Search NASA⌕ Search

SEARCH · Search NASA

Results for “HCS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Observations of SO2 and HCS(+) in cold molecular clouds

The first instance of SO2 emission from a dark dust cloud (L183), and the first astronomical detections of the J = 1-0 rotational transition of the HCS(+) ion and the J = 16-15 transition of HC5N, both towards the cold cloud TMC-1, are reported. The HCS(+)/CS abundance ratio in TMC-1 is greater than about 0.1. Unlike HCS(+) and the cyanopolyynes, SO2 appears to be more abundant in L183 than in TMC-1. SO2 was also detected in the Orion ambient molecular cloud and in the Rho Oph cloud.

Irvine, W. M.↗

Evidence for HCS(+) and CH2SH(+) in the inner coma of Comet Halley

Number densities for ion species with masses 44, 45, and 47 amu/q were derived from ram energy spectra of the neutral gas mass spectrometer experiment on Giotto in the inner coma of comet Halley. The relative abundances of the masses suggest the presence of the ions CS(+), HCS(+), and CH2SH(+).

Krankowsky, D.↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 SWMU #041 Year 3 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 3 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 3 PMR extends from September 2021 through October 2022. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 3 reporting period was approximately 91%, with the majority of downtime attributed to system maintenance and repair. This is generally consistent with Year 1 and Year 2 runtimes of 85% and 92%, respectively. To help reduce downtime, an anti-scaling amendment, Redux 390, has been used to reduce scaling and help maintain system design parameters. Over nine million gallons of groundwater were treated during Year 3 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 97%. This PMR describes the activities that were performed during Year 3 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 3 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 3 plume conditions. Therefore, it can be assumed that the projected path remains valid for transition to MNA in one to two years of continuous HCS operation. The contents of this Year 3 PMR were presented during the February 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Replacement of MW0019 and VMP04 was also recommended, as well as additional direct-push technology sampling to further delineate the downgradient plume and confirm overall site-wide low-concentration plume boundaries. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Global, quasi-steady dynamics of the distant solar wind 2: Deformation of the heliospheric current sheet

A three-dimensional (3-D) magnetohydrodynamic (MHD) numerical model is used to trace global deformations of the heliospheric current sheet (HCS) caused by large-scale dynamical interactions associated with corotating solar wind flows. Configurations incorporating the tilted-dipole geometry are investigated out past 30 AU for a variety of dipole tilt angles, alpha. Inclusion of the full, 3-D interplanetary dynamics allows north-south displacements and the east-west warping of the HCS by advective corotational effects to be accurately assessed for the first time. It is found that large-scale spatial correlations between velocity and density imposed at the coronal source (i.e., the geometric arrangement whereby regions of high-speed low-density material lying adjacent to areas of slow, dense flow interact obliquely under the influence of solar rotation) result in a distinctive pattern of deformation of the HCS. For an alpha = 30 deg tilted-dipole example, it is shown that typical zonal variations in radial velocity lead to significant folding of the HCS within about 5 AU of the Sun. By 10 AU, additional sharp bends appear near the latitudinal extremes of the HCS surface, where it is overtaken by shock fronts driven by 3-D corotating interaction regions (CIRs). Moreover, the model suggests that inside about 20 AU, major plasma structures are systematically organized, about the HCS, such that the greatest concentrations of material and magnetic field (the centroids of the 3-D CIR structures) are coincident with the folded crests of the HCS (near heliographic latitudes lambda = +/- alpha). Thus, in these circumstances many of the more interesting dynamical features inconveniently lie well away from the heliographic equator. At larger heliocentric distances, where neighboring CIRs begin to interact strongly, the warping of the HCS abates dramatically and the association between folds in the HCS and major field and density concentrations is weakened and ultimately breaks down. On the basis of the model calculations, quasi-steady deformations and related phenomena should figure prominently in the interplanetary medium, except during those periods when the magnetic dipole and solar spin axes are nearly aligned (alpha is approximately less than 10 deg). Even then, they may be of significance if there are any substantial local warps or kinks in the streamer belt.

Pizzo, V. J.↗

Solar Wind Stream Interaction Regions without Sector Boundaries

During periods of high solar activity when there are many sources of solar wind on the solar disk, a spacecraft occasionally encounters consecutive solar wind streams with the same magnetic polarity. The low-speed wind in the region of interaction between the two streams exhibits many of the same features as, but has some differences from, the low-speed wind that includes crossings of the heliospheric current sheet (HCS) where the direction of the heliospheric magnetic field reverses. The non-HCS slow wind exhibits many of the same small-scale structures usually associated with the slow wind around the HCS; these include discontinuous stream interfaces and other discontinuities, magnetic holes, and low-entropy structures. These entropy holes do not appear to have the same origin as the plasma sheets observed near the HCS, however. The helium abundances and heavy ion charge states in the non-HCS regions are not significantly different from those in HCS-associated regions. Some of the dynamical properties of the non-HCS regions differ from those found near the HCS; the regions between leading and trailing stream interfaces have a shorter duration or scale size, greater minimum speed, and lower peak and average densities. No correlation could be found between the non-HCS slow wind and visible coronal streamers.

interaction regions↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 Solid Waste Management Unit #041 Year 4 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 4 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 4 PMR extends from November 2022 through September 2023. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 4 reporting period was approximately 94%, with the majority of downtime attributed to associated groundwater sampling events, maintenance, and Hurricane Nicole. Almost five million gallons of groundwater were treated during Year 4 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 99%. This PMR describes the activities that were performed during Year 4 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 4 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 4 plume conditions. A supplemental DPT study conducted in 2022 and 2023. This study indicated that low-concentration plume conditions, where concentrations exceed State of Florida Groundwater Cleanup Target Levels, expanded westward to Kennedy Parkway North and northward to the vicinity of the railroad tracks. Based on these results, recommendations were made to install 14 wells to monitor the downgradient and boundary conditions of the expanded LCP. The contents of this Year 4 PMR were presented during the November 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Multiple Subscale Magnetic Reconnection Embedded inside a Heliospheric Current Sheet Reconnection Exhaust: Evidence for Flux Rope Merging

We report observations of multiple subscale reconnecting current sheets embedded inside a large-scale heliospheric current sheet (HCS) reconnection exhaust. The discovery was made possible by the unusual skimming trajectory of Parker Solar Probe through a sunward-directed HCS exhaust, sampling structures convecting with the exhaust outflows for more than 3 hr during Encounter 14, at a radial distance of ∼17 solar radii. A large number of subscale current sheets (SCSs) were detected inside the HCS exhaust. Remarkably, five SCSs showed direct evidence for reconnection, displaying near-Alfvénic outflow jets and bifurcated current sheets. The reconnecting SCSs all had small magnetic shears (27°–81°), i.e., strong guide fields. The thickness of the subscale reconnecting current sheets ranged from ∼60 km to ∼5000 km (∼20–2000 ion inertial lengths). The SCS exhausts were directed predominantly in the normal or out-of-plane direction of the HCS, i.e., nearly orthogonal to the HCS exhaust direction. The presence of multiple low-magnetic-shear reconnecting current sheets inside a large-scale exhaust could be associated with coalescence of multiple large flux ropes inside the HCS exhaust. The orientation of some SCS exhausts was partly in the ecliptic plane of the HCS, which may indicate that the coalescence process is highly three-dimensional. Since the coalescence process is likely short-lived, the detection of five such events inside a single HCS crossing could imply the common occurrence of flux rope coalescence in large-scale HCS reconnection exhausts.

T D Phan↗

Solar wind eddies and the heliospheric current sheet

Ulysses has collected data between 1 and 5 AU during, and just following solar maximum, when the heliospheric current sheet (HCS) can be thought of as reaching its maximum tilt and being subject to the maximum amount of turbulence in the solar wind. The Ulysses solar wind plasma instrument measures the vector velocity and can be used to estimate the flow speed and direction in turbulent 'eddies' in the solar wind that are a fraction of an astronomical unit in size and last (have either a turnover or dynamical interaction time of) several hours to more than a day. Here, in a simple exercise, these solar wind eddies at the HCS are characterized using Ulysses data. This character is then used to define a model flow field with eddies that is imposed on an ideal HCS to estimate how the HCS will be deformed by the flow. This model inherently results in the complexity of the HCS increasing with heliocentric distance, but the result is a measure of the degree to which the observed change in complexity is a measure of the importance of solar wind flows in deforming the HCS. By comparison with randomly selected intervals not located on the HCS, it appears that eddies on the HCS are similar to those elsewhere at this time during the solar cycle, as is the resultant deformation of the interplanetary magnetic field (IMF). The IMF deformation is analogous to what is often termed the 'random walk' of interplanetary magnetic field lines.

Suess, S. T.↗

STEREO Observations of Stream Interaction Regions in 2007-2016:Relationship with Heliospheric Current Sheets, Solar Cycle Variations, and Dual Observations

We have conducted a survey of 575 slow-to-fast stream interaction regions (SIRs) using STEREOA/B data in 2007-2016 (Jian et al., 2019). Among 518 well-defined SIRs, 54% are associated with heliospheric current sheet (HCS) crossings, and 34% are without any HCS crossing. The other 12% of the SIRs often occur in association with magnetic sectors shorter than 3 days. The SIRs with HCS crossings have slightly slower speeds but higher maximum number densities, magnetic field strengths, dynamic pressures, and total pressures than the SIRs without an HCS. The iron charge state is higher throughout the SIRs with an HCS than the SIRs without an HCS, by about 1/3 charge unit. In contrast with the comparable phases of solar cycle 23,slightly more SIRs and higher recurrence rates are observed in the years 2009-2016 of cycle 24,with a lower HCS association rate, possibly attributed to persistent equatorial coronal holes and more pseudostreamers in this recent cycle. The solar wind speed, peak magnetic field and pressures of SIRs are all lower in this cycle, but the weakening is less than for the comparable background solar wind parameters. Before STEREO B lost contact in 2014 October, 151 SIR pairs were observed by the twin spacecraft. Of the dual observations, the maximum speed is the best correlated of the plasma parameters. We have obtained a sample of plasma parameter differences analogous to those that would be observed for a mission at Lagrange point 4 or 5.By studying several cases with large discrepancies between the dual observations, we have also investigated the effects of HCS relative location, tilt of stream interface, and small transients on the SIR properties.

Lan K Jian↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

The North-South Asymmetry of the Heliospheric Current Sheet: Results of an MHD Simulation

A displacement of the heliospheric current sheet (HCS) south of the helioequator by approx.10deg was proposed by Simpson et al. (1996) as a possible explanation of the north-south asymmetry in the galactic cosmic rays observed by Ulysses during its first fast transit in 1994-1995. The idea was not supported by magnetic field measurements on Ulysses and, on this ground, was dismissed by Simpson et al. (1996). In addition, Erdos & Balogh (1998) argued that any north-south symmetry was unlikely as there should be flux balance between the magnetic sectors of opposite polarity. Nonetheless, many in the scientific community have accepted the original suggestion of Simpson et al. (1996) that a displacement of the HCS was responsible for the cosmic ray asymmetry. In this paper, using a magnetohydrodynamic model of the solar corona and solar wind that includes both dipole and quadrupole magnetic source terms, we show that a north-south asymmetry of the magnetic field on the Sun does not give rise to a displacement of the HCS. The lack of displacement of the HCS results from a latitudinal redistribution of magnetic flux near the Sun where the plasma beta much < 1. The latitudinal redistribution is a direct consequence of the magnetic field gradient between pole and equator. Near the Sun, the latitudinal gradient in magnetic field generates meridional flows directed equatorward that tend to relax the gradient in the magnetic field (to make it more latitude-independent) as heliocentric distance increases. If there is an asymmetry between north and south magnetic field strength then the meridional flows are also asymmetric (i.e., stronger in the hemisphere of stronger magnetic field). Because the magnetic fluxes (positive and negative) in the hemispheres must be equal, the redistribution shifts the HCS into balance by approx. 16 R(solar mass). At larger distances, where the magnetic field is relatively weak (beta much > 1), the HCS can be displaced if there is a difference in total pressure between the hemispheres.

solar wind↗

Parker Solar Probe Observations of Solar Wind Energetic Proton Beams Produced by Magnetic Reconnection in the Near‐Sun Heliospheric Current Sheet

We report observations of reconnection exhausts in the Heliospheric Current Sheet (HCS) during Parker Solar Probe Encounters 08 and 07, at 16 Rs and 20 Rs, respectively. Heliospheric current sheet (HCS) reconnection accelerated protons to almost twice the solar wind speed and increased the proton core energy by a factor of ∼3, due to the Alfvén speed being comparable to the solar wind flow speed at these near-Sun distances. Furthermore, protons were energized to super-thermal energies. During E08, energized protons were found to have leaked out of the exhaust along separatrix field lines, appearing as field-aligned energetic proton beams in a broad region outside the HCS. Concurrent dropouts of strahl electrons, indicating disconnection from the Sun, provide further evidence for the HCS being the source of the beams. Around the HCS in E07, there were also proton beams but without electron strahl dropouts, indicating that their origin was not the local HCS reconnection exhaust.

T D Phan↗

The effect of coronal mass ejections on the structure of the heliospheric current sheet

The existence of a stable heliospheric current sheet (HCS) structure near solar cycle maximum was questioned since the recognition that coronal mass ejections (CME's) occur in coronal helmet streamers. Evidence is presented suggesting that pre-existing helmet streamers disrupted or blown out by CME's reform in a time interval much shorter than the life time of the HCS, and that the concept of the HCS has a meaning at any time of thesolar cycle. It appears that the HCS, the current layer that separates adjacent interplanetary magnetic field regions with opposite magnetic polarity, exists throughout the solar cycle, though not always as a thin disk-like sheet. The sheet may be thickened by embedded magnetic ropes formed by CME's, especially near sunspot maximum. The HCS may be used as timing mark in identifying or predicting CME's in the interplanetary medium.

Zhao, Xuepu↗

Macroscale coherence of the heliospheric current sheet: Pioneers 10 and 11 comparisons

We use the near radial alignments of Pioneers 10 and 11 during 1974 to study the macroscale geometry of the heliospheric current sheet (HCS). The interval of near alignment gave eight analyzable cases of encounters of both spacecraft with the same HCS and one case in which the IMP and Pioneer 11 spacecraft, while nearly radially aligned, encountered the same current sheet. The degree of macroscale coherence of the HCS was judged by comparing observed solar wind speeds against solar wind speeds calculated on the bases of HCS encounter times and ideal Parker spiral geometry. The correlation coefficient between the two sets of speeds is 0.53. The difference between the calculated and observed speeds can be understood in terms of observed deviations from ideal spiral geometry in the ecliptic plane or in terms of typical corrections to the calculations from small latitudinal factors. One case, however, defies explanation in these terms. This range of behavior demonstrates that the HCS is a useful probe of heliospheric dynamics.

Siscoe, George↗

The Heliospheric Current Sheet in the Inner Heliosphere Observed by the Parker Solar Probe

The Parker Solar Probe (PSP) completed its first solar encounter in 2018 November, bringing it closer to the Sun than any previous mission. This allowed in situ investigation of the heliospheric current sheet (HCS) inside the orbit of Venus. The Parker observations reveal a well defined magnetic sector structure placing the spacecraft in a negative polarity region for most of the encounter. The observed current sheet crossings are compared to the predictions of both potential field source surface and magnetohydrodynamic models. All the model predictions are in good qualitative agreement with the observed crossings of the HCS. The models also generally agree that the HCS was nearly parallel with the solar equator during the inbound leg of the encounter and more significantly inclined during the outbound portion. The current sheet crossings at PSP are also compared to similar measurements made by the Wind spacecraft near Earth at 1 au. After allowing for orbital geometry and propagation effects, a remarkable agreement has been found between the observations of these two spacecraft underlying the large-scale stability of the HCS. Finally, the detailed magnetic field and plasma structure of each crossing is analyzed. Marked differences were observed between PSP and Wind measurements in the type of structures found near the HCS. This suggests that significant evolution of these small solar wind structures takes place before they reach 1 au.

Szabo, Adam↗

Characteristics of Multi-scale Current Sheets in the Solar Wind at 1 au Associated with Magnetic Reconnection and the Case for a Heliospheric Current Sheet Avalanche

Wind spacecraft measurements are analyzed to obtain a current sheet (CS) normal width dcs-distribution of 3374 confirmed magnetic reconnection exhausts in the ecliptic plane of the solar wind at 1 AU. The dcs-distribution displays a nearly exponential decay from a peak at dcs=25 di to a median at dcs=85 di and a 95th percentile at dcs=905 di with a maximum exhaust width at dcs=8077 di. A magnetic field ϴ-rotation angle distribution increases linearly from a relatively few high-shear events toward a broad peak at 35o<ϴ<65o. The azimuthal φ-angles of the CS normal directions of 430 thick dcs≥500 di exhausts are consistent with a dominant Parker-spiral magnetic field and a CS normal along the ortho-Parker direction. The CS normal orientations of 370 kinetic-scale dcs<25 di exhausts are isotropic in contrast, and likely associated with Alfvénic solar wind turbulence. We propose that the alignment of exhaust normal directions from narrow dcs~15-25 di widths to well beyond dcs~500 di with an ortho-Parker azimuthal direction of a large-scale HCS is a consequence of CS bifurcation and turbulence within the HCS exhaust that may trigger reconnection of the adjacent pair of bifurcated CSs. The proposed HCS-31 avalanche scenario suggests that the underlying large-scale parent HCS closer to the Sun evolves with heliocentric distance to fracture into many, more or less aligned, secondary current sheets due to reconnection. A few wide exhaust-associated HCS-like CSs could represent a population of HCSs that failed to reconnect as frequently between the Sun and 1 AU as other HCSs.

Stefan Eriksson↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗