Forecasting Smart Grid Load on the Wire
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Grid edge renewable energy resources, such as rooftop solar photovoltaics, closely interact with consumer load profiles. Therefore, forecasting future electricity demand, ideally at the individual household level, is indispensable. In this paper, we present a transfer learning enhanced household load profile forecasting method. First, we tune a long short-term memory forecasting model to perform day-ahead prediction of household electricity load profiles. Then we improve these individualized models using transfer learning, and we use k-means clustering to create optimal source data sets. We find average improvements of 4.38% (largest improvement of 10.71%) when the entire data set was used to train the source model and 2.45% (largest improvement of 11.57%) in the mean absolute error when households were first clustered and used to train separate source models for each cluster. We find that transfer learning with clustered data can effectively boost the forecasting performance of the LSTM models. We use realistic household power measurements for 148 real residential households in Austin, Texas.
The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.
The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system “breaking points”, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.
In this paper, a new approach to evaluate the uncertainty ranges for the required generation performance envelope, including the balancing capacity, ramping capability and ramp duration is presented. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (CAISO) real life data have shown the effectiveness and efficiency of the proposed approach.
CalderaCast is a user-friendly web-based tool for electrical-load forecast, providing stakeholders with a fully customizable decision-support framework that estimates the likely power draw from a possible future electric-vehicle (EV) charging station at a given location on a given day along an alternative fuel corridor (AFC). These EV charging profiles are accurately modeled in CalderaCast using the Caldera software framework developed by Idaho National Laboratories (INL), reflecting the realistic charging levels observed in actual charge events. This tool was developed as part of the National Electric Vehicle Infrastructure (NEVI) program, which is quickly generating substantial interest from would-be charging station operators (CSO), large and small electric utilities, and state transportation planners, some of whom had not seriously considered EV charging previously. All these entities—with or without background in EV infrastructure—must estimate the electricity load that a proposed charging station will generate. This load forecast is critically important for a utility to properly assess the capacity of their distribution network to support the proposed station or properly size grid upgrades for potential load growth due to future EV adoption, vehicle technology improvements, or station growth. This document describes each aspect of the CalderaCast tool and provides guidance to users who are interested in utilizing the tool for their work.
The smart grid is enabling the collection of massive amounts of high-dimensional and multi-type data about the electric power grid operations, by integrating advanced metering infrastructure, control technologies, and communication technologies. However, the traditional modeling, optimization, and control technologies have many limitations in processing the data; thus, the applications of artificial intelligence (AI) techniques in the smart grid are becoming more apparent. This survey presents a structured review of the existing research into some common AI techniques applied to load forecasting, power grid stability assessment, faults detection, and security problems in the smart grid and power systems. It also provides further research challenges for applying AI technologies to realize truly smart grid systems. Finally, this survey presents opportunities of applying AI to smart grid problems. The paper concludes that the applications of AI techniques can enhance and improve the reliability and resilience of smart grid systems.
Bottom-up load modeling of buildings offers a versatile approach to simulating baseline demand and scenarios of future technology evolution and adoption at the individual building level. This capability is essential to understanding how future load shapes may change with the adoption of electric equipment and vehicles, particularly as it relates to grid planning and infrastructure investments. Traditionally, grid planning techniques have used historical load data to predict future load and infrastructure needs. However, with the anticipated rise in adoption of electrification technologies such as heat pumps and electric vehicles, historical data become less reliable predictors of the future. By employing ResStock, a high-fidelity building stock modeling tool, we can fine-tune electrification scenarios and aggregate models to represent varying geographic resolutions of the grid system, while considering the underlying features of homes. This may enable a more accurate and responsive approach to anticipate and plan for the evolving landscape of energy demands. We present a new framework that leverages building stock energy modeling to identify building models that align with the load shapes and housing attributes of buildings with AMI data. This approach applies two model layers: (1) a classification step that identifies the presence of air conditioning, electric heating, and electric water heating, and (2) an optimization routine that identifies building energy models aligning with load profile data from advanced metering infrastructure meters. This report demonstrates one approach to deploying this framework, and presents results for three test cases that use both modeled and AMI data to assess performance. For a test case using AMI data in Fort Collins, Colorado, we observed a median monthly electricity load CV-RMSE of 16.6%, and a top ten daily heating and cooling median absolute percent error of 7.7% and 8.3%, respectively. For each AMI meter, we identify a set of potential energy models so that downstream use-cases can account for uncertainty driven by variability of baseline technologies and occupant behavior, which impact the response to electrification and energy efficiency scenarios. Our results indicate that ResStock has potential as a scalable solution for modeling residential energy demand at local grid resolutions. Its performance depends on location-specific factors, underlying building characteristics, and the level of aggregation, offering a path towards more precise and adaptive distribution grid planning for the evolving energy landscape.
The example embodiments are directed to a system and method for forecasting load flexibility of a power grid. In one example, the method includes receiving temperature values associated with temperature set points of a plurality of loads that are included on a power grid, forecasting a flexibility of the plurality of loads using a polynomial-time mixed-integer non-linear programming (MINLP) optimization based on the received temperature values for the plurality of loads, and outputting information about the forecasted flexibility for display to a display device. The MINLP optimization performs the forecasting of the load flexibility on a fine-grained basis in comparison to conventional methods and is still fast enough that it can be computed in real-time.
Short-term load forecasting is crucial for the operations planning of an electrical grid. Forecasting the next 24 h of electrical load in a grid allows operators to plan and optimize their resources. The purpose of this study is to develop a more accurate short-term load forecasting method utilizing non-linear autoregressive artificial neural networks (ANN) with exogenous multi-variable input (NARX). The proposed implementation of the network is new: the neural network is trained in open-loop using actual load and weather data, and then, the network is placed in closed-loop to generate a forecast using the predicted load as the feedback input. Unlike the existing short-term load forecasting methods using ANNs, the proposed method uses its own output as the input in order to improve the accuracy, thus effectively implementing a feedback loop for the load, making it less dependent on external data. Using the proposed framework, mean absolute percent errors in the forecast in the order of 1% have been achieved, which is a 30% improvement on the average error using feedforward ANNs, ARMAX and state space methods, which can result in large savings by avoiding commissioning of unnecessary power plants. The New England electrical load data are used to train and validate the forecast prediction.
This presentation covers the work completed for the HECO Forecasting Department for the Electric Vehicle Stock and Load Forecast for Integrated Grid Planning project. This project uses a suite of detailed analytical tools developed by the National Laboratory of the Rockies, including TEMPO and EVI-Pro, to develop future scenarios to 2050 of county-level electric vehicle adoption and associated annual hourly charging load profiles for the state of Hawaii.
Time-coincident load, wind, and solar data including actual and probabilistic forecast datasets at 5-min resolution for ERCOT, MISO, NYISO, and SPP. Wind and solar profiles are supplied for existing sites as well as planned sites based on interconnection queue projects as of 2021. For ERCOT actuals are provided for 2017 and 2018 and forecasts for 2018, and for the remaining ISOs actuals are provided for 2018 and 2019 and forecasts for 2019. There datasets were produced by NREL as part of the ARPA-E PERFORM project, an ARPA-E funded program that aim to use time-coincident power and load seeks to develop innovative management systems that represent the relative delivery risk of each asset and balance the collective risk of all assets across the grid. For more information on the datasets and methods used to generate them see https://github.com/PERFORM-Forecasts/documentation.
Accurate net-load forecasting is vital for energy planning, aiding decisions on trade and load distribution. However, assessing the performance of forecasting models across diverse input variables, like temperature and humidity, remains challenging, particularly for eliciting a high degree of trust in the model outcomes. In this context, there is a growing need for data-driven technological interventions to aid scientists in comprehending how models react to both noisy and clean input variables, thus shedding light on complex behaviors and fostering confidence in the outcomes. In this paper, we present Forte, a visual analytics-based application to explore deep probabilistic net-load forecasting models across various input variables and understand the error rates for different scenarios. With carefully designed visual interventions, this web-based interface empowers scientists to derive insights about model performance by simulating diverse scenarios, facilitating an informed decision-making process. We discuss observations made using Forte and demonstrate the effectiveness of visualization techniques to provide valuable insights into the correlation between weather inputs and net-load forecasts, ultimately advancing grid capabilities by improving trust in forecasting models.
The impact of wind and load forecast errors on power grid operations is frequently evaluated by conducting multi-variant studies, where these errors are simulated repeatedly as random processes based on their known statistical characteristics. To generate these errors correctly, we need to reflect their distributions (which do not necessarily follow a known distribution law), standard deviations, auto- and cross-correlations. For instance, load and wind forecast errors can be closely correlated in different zones of the system. This paper introduces a new methodology for generating multiple cross-correlated random processes to simulate forecast error curves based on a transition probability matrix computed from an empirical error distribution function. The matrix will be used to generate new error time series with statistical features similar to observed errors. We present the derivation of the method and present some experimental results by generating new error forecasts together with their statistics.
Heat pump water heaters (HPWH) can achieve energy savings of 60-70% compared to conventional electric-resistance water heaters. However, even with a favorable simple payback period within the typical product lifetime, HPWHs make up only 1% of all electric water heaters sold in the residential sector. Market adoption is challenged, in part, by the lack of effective energy efficiency programs in the U.S. region with the greatest amount of residential electric water heaters. The recent integration of connected functionality into HPWHs offers the capability to shift load without undue negative impact on customers. This capability can provide value to utilities with peak load constraints, motivating them to promote HPWHs for the first time. This paper will present a methodology to forecast connected HPWH energy use and extrapolate load shifting potential for the Southeast U.S. region. The methodology leverages data from a robust connected HPWH field study conducted in the Pacific Northwest. A coefficient of performance (COP) relationship for HPWHs was developed using ambient and inlet water temperature data to forecast HPWH performance on a month-by-month basis. Using the forecasted COP, HPWH operating hours were calculated for meeting load, which serve as the proxy to extrapolate load shifting potential from the Pacific Northwest to the Southeast. As a use case, analytical results are presented for a specific utility. This methodology, in combination with market analysis, facilitates the development of customized energy savings and load shifting forecasts to understand the potential impacts of launching connected HPWH programs in specific utility service territories.
This document summarizes objectives and context related to a DOE-funded workshop on proactive regulatory approaches to electrification and load growth. It briefly summarizes some of the regulatory barriers to pursuing a proactive approach and some of the risks associated with such an approach. It then summarizes a selection of recent utility proposals and public utility commission actions related to proactive approaches.
Smart meters and the advanced metering infrastructure (AMI) facilitate distribution system operators (DSOs) to gather information on energy consumption at the customer level. With the increasing penetration of building-level intermittent distributed energy resources (DERs) behind the meter, DER information is not available to DSOs. At the same time, smart meter enables users to participate in grid, with real-time information. Information for behind the meter is needed by user to coordinate building level assets for maximum benefits. The concept of unbundled smart meter (USM) needs agents to decompose smart meter measurements to provide service to DSO as well as customers. In this paper, we propose a Spatio-Temporal Decomposition Agent (STDA) for USM based on Artificial Intelligence (AI). STDA can help users optimize their energy usage, help DSO to utilize building assets for the grid operation. The energy usage strategy developed by STDA is suitable for different users, and can be customized by deep learning (DL) models according to the different energy consumption habits of each user. The power prediction performance results of various DL models and evaluation using a set of data from a Hawaii utility is presented. Furthermore, STDA integration with Home Energy management Systems (HEMS) to manage resources is presented and validated. STDA pre-processes the measurements before model training, and provides the spatio-temporal decomposed forecasting.
Accurate short-term energy consumption forecasting for commercial buildings is crucial for smart grid operations. While smart meters and deep learning models enable forecasting using past data from multiple buildings, data heterogeneity from diverse buildings can reduce model performance. The impact of increasing dataset heterogeneity in time series forecasting, while keeping size and model constant, is understudied. We tackle this issue using the ComStock dataset, which provides synthetic energy consumption data for U.S. commercial buildings. Two curated subsets, identical in size and region but differing in building type diversity, are used to assess the performance of various time series forecasting models, including finetuned open-source foundation models (FMs). The results show that dataset heterogeneity and model architecture have a greater impact on post-training forecasting performance than the parameter count. Moreover, despite the higher computational cost, finetuned FMs demonstrate competitive performance compared to base models trained from scratch.