Saltstone SDU6 Modeling Study

A new disposal unit, designated as Saltstone Disposal Unit 6 (SDU6), is being designed for support of site accelerated closure goals and salt waste projections identified in the new Liquid Waste System Plan. The unit is a cylindrical disposal cell of 375 ft in diameter and 43 ft in height, and it has a minimum 30 million gallons of capacity. SRNL was requested to evaluate the impact of an increased grout placement height on the flow patterns radially spread on the floor and to determine whether grout quality is impacted by the height. The primary goals of the work are to develop the baseline Computational Fluid Dynamics (CFD) model and to perform the evaluations for the flow patterns of grout material in SDU6 as a function of elevation of grout discharge port and grout rheology. Two transient grout models have been developed by taking a three-dimensional multiphase CFD approach to estimate the domain size of the grout materials radially spread on the facility floor and to perform the sensitivity analysis with respect to the baseline design and operating conditions such as elevation height of the discharge port and fresh grout properties. For the CFD modeling calculations, air-grout Volume of Fluid (VOF) method combined with Bingham plastic and time-dependent grout models were used for examining the impact of fluid spread performance for the initial baseline configurations and to evaluate the impact of grout pouring height on grout quality. The grout quality was estimated in terms of the air volume fraction for the grout layer formed on the SDU6 floor, resulting in the change of grout density. The study results should be considered as preliminary scoping analyses since benchmarking analysis is not included in this task scope. Transient analyses with the Bingham plastic model were performed with the FLUENT TM code on the high performance parallel computing platform in SRNL. The analysis coupled with a transient grout aging model was performed by using ANSYS-CFX code in the parallel computing platform in Mercer University. Recommended operational guidance was developed assuming that local shear rates and flow patterns related to radial spread along the SDU floor can be used as a measure of grout performance and spatial dispersion affected by the grout height and viscosity. The main conclusions drawn from the grout modeling and calculations are as follows: • The 5 ft height baseline results show that when the 150 gpm grout flow with a 5 Pa yield stress and a 60 cp viscosity is poured down through a 3 inch discharge port, the grout is spread radially up to about 64 ft distance from the pouring center after 2 hours’ pouring time. The air volume fraction of the grout layer is about 29% at 5 minutes’ transient time, and it is reduced by about 9% in 2 hours’ pouring time, resulting in the grout density consisting of about 80% grout and 20% air volume fractions. • The sensitivity results show that when the discharge port is located at a higher position, a larger amount of air is trapped inside the layer formed below the discharge port at the early transient time of less than 30 minutes because of the higher impinging momentum of the grout flow on the floor, resulting in the formation of less smooth layer. • The results clearly indicate that the radial spread for the 43 ft discharge port is about 10% faster than that of the 5 ft discharge port for the early transient period of 5 minutes. However, for the pouring time longer than half an hour, the discharge port height does not affect the radial distance spread on the disposal floor. • When grout quality is related to grout volume fraction, the grout volume fraction for the 43 ft discharge port has lower volume fraction than the 5 ft discharge port for the transient period of the first 5 minutes. However, for the pouring time longer than half an hour, the discharge port height does not affect the grout volume fraction for the layer accumulated on the disposal floor. • A modified Bingham plastic model coupled with time-dependent viscosity behavior was developed for conducting the initial scoping calculations to assess the impact of fluid residence time on radial spreading and basic flow patterns. • The results for the transient viscosity model show that when grout material becomes more viscous, the thickness of the grout layer accumulated on the floor becomes higher, but the radial distance spread on the horizontal floor becomes smaller. The early transient results for the grout density with about 32% air volume fractions are in reasonable agreement with those of the idealized Bingham plastic model. • It is recommended that the current models developed here be benchmarked against the experimental results for critical applications of the modeling results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Grout long radius flow testing to support Saltstone disposal Unit 5 design

The Saltstone Facility, located within the Savannah River Site (SRS) near Aiken, South Carolina, consists of two facility segments: The Saltstone Production Facility (SPF) and the Saltstone Disposal Facility (SDF). The SPF receives decontaminated legacy low level sodium salt waste solution that is a byproduct of prior nuclear material processing. The salt solution is mixed with cementitious materials to form a grout slurry known as “Saltstone”. The grout is pumped to the SDF where it is placed in a Saltstone Disposal Unit (SDU) to solidify. SDU 6 is referred to as a “mega vault” and is currently in the design stage. The conceptual design for SDU 6 is a single cell, cylindrical geometry approximately 114.3 meters in diameter by 13.1 meter high and is larger than previous cylindrical SDU designs, 45.7 meters in diameter by 7.01 meters high (30 million gallons versus 2.9 million gallons of capacity). Saltstone slurry will be pumped into the new waste disposal unit through roof openings at a projected flow rate of about 34.1 cubic meters per hour. Nine roof openings are included in the design to discharge material into the SDU with an estimated grout pour radius of 22.9 to 24.4 meters and initial drop height of 13.1 meters. The conceptual design for the new SDU does not include partitions to limit the pour radius of the grout slurry during placement other than introducing material from different pour points. This paper addresses two technical issues associated with the larger diameter of SDU 6; saltstone flow distance in a tank 114.3 meters in diameter and quality of the grout. A long-radius flow test scaled to match the velocity of an advancing grout front was designed to address these technology gaps. The emphasis of the test was to quantify the flow distance and to collect samples to evaluate cured properties including compressive strength, porosity, density, and saturated hydraulic conductivity. Two clean cap surrogate mixes (saltstone premix plus water) were designed to simulate slurry with the reference saltstone rheology and a saltstone with extra water from the process flushing operation. Long-radius flow tests were run using approximately 4.6 cubic meters of each of these mixes. In both tests the pump rate was 0.063 liters/second (1 gpm). A higher pump rate, 0.19 liters/second (3 gpm), was used in a third long-radius flow test. The angle of repose of the grout wedges increased as a function of time in all three tests. The final angles of repose were measured at 3.0º, 2.4º, and 0.72º. The pump rate had the largest effect on the radial flow distance and slope of the grout surface. The slope on the pour placed at 0.19 liters/second (3 gpm) was most representative of the slope on the grout currently being pumped into SDU 2 which is estimated to be 0.7º to 0.9º. The final grout heights at 1/3 of a meter from the discharge point were 115, 105, and 38 cm. Entrapped air (≥ 0.25 cm bubbles) was also observed in all of the mixes. The entrapped air appeared to be released from the flows within about 3.1 meters (10 feet) of the discharge point. The bleed water was clear but had a thin layer of floating particulates. The bleed water should be retrievable by a drain water collection system in SDU 6 assuming the system does not get clogged. Layering was observed and was attributed to intervals when the hopper was being cleaned. Heat from the hydration reactions was noticeable to the touch.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Grout Long Radius Flow Testing to Support Saltstone Disposal Unit 6 Design - 13352

The Saltstone Facility, located within the Savannah River Site (SRS) near Aiken, South Carolina, consists of two facility segments: The Saltstone Production Facility (SPF) and the Saltstone Disposal Facility (SDF). The SPF receives decontaminated legacy low level sodium salt waste solution that is a byproduct of prior nuclear material processing. The salt solution is mixed with cementitious materials to form a grout slurry known as 'Saltstone'. The grout is pumped to the SDF where it is placed in a Saltstone Disposal Unit (SDU) to solidify. SDU 6 is referred to as a 'mega vault' and is currently in the design stage. The conceptual design for SDU 6 is a single cell, cylindrical geometry approximately 114.3 meters in diameter by 13.1 meter high and is larger than previous cylindrical SDU designs, 45.7 meters in diameter by 7.01 meters high (30 million gallons versus 2.9 million gallons of capacity). Saltstone slurry will be pumped into the new waste disposal unit through roof openings at a projected flow rate of about 34.1 cubic meters per hour. Nine roof openings are included in the design to discharge material into the SDU with an estimated grout pour radius of 22.9 to 24.4 meters and initial drop height of 13.1 meters. The conceptual design for the new SDU does not include partitions to limit the pour radius of the grout slurry during placement other than introducing material from different pour points. This paper addresses two technical issues associated with the larger diameter of SDU 6; Saltstone flow distance in a tank 114.3 meters in diameter and quality of the grout. A long-radius flow test scaled to match the velocity of an advancing grout front was designed to address these technology gaps. The emphasis of the test was to quantify the flow distance and to collect samples to evaluate cured properties including compressive strength, porosity, density, and saturated hydraulic conductivity. Two clean cap surrogate mixes (Saltstone premix plus water) were designed to simulate slurry with the reference Saltstone rheology and a Saltstone with extra water from the process flushing operation. Long-radius flow tests were run using approximately 4.6 cubic meters of each of these mixes. In both tests the pump rate was 0.063 liters/second (1 gpm). A higher pump rate, 0.19 liters/second (3 gpm), was used in a third long-radius flow test. The angle of repose of the grout wedges increased as a function of time in all three tests. The final angles of repose were measured at 3.0 deg., 2.4 deg., and 0.72 deg.. The pump rate had the largest effect on the radial flow distance and slope of the grout surface. The slope on the pour placed at 0.19 liters/second (3 gpm) was most representative of the slope on the grout currently being pumped into SDU 2 which is estimated to be 0.7 deg. to 0.9 deg. The final grout heights at 1/3 of a meter from the discharge point were 115, 105, and 38 cm. Entrapped air (≥ 0.25 cm bubbles) was also observed in all of the mixes. The entrapped air appeared to be released from the flows within about 3.1 meters (10 feet) of the discharge point. The bleed water was clear but had a thin layer of floating particulates. The bleed water should be retrievable by a drain water collection system in SDU 6 assuming the system does not get clogged. Layering was observed and was attributed to intervals when the hopper was being cleaned. Heat from the hydration reactions was noticeable to the touch. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Low-Level Waste at Dounreay - 16269

Dounreay Site Restoration Limited (DSRL) is the site licence company responsible for the clean-up and demolition of Britain's former centre of fast reactor research and development. The Dounreay site requires facilities to dispose of up to 175,000 cubic metres of low level waste (LLW) that has been and will continue to be generated during the decommissioning and restoration of the site. In May 2014, construction of two new vaults for the disposal of LLW at Dounreay was completed, including the necessary roads, infrastructures and services, followed by an encapsulation plant in September 2014. The vaults are located immediately to the northeast of the Dounreay licensed site, on NDA-owned land. The facilities are for disposal of the solid LLW generated at Dounreay and the adjacent Vulcan site only. In 2004, following consultation with stakeholders and members of the public, Dounreay issued the 'Best Practicable Environmental Option (BPEO) Report' on the management of Dounreay LLW. This report assessed potential management options for LLW against a range of criteria, including technical, environmental, cost, health and safety issues. The study was conducted in line with best practice and involved consultation with a range of people, including the local community and organisations with an interest in radioactive waste management. The recommendations and conclusions from the study provided the basis for the 'Dounreay Solid LLW Overall Strategy', which was published in March 2005. A fundamental component of this strategy was the development of new below-ground disposal vaults for LLW at Dounreay. Siting the vaults on land at Dounreay avoids any need to transport the LLW away from Dounreay on public roads. Disposal at Dounreay therefore satisfies the proximity principle of managing the waste at source. Disposal at Dounreay is also consistent with UK Government Policy on LLW management, the Scottish Government's Radioactive Waste Management Policy and the Nuclear Decommissioning Authority's (NDA's) strategy on management of LLW from the UK nuclear industry. A planning application was initially lodged with the Highland Council in June 2006. The period for the determination of this application was extended to allow the Scottish Environment Protection Agency (SEPA) sufficient time to assess fully the supporting Environmental Safety Case (ESC). The planning application was re-activated in May 2008, and planning permission was granted by Highland Council in April 2009. The planning permission included 26 conditions on DSRL, covering a wide range of environmental issues such as construction noise/dust, traffic, visual impact and also a condition to develop a community fund aimed at socio-economic development of the area around the Dounreay site. After undertaking the necessary detailed design work, construction of the phase one vaults commenced in November 2011 by principal contractor, Graham Construction. Work was undertaken on both vaults simultaneously, excavating around 243,000 m{sup 3} of rock. When excavation was complete, steel reinforcement was placed and concrete poured to construct the floor slabs. This was followed by the construction of the reinforced walls and then the installation of the steel support structure and materials that form the roof. Mechanical and electrical installation then followed, in parallel with the construction of the vault apron, ramps and access roads. A pumping system and control building was also constructed to remove groundwater from around the vaults to allow the vaults to be kept dry while they are being filled with waste. A layer of excavated material, approximately 3 m thick, was placed across the existing ground surface between the vaults and the coast, to ensure the water table lies well below the new ground surface after closure of the vaults, and that any future trace contaminated groundwater flows out to the sea rather than to the soil zone. This layer is referred to in project documents as the 'enhanced geosphere'. After disposals are completed and the vaults are closed, this layer will be joined to the capping over the vaults so that the ensemble merges visually with the surrounding landscape. The original vegetation and soil mix will be returned as far as is practicable. An encapsulation plant has been constructed to fill the LLW containers with grout prior to disposal in the vault, similar to the process used at the national Low-Level Waste Repository facility (LLWR), near Drigg in Cumbria. The plant has the capacity to grout up to four containers per day. The grout fills voids in the container and helps provide chemical conditions in the vault that limit the release of radionuclides in the far future, after the vault has been penetrated by groundwater. On April 24 2015, active commissioning began at the Encapsulation Plant and LLW Vaults. Half-height ISO containers packed with low level waste are currently being filled with grout and disposed of in the LLW Vault. Also packaged Demolition Low Level Waste (DLLW) is being processed and disposed of in the Demolition Low Level Waste Vault. To date over 2500 packages of DLLW and 70 containers LLW have been disposed of. Completion of construction and the start of operating the Phase One vaults and encapsulation plant are fundamental to the successful and efficient decommissioning of the Dounreay site, upon which many millions of pounds of investment and hundreds of jobs rely.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗