and service companies) to weigh potential geothermal market participation and customization. This report details recent drilling improvements from the Utah Frontier Observatory for Research in Geothermal Energy (FORGE) and the O&G sector, comparing drilling performance and costs with values in GETEM, particularly the baseline drilling cost curves. Although drilling performance at FORGE has improved significantly, we did not find associated cost decreases that would justify lowering the GETEM baseline cost curves at this time.

API↗

Report on the U.S. DOE Geothermal Technologies Program's 2009 Risk Analysis

NREL conducted an annual program risk analysis on behalf of the U.S. Department of Energy Geothermal Technologies Program (GTP). NREL implemented a probabilistic risk analysis of GTP-sponsored research, development, and demonstration (RD&D) work, primarily for enhanced geothermal systems (EGS). The analysis examined estimates of improvement potential derived from program RD&D work for two types of technology performance metric (TPM): EGS-enabling technologies potential and EGS cost improvement potential. Four risk teams (exploration, wells/pumps/tools, reservoir engineering, and power conversion) comprised of industry experts, DOE laboratory researchers, academic researchers, and laboratory subcontractors estimated the RD&D impacts and TPM-improvement probability distributions. The assessment employed a risk analysis spreadsheet add-in that uses Monte Carlo simulation to drive the Geothermal Electric Technology Evaluation Model (GETEM). The GETEM-based risk analysis used baseline data from the experts' discussion of multiple reports and data sources. Risk results are expressed in terms of each metric's units and/or the program's top-level metric: levelized costs of electricity (LCOE). Results--both qualitative comments and quantitative improvement potential--are thorough and cohesive in three of the four expert groups. This conference paper summarizes the industry's current thinking on various metrics and potential for research improvement in geothermal technologies.

15 GEOTHERMAL ENERGY↗

Report on the U.S. DOE Geothermal Technologies Program's 2009 Risk Analysis

NREL conducted an annual program risk analysis on behalf of the U.S. Department of Energy Geothermal Technologies Program (GTP). NREL implemented a probabilistic risk analysis of GTP-sponsored research, development, and demonstration (RD&D) work, primarily for enhanced geothermal systems (EGS). The analysis examined estimates of improvement potential derived from program RD&D work for two types of technology performance metric (TPM): EGS-enabling technologies potential and EGS cost improvement potential. Four risk teams (exploration, wells/pumps/tools, reservoir engineering, and power conversion) comprised of industry experts, DOE laboratory researchers, academic researchers, and laboratory subcontractors estimated the RD&D impacts and TPM-improvement probability distributions. The assessment employed a risk analysis spreadsheet add-in that uses Monte Carlo simulation to drive the Geothermal Electric Technology Evaluation Model (GETEM). The GETEM-based risk analysis used baseline data from the experts' discussion of multiple reports and data sources. Risk results are expressed in terms of each metric's units and/or the program's top-level metric: levelized costs of electricity (LCOE). Results--both qualitative comments and quantitative improvement potential--are thorough and cohesive in three of the four expert groups. This conference paper summarizes the industry's current thinking on various metrics and potential for research improvement in geothermal technologies.

15 GEOTHERMAL ENERGY↗

Preliminary Technical Risk Analysis for the Geothermal Technologies Program

This report explains the goals, methods, and results of a probabilistic analysis of technical risk for a portfolio of R&D projects in the DOE Geothermal Technologies Program (The Program). The analysis is a task by Princeton Energy Resources International, LLC, in support of the National Renewable Energy Laboratory on behalf of the Program. The main challenge in the analysis lies in translating R&D results to a quantitative reflection of technical risk for a key Program metric: levelized cost of energy (LCOE).

Geothermal Electric Technology Evaluation Model↗

Development of a Geothermal Module in reV: Quantifying the Geothermal Potential while Accounting for the Geospatial Intersection of the Grid Infrastructure and Land Use Characteristics

The Renewable Energy Potential (reV) model is a geospatial platform for estimating technical potential and developing renewable energy supply curves, initially developed for wind and solar technologies. The model evaluates deployment constraints, considering land use, environmental, and cultural factors, and estimates the distance to existing grid features to connect future plants (Maclaurin et al., 2021). A pressing deficiency in the reV model, however, is representation of geothermal electricity generation technologies. To address this gap, we developed a novel geothermal generation module for reV that allows for representation and analysis at the same level of detail as other renewable technologies. This paper describes our process for evaluating data sources for the modeling, and presents five preliminary reV geothermal results. More specifically, we present two sets of resource data that represent upper and lower bounds for geothermal potential. We then present several sensitivity runs using the upper bound resource data; the results are encouraging that levelized cost of electricity (LCOE) can be reduced by optimizing the location and estimated capacity of the spatially diverse geothermal resource while considering the distance to existing grid infrastructure. Our preliminary supply curves and levelized cost of electricity (LCOE) results should be considered with care due to the highly uncertainty in geothermal resource potential data. We present median LCOE values for the conterminous U.S. for five scenarios: four hydrothermal (3.5km depth) and one EGS (4.5km depth). The capital and operating costs for each respective technology are modeled. We also compare results using two different resource data sources.

exclusions↗

Development of a Geothermal Module in reV: Quantifying the Geothermal Potential While Accounting for the Geospatial Intersection of the Grid Infrastructure and Land Use Characteristics: Preprint

The Renewable Energy Potential (reV) model is a geospatial platform for estimating technical potential and developing renewable energy supply curves, initially developed for wind and solar technologies. The model evaluates deployment constraints, considering land use, environmental, and cultural factors, and estimates the distance to existing grid features to connect future plants (Maclaurin et al., 2021). A pressing deficiency in the reV model, however, is representation of geothermal electricity generation technologies. To address this gap, we developed a novel geothermal generation module for reV that allows for representation and analysis at the same level of detail as other renewable technologies. This paper describes our process for evaluating data sources for the modeling, and presents five preliminary reV geothermal results. More specifically, we present two sets of resource data that represent upper and lower bounds for geothermal potential. We then present several sensitivity runs using the upper bound resource data; the results are encouraging that levelized cost of electricity (LCOE) can be reduced by optimizing the location and estimated capacity of the spatially diverse geothermal resource while considering the distance to existing grid infrastructure. Our preliminary supply curves and levelized cost of electricity (LCOE) results should be considered with care due to the highly uncertainty in geothermal resource potential data. We present median LCOE values for the conterminous U.S. for five scenarios: four hydrothermal (3.5km depth) and one EGS (4.5km depth). The capital and operating costs for each respective technology are modeled. We also compare results using two different resource data sources.

exclusions↗

Renewable Energy Potential Model: Geothermal Supply Curves

The Renewable Energy Potential (reV) model is a geospatial platform for estimating technical potential and developing renewable energy supply curves, initially developed for wind and solar technologies. The model evaluates deployment constraints, considering land use, environmental, and cultural factors, and estimates the distance to existing grid features to connect future plants (Maclaurin et al., 2021). A pressing deficiency in the reV model, however, is representation of geothermal electricity generation technologies. To address this gap, we developed a novel geothermal generation module for reV that allows for representation and analysis at the same level of detail as other renewable technologies. The included paper describes our process for evaluating data sources for the modeling, and presents five preliminary reV geothermal results. More specifically, we present two sets of resource data that represent upper and lower bounds for geothermal potential. We then present several sensitivity runs using the upper bound resource data; the results are encouraging that levelized cost of electricity (LCOE) can be reduced by optimizing the location and estimated capacity of the spatially diverse geothermal resource while considering the distance to existing grid infrastructure. Our preliminary supply curves and levelized cost of electricity (LCOE) results provided here should be considered with care due to the high uncertainty in geothermal resource potential data. We present median LCOE values for the conterminous U.S. for three scenarios: two hydrothermal (3.5km depth, USGS heat flow & SMU temperatures respectively) and one EGS (4.5km depth, SMU temperatures). The capital and operating costs for each respective technology are modeled. We also compare results using two different resource data sources.

15 GEOTHERMAL ENERGY↗

An Overview of the U.S. Department of Energy's GeoVision Report: Preprint

The U.S. Department of Energy's (DOE's) Geothermal Technologies Office (GTO) engaged in a multiyear research collaboration among national laboratories, industry experts, and academia to identify a vision for growth of the domestic geothermal industry across a range of geothermal energy types. The effort, called the GeoVision analysis, assessed opportunities to expand geothermal energy deployment by improving technologies, reducing costs, and mitigating barriers. The analysis also evaluated the economic and environmental impacts of such deployment - including industry growth, consumer energy prices, water use, and air emissions - and investigated opportunities for desalination, mineral recovery, and hybridization with other energy technologies for greater efficiencies and lower costs. The GeoVision analysis used a suite of modeling tools and scenarios to evaluate the performance of geothermal technologies relative to other energy technologies. The assessment included evaluating the potential role of existing and future geothermal deployment in both the electric sector and the heating and cooling sector. In the electric sector, the GeoVision analysis considered electricity generation from existing conventional (hydrothermal) geothermal resources as well as unconventional geothermal resources, such as enhanced geothermal systems (EGS). In the heating and cooling sector, the analysis modeled geothermal heat pumps (GHPs, also called ground source heat pumps) and district-heating systems using both conventional and EGS resources. The analysis culminated in a summary report, GeoVision: Harnessing the Heat Beneath Our Feet (DOE 2019), as well as eight supporting task force reports (Lowry et al. 2017, Doughty et al. 2018, Wendt et al. 2018, Augustine et al. 2019, Liu et al. 2019, McCabe et al. 2019, Millstein et al. 2019, Young et al. 2019). Among other results, key findings of the analysis indicate that optimized permitting could potentially double geothermal capacity by 2050; technology improvements could increase geothermal power generation nearly 26-fold from today; and increased geothermal deployment can provide economic and environmental benefits to the United States. The analysis also concludes that GHPs can provide heating and cooling solutions to the equivalent of 28 million households and geothermal district-heating systems could experience exponential growth - from 21 installations today to 17,500 nationwide. In addition to summarizing analytical results about geothermal energy opportunities, the report includes a Roadmap of actionable items on which the stakeholder community can engage to achieve the outcomes of the analysis. The GeoVision Roadmap is a comprehensive call to action to encourage and guide stakeholders toward the shared goal of realizing the deployment levels and resulting benefits identified in the GeoVision analysis.

15 GEOTHERMAL ENERGY↗

An Overview of the U.S. Department of Energy’s GeoVision Report

The U.S. Department of Energy's (DOE's) Geothermal Technologies Office (GTO) engaged in a multiyear research collaboration among national laboratories, industry experts, and academia to identify a vision for growth of the domestic geothermal industry across a range of geothermal energy types. The effort, called the GeoVision analysis, assessed opportunities to expand geothermal energy deployment by improving technologies, reducing costs, and mitigating barriers. The analysis also evaluated the economic and environmental impacts of such deployment - including industry growth, consumer energy prices, water use, and air emissions - and investigated opportunities for desalination, mineral recovery, and hybridization with other energy technologies for greater efficiencies and lower costs. The GeoVision analysis used a suite of modeling tools and scenarios to evaluate the performance of geothermal technologies relative to other energy technologies. The assessment included evaluating the potential role of existing and future geothermal deployment in both the electric sector and the heating and cooling sector. In the electric sector, the GeoVision analysis considered electricity generation from existing conventional (hydrothermal) geothermal resources as well as unconventional geothermal resources, such as enhanced geothermal systems (EGS). In the heating and cooling sector, the analysis modeled geothermal heat pumps (GHPs, also called ground source heat pumps) and district-heating systems using both conventional and EGS resources. The analysis culminated in a summary report, GeoVision: Harnessing the Heat Beneath Our Feet (DOE 2019), as well as eight supporting task force reports (Lowry et al. 2017, Doughty et al. 2018, Wendt et al. 2018, Augustine et al. 2019, Liu et al. 2019, McCabe et al. 2019, Millstein et al. 2019, Young et al. 2019). Among other results, key findings of the analysis indicate that optimized permitting could potentially double geothermal capacity by 2050; technology improvements could increase geothermal power generation nearly 26-fold from today; and increased geothermal deployment can provide economic and environmental benefits to the United States. The analysis also concludes that GHPs can provide heating and cooling solutions to the equivalent of 28 million households and geothermal district-heating systems could experience exponential growth - from 21 installations today to 17,500 nationwide. In addition to summarizing analytical results about geothermal energy opportunities, the report includes a Roadmap of actionable items on which the stakeholder community can engage to achieve the outcomes of the analysis. The GeoVision Roadmap is a comprehensive call to action to encourage and guide stakeholders toward the shared goal of realizing the deployment levels and resulting benefits identified in the GeoVision analysis.

40 EE - Geothermal Technologies Office (EE-4G)↗